SECTION 7<br />

(ii) On standard sectional weight basis for bars above 10 mm dia. In the latter case, the<br />

measurements should indicate the total number with length of bars in each bundle, total number<br />

of bundles, standard weight running meter weight of each bundle, total weight of all bundles,<br />

etc. The entry should not be a copy from the invoice issued by the firm.<br />

(2) Issue of steel<br />

The issue of steel shall be made in the same manner as for the supply as described in sub-para<br />

(1) above.<br />

(3) Laying of steel<br />

(i) Wherever the structural drawings that are approved by the <strong>Department</strong> for a work contain the<br />

bar bending schedule, the measurements of reinforcement bars laid shall be recorded on the<br />

basis of this schedule after due verification that they have been laid in conformity to the structural<br />

drawings. The bar bending schedule shall show the extra percentages that shall be allowed for<br />

laps and wastages. Detailed measurements of each and every bar shall be dispensed with in<br />

such cases.<br />

(ii) In other cases, the bar bending schedule shall be prepared by the contractor, and checked<br />

and signed by the Engineer – in - charge before the bending of bars is taken up at site.<br />

(4) Test check of steel<br />

Para 7.10.2(3) may be referred to for test check of steel.<br />

7.10 Test checking of Measurements<br />

7.10.1 Test check by the Assistant Engineer<br />

(1) The Assistant Engineer must satisfy himself before passing a bill for payment, or before submitting<br />

it to the Divisional Officer for payment, that the work or supply billed for has actually been carried<br />

out/completed in accordance with the terms and conditions of the contract. He should personally<br />

inspect all works of any magnitude before authorizing final payments in connection therewith.<br />

(2) In addition to the above, he is required to check measure the works in his charge as below:<br />

(i) All items of work in a project irrespective of their cost, shall be measured and recorded by the<br />

Junior Engineer-in-charge of the work. It is, however, open to the Assistant Engineer to record<br />

measurements for any particular item of work himself. In case of absence of Junior Engineer,<br />

the Assistant Engineer may be asked to record measurements .<br />

(ii) The Officer accepting the tender for any work may stipulate and require the Assistant Engineer<br />

to record measurements himself or exercise 100% check on the measurements recorded by<br />

his subordinate for any item including those, which, owing to their situation, cannot subsequently<br />

be checked measured or which have very high unit rates or which in the opinion of the Officer<br />

are important.<br />

Important items for Measurements<br />

Important works, within meaning of the above, include items which owing to the situation cannot be<br />

subsequently checked or which have very high unit rates. For guidance, these items are classified generally<br />

as below :-<br />

Items of work which owing to their situation cannot subsequently be checked.<br />

(i) All work below ground level such as Concrete, Masonry, Steel work etc. in foundation; and<br />

(ii) Fabricated Steel work in columns, beams, etc. which are encased either in masonry or concrete,<br />

reinforcement in RCC/RB work.<br />

(iii) Wood work, Iron work etc. hidden by ceilings, wall panelling or floor boardings.<br />

(iv) Bitumen painting of roofs under mud phuska and tiles paving or under terrace concrete.<br />

(v) Water proofing compounds used in gauging cement.<br />

(vi) Lines of pipes buried in floor or masonry in Internal sanitary, water supply or drainage installations.<br />

(vii) Earthing installation, cable laying etc.<br />

55