12.10.2013 Views

UltraVoice Manual - Alerting & Notification

UltraVoice Manual - Alerting & Notification

UltraVoice Manual - Alerting & Notification

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Drill a 3/8" pilot hole at each of<br />

the locations. Drill each hole at<br />

least 3-1/2" (90 mm.) deep.<br />

4. Use a lift to lift the primary control<br />

battery box assembly to the<br />

desired height along the pole.<br />

Attach the primary control battery<br />

box assembly to the wall, using<br />

four (4) user-supplied 1/2" x 5"<br />

lag bolts. Slide a user-supplied<br />

1/2" flat washer onto each bolt<br />

before threading the bolt into the<br />

pole.<br />

5. Attach the primary control box<br />

assembly to the wall, using four<br />

(4) user-supplied 1/2" x 5" lag<br />

bolts. Slide a user-supplied 1/2"<br />

flat washer onto each bolt before<br />

threading the bolt into the pole.<br />

Repeat the process for the<br />

secondary cabinets (UV6048<br />

models only).<br />

Federal Signal <strong>UltraVoice</strong><br />

Installation and Operation <strong>Manual</strong><br />

INSTALLATION<br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!