SAMPLE<br />
5.4 – QC Sampling <strong>and</strong> Testing Requirements<br />
The specific requirements (Quality Characteristics, frequency, location, methods) for QC<br />
sampling <strong>and</strong> testing of each Earthwork item are outlined in the tables below.<br />
5.4.1 – Backfill Material for Muck Excavation<br />
Appendix B: Quality Assurance Resources<br />
CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />
QC Sampling <strong>and</strong> Testing Requirements<br />
Sublot Size/<br />
Quality Test Point of Sampling<br />
Characteristic Test Method(s) Lot Size Frequency Sampling Method<br />
Gradation AASHTO T11 Total Quantity of 1 Sample/<br />
AASHTO T27 Backfill Material 5,000 m 3 for<br />
Type / Source / 1st 50,000 m 3 From In-Place R<strong>and</strong>om<br />
Project Segment 10,000 m 3 Lift of Backfill T2, T248<br />
thereafter<br />
Maximum Dry AASHTO T99 Total Quantity of 1 Sample/<br />
Density <strong>and</strong> (Method C) Backfill Material 5,000 m3 for<br />
Optimum AASHTO T180 Type / Source / 1st 50,000 m3 From In-Place R<strong>and</strong>om<br />
Moisture Content (Method D) Project Segment <strong>and</strong> 1 Sample/<br />
10,000 m<br />
Lift of Backfill T2, T248<br />
3<br />
thereafter<br />
Maximum Total Quantity of<br />
Rock Size Visual/Tape Backfill Material Minimum From In-Place R<strong>and</strong>om<br />
(< 1 m) Type / Source / 4/Lift/Day Lift of Backfill Visual<br />
Project Segment<br />
Maximum Total Quantity of<br />
Lift Thickness Rod/Grade Backfill Material Minimum From In-Place R<strong>and</strong>om<br />
(< 300 mm) Stake Type / Source / 4/Lift/Day Lift of Backfill Visual<br />
Project Segment<br />
In-Place Total Quantity of 1 Sample/1,000<br />
Density <strong>and</strong> AASHTO T310 Backfill Material m 3 , but From R<strong>and</strong>om<br />
Moisture Content (Method B) Type / Source / not less than Compacted T310<br />
(Per Targets) Project Segment 1/Placement Backfill<br />
Location/Day<br />
B–33