SAMPLE<br />

5.4 – QC Sampling <strong>and</strong> Testing Requirements<br />

The specific requirements (Quality Characteristics, frequency, location, methods) for QC<br />

sampling <strong>and</strong> testing of each Earthwork item are outlined in the tables below.<br />

5.4.1 – Backfill Material for Muck Excavation<br />

Appendix B: Quality Assurance Resources<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

QC Sampling <strong>and</strong> Testing Requirements<br />

Sublot Size/<br />

Quality Test Point of Sampling<br />

Characteristic Test Method(s) Lot Size Frequency Sampling Method<br />

Gradation AASHTO T11 Total Quantity of 1 Sample/<br />

AASHTO T27 Backfill Material 5,000 m 3 for<br />

Type / Source / 1st 50,000 m 3 From In-Place R<strong>and</strong>om<br />

Project Segment 10,000 m 3 Lift of Backfill T2, T248<br />

thereafter<br />

Maximum Dry AASHTO T99 Total Quantity of 1 Sample/<br />

Density <strong>and</strong> (Method C) Backfill Material 5,000 m3 for<br />

Optimum AASHTO T180 Type / Source / 1st 50,000 m3 From In-Place R<strong>and</strong>om<br />

Moisture Content (Method D) Project Segment <strong>and</strong> 1 Sample/<br />

10,000 m<br />

Lift of Backfill T2, T248<br />

3<br />

thereafter<br />

Maximum Total Quantity of<br />

Rock Size Visual/Tape Backfill Material Minimum From In-Place R<strong>and</strong>om<br />

(< 1 m) Type / Source / 4/Lift/Day Lift of Backfill Visual<br />

Project Segment<br />

Maximum Total Quantity of<br />

Lift Thickness Rod/Grade Backfill Material Minimum From In-Place R<strong>and</strong>om<br />

(< 300 mm) Stake Type / Source / 4/Lift/Day Lift of Backfill Visual<br />

Project Segment<br />

In-Place Total Quantity of 1 Sample/1,000<br />

Density <strong>and</strong> AASHTO T310 Backfill Material m 3 , but From R<strong>and</strong>om<br />

Moisture Content (Method B) Type / Source / not less than Compacted T310<br />

(Per Targets) Project Segment 1/Placement Backfill<br />

Location/Day<br />

B–33