24.10.2012 Views

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

368 APPENDIX 4<br />

PROFORMA 3-D OF APPENDIX - 4<br />

CENTRAL PUBLIC WORKS DEPARTMENT<br />

No. Dated, the<br />

To<br />

The Executive Engineer,<br />

.............................<br />

.............................<br />

Name of Work:<br />

Kindly furnish the following information for the above work of Storm Water Drainage of the area as<br />

early as possible in order to enable this office to prepare project estimate for the same.<br />

1. Give a survey plan of the area for which the Drainage system is to be designed showing the spot<br />

levels at intervals of 60m and proposed layout of roads and buildings. Formation levels of ground<br />

along side of the roads and crown levels of roads may be given at intervals of 60m.<br />

2 (a) If the area forms of part of a bigger catchment, a site and contour plan of the entire catchment<br />

area should be given.<br />

(b) If it is likely that drainage from the upper portion of the catchment enters the area now proposed<br />

to be developed, suggest measures to intercept the drainage or indicate the probable additional<br />

run off to be allowed for.<br />

3. The maximum intensity of the rainfall in the area and its duration and the total annual rainfall.<br />

4. Nature of the soil and vegetation in the area.<br />

5. Full particulars of any natural water course or Nallah passing near the area into which the area<br />

under consideration can be drained, together with the HFL in the storm water drainage. A plan<br />

showing the Nallah and “L” section of the Nallah showing the HFL for about 400 metres above and<br />

below the point where it is proposed to discharge the drainage into the Nallah may also be supplied.<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.<br />

No. Dated, the<br />

Copy forwarded to:<br />

1. The Executive Engineer (Electrical) .............. Division .............. for furnishing the information in<br />

connection with the existing electric mains, their distance from the area, type of power available and<br />

adequacy of electric energy etc.<br />

2. The Superintending Engineer .............. Circle, CPWD, for information.<br />

3. The Superintending Engineer .............. Electrical Circle, CPWD, for information.<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!