24.10.2012 Views

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 25<br />

25.2 Maintenance of Inspection Register<br />

(1) An Inspection Register is required to be maintained at every site of work, duly issued by Executive<br />

Engineer and docketed from the Division Office.<br />

(2) The proforma for the Inspection Register shall be as per Annexure.<br />

(3) Entries regarding site visit of senior officers<br />

(i) Whenever he visits the site, the Superintending Engineer shall record the date and time of his<br />

visit, items inspected and his observations. Entry of visit should be made even if no defects<br />

are observed.<br />

(ii) Similarly, the Chief Engineer shall record his observations in the Inspection Register, at least<br />

in 50% of his visits, and in other visits he shall at least sign the Inspection Register in token of<br />

his visit to the work.<br />

(iii) If for some reason, the Chief Engineer is not in a position to do so, he may direct the Executive<br />

Engineer to record his observations in the Inspection Register and send a copy of those<br />

observations to the Chief Engineer by way of confirmation.<br />

(4) Alternatively, the Chief Engineer/Superintending Engineer may issue inspection notes, copies of<br />

which shall be pasted in the Inspection Register.<br />

(5) It will be the responsibility of the Executive Engineer to ensure that the observations of the inspecting<br />

officers for each and every visit are available in the Inspection Register, either through recorded<br />

notes or through pasting of the inspection notes.<br />

(6) Carrying over senior officers’ observations to the Site Order Book<br />

The Executive Engineer/Assistant Engineer shall carry over such observation and defects on<br />

which action is to be taken by contractor to the Site Order Book with appropriate cross references<br />

in the Inspection Register.<br />

(7) Review of observations for compliance<br />

It is also necessary that the observations recorded in the Inspection Register by the Chief Engineer/<br />

Superintending Engineer be reviewed during their subsequent inspections to ensure their<br />

compliance.<br />

(8) These are also required to be reviewed during Quality Assurance Inspection.<br />

171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!