FACT SHEET<br />

TELEPHONE 0800 327 646 I WEBSITE WWW.FEDFARM.ORG.NZ<br />

UNDERGROUND TELECOMMUNICATIONS CABLES ACROSS<br />

PRIVATE LAND<br />

BACKGROUND<br />

The Rural Broadband Initiative envisages substantially improved broadband access for people in<br />

rural locations. This enhanced telecommunications fibre network will require the acquisition of<br />

rights from private landowners to lay fibre cabling underground, across their land, and protect it.<br />

The gaining of those rights, and associated compensation, will generally be achieved by way of an<br />

easement agreement between the landowner and the broadband provider / telecommunications<br />

company.<br />

If you have been approached by a broadband provider/telecommunications company seeking to<br />

lay a fibre optic cable across your land, this fact sheet can be of assistance to you.<br />

FEDERATED FARMERS OF NEW ZEALAND’S POSITION ON RURAL BROADBAND<br />

Federated Farmers of New Zealand is a supporter of the Rural Broadband Initiative, and is working<br />

hard to get the best deal for rural areas.<br />

The Federation has developed sound knowledge of easement provisions and how they affect<br />

landowners, principally through advising landowners that are negotiating easements for public<br />

infrastructure such as electricity lines and gas pipelines.<br />

WHAT IS AN EASEMENT?<br />

An easement is a property right the broadband provider / telecommunications company will need to<br />

purchase from landowners along the fibre network route. Rights and obligations of the parties over<br />

the easement land will be set out in the agreement.<br />

For the landowner, it will set out the easement area and what they can or cannot do within it. It will<br />

also set out the broadband provider / telecommunications company rights of access to the land,<br />

and payment of compensation for temporary disturbances during the laying of the fibre.<br />

Easement terms related to underground fibre optic cables are not thought to be onerous on the<br />

landowner. Once laid, an underground fibre network rarely requires maintenance, and the fact of it<br />

being hardened and underground substantially reduces the impact on the landowner. The rights<br />

acquired from the landowner, and the obligations placed on them by the easement, are much less,<br />

for example, than those associated with an electricity line.<br />

Nevertheless it is important that landowners ensure that their interests, short and long term, are<br />

protected, and they come to an arrangement with the broadband provider / telecommunications<br />

company that is optimal for them.<br />

CONSTRUCTION<br />

It is important that the landowner find out from the company just how the company intends to<br />

construct the cable across their land. This could have quite significant effects that need to be<br />

considered as part of the easement negotiations.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 1


Construction will in most cases involve the laying of ducting for fibre-optic cable by way of moleplough.<br />

This means that the cable will be laid with very little disruption to the land over a very brief<br />

period. Given the undergrounding of the cable avoids the engineering concerns of overhead lines<br />

(line tension, spacing between poles, etc.), the route the cable takes can more easily take account<br />

of routes the landowner would prefer taken through their land.<br />

There is however situations where the undergrounding of the fibre cable by mole-plough will not be<br />

possible, whether for reasons of topography (steep slopes) or soil structure (stony or hard ground).<br />

In these situations, the line will likely be directional drilled, trenched or strung up above ground<br />

along poles. This means that parts of the line could be more intrusive and potentially have a larger<br />

on-going impact on the landowner’s use of their land. This impact must be discussed with the<br />

company so the company can either alter the route to minimise the impact, take other steps to<br />

minimise the impact or compensate for the impact.<br />

COMPENSATION<br />

Compensation is paid for the rights acquired by the easement and any associated impact on the<br />

surrounding property and the landowner’s use of it.<br />

Where fibre optic cabling is laid underground, there is no visual impact on the property and<br />

limitations on the use of the easement area are less than is the case for infrastructure that is above<br />

ground. As such, compensation can be insubstantial.<br />

The preference of companies for property rights under an easement is that compensation be paid<br />

as a once-off lump sum. There are reasons for this, such as the principle of equivalence under the<br />

Public Works Act.<br />

A major perceived shortcoming of once-off lump sum payments, however, is that they cannot<br />

accommodate the on-going impact on the landowner’s future economic potential use of the <strong>Land</strong>. It<br />

may be that, for example, the landowner in the future wishes to take advantage of conversion of<br />

the land to production forestry but is limited by the presence of the easement and the cable’s<br />

location.<br />

As such, Federated Farmers considers compensation paid as an annual rental may better reflect<br />

this changing situation and may be worth the landowner pursuing in their negotiations with the<br />

company.<br />

Alternatively, it is worth understanding that there exists a certain amount of pragmatism and<br />

flexibility in the laying of fibre networks where the company is reluctant to pay compensation as an<br />

annual rental. Federated Farmers would encourage landowners to seek compensation additional<br />

to the once-off lump sum, perhaps, in the form of an additional goodwill payment or some other<br />

form of additional assistance.<br />

EASEMENT VS LEASE<br />

The land rights allowing the laying of fibre across private land are usually secured by way of<br />

easement agreement. This is in recognition of the permanent tenure of the cable across that land.<br />

This is a situation also common to gas pipelines, electricity lines and other long-term infrastructure.<br />

This situation is however different with the construction and siting of cellphone / wireless towers on<br />

private land. As these towers can service a large area wirelessly, the siting of the tower is a lot<br />

more flexible. Standard practice for cellphone / wireless towers is for the property rights to be<br />

secured through a combination of lease and easement agreements.<br />

This usually happens where the tower and an area at the base of the tower are secured by lease,<br />

while the fibre cable and electricity line that connect the tower to both the telecommunications and<br />

electricity networks are secured by easement agreement.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 2


A separate fact sheet has been developed to assist landowners in their lease negotiations with<br />

telecommunications companies. Members can obtain a copy of this fact sheet by calling<br />

0800 327 646.<br />

EASEMENT GUIDANCE<br />

Below are a range of suggestions as to provisions that Federated Farmers considers necessary in<br />

an easement agreement that balances the rights and obligations of the landowner and the<br />

company.<br />

The easement negotiation and associated compensation are a business matter between the<br />

landowner and the broadband provider / telecommunications company. The easement agreement<br />

provisions below are suggested as guidance and a starting point for landowners in their<br />

negotiations, and are not intended as a comprehensive legal agreement.<br />

1) Purposes of the easement<br />

The purpose of this section is to set out the intent of the agreement, as well as define basic terms<br />

like:<br />

Accessway: the agreed access route across the land to the Easement Area.<br />

Company: the telecommunications company seeking to purchase rights to use<br />

private land to host <strong>Telecommunications</strong> Infrastructure on the Easement Area.<br />

Easement Area: the area of land the company requires to site the<br />

<strong>Telecommunications</strong> Infrastructure<br />

<strong>Land</strong>: the area around the Easement Area that comprises the rest of the<br />

property.<br />

<strong>Land</strong>owner: the owner of the land selling land use rights to the Company under<br />

the easement.<br />

<strong>Telecommunications</strong> Infrastructure: the fibre cable and any other additional<br />

equipment or structures to be constructed on the Easement Area under the<br />

easement agreement.<br />

An agreement will set out its purposes, for example that it is “to allow the company to construct and<br />

use <strong>Telecommunications</strong> Infrastructure on the Easement Area”. It may perhaps go further to make<br />

it clear that the agreement describes the rights the Company is acquiring from the <strong>Land</strong>owner, the<br />

obligations on the <strong>Land</strong>owner that arise from the Company’s occupation and use of the Easement<br />

Area, and the obligations the Company has to the <strong>Land</strong>owner as occupant of the Easement Area.<br />

One aspect the <strong>Land</strong>owner would do well to assert in their negotiations is the inclusion of a<br />

statement that makes it clear what the easement does not seek to do, namely:<br />

“This easement does not prevent the <strong>Land</strong>owner from continuing to use the <strong>Land</strong><br />

outside of the Easement Area for normal farming practice except where it would<br />

interfere with the <strong>Telecommunications</strong> Infrastructure.”<br />

2) Company’s rights<br />

The purpose of this section is to clearly describe the rights that the <strong>Land</strong>owner is allowing the<br />

Company to purchase under the agreement. In general terms, the rights cover everything from the<br />

right to enter the <strong>Land</strong>, to construct and do work on the Easement Area, and to have their cable<br />

sited on the Easement Area.<br />

This section is important because it outlines what the Company is allowed to do. While it should be<br />

focussed on the positive aspects, one should also bear in mind those activities the landowner<br />

would rather the company did not do while on their land. An example is the securing of an agreed<br />

Accessway between the <strong>Land</strong>owner and the Company, in such a way that the <strong>Land</strong>owner has<br />

control over the entry point and route the Company uses to access the Easement Area.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 3


It is important of course not to grant the Company excessive rights. We suggest that the provisions<br />

below are adequate for the purposes of describing the basic rights an easement for underground<br />

fibre optic cabling:<br />

“This easement gives the Company the following rights:<br />

To construct, install, inspect, operate, repair, maintain, renew, replace, add to,<br />

modify and remove the <strong>Telecommunications</strong> Infrastructure on the Easement<br />

Area;<br />

to transmit, convey, send, distribute, convert and receive telecommunications<br />

signals by means of the <strong>Telecommunications</strong> Infrastructure;<br />

to undertake any tests, investigations and surveys to exercise the Company’s<br />

rights and obligations under this easement;<br />

to enter and remain on the Easement Area and the Accessway with or without<br />

vehicles and equipment to exercise the Company’s rights and obligations under<br />

this easement;<br />

to enter and remain on parts of the <strong>Land</strong> outside the Easement Area and the<br />

Accessway with or without vehicles and equipment to exercise its rights and<br />

obligations under this easement, but only if:<br />

o the Accessway is not available for any reason; or<br />

o access to and from the Easement Area is by air; or<br />

o we need to have access outside the easement area and the Accessway<br />

to exercise our rights under this easement; but only with the prior<br />

agreement of the <strong>Land</strong>owner.<br />

And then the Company may use any access route to exercise its rights and<br />

obligations.”<br />

The Company will make best attempts to run the fibre cable along existing fence lines or otherwise<br />

avoid the need to cross through fences, as it eases problems for both parties. It may however be<br />

necessary in some situations for the Company to interfere with fences or gates within fences to<br />

complete the laying of the fibre cable along the Easement Area.<br />

In these instances, the <strong>Land</strong>owner would do well to argue that while the Company can have the<br />

right to install gates within fences, this should only happen when essential to achieve the purposes<br />

of the easement.<br />

The Company will likely seek the right to construct, use and modify access tracks on the <strong>Land</strong>.<br />

This is necessary to ensure the Company can use access tracks that are fit for their purposes<br />

under this easement. The important consideration for the <strong>Land</strong>owner is to argue that the easement<br />

should ensure the Company must first obtain the <strong>Land</strong>ower’s consent.<br />

The Company may want to have the right to keep the Easement Area clear of obstacles like trees,<br />

soil, and structures. This is reasonable as such things would impede their access to the cable. The<br />

<strong>Land</strong>owner would do well to argue in their negotiations that the Company should cover the costs of<br />

keeping the Easement Area clear.<br />

Additional rights the Company may reasonably seek in the easement could include:<br />

to excavate the Easement Area and remove vegetation (including trees), soil,<br />

earth, gravel and stone from the Easement Area;<br />

to temporarily exclusively occupy any part of the Easement Area to undertake<br />

work safely including temporarily fencing off the occupied area and temporarily<br />

preventing or restricting the <strong>Land</strong>owner’s access to the occupied area.”<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 4


3) Limitation on the Company’s rights<br />

The purpose of this section is to clearly constrain what the Company can build on the Easement<br />

Area under this agreement to what is agreed. It is important to ensure that it is clear in the<br />

easement agreement that the Company does not have the right to redevelop and extend the<br />

<strong>Telecommunications</strong> Infrastructure beyond that for which the Easement was negotiated with the<br />

<strong>Land</strong>owner.<br />

This is a safety mechanism and might be worded as follows:<br />

“The Company does not have the right to:<br />

install <strong>Telecommunications</strong> Infrastructure to a specification beyond or in<br />

addition to that which is negotiated with the <strong>Land</strong>owner for the purposes of this<br />

easement;<br />

use the Easement Area for purposes other than those negotiated for the<br />

purposes of this easement.”<br />

The constantly evolving technology related to <strong>Telecommunications</strong> Infrastructure is such that<br />

capacity and performance can be enhanced without the need for additional infrastructure to that<br />

negotiated with the <strong>Land</strong>owner. This can be achieved with replacement infrastructure that performs<br />

to a higher specification. It is not our intention within this easement guidance to limit the<br />

replacement of <strong>Telecommunications</strong> Infrastructure that is the same or similar to the agreed with the<br />

<strong>Land</strong>owner but can perform to a higher specification.<br />

4) Company’s obligations<br />

The purpose of this section is to describe the obligations the Company will have towards the<br />

<strong>Land</strong>owner and the <strong>Land</strong>owner’s use of the <strong>Land</strong>. These generally focus on the things the<br />

Company needs to have regard for when they enter the <strong>Land</strong>, while they are on the <strong>Land</strong>, and<br />

when the Company will compensate the <strong>Land</strong>owner for losses arising from their entry to the <strong>Land</strong>.<br />

Although these obligations are likely to be fairly standard, it would help to discuss with the<br />

Company just exactly what they intend to do while on the <strong>Land</strong>. There may be aspects to your<br />

farming operation that you’d rather the Company stayed far away from, or that they took specific<br />

actions while entering your <strong>Land</strong>. The key here is to be clear what the Company needs to do to<br />

avoid a situation where you need to be compensated for damage.<br />

We suggest the following as a helpful guide for your discussions with the Company:<br />

“When the Company enters the <strong>Land</strong>, they must;<br />

only enter the <strong>Land</strong> at access points and via Accessways and / or access tracks<br />

agreed to with the <strong>Land</strong>owner and specified on the maps accompanying this<br />

easement;<br />

have regard to the <strong>Land</strong>owner’s use of the <strong>Land</strong>;<br />

minimise disruption to the <strong>Land</strong>owner’s use of the <strong>Land</strong>;<br />

restore any part of the surface of the <strong>Land</strong> that is damaged by the Company as<br />

close to its prior condition as reasonable practicable and repair any other direct<br />

physical damage caused;<br />

the Company shall use its best endeavours to prevent the outbreak and spread<br />

of noxious weeds and fire; and<br />

remove any debris the Company creates in undertaking any works and<br />

otherwise leave any work sites in tidy condition.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 5


“Upon completing the installation of the <strong>Telecommunications</strong> Infrastructure, and in<br />

the course of exercising its rights under this easement, the Company must:<br />

restore the soil surface to its original contour and condition;<br />

restore any crops or pasture disturbed by the Company;<br />

complete all site restoration requirements of any resource consents or any<br />

Authority; and<br />

restore any fences, including boundary fences, modified by the exercise of their<br />

rights under this easement.<br />

“The company will compensate any loss to the <strong>Land</strong>owner resulting from:<br />

any damage caused to the surface of the <strong>Land</strong> to the extent that the Company<br />

cannot restore it; and<br />

any trees that the Company removes outside of the Easement Area.”<br />

5) Accessway and access tracks<br />

The purpose of this section is to clearly describe what the Company can and cannot do as regards<br />

Accessways or access tracks across your <strong>Land</strong>. This means considering what rights you will allow<br />

the Company to purchase to construct new access tracks or modify existing ones. There is limited<br />

likelihood that the Company will require permanent access tracks for underground fibre optic<br />

cables, however it is still important to set out conditions.<br />

The following are suggested provisions:<br />

“If the company constructs, modifies or upgrades any access track (including<br />

culverts, bridges and other supports) on the Easement Area or the Accessway, it<br />

will at their cost:<br />

Take steps prior to entry to ensure the access track is of the standard they<br />

require.<br />

Repair any damage they cause to the access track.<br />

“If the <strong>Land</strong>owner damages any access track that the Company has constructed,<br />

modified or upgraded on the Easement Area or the Accessway, the Company may<br />

recover the cost of repairing that damage from the <strong>Land</strong>owner.<br />

“All access tracks that the Company constructs, modifies or upgrades on the<br />

Easement Area or the Accessway will form part of the <strong>Land</strong> and will be the property<br />

of the landowner (unless agreed otherwise in writing with the <strong>Land</strong>owner).”<br />

6) Notices<br />

The purpose of this section is to clearly describe the obligations on the Company to provide notice<br />

in advance of their intention to enter the <strong>Land</strong>, as well as the rights of the <strong>Land</strong>owner to manage<br />

that access.<br />

This section of the agreement is important because notice provisions ensure that potential<br />

interruptions to the <strong>Land</strong>owner’s use of the <strong>Land</strong> are managed in the best interests of the<br />

<strong>Land</strong>owner. It may seem unreasonable to require the Company to give 10 working days notice, but<br />

the Company must be required to give notice far enough in advance that the <strong>Land</strong>owner has a<br />

chance to advise of any conditions or delays they may need for farm management purposes.<br />

We suggest the following as a helpful guide for your discussions with the Company:<br />

“The Company will give the <strong>Land</strong>owner at least 10 working days notice of their<br />

intention to enter the <strong>Land</strong> for any purpose allowed by this easement.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 6


“The <strong>Land</strong>owner may set reasonable conditions on Company entry onto the <strong>Land</strong>,<br />

but the <strong>Land</strong>owner must inform the Company at least 2 working days before their<br />

proposed date of entry. Reasonable conditions could include matters of animal<br />

welfare, stock and crop disturbance, high fire risk, and biosecurity risk.<br />

“In an Emergency, the Company may enter the <strong>Land</strong> without giving prior notice to<br />

the <strong>Land</strong>owner, but must give notice as soon as possible and no later than 5<br />

working days after the event, and must comply with all other provisions of this<br />

easement relating to their entry.<br />

“The <strong>Land</strong>owner must advise any tenant of the <strong>Land</strong> of the Company’s proposed<br />

entry onto the <strong>Land</strong> if the <strong>Land</strong>owner is given notice of proposed entry. If the<br />

<strong>Land</strong>owner has notified the Company of any tenant, the company may send a<br />

notice directly to that tenant.”<br />

7) <strong>Land</strong>owner’s obligations<br />

The purpose of this section is to describe the actions and activities that the Company requires the<br />

<strong>Land</strong>owner to perform. These typically fall under a general obligation on the <strong>Land</strong>owner not to<br />

interfere with the Company’s use of the Easement Area.<br />

In the case of <strong>Telecommunications</strong> Infrastructure, these obligations should not be excessive and<br />

might reasonably be encompassed by agreeing not to excavate, erect structures, plant trees,<br />

impede access, or flood the Easement Area or Accessway. Many of these will be reasonable<br />

expectations on the part of the Company so they can exercise the rights they are purchasing under<br />

the easement. It is important however to keep in mind the restrictions the Company is looking to<br />

impose on the <strong>Land</strong>owner’s use of the <strong>Land</strong> and Easement Area. It is further important that the<br />

<strong>Land</strong>owner argue that the easement include an additional provision that allows for exceptions to be<br />

negotiated as required.<br />

We suggest the following as a helpful guide for your discussions with the Company:<br />

“Exceptions to these obligations must be obtained by the Company’s prior written<br />

consent.”<br />

8) Breach of respective obligations<br />

The purpose of this section is to describe the process the Company and the <strong>Land</strong>owner must<br />

pursue where they believe the other party has breached a condition contained within the<br />

easement. This should include a dispute resolution process, suggested as follows:<br />

“If either the Company or the <strong>Land</strong>owner breaches any of their obligations in this<br />

easement, the other party may:<br />

if reasonable in the circumstances, give notice of the breach and give a<br />

reasonable period to remedy the breach; and<br />

take all reasonable steps to remedy the breach; or<br />

refer the matter for mediation.<br />

“Mediation will be undertaken by a registered mediator with at least 10 years<br />

experience in disputes resolution.”<br />

9) Health and safety<br />

The purpose of this section is to describe who is responsible for the health and safety of people the<br />

Company send on to the property, and is essential from a liability perspective. Although, there are<br />

general obligations under the Health and Safety in Employment Act on the <strong>Land</strong>owner, this section<br />

does provide the opportunity for the <strong>Land</strong>owner to require the Company to take additional<br />

measures.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 7


We suggest the following as a helpful guide for your discussions with the Company:<br />

“The Company will be responsible for the health and safety of any persons who<br />

enter the <strong>Land</strong> at the Company’s request to the maximum extent allowed by law.<br />

“The <strong>Land</strong>owner will be responsible for complying with their obligations under the<br />

Health and Safety in Employment Act.<br />

“The <strong>Land</strong>owner must notify the Company of any rules or procedures regarding the<br />

health and safety of persons on the <strong>Land</strong> and the identification and mitigation of<br />

hazards. The Company will comply with all reasonable rules and procedures that<br />

the <strong>Land</strong>owner provides.”<br />

10) Indemnity and liability<br />

The purpose of this section is to clarify how liability will be dealt with between the <strong>Land</strong>owner and<br />

the Company where there is damage to the <strong>Land</strong>, the fibre cable or the interests of third parties.<br />

It is essential to emphasise indemnification of the <strong>Land</strong>owner against damage to the <strong>Land</strong> in an<br />

easement agreement for any infrastructure on private land. The Company will also seek<br />

indemnification from the <strong>Land</strong>owner in circumstances where the agreement has been breached, or<br />

there has been wilful damage.<br />

There are no cases of which Federated Farmers is aware, where the <strong>Land</strong>owner has been liable<br />

for the knock-on costs to the consumers of services delivered through infrastructure (for example<br />

electricity users and in this case businesses and residences using the fibre network), in the event<br />

of an outage arising from a <strong>Land</strong>owner’s breach of the agreement or wilful damage. Such liability<br />

does however still potentially exist and there should be a limitation placed upon it.<br />

We suggest the following as a helpful guide for your discussions with the Company:<br />

“The Company indemnifies the <strong>Land</strong>owner against:<br />

any physical damage to the <strong>Land</strong> or anything located on the <strong>Land</strong>; and<br />

any damage to a third party for which a claim is successfully brought against the<br />

<strong>Land</strong>owner;<br />

where that damage is caused by the Company’s act or omission in breach of this<br />

easement or is caused by the Company’s negligence.<br />

“The <strong>Land</strong>owner indemnifies the Company against:<br />

any physical damage to the <strong>Telecommunications</strong> Infrastructure, equipment and<br />

the Company’s other property; and<br />

any damage to a third party for which a claim is successfully brought against the<br />

Company;<br />

where that damage is caused by the <strong>Land</strong>owner’s act or omission in breach of this<br />

easement or is caused by the <strong>Land</strong>owner’s negligence.”<br />

It would be worth the <strong>Land</strong>owner arguing for the inclusion of a cap on the liability they bear under<br />

this easement. This is something Federated Farmers has secured from its negotiations with<br />

Transpower over the siting of transmission lines across private land. The Company should be<br />

asked to tie the cap to breaches of easement provisions, any damage to a third party, or otherwise<br />

required by law. The cap should be set at a level agreed by both parties, and the premiums for<br />

public liability insurance to that level should be paid by the Company additional to any<br />

compensation to the <strong>Land</strong>owner under the easement.<br />

11) Compensation<br />

The purpose of this section is to describe those aspects of the construction of <strong>Telecommunications</strong><br />

Infrastructure and the Company’s on-going use of the Easement Area that are to be compensated<br />

to the <strong>Land</strong>owner under the easement.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />

2012_4 Page 8


When considering allowing a cable across the property it is important that negotiations with the<br />

Company have regard to the fact that the land title will be permanently encumbered by an<br />

easement agreement. Even though the fibre will not be visible, the easement may impact on the<br />

market value of the property and therefore should be compensated.<br />

Of significant importance is the extent of the rights the Company is taking over the Easement Area.<br />

These rights are valuable and should be appropriately compensated. The <strong>Land</strong>owner will have<br />

obligations under the easement and these should also be appropriately compensated. The<br />

<strong>Land</strong>owner should also be compensated for the inconvenience caused during the days the cable is<br />

being installed on the Easement Area.<br />

12) General provisions<br />

The purpose of this section is to cover off the lesser aspects of the easement that do not easily fall<br />

under separate sections of their own. Although they may appear minor, many of the aspects<br />

covered off in this section could have significance to the <strong>Land</strong>owner’s on-going use of the <strong>Land</strong>.<br />

The easement should state that the <strong>Telecommunications</strong> Infrastructure and associated equipment<br />

and vehicles will not, for any reason, become the property of the <strong>Land</strong>owner. This is a good thing<br />

as it avoids the <strong>Land</strong>owner assuming responsibility for such things.<br />

The easement may state that if any provision of the easement requires one party to obtain the<br />

other party’s consent, then consent must not be unreasonably withheld or delayed; may be given<br />

subject to reasonable conditions; and that the party giving consent must not require a payment as<br />

a condition of giving consent. This is reasonable given the relationship the <strong>Land</strong>owner and the<br />

Company will have under the easement.<br />

The <strong>Land</strong>owner would do well to understand that it is standard for easements to continue forever<br />

unless surrendered by the company. The easement will likely further state the landowner has no<br />

power to terminate the easement. The perpetual nature of the rights obtained by the Company<br />

under the easement agreement should form part of the case for appropriate compensation.<br />

The easement may state that where there is an outage for reasons of an emergency or under<br />

storm conditions, that both the <strong>Land</strong>owner and the Company will work responsibly to ensure that<br />

telecommunications are restored to those benefit of those affected. This is not intended to see the<br />

<strong>Land</strong>owner having to actively work on the infrastructure, but to instead enable the Company to<br />

access the fault and otherwise assist where reasonable and necessary. This obligation would only<br />

apply where there was a risk to human health or property, or as the result of an adverse event like<br />

a storm, so the circumstances would be severe as would the need for telecommunications to be<br />

reinstated. It would be reasonable for the <strong>Land</strong>owner to argue that this provision does not imply<br />

any liability on the <strong>Land</strong>owner for costs arising from the outage.<br />

There will also be general obligations on the <strong>Land</strong>owner and the Company to comply with all of<br />

their legal requirements. This is reasonable as there are many requirements under law that neither<br />

party can contract out. An example is the duty of care the <strong>Land</strong>owner has towards visitors under<br />

the Health and Safety in Employment Act.<br />

CONTACT<br />

Federated Farmers of New Zealand fact sheets are produced for our members by the Federation as a quick and easy<br />

reference guide to general information on topics of interest. If you wish to reproduce the information please ensure that<br />

you provide appropriate acknowledgement of the Federation as the source.<br />

To either seek further advise on information on the material contained in this fact sheet or to order a contract or<br />

agreement ring 0800 327 646.<br />

The information contained within these fact sheets should not be relied upon in lieu of legal advice. If you require<br />

specialised legal advice, please contact Federated Farmers’ team of employment lawyers and OSH specialists.<br />

Fact Sheet – <strong>Underground</strong> <strong>Telecommunications</strong> <strong>Cables</strong> <strong>Across</strong> <strong>Private</strong> <strong>Land</strong><br />