Appendix B: Quality Assurance Resources<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

B–24 SAMPLE<br />

QC Laboratory personnel have responsibility <strong>and</strong> authority for the following items:<br />

▼ Sampling of Earthwork materials<br />

▼ Laboratory testing of Earthwork materials<br />

▼ Preparing <strong>and</strong> signing st<strong>and</strong>ard Test Report Forms (TRFs) for each test completed<br />

▼ Properly storing all Earthwork material samples<br />

▼ Identifying Earthwork materials test results which do not conform with the requirements of<br />

the relevant specifications <strong>and</strong> this QC Plan, <strong>and</strong> discussing with the QC Manager<br />

2.4 – Qualified On-Site Field QC Personnel<br />

Personnel assigned to perform On-Site Field QC sampling, testing, <strong>and</strong> inspection of Earthwork<br />

materials are identified in the table below. A current listing of qualified On-Site Field QC<br />

personnel will be included in the “Weekly QC Summary Report.”<br />

Project<br />

Segment QC Position Personnel - Company Qualifications<br />

1 Lead QC Inspector Kevin Boulder – XYZ NETTCP Soils <strong>and</strong> Agg.Inspector<br />

# SAI 491<br />

2 Lead QC Inspector George Troxler – XYZ Not Currently<br />

NETTCP Certified<br />

3 Lead QC Inspector Mike Gravel – XYZ Not Currently<br />

NETTCP Certified<br />

1, 2, 3 Soils Inspector Various – XYZ NETTCP Soils <strong>and</strong> Agg. Inspector<br />

(See Weekly (See Weekly<br />

QC Summary Report) QC Summary Report)<br />

On-Site Field QC personnel have responsibility <strong>and</strong> authority for the following items:<br />

▼ Obtaining r<strong>and</strong>om Field samples of Earthwork materials for laboratory testing<br />

▼ Performing In-Place sampling <strong>and</strong> testing of Earthwork<br />

▼ Preparing <strong>and</strong> signing st<strong>and</strong>ard Test Report Forms (TRFs) for each test completed<br />

▼ Inspecting On-Site Earthwork production <strong>and</strong> placement operations<br />

▼ Preparing <strong>and</strong> signing st<strong>and</strong>ard QC <strong>Inspection</strong> report forms for each placement location<br />

▼ Identifying On-Site Field placement practices or materials which do not conform with the<br />

requirements of the relevant specifications <strong>and</strong> this QC Plan, <strong>and</strong> discussing appropriate<br />

corrective action with the Segment Field Superintendent <strong>and</strong> the QC Manager<br />

▼ Suspending the placement of Earthwork materials when materials are not in conformance<br />

with the relevant specification requirements or when corrective actions have been determined<br />

necessary <strong>and</strong> are not implemented