APPENDIX 2<br />

(d) Do the invert levels permit connection to existing duct by gravity? If not, has provision been made<br />

for pumping the sewerage?<br />

(e) If pumping is necessary :<br />

(1) Has provision been made for sumps, pumps, pump house and rising mains?<br />

(2) Is electricity available?<br />

(3) Is arrangement for prime mover in an emergency breakdown required?<br />

(f) Details of sumps with regard to capacity, diameter.<br />

(g) (1) Details of pumps with regard to capacity, horse power, type of pumps (vertical or horizontal)<br />

etc.<br />

(2) Efficiency factor assumed in the design of pumps.<br />

(h) Details of pump house, rising mains, etc.<br />

(i) In case connection to existing duct has not been provided :<br />

(1) Has provision for septic tank, treatment plant, etc. been made ?<br />

(2) Have soak pits or dispersion trenches been provided?<br />

(3) What is the type of soil?<br />

(j) Maximum and minimum depths below ground level of the ground water table.<br />

(k) Arrangements for disposal of treated effluents.<br />

(l) If sewers are to be laid in filling or across nallahs, have supports to firm ground been provided?<br />

(m) Have sewers and water mains been planned on opposite sides of the road?<br />

(n) Where sewers cross nallah, arrel etc. has the design been appropriately made?<br />

(o) In case of stage development schemes or where delay in the procurement of equipment is<br />

anticipated, have temporary arrangements been made for disposal work?<br />

9 (a) Has provision been made for concreting upto haunches or all round?<br />

(b) If so, on what basis?<br />

10. Is provision of excavation under sub-soil was necessary?<br />

11. Has provision been made for laying concrete and sewers under sub-soil water?<br />

12. Is cutting through rock involved?<br />

13. Has provision been made for crossing roads and nallahs?<br />

Part II - Materials<br />

14. Requirements of different types/sizes of pipes and specials.<br />

15. Requirements of different types of manhole covers.<br />

16. Have requirements of pumps been determined in consultation with the Electrical Engineer?<br />

17. Requirements of any other materials/tools and plants.<br />

PROFORMA – 5 OF APPENDIX 2<br />

CITY ROADS<br />

1. Name of project.<br />

2. (a) Reference to administrative approval and expenditure sanction and their amounts.<br />

(b) Provision to cover the portion of work for which detailed estimate has been prepared.<br />

3. Amount of detailed estimate.<br />

Part I - Engineering Appreciation<br />

4. Reference to approval of the layout and alignment by competent authority.<br />

5. Justification for the choice of the alignment indicating inter-alia obligatory points.<br />

6. (a) Standards to be followed for :<br />

(i) Cross-section of the road (indicating number of lanes)<br />

(ii) Class of road<br />

(b) Have suitable road junctions and crossings been designed and provisions made in the estimate?<br />

(c) Has provision been made for road signs?<br />

7. Nature of sub-grade and sub-grade preparation suggested.<br />

347