When experience counts...<br />

<strong>Submarine</strong> <strong>Cable</strong> <strong>Installation</strong> <strong>Contractor</strong>s


Who we are...<br />

Five Oceans Services (FOS) is a German company having its head<br />

offi ce in the city of Leer. Since its formation in 2003 subsidiary<br />

and representative offi ces have been opened in Egypt, India and<br />

Iran. Furthermore FOS has an operational base in Germany and a<br />

local support base in Abu Dhabi, United Arab Emirates.<br />

FOS is a submarine cable installation contractor serving<br />

the worldwide offshore oil and gas industry with a specifi c<br />

geographical focus on the Eastern Mediterranean Sea, the<br />

Middle East and India.<br />

The team behind the FOS organization has a history of being<br />

active in the submarine cable installation market since 1985,<br />

whereby engineering disciplines from mechanical via civil to<br />

maintenance and ocean engineering are fully integrated.<br />

FOS currently utilizes on a long-term basis its DP-2 cable lay<br />

vessel “Siem Carrier” in close operational combination with the<br />

installation support vessel “Zakher Crown” as its core assets to<br />

service its clients. Additional resources are sourced on a project<br />

specifi c basis enabling FOS to provide the most suitable technical<br />

and economic solution to its clients.<br />

Based on its in-house resources FOS can install, maintain and<br />

repair submarine cables in water depths up to 1,000 meter.<br />

To compliment client requirements for turnkey solutions, FOS<br />

has established long-term cooperation agreements for services<br />

inclusive but not limited to diving, trenching and ROV support,<br />

marine survey and positioning as well as cable termination and<br />

testing.<br />

What we do best...<br />

The projects we perform involve complex operations: tough<br />

environmental conditions, complex logistics, stringent<br />

design criteria and third party interfaces are amongst the<br />

challenges our project teams are confronted with.<br />

These challenges are being dealt with under stringent time<br />

constraints of the overall project as well as specifi c client<br />

requirements.<br />

We believe that these challenges can only be met by both<br />

strong project management and close cooperation between<br />

all involved parties.<br />

Our performance during submarine cable installation projects<br />

is always based on fl exibility, experience, knowledge and the<br />

commitment of our personnel preparing and undertaking<br />

the work.


Al Khaleej Gas Project<br />

Phase 2 for WH10 and WH11 Platforms<br />

The works of the Al Khaleej Gas Project Phase 2 – as part of<br />

the RasGas Field Development Projects – were performed in<br />

the period between April and July 2009 in the North Field Alfa<br />

offshore Qatar, based on a contract with J. Ray McDermott<br />

Eastern Hemisphere Ltd. (JRMEHL) as main contractor of the<br />

Ras Laffan Liquefi ed Natural Gas Company.<br />

The scope of work as undertaken by FOS involved the<br />

engineering, transportation and installation of 2x 8kV<br />

submarine composite power cables with a total length of<br />

63.1km incl. 4x J-tube pull-ins as well as crossings of various<br />

infrastructure.<br />

Our typical work...<br />

Al-Khafji Joint Operations<br />

Field Development Plan Phase 1<br />

The works of the Al-Khafji Joint Operations Field Development<br />

Plan Phase 1 were performed in the period between<br />

March 2008 and May 2009 offshore the Saudi Arabian coast<br />

line at Ras Al-Khafji, based on a contract with Petroleum<br />

Marine Services (PMS) as consortium member along<br />

with its partners of the Petroleum Projects and Technical<br />

Consultations Company (PETROJET) and Engineering for the<br />

Petroleum & Process Industries (Enppi) as main contractor of<br />

Al-Khafji Joint Operations (KJO), a joint venture of Kuwait<br />

Gulf Oil Company and Aramco Gulf Operations Company.<br />

The scope of work as undertaken by FOS involved the<br />

engineering, transportation and installation of 24x 5kV<br />

and 7x 36kV submarine composite cables with a total<br />

length of 52.7km. In addition the scope of work involved<br />

the installation of 31x J-tubes on existing platforms and the<br />

installation of 62x cable hold-back arrangements as well as<br />

the protection of 357x subsea crossings whereof 28x required<br />

the installation of concrete mattresses.<br />

Taurt LNG Train 1 Supply Project<br />

Phase 1 – Subsea Umbilical <strong>Installation</strong><br />

The works of the Taurt LNG Train 1 Supply Project were<br />

performed in the period between January 2007 and May<br />

2008 offshore the Egyptian Mediterranean coast line in<br />

the vicinity of Port Said, based on a contract with Gulf Suez<br />

Petroleum Company (GUPCO), a joint venture company<br />

of British Petroleum (BP) and Egyptian General Petroleum<br />

Corporation (EGPC).<br />

The scope of work as undertaken by FOS involved the<br />

engineering, transportation, installation and post-lay<br />

trenching of 1x 68.5km long electro-hydraulic control<br />

umbilical incl. 1x approx. 2.5km long shore end installation<br />

as well as the lay-down of 1x umbilical termination and<br />

distribution assembly (UTDA) at the subsea control center.<br />

Furthermore the scope of work included the post-lay<br />

stabilization of 1x 20” concrete coated pipeline in shallow<br />

water.


How to contact us...<br />

Five Oceans Services GmbH<br />

Hafenstrasse 6a<br />

D-26789 Leer<br />

Germany<br />

Tel.: +49 (0)491 912 43-0<br />

Fax: +49 (0)491 912 43-29<br />

E-mail: info@fi veoceansservices.com<br />

Web: www.fi veoceansservices.com<br />

Pyramid Oilfi eld Supply Co.<br />

6A, Sakhawi Street<br />

Cairo, 11341<br />

Egypt<br />

Tel.: +20 (0)2 2453 1139<br />

Fax: +20 (0)2 2257 5695<br />

E-mail: posco@pyramid.com.eg<br />

Web: www.pyramid.com.eg<br />

Vajra InfraTech Pvt. Ltd.<br />

Soundarya, C-6, Gulmohar Park<br />

New Dehli, 110 049<br />

India<br />

Tel.: +91 (0)11 2685 1564<br />

Fax: +91 (0)11 2685 0247<br />

E-mail: contact@vajrainfratech.com<br />

Web: www.vajrainfratech.com<br />

Deep Offshore Construction Co.<br />

Unit 2, No. 18, Fathi Shaghaghi Street<br />

Tehran, 14336 33331<br />

Iran<br />

Tel.: +98 (0)21 8810 4825<br />

Fax: +98 (0)21 8810 4826<br />

E-mail: info@deepoffshoreconstruction.com<br />

Web: www.deepoffshoreconstruction.com<br />

A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!