- Page 1 and 2:
Construction Program Management and
- Page 3 and 4:
Notice This publication is dissemin
- Page 5 and 6:
iv Contents CONSTRUCTION PROGRAM MA
- Page 8 and 9:
List of Acronyms AASHTO American As
- Page 10:
1. Introduction The Federal Highway
- Page 13 and 14:
2-2 Background CONSTRUCTION PROGRAM
- Page 15 and 16:
3-2 Construction Program Management
- Page 17 and 18:
3-4 Construction Program Management
- Page 19 and 20:
3-6 Construction Program Management
- Page 21 and 22:
4-2 Construction Program Management
- Page 23 and 24:
4-4 Construction Program Management
- Page 25 and 26:
4-6 Construction Program Management
- Page 28:
5. Summary ▼ Construction program
- Page 31 and 32:
A-2 AppendixA: Policy Memoranda Reg
- Page 33 and 34:
A-4 AppendixA: Policy Memoranda Reg
- Page 35 and 36:
A-6 AppendixA: Policy Memoranda Reg
- Page 37 and 38:
A-8 AppendixA: Policy Memoranda Reg
- Page 40 and 41:
SAMPLE Appendix B: Quality Assuranc
- Page 42 and 43:
SAMPLE Appendix B: Quality Assuranc
- Page 44 and 45:
SAMPLE Outline of Contractor Qualit
- Page 46 and 47:
SAMPLE below). This does not includ
- Page 48 and 49:
SAMPLE Contractor Evaluation The pe
- Page 50 and 51:
SAMPLE Continued from previous page
- Page 52 and 53:
SAMPLE Continued from previous page
- Page 54 and 55:
SAMPLE Continued from previous page
- Page 56 and 57:
SAMPLE A Model Quality Control Plan
- Page 58 and 59:
SAMPLE Submitted By: Approved By: S
- Page 60 and 61:
SAMPLE ▼ Rock Excavate - Earthwor
- Page 62 and 63:
SAMPLE 2.2 - Qualified Off-Site Pro
- Page 64 and 65:
SAMPLE 3.0 Quality Control Laborato
- Page 66 and 67:
SAMPLE 4.1.2 - Roadway Embankment M
- Page 68 and 69:
SAMPLE Material Source Characteriza
- Page 70 and 71:
SAMPLE 4.2.2 - Mix Designs Earthwor
- Page 72 and 73:
SAMPLE 5.4 - QC Sampling and Testin
- Page 74 and 75:
SAMPLE 5.4.3 - Embankment Material
- Page 76 and 77:
SAMPLE 5.4.5 - Backfill Material fo
- Page 78 and 79:
SAMPLE 6.0 Production Facility Mana
- Page 80 and 81:
SAMPLE 6.4 - Production Facility Co
- Page 82 and 83:
SAMPLE Earthwork Item Placement Equ
- Page 84 and 85:
SAMPLE Step J. - If the PWL for Con
- Page 86 and 87:
SAMPLE 7.5 - Placement Control Char
- Page 88 and 89:
SAMPLE ▼ Once the cause of the fa
- Page 90 and 91:
SAMPLE 8.6 - Application of Enginee
- Page 92 and 93:
SAMPLE 8.6.2 - Roadway Embankment M
- Page 94 and 95:
SAMPLE 8.6.2 - Roadway Embankment M
- Page 96 and 97:
SAMPLE 8.6.4 - Backfill Material fo
- Page 98 and 99:
SAMPLE 8.6.5 - Backfill Material fo
- Page 100 and 101:
SAMPLE Appendix C: Process Review/P
- Page 102 and 103:
SAMPLE V. Overview of the Program R
- Page 104 and 105:
SAMPLE Special Emphasis Areas Desig
- Page 106 and 107:
SAMPLE Criteria Assessment Review F
- Page 108 and 109:
SAMPLE input. It is recommended, th
- Page 110 and 111:
SAMPLE The guidelines should also b
- Page 112 and 113:
SAMPLE weeks should be adequate. Th
- Page 114 and 115:
SAMPLE cases where there is no spec
- Page 116 and 117:
SAMPLE Appendix C: Process Review/P
- Page 118:
SAMPLE Summary of Duties Process Re
- Page 121 and 122:
D-2 Appendix D: Inspections-in-Dept
- Page 123 and 124:
D-4 Appendix D: Inspections-in-Dept
- Page 125 and 126:
D-6 Appendix D: Inspections-in-Dept
- Page 127 and 128:
D-8 Appendix D: Inspections-in-Dept
- Page 129 and 130:
D-10 Appendix D: Inspections-in-Dep
- Page 131 and 132:
D-12 Appendix D: Inspections-in-Dep
- Page 133 and 134:
D-14 Appendix D: Inspections-in-Dep
- Page 135 and 136:
D-16 Appendix D: Inspections-in-Dep
- Page 137 and 138: D-18 Appendix D: Inspections-in-Dep
- Page 139 and 140: D-20 Appendix D: Inspections-in-Dep
- Page 141 and 142: D-22 Appendix D: Inspections-in-Dep
- Page 144 and 145: Appendix E: Technical References an
- Page 146 and 147: Shallow Foundations (training cours
- Page 148 and 149: Appendix F: Examples of Reporting P
- Page 150 and 151: Progress and Quality of Work Report
- Page 152 and 153: Materials and Quality Control Repor
- Page 154 and 155: Construction Operations and Feature
- Page 156 and 157: Subcontracting Report Item Names of
- Page 158 and 159: Appendix F: Examples of Reporting P
- Page 160 and 161: Staffing and Project Control Report
- Page 162: Evaluation of Design and Potential
- Page 165 and 166: G-2 Appendix G: Project Implementat
- Page 167 and 168: G-4 Appendix G: Project Implementat
- Page 169 and 170: G-6 Appendix G: Project Implementat
- Page 171 and 172: G-8 Appendix G: Project Implementat
- Page 173 and 174: G-10 Appendix G: Project Implementa
- Page 175 and 176: G-12 Appendix G: Project Implementa
- Page 177 and 178: G-14 Appendix G: Project Implementa
- Page 179 and 180: G-16 Appendix G: Project Implementa
- Page 181 and 182: G-18 Appendix G: Project Implementa
- Page 183 and 184: G-20 Appendix G: Project Implementa
- Page 185 and 186: G-22 Appendix G: Project Implementa
- Page 187: G-24 Appendix G: Project Implementa
- Page 191 and 192: G-28 Appendix G: Project Implementa
- Page 193 and 194: G-30 Appendix G: Project Implementa
- Page 195 and 196: G-32 Appendix G: Project Implementa