13.10.2013 Views

Selling price calculation of a Wind Turbine Generator (WTG)

Selling price calculation of a Wind Turbine Generator (WTG)

Selling price calculation of a Wind Turbine Generator (WTG)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Selling</strong> <strong>price</strong> <strong>calculation</strong><br />

<strong>of</strong> a <strong>Wind</strong> ind <strong>Turbine</strong> urbine <strong>Generator</strong> enerator (<strong>WTG</strong>)


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


1. Technical specifications<br />

Name:<br />

<strong>WTG</strong> WP/S-III WP/S III 1,5 MW<br />

Rotor diameter 76 m<br />

Capacity <strong>of</strong> generator 1.500 kW<br />

Base 4.590 m²<br />

Price 1 mio. €<br />

capacity<br />

[kW]<br />

1600<br />

1400<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Capactiy in relation to the wind<br />

speed<br />

0 5 10 15<br />

<strong>Wind</strong> speed [m /s]


1. Technical specifications<br />

- <strong>Wind</strong> speed: 6,5m/s<br />

- Energy output: 342.47 kW<br />

- Capacity apacity p.a.:<br />

8.760 h x 342.47 kW = 3.000 MWh<br />

3.000 MWh<br />

1,5 MW x 8.760 h<br />

Average capacity<br />

- <strong>Wind</strong>turbine utilization factor:<br />

x 100 = 22,7 %


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


2. Decide the costs<br />

- Costs for the wind turbine generator<br />

- <strong>WTG</strong> itself<br />

- Supplement and buildup<br />

- Costs for the property / land<br />

- Costs for the loan (interest)<br />

- Costs for the fall in value (write-down)<br />

(write down)<br />

- Costs for keeping the basement (base fee)<br />

- Costs for maintenance (material and work)<br />

- Calculative costs (e.g. rental for land)


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


3. Valuation <strong>of</strong> costs<br />

Part 1 – Valuation <strong>of</strong> purchasing costs<br />

<strong>WTG</strong> 1.000.000,-<br />

1.000.000,<br />

Buildup 80.000,- 80.000,<br />

Property 225.000,- 225.000,<br />

Purchasing costs 1.305.000,-<br />

1.305.000,


3. Valuation <strong>of</strong> costs<br />

[loan 1.305.000,- 1.305.000, ]<br />

Part 2 – Calculation <strong>of</strong> loan repayment<br />

Repayment p.a. 1.305.000,- 1.305.000, : 20 years = 62.250,- 62.250,<br />

Average interest p.a. 1.305.000,- 1.305.000, : 10 years x 5% = 6.525,- 6.525,<br />

Loan repayment p.a. = 68.775,- 68.775,


3. Valuation <strong>of</strong> costs<br />

Part 3 – Valuation <strong>of</strong> write-down<br />

write down<br />

<strong>WTG</strong> 1.000.000,-<br />

1.000.000,<br />

Buildup 80.000,- 80.000,<br />

Purchasing costs 1.080.000,- 1.080.000, : 20 years =<br />

write-down write down p.a. 54.000,-<br />

54.000,


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


4. Calculation costs<br />

maintenance (material and work) 50.000,-<br />

keeping the basement (base fee) 10.000,-<br />

loan (interest) 68.775,- 68.775,<br />

fall in value (write-down) (write down) 54.000,-<br />

54.000,<br />

property / land (calculative costs) 27.000,-<br />

Summary costs p.a. 245.775,


Overview<br />

1. Technical specifications<br />

2. Decide the costs<br />

3. Valuation <strong>of</strong> costs<br />

4. Calculation costs<br />

5. Result on the market


5. Result on the market<br />

Summary costs p.a. 245.775,- 245.775,<br />

Performance 3.000.000 kWh p.a.<br />

Income per kWh 0,11 EUR<br />

- Costs per kWh 0,08 EUR<br />

pr<strong>of</strong>it per kWh 0,03 EUR<br />

= 0,08 EUR / kWh<br />

pr<strong>of</strong>it per 3 mio. mio.<br />

kWh p.a. 90.000,- 90.000, EUR


A <strong>WTG</strong> is a pr<strong>of</strong>itable<br />

investment for the<br />

future and a high quality<br />

option to save the<br />

environment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!