UltraVoice Manual - Alerting & Notification
UltraVoice Manual - Alerting & Notification
UltraVoice Manual - Alerting & Notification
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
6. Drill a 3/8" pilot hole at each of<br />
the locations. Drill each hole at<br />
least 3-1/2" [90 mm] deep.<br />
7. Use a crane or mechanical hoist<br />
to lift the primary control battery<br />
box assembly to the desired<br />
height along the pole. Attach the<br />
primary control battery box<br />
assembly to the pole, using four<br />
(4) user-supplied 1/2" x 5" lag<br />
bolts. Slide a user-supplied 1/2"<br />
flat washer onto each bolt before<br />
threading the bolt into the pole.<br />
8. Attach the primary control box<br />
assembly to the pole, using four<br />
(4) user-supplied 1/2" x 5" lag<br />
bolts. Slide a user-supplied 1/2"<br />
flat washer onto each bolt before<br />
threading the bolt into the pole.<br />
Repeat the process on the other<br />
side of the pole for the secondary<br />
cabinets (UV6048 models only).<br />
9. Mount a user-supplied fused<br />
disconnect switch on the pole<br />
beneath or beside control unit.<br />
See Electrical Connections Section 5.1.<br />
C. Flat Surface Mount<br />
Federal Signal <strong>UltraVoice</strong><br />
Installation and Operation <strong>Manual</strong><br />
INSTALLATION<br />
33<br />
WARNING<br />
It is recommended that notices be<br />
posted at all roof access points<br />
indicating a roof mounted siren is<br />
installed and a potential of hearing<br />
damage exists.<br />
It may be practical to mount the siren<br />
on a flat-roofed building, depending<br />
on the location of the speaker array.<br />
When installing the siren on a flat<br />
roof, always be sure that the<br />
loudspeakers clear parapets or other<br />
obstructions by at least ten (10) feet.<br />
Total weight of the ULTRAVOICE<br />
control and battery box assembly is<br />
listed in specifications section. Make<br />
sure that the mounting surface and<br />
mounting method selected can safely<br />
sustain the weight of the assembly and<br />
user provided batteries. In addition, the<br />
mounting method used must be able to<br />
withstand external mechanical stresses<br />
that may be applied to the assembly<br />
(such as applicable wind-loads for the<br />
area). Consult building authorities in<br />
your area for recommendations<br />
regarding local ground conditions and<br />
wind-loads.<br />
1. Install the speaker array on the<br />
roof, following the instructions<br />
supplied with the array.<br />
2. Attach the template to the wall<br />
and mark the eight (8) mounting<br />
holes on the pole for the primary<br />
control and battery cabinets.<br />
Repeat the process for the<br />
secondary control and battery<br />
cabinets.