342 APPENDIX 1<br />

41 Contengencies and its utilization<br />

(Refer para 4.1.5(3)) When Other works<br />

(Added vide OM/MAN/231) sanctioned cost<br />

of the work is<br />

within his power<br />

to accord TS<br />

EE Full powers to 5 lac<br />

utilize available<br />

contingencies<br />

SE/ DOH Full powers to 15 lac<br />

utilize available<br />

contingencies<br />

SE Promoted Full powers to 7.5 lac<br />

on in situ basis utilize available<br />

contingencies<br />

CE Full powers to<br />

utilize available<br />

contingencies<br />

Authority under which the competency of the work falls should be kept inform about utilization of<br />

contingencies for every utilization indicating utilized and available amount<br />

42 Invitation of tenders for components<br />

parts (Refer para 15.3(2))<br />

(Added vide OM/MAN/231) EE Up to 10% of<br />

TS power<br />

SE Up to 10% of<br />

TS power<br />

SE promoted Up to 10% of<br />

on in situ basis TS power<br />

CE Full powers