36 SECTION 6<br />

SECTION 6<br />

MISCELLANEOUS<br />

6.1 Expenditure on survey work<br />

Where survey of site and/or digging of trial pits for the work of load bearing capacity and sub-soil<br />

observations are required to be undertaken before proceeding with the main project, the expenditure on<br />

these items should form part of the main project. In case, however, the project is abandoned as a result of<br />

these trials and examinations or some other reason, the expenditure incurred on survey works etc. should<br />

be treated on the same line as for abandoned works. Para 4.1.1 may also be seen.<br />

6.2 Expenditure on exhibitions<br />

Wherever exhibitions are organized or held anywhere with participation of the <strong>Central</strong> P.W.D. in it, the<br />

Director General (<strong>Works</strong>)/Additional Directors General/Chief Engineer are empowered to incur expenditure<br />

upto a limit given in Appendix-1 in each case.<br />

6.3 Expenditure on inauguration<br />

(1) In case of foundation stone laying or opening ceremonies of Government projects/works, the<br />

expenditure should be restricted to items like foundation stone, erection and hire of pandals, lighting<br />

arrangements, light refreshments such as tea, coffee or cold drinks and other incidental items.<br />

The Director General (<strong>Works</strong>)/Additional Directors General/Chief Engineers are delegated powers<br />

to sanction such expenditure upto a limit given in Appendix-1 on each occasion. This expenditure<br />

shall be met from the contingent grant of the Establishments concerned, as the case may be.<br />

(2) In respect of deposit works, such expenditure shall be incurred with the approval of the client.<br />

6.4 Expenditure on architectural models<br />

Wherever required, the Chief Architect/Senior Architect shall arrange for the preparation of architectural<br />

models and their presentation. He shall invite quotations for the same and award the work. The bill(s) for<br />

such work(s) shall be verified and accepted by him, and passed on to the concerned Executive Engineer<br />

for payment.<br />

6.5 Register of Buildings<br />

(1) Every Division should maintain a Register of Buildings upto date. The Executive Engineer should<br />

certify to that effect at the end of every financial year after ensuring that necessary additions in the<br />

cost and in structures are made upto date. This certificate should be furnished by him to the<br />

Superintending Engineer every year in the month of July.<br />

(2) The Superintending Engineer, during his inspection of the Divisional Office, should examine this<br />

register to verify that it is being posted and maintained upto date.<br />

6.6 Safety of buildings/structures<br />

6.6.1 Inspection of buildings/installations for safety<br />

(1) The Junior Engineers are required to inspect all buildings/structures twice a year to ensure that<br />

the building/structure is not unsafe for use, and they shall record a certificate to that effect. All<br />

buildings/structures are also required to be inspected once a year by the Assistant Engineer-incharge<br />

to ensure that the building/structure is not unsafe for use. In case of electrical and other<br />

installations, the Assistant Engineer (Electrical) should inspect the same and record a certificate<br />

to that effect. Non compliance of the laid down procedure may attract serious disciplinary action<br />

against defaulters. (Added vide OM/MAN/203)<br />

(2) In case of any deficiency found in the building/structure, necessary report should be made to<br />

higher authorities, and immediate steps taken to get the same inspected by the Executive Engineer.<br />

Further action should be taken forthwith to remedy the defects.