SECTION 47 47<br />

47.3.2. Other Heads<br />

(1) Apart from the above heads, the <strong>Central</strong> PWD also deals with the budget of various other Ministries<br />

for which there are different Major heads/Minor heads. In such cases, the Budget Estimates and<br />

Revised Budget Estimates, etc. should be sent to the respective Ministries by the Ministry of<br />

Urban Development to whom CPWD sends BE & RE of all heads. The estimated expenditure for<br />

these kinds of works is shown separately under each such head of accounts as indicated by the<br />

concerned Ministry in the expenditure sanction accorded for the work.<br />

(2) Expenditure on works of special requirements like airconditioning, special electrical fittings, strong<br />

rooms, swimming pools, special horticulture works, firing range, open-air theatre, etc. that are<br />

required by the client Ministries/<strong>Department</strong>s, would have to be borne by them out of their own<br />

grants, and not from the funds provided in the grants of the Ministry of Urban Development. The<br />

account of the Ministry of Urban Development should only cover expenditure on normal construction<br />

along with electrical requirements.<br />

(3) Expenditure on account of departmental charges, wherever leviable in respect of other <strong>Department</strong>s,<br />

is to be treated as ‘Voted’.<br />

47.4 Preparation of Budget for CPWD<br />

(1) Budget Estimates (including Revised Estimates) for works etc. should be prepared in the forms<br />

prescribed by the Ministry of Urban Development. For non-plan expenditure, the Estimates should be<br />

submitted before 31st October. For plan expenditure, Annual Plan allocations by the Planning<br />

Commission and their communication to Ministries/<strong>Department</strong>s concerned determine the time schedule.<br />

(2) Proposals for Revised Estimates for current year and Budget estimates for ensuing year in respect<br />

of Revenue Section (<strong>Works</strong>) in Demand for <strong>Public</strong> <strong>Works</strong> and Demand for Housing and Urban<br />

Development may be prepared in the following manner:<br />

[All expenditure estimates will be entered on a Gross basis, and recoveries in reduction of expenditure<br />

exhibited thereunder.]<br />

47.4.1 Heads of Account<br />

The demands for Revenue items will be shown under major Head “2059-<strong>Public</strong> <strong>Works</strong>” in Demand for<br />

<strong>Public</strong> <strong>Works</strong> and Major Head “2216 Housing” in Demand for Housing and Urban Development. While all<br />

non-residential works will be shown under Major Head “2059 <strong>Public</strong> <strong>Works</strong>”, all residential works will be<br />

shown under Major Head “2216 Housing”. The sub-heads/units of appropriation under these Major Heads<br />

will be as exhibited in the Book of Demands for the current year.<br />

47.4.2 Direction and Administration and Construction<br />

Proposals for “Direction and Administration”, “Construction”, “<strong>Public</strong> <strong>Works</strong> <strong>Works</strong>hop”, “Machinery<br />

and Equipment”, etc. under Major Head “2059” may be prepared after taking into account the work load,<br />

yardstick laid down and the actual “Machinery and Equipment” required. For “Major <strong>Works</strong>” and “Minor<br />

<strong>Works</strong>”, the Schedules showing items for individual works are to be enclosed.<br />

47.4.3 Maintenance and Repairs<br />

The following instructions may be followed for submission of proposals for provisions for “Maintenance<br />

and Repairs”:<br />

(a) The <strong>Central</strong> <strong>Public</strong> <strong>Works</strong> <strong>Department</strong> have laid down scales of expenditure for maintenance and<br />

repairs of buildings. The “Plinth area” of the building and the expenditure that is required to be<br />

incurred as per the scale may be indicated in a separate Schedule (Schedule I).<br />

(b) The amount required to be paid as “Salary” and “Allowances” to the departmental staff engaged for<br />

repairs and maintenance may be shown separately (Schedule-II).<br />

(c) Cost of materials required for maintenance and repairs should be shown separately (Schedule-III).<br />

(d) The amount required for special repairs to specified buildings, may also be shown separately<br />

(Schedule IV).<br />

263