24.10.2012 Views

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 6A<br />

PACKAGE<br />

PROJECT<br />

GREEN PARAMETER TABLE 4 – HORTICULTURE<br />

Nomenclature of criterion Maximum Points Remarks<br />

Points earned indicating reasons for<br />

dissatisfaction if points<br />

earned are lesser than<br />

maximum points<br />

Criteria 2: Preserve and protect landscape during construction<br />

/compensatory depository forestation. 2<br />

Criteria 10: Reduce landscape water requirement 3<br />

Total score 5<br />

Criteria 34: Innovation (Beyond 100) 4<br />

Total score 9<br />

To be signed by DoH / SE (C)<br />

PACKAGE<br />

PROJECT<br />

GREEN PARAMETER TABLE 5 – COMPREHENSIVE<br />

49<br />

(To be placed on Completion<br />

Certificate issued by DoH / SE).<br />

Nomenclature of criterion Maximum Points Remarks<br />

Points earned indicating reasons for<br />

dissatisfaction if points<br />

earned are lesser than<br />

maximum points<br />

Criteria 1: Site Selection 1<br />

Criteria 2: Preserve and protect landscape during 5<br />

construction /compensatory depository forestation.<br />

Criteria 3: Soil conservation (post construction) 4<br />

Criteria 4: Design to include existing site features 2<br />

Criteria 5: Reduce hard paving on site 2<br />

Criteria 6: Enhance outdoor lighting system efficiency 3<br />

Criteria 7: Plan utilities efficiently and optimize on site 3<br />

circulation efficiency<br />

Criteria 8: Provide, at least, minimum level of 2<br />

sanitation/safety facilities for construction workers<br />

Criteria 9: Reduce air pollution during construction 2<br />

Criteria 10: Reduce landscape water requirement 3<br />

Criteria 11: Reduce building water use 2<br />

Criteria 12: Efficient water use during construction 1<br />

Criteria 13: Optimize building design to reduce conventional 6<br />

energy demand<br />

Criteria 14: Optimize energy performance of building within 12<br />

specified comfort<br />

Criteria 15: Utilization of flyash in building structure 6<br />

Criteria 16: Reduce volume, weight and time of construction by 4<br />

adopting efficient technology (e.g. pre-cast systems,<br />

ready-mix concrete, etc.)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!