APPENDIX 4<br />

PROFORMA 3-A OF APPENDIX - 4<br />

CENTRAL PUBLIC WORKS DEPARTMENT<br />

No. Dated, the<br />

The Executive Engineer,<br />

………………………………<br />

Name of the work:<br />

Kindly furnish the following information for the above work as early as possible in order to enable this<br />

office to prepare preliminary estimate<br />

(i) Name and nature of soil strata upto 3m to 3.5m where footings are to be founded. If black<br />

cotton or filled up soil is met with, depth of such soil.<br />

(ii) Approximate recommended depth of foundations.<br />

(iii) Approximate recommended bearing capacity of soil.<br />

(iv) Whether any special type of foundations are to be provided.<br />

(v) Sub-soil water level (Maximum and Minimum).<br />

(vi) Any existing building to be dismantled, or telegraph or electric poles or cables or sewers to be<br />

shifted, or thick jungle clearance to be done with rough details. Encroachment by foundations<br />

of the structures abutting our site, if any, may be indicated with sketches.<br />

(vii) Whether site requires extensive levelling, and if so, the cost with approximate details.<br />

(viii) Data regarding High Flood Levels in case area is liable to flooding.<br />

(ix) Details of external services:<br />

(a) Water mains: Whether they are available for our connections, and if so, at what distance,<br />

and of what size. If not, specify what type of well to be constructed (open well, etc. with<br />

size and depth) and the approximate cost of construction. In case of large requirement of<br />

water, whether the local body will give adequate supply should be assured.<br />

(b) Sewer mains: Whether they are available for our connection, and if so, at what distance.<br />

(c) Electric Mains:<br />

(d) Road: Whether any approach road is to be constructed beyond that shown on site plan: if so,<br />

of what length? Give specification locally adopted and the rate per 10 sqm of road surface.<br />

(e) Storm water drain and culverts: general arrangement of drainage:<br />

Any storm water drains required with approximate cost, number of culverts to be<br />

provided with approximate sizes.<br />

(x) Cost index with detailed calculations, leads of materials and reference to Schedule of Rates<br />

applicable.<br />

(xi) Nearest Railway Station and distance of site from the Station.<br />

(xii) Whether any special provisions are required due to special local conditions, e.g. stone work<br />

instead of brick work, etc.<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.<br />

Copy to<br />

1. The Executive Engineer (Elect) ................. Division ................. for intimating the amount required for<br />

external electrical services to be provided for in the preliminary estimate. The amount should be given<br />

separately for connection to electric mains, sub-station equipments, pumping sets for water supply<br />

and their erection, street lighting, etc. (along with prescribed percentages on PAR, etc. as applicable.)<br />

If the provision required for internal electrical services is more than the usual provision of 12.5% of the<br />

building cost, the additional amount (or percentages as required) should be given in a specific manner.<br />

2. The Executive Engineer (Elect) (P),................. Zone, for supplying the above information.<br />

For Superintending Engineer(P)<br />

.............. Zone, CPWD.<br />