308 SECTION 53<br />

8.2 Items not conforming to specifications:<br />

(a) Whether notice was issued as specified in contract?<br />

(b) Whether approval in principle was obtained from competent authority before acceptance of substandard<br />

work?<br />

8.3 Extra/substituted items:<br />

(a) Are justification of items proper?<br />

(b) Sanction of competent authority:<br />

8.4 Part Rates - whether rates held back are adequate?<br />

8.5 Comments on secured advance paid with reference to materials lying at site.<br />

8.6 Test Check by AE/EE<br />

(a) Critical item:<br />

(b) Hidden items:<br />

(c) Extent (whether satisfactory?)<br />

8.7 Any other observation?<br />

[The observation made about quality of material and workmanship relate to only what could be randomly<br />

seen at locations specified. Executive Engineer and supervisory staff shall thoroughly inspect the entire<br />

work for such defects as observed as well as for other defects and take suitable remedial measures<br />

properly. The Executive Engineer shall be responsible for accepting any defective work that went unnoticed<br />

but pointed out during such inspection.]