14.10.2013 Views

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Aggregate Material Sources<br />

▼ Examine material sources (pits or quarries) for<br />

uniformity of materials, presence of pockets or lenses of<br />

deleterious material, pit operations, supervision, <strong>and</strong><br />

other production procedures.<br />

▼ Check on any materials source testing <strong>and</strong> approvals.<br />

▼ Comment on the uniformity of product.<br />

▼ Document whether the source has been designated by<br />

the STA or selected by the contractor <strong>and</strong> approved by<br />

the STA.<br />

▼ Verify that appropriate environmental clearances were<br />

obtained.<br />

▼ Inspect processing equipment for compliance with<br />

specifications. If more than one material is proportioned<br />

<strong>and</strong> mixed into a combined subbase or base material in<br />

order to comply with the specifications, either in a<br />

central plant or by road mixing operations, determine<br />

the types, quality, <strong>and</strong> proportions of the materials used<br />

<strong>and</strong> the tests performed to ensure that the specified<br />

proportions are followed <strong>and</strong> that the end product<br />

complies with the specified requirements.<br />

On-site Production<br />

Appendix D: <strong>Inspection</strong>s-in-Depth<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

▼ Review quality control <strong>and</strong> acceptance moisture,<br />

density, aggregate quality, <strong>and</strong> gradation tests.<br />

▼ Verify subbase <strong>and</strong> base width <strong>and</strong> compacted thickness.<br />

▼ Ensure that soft or failing subgrade areas were replaced<br />

prior to placement of subbase or base.<br />

▼ Verify method used for documenting pay quantities.<br />

D–17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!