348 APPENDIX 2<br />

8. Earth works : cutting and filling balance, if not, what is the :<br />

(a) Quantity of surplus/deficit earth.<br />

(b) Site and lead for disposal of surplus earth (in case of excess cutting)<br />

(c) Source of obtaining earth required and lead (in case of excess fillings).<br />

(d) Royalty payable, if any.<br />

9. Method and salient features of road crust.<br />

10. (a) Soling<br />

(b) Wearing coat<br />

(c) Surface treatment.<br />

11. (a) Cross section between building lines showing the hard crust edging ( if any), berms provisions for<br />

future widening (if any), storm water drains and their outlets and other services, both to be provided<br />

immediately and in the near future.<br />

(b) Existing services, if any.<br />

12. Details of bridges including class of loading for which they have been designed, culverts and other<br />

structures provided.<br />

13. Details of land acquisition.<br />

14. Phasing of the project.<br />

15. (a) Rate of cost<br />

(i) per unit length of different types of roads.<br />

(ii) per unit of the area developed<br />

(b) (i) Total cost of the work<br />

(ii) Comparison of total cost with respect to provision in preliminary estimate.<br />

Part II - Materials<br />

16. Soling stone<br />

(a) Total quantity.<br />

(b) Name of quarry.<br />

(c) Distance of quarry from site (Does scheduled rate for supply of soling stone indicate this lead? If<br />

not, has provision been made for extra lead?)<br />

(d) Market rate at quarry.<br />

(e) Prevalent carriage charges.<br />

17. Stone ballast<br />

(a) Total quantity<br />

(b) Name of quarry<br />

(c) Distance of quarry from site (Does schedule rate for supply of stone ballast indicate this lead?)<br />

(d) Market rate at quarry.<br />

(e) Prevalent carriage charges.<br />

18. Bitumen<br />

(a) Total quantity.<br />

(b) Arrangements for procurement.<br />

19. Cement<br />

(a) Total quantity.<br />

(b) Arrangements for procurement.<br />

20. Steel<br />

(a) Total quantity.<br />

(b) Arrangements for procurement.<br />

21. Pipes<br />

(a) Total quantity.<br />

(b) Arrangements for procurement.