SECTION 53<br />

53.13 Calendar of returns<br />

(1) To enable the functioning of Core Wing as well as the Quality Assurance teams at the Circle level,<br />

the information as detailed below is to be furnished by the Divisions and the Circles:<br />

(a) To be submitted by the Divisions to the Circle office<br />

(i) Quarterly statement of works in progress in respect of all works under the tender acceptance<br />

power of Chief Engineer and above level officers, as on 31st March, 30th June, 30th<br />

September, and 31st December every year as per proforma at Annexure VI.<br />

(ii) Quarterly statement of works under the tender acceptance power of Superintending<br />

Engineer as per proforma at Annexure VI.<br />

(b) To be submitted by Circle Office to the Core Wing/Regional QA Unit Quarterly statement<br />

showing the progress of original works under the tender acceptance power of Chief Engineer<br />

and above level officers, as on 31st March, 30th June, 30th September and 31st December,<br />

every year as per proforma at Annexure VI.<br />

53.14 Issue of Inspection Reports by Core Wing/Regional TLCQA units and follow-up action<br />

(1) During the inspection, the QA unit will prepare the necessary observations based on the proforma<br />

as Annexure VlI.<br />

(2) The emphasis of QA inspection should be more on enforcing the required quality of work rather<br />

than on fault finding. The QA cell should also consider itself to be a part of the team with the field<br />

units to achieve the quality, and at the same time retain its independent status to ensure the<br />

required quality standards in the work. The QA inspections should, therefore, focus on ways and<br />

means to give the desired results in terms of quality of work. The report shall be prepared carefully,<br />

avoiding tendency to report shortcomings of minor/ routine nature possibly covered by the QA unit<br />

of the Circle Office. Defects/deficiency in the Quality Assurance system at the field unit level,<br />

lapses in the implementation of the Quality Assurance Plan should be indicated for corrective<br />

action. The inspection report should consequently be broadly in two parts-the first, being corrective<br />

in nature, and the second, mandatory.<br />

(i) The first part should be on the shortcomings that are noticed, with necessary directions, and<br />

where necessary with necessary ways/methods, to rectify them. The field units should<br />

immediately act upon them, and report compliance to the QA cell.<br />

(ii) The sec6nd part should cover serious shortcomings that affect the structural safety or life of<br />

the structure or installation. These may be due to oversight, carelessness, inadvertent<br />

miscalculation, or deliberate action of a functionary or functionaries in the field formation. Such<br />

observations shall require immediate remedial measures that could include rejection of the<br />

item of work or supply and re-doing the same, or reduction in payment, or in additional safety/<br />

corrective measures. The inspection report should indicate the action to be taken by the field<br />

units. Where such shortcomings are due to, or are suspected to be due to deliberate and/or<br />

malafide motives, the QA cell shall refer the case to the Chief Engineer for action to be taken<br />

against the erring officer(s) and/or official(s).<br />

(iii) While mentioning the shortcomings noticed under 2(i) and 2(ii) above, corrective steps/<br />

methodology to be taken up against each observation is to be indicated in the inspection<br />

report. EE/SE/CE may give their opinion on such corrective steps as suggested which<br />

should be considered by QA unit and final decision to be conveyed to field units with<br />

minimum delay. (Added vide OM /MAN/233)<br />

(3) After finalization of the report, the Executive Engineer (QA) shall sign and send the report to the<br />

concerned Executive Engineer, simultaneously enclosing copies to the concerned Chief Engineer<br />

and the Superintending Engineer. A copy of the report will also be endorsed to the Additional<br />

Director General of Region by the Regional TLCQA unit, and to the Chief Engineer (CSQ) by the<br />

Core Wing.<br />

(4) Any point considered serious enough to be brought to the specific notice of the concerned<br />

Superintending Engineer/Chief Engineer will be intimated by the Superintending Engineer (QA) of<br />

the Region/Chief Engineer (CSQ) through a separate letter by name in addition to the normal report.<br />