14.10.2013 Views

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

Construction Program Management and Inspection Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SAMPLE<br />

Special Emphasis Areas<br />

Design<br />

▼ Selection of 3R Strategy, Adequacy of<br />

Structural Section<br />

▼ Accommodation of Safety Features, Roadside Safety<br />

▼ Accommodation of the H<strong>and</strong>icapped<br />

▼ Design St<strong>and</strong>ards, Design Exceptions, Commitments<br />

to FHWA<br />

▼ Drainage, Hydraulic Analysis, Floodplain<br />

Risk Assessment<br />

▼ Foundations Analysis for Bridge Design<br />

▼ Seismic Analysis<br />

▼ Traffic Through <strong>Construction</strong><br />

▼ Traffic <strong>Management</strong> Planning<br />

▼ Traffic Signals <strong>and</strong> Traffic Signal Systems<br />

▼ Railroads <strong>and</strong> Utilities Agreements <strong>and</strong> Plans<br />

▼ Bridge Widening <strong>and</strong> Rehabilitation<br />

▼ Bridge Design<br />

▼ Consultant Services<br />

▼ Highway L<strong>and</strong>scaping<br />

▼ Pavement, Pavement Selection<br />

▼ Culverts <strong>and</strong> Retaining Walls<br />

▼ Signs <strong>and</strong> Markings<br />

▼ Safety Roadside Rest Areas<br />

▼ St<strong>and</strong>ard Plans<br />

▼ HOV Lanes, Ramp Meters<br />

▼ Plans, Specifications, <strong>and</strong> Estimates Approval of Local<br />

Agency Projects<br />

▼ Oversight of Local Agency Delegations (Certification<br />

Acceptance)<br />

Appendix C: Process Review/Product Evaluation <strong>Guide</strong>lines<br />

CONSTRUCTION PROGRAM MANAGEMENT AND INSPECTION GUIDE (5/01/04)<br />

▼ Federal-Aid Requirements<br />

▼ 50% Minimum Federal Funds<br />

▼ State Preference in the Selection of Materials<br />

▼ Materials Produced by Convict Labor<br />

▼ Local Hiring Preferences<br />

▼ Publicly Owned Equipment<br />

▼ Patented or Proprietary Products<br />

▼ Warranty Clauses<br />

▼ State-Owned or State-Furnished Materials<br />

▼ Salvage Credit<br />

▼ Public Interest Findings<br />

Environment<br />

▼ Public Involvement, Public Hearings<br />

▼ Accomplishment of Mitigation Measures<br />

▼ Noise Walls, Selection, Design, <strong>and</strong> <strong>Construction</strong><br />

▼ Processing of Local Agency Documents<br />

<strong>Construction</strong> (also see Contract Administration)<br />

▼ Grading <strong>and</strong> Drainage<br />

▼ Subbase <strong>and</strong> Base<br />

▼ Asphalt Concrete Pavements<br />

▼ Portl<strong>and</strong> Cement Concrete Pavements<br />

▼ Signs, Signals, <strong>and</strong> Traffic Control Devices<br />

▼ Guardrail <strong>and</strong> Median Barriers<br />

▼ Traffic Safety in Work Zones (see 23 CFR 630.1010 (e))<br />

▼ Bank <strong>and</strong> Slope Protection<br />

▼ Bridges <strong>and</strong> Major Structures<br />

▼ Culverts <strong>and</strong> Retaining Walls<br />

▼ Materials Sampling <strong>and</strong> Testing<br />

▼ <strong>Inspection</strong>/Project Administration by Consultants<br />

▼ Oversight of Local Agency Projects<br />

▼ Experimental Features/Projects<br />

▼ OSHA Safety<br />

▼ Bridge Deck <strong>Construction</strong><br />

C–5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!