24.10.2012 Views

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX 2<br />

roads with a width of ……………. metres, a staggered layout will be adopted. … Also indicate the<br />

arrangements adopted for sectionalizing and isolating portions of the net work for the purposes of<br />

maintenance and repairs”.<br />

*In case of composite lines carrying street light and L.T. distribution lines, the basis of allocation of<br />

cost to street lighting and L.T. distribution lines should be given.<br />

PROFORMA – 8 OF APPENDIX 2<br />

STREET LIGHTING<br />

1. Name of project.<br />

2. (a) Reference to administrative approval and expenditure sanction and their amounts.<br />

(b) Provision to cover the component for which this detailed estimate has been prepared.<br />

Part I - Engineering Appreciation<br />

*3. Brief specification of the system.<br />

4. Average rate per sqm of<br />

(i) detailed estimate,<br />

(ii) preliminary estimate.<br />

5. (a) Agency for execution.<br />

(b) <strong>Department</strong>al charges.<br />

6. Special T&P required.<br />

7. Brief particular of source of power supply<br />

8. Provision of future expansion and its extent.<br />

9. Tariff applicable.<br />

10.Phasing of different portions of the work in consonance with the progress of civil work.<br />

11. Has the location of poles been decided in consultation with Director of Horticulture and the landscape<br />

architect?<br />

12.Special remarks, if any.<br />

*Give a brief description of the system as in the example below:<br />

“……….. Incandescent/High Pressure Mercury Vapour/fluorescent lamps will be provided on ….roads.<br />

The type of fittings shall be enclosed/open/semi-open tubes, and these will be suspended/fixed on<br />

brackets. The system of wiring will be with over-head copper/aluminum conductors of<br />

sizes…..Connections to poles will be given by means of underground cables of …….size and joints<br />

shall be used. For the major roads of widths ………, poles will be located on the central verge with<br />

double arc brackets for the lighting fixtures. For minor roads, poles will be located in a staggered<br />

……. pattern with an average spacing of ……. An average illumination of ……is arrived at on the main<br />

roads. Also indicate scheme of controlling lights, i.e. switching equipment”.<br />

In case of composite lines carrying street light and L.T. distribution lines, the basis of allocation of<br />

costs to street lighting and distribution lines should be given.<br />

Part II – Information Regarding Procurement of Materials<br />

Sl.no Principal items to be Available with central Items to be especially procured for Foreign<br />

supplied by Govt. stores or to be the work. Details of procurement Exchange<br />

for use on the work indented on DGS&D Sources Time required<br />

1 2 3 4 5 6<br />

351

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!