APPENDIX 4<br />

PROFORMA 3-E OF APPENDIX- 4<br />

CENTRAL PUBLIC WORKS DEPARTMENT<br />

No. Dated, the<br />

The Executive Engineer,<br />

.............................<br />

.............................<br />

Name of Work:<br />

Kindly furnish the following information for the above work of development of the area as early as<br />

possible in order to enable this office to prepare project estimate for the same.<br />

1. Survey plan of the area. The plan should show all local features such as existing structures, Nallahs,<br />

wells, drains, sewers, water mains, electric mains and cables, telegraph and electric poles, brick<br />

kilns, fields, ponds, trees, roads, culverts and bridges etc.<br />

2. Contour plan of the area with spot levels taken at not more than 60m distances. If possible, the<br />

levels should be reduced with reference to GTS Bench Mark. Otherwise, full description of assumed<br />

R.L. of the Bench Mark should be given.<br />

3. Index plan of the area showing places from where earth for filling the area, if necessary, may be<br />

brought, or where the earth obtained from cutting of the area should be disposed off.<br />

4. Crown levels of all the adjoining roads, at suitable intervals.<br />

5. Nature of soil surface as determined by visual inspections.<br />

6. Nature of sub soil strata as determined by trial pits or trial bores at the rate of one pit or bore for<br />

every 20 acres or less. Cross sections of trial pits or bores should be suitably increased.<br />

7. Details of water mains as existing, indicating the distance, diameter, pressure in the water mains.<br />

8. Details of existing sewer mains, if available, indicating distances, invert level, diameter and spare<br />

capacity of the sewer mains.<br />

9. Details of existing storm water drains and culverts, indicating section of drains, slope, spare<br />

capacity, invert level etc. It should also be indicated if the area itself is a part of bigger catchment<br />

area and thus receives storm water from other areas. If so, full details should be given.<br />

10. Cost index of the place with details calculations.<br />

11. Data regarding High Flood Levels, in case area is subject to flooding or is lower than HFL.<br />

369<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.<br />

Copy to:<br />

1. The Executive Engineer (Elect) .............. Division .............. for furnishing the information in connection<br />

with the existing electric mains, their distance from the area, type of power available and adequacy<br />

of electric energy etc.<br />

2. The Superintending Engineer .............. Circle, CPWD .............., for information.<br />

3. The Superintending Engineer .............. Electrical Circle, CPWD .............. , for information<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.