Appendix B: Quality Assurance Resources<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

B–26 SAMPLE<br />

4.0 Materials Control<br />

The types, sources, properties, <strong>and</strong> procedures for storing of materials to be used for each<br />

Earthwork category are as indicated below.<br />

4.1 – Material Types <strong>and</strong> Source(s) of Supply<br />

Earthwork material will be classified according to the following Earthwork Item categories:<br />

▼ Backfill Material for Muck Excavation<br />

▼ Roadway Embankment Material<br />

▼ Embankment Material under Bridge Foundations<br />

▼ Backfill Material for Structures<br />

▼ Backfill Material for Pipes<br />

4.1.1 – Backfill Material for Muck Excavation<br />

The types <strong>and</strong> potential sources of material currently identified for use as Backfill Material<br />

for Muck Excavation are listed in the table below.<br />

Backfill Material for Muck Excavation<br />

Material Type Material Source<br />

Rock Excavate ▼ On-Site, Segment 1, Rte 99 Median<br />

▼ On-Site, Segment 3, Rte 99 Median<br />

Special Borrow ▼ On-Site, Segment 1<br />

▼ On-Site, Segment 2<br />

▼ Borrow Producer (TBD)<br />

ABC Contractors will submit updated information on the types <strong>and</strong> sources of Backfill Material<br />

for Muck Excavation as part of the “Weekly Schedule of Earthwork Materials<br />

Production Operations” as outlined under Section 6.1 below.