346 APPENDIX 2<br />

Part II - Materials<br />

21. Requirement of different sizes/types of pipes and specials and method of procurement.<br />

22. Requirement of pig lead<br />

23. Have requirements of pumps and accessories been determined, in consultation with the Electrical<br />

Engineer? Give details.<br />

24. Requirement of any other materials/tools and plants.<br />

PROFORMA – 4 OF APPENDIX 2<br />

SEWERAGE<br />

1. Name of Project<br />

2 (a) Reference to administrative approval and expenditure sanction and their amounts.<br />

(b) Provision for sewerage<br />

(c) Provision for ancillary works such as pumps, sumps, pump houses connection to existing ducts,<br />

septic tanks, etc.<br />

3. (a) Amount of detailed estimate<br />

(b) Rate per sqm as per the detailed estimate and how it compares with provision in administrative<br />

approval.<br />

Part 1 - Engineering Appreciation<br />

4. Area covered (Give details of areas covered, if any, which have not been provided for in A/A: future<br />

extensions, etc.)<br />

5. (a) Population.<br />

(b) Basis of assessment.<br />

(c) Future increase.<br />

6. Sewers<br />

(a) Shape of sewer<br />

(b) Minimum size used<br />

(c) Slopes adopted<br />

(d) Self cleansing velocity assumed and at what depth of flow.<br />

(e) If self-cleansing velocity not possible, have flushing arrangements been made?<br />

(f) Minimum velocity attained in the design<br />

(g) Is designed discharge three times the average discharge<br />

(h) Brief description of the system of sewerage<br />

(i) Design formula and the coefficient of rugosity adopted.<br />

7. Manholes:<br />

(a) Minimum depth of starting manholes.<br />

(b) Types of manholes (rectangular, circular, arch type).<br />

(c) Types of manhole covers used (whether heavy, medium, light) and principles governing their use.<br />

(d) Has location of manhole been fixed on the consideration that:<br />

(i) Each manhole should serve maximum number of plots.<br />

(ii) Manholes provided at bends-change in diameter and gradients.<br />

(e) Maximum distance between two manholes.<br />

(f) Distance of vent shafts; has provision of these been made in the estimates?<br />

(g) Has provision been made for drop connections?<br />

(h) What is the maximum velocity in the sewer? (upto 2.44 metres per second avoids erosion of<br />

invert).<br />

8. Disposal<br />

(a) Arrangement for disposal of sewerage.<br />

(b) Has permission of local body been sought if discharge is led into an existing sewer direct?<br />

(c) Distance of the existing duct from the last manhole in the area.