364 APPENDIX 4<br />

PROFORMA 3-B OF APPENDIX - 4<br />

CENTRAL PUBLIC WORKS DEPARTMENT<br />

No. Dated, the<br />

The Executive Engineer,<br />

..........................................<br />

Name of Work: ..........................................<br />

Kindly furnish the following information for the above work of Water Supply Scheme as early as<br />

possible in order to enable this office to prepare project estimate for the same.<br />

1 (a) What is the area in acres to be served by the Scheme?<br />

(b) Present population to be catered for<br />

(c) Probable population after 20 years to be catered for<br />

(d) Per capita water supply required by the sponsoring authorities or Municipal bye-laws.<br />

2 (a) Site plan of the area for which water supply is required showing the buildings to be served, with<br />

spot levels at 60m intervals. The plan should show the layout of the buildings, main roads, service<br />

roads etc., and ground formation levels alongside of all roads shall be given at intervals of 60m.<br />

(b) If it is anticipated that any additional areas are to be covered in this scheme at any future date,<br />

these should be marked in the plan and the requirements given.<br />

3. State if there is any existing filtered water supply in the area or in the vicinity. If so, furnish the following<br />

particulars:<br />

(i) A key plan showing the area to be served, and the nearest main from which water is proposed to<br />

be tapped, and the point of tapping.<br />

(ii) State the size of the main, and if it is adequate to cater for the additional supply required for the<br />

project.<br />

(iii) Pressure available in the main at the proposed point of tapping, and the reduced level of the main<br />

at this point.<br />

4. If supply is to be taken direct from the storage reservoir, give the following details:<br />

(i) Site of the reservoir with reference to the site to be developed for water supply and distance from<br />

site.<br />

(ii) Capacity of the reservoir.<br />

(iii) Whether it is capable of meeting the extra demand in the worst summer?<br />

(iv) Reduced level of the reservoir floor and depth of water in reservoir.<br />

(v) Longitudinal sections of the proposed alignment of the main from the reservoir to the site, with<br />

nature of soil and sub soil.<br />

5 (a) If there is no water supply in the area, how do you propose to provide water supply:<br />

(i) From open or tube wells for smaller groups of buildings or colonies.<br />

(ii) From any existing perennial sources of water supply, e.g. river, stream, canal etc. Give the<br />

details of dry weather and monsoon flow, low water level and RFL etc. Give details of weirs,<br />

if any required for heading up water in the stream, arrangements for purification, location of<br />

intake well, filter beds, pumping station etc. Also give an index plan showing the recommended<br />

location of water works.<br />

(b) Indicate the size and depth of open or tube wells, expected supply per hour and approximate cost<br />

of the installations including cost of delivery main upto site.<br />

6. In case storage or service reservoir is required, possible location of reservoir to be indicated on an<br />

index plan along with the ground levels at the site. In case a high level reservoir is to be constructed,<br />

local restriction regarding maximum height due to proximity of air field, if any, may be indicated.