12.10.2013 Views

NZIER report on compensation for transmission infrastructure

NZIER report on compensation for transmission infrastructure

NZIER report on compensation for transmission infrastructure

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 1 Compensati<strong>on</strong> summary<br />

Country (utility, state) Damages<br />

Australia<br />

(Victoria)<br />

Australia<br />

(Queensland)<br />

Canada (Altalink<br />

Alberta)<br />

Canada (Hydro-<br />

Québec, Québec)<br />

Finland<br />

(Fingrid Oyj)<br />

United Kingdom<br />

(Nati<strong>on</strong>al Grid)<br />

United States<br />

(Wisc<strong>on</strong>sin)<br />

New Zealand<br />

(Transpower)<br />

Source: <str<strong>on</strong>g>NZIER</str<strong>on</strong>g><br />

Payment covers Payment method Pay basis<br />

Producti<strong>on</strong><br />

loss<br />

Operating<br />

cost<br />

Externalities<br />

Lump-sum<br />

payment<br />

x x x x x<br />

x x x x x<br />

Annual<br />

payment<br />

<str<strong>on</strong>g>NZIER</str<strong>on</strong>g> – Compensati<strong>on</strong> <strong>for</strong> transmissi<strong>on</strong> <strong>infrastructure</strong> 28<br />

No. support<br />

structures<br />

x x x x x x<br />

x x x x x x<br />

x x x x<br />

x x x x x x<br />

x x x<br />

x x x x

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!