SECTION 23<br />

(ii) However, the Sub-Divisional Officers, instead of Divisional Officers, can sign the agreements<br />

for works costing within their powers “for and on behalf of the President of India” after the<br />

tenders have been accepted by the competent authority. In case the tendered amount of a<br />

tender, which was initially within Sub-Divisional Officer’s power of acceptance, goes beyond<br />

his power and is accepted by the Executive Engineer, the contract will be signed by the Sub-<br />

Divisional Officer after such acceptance by the Executive Engineer.<br />

(2) Avoidance of delay<br />

There should be no delay in executing the agreement as soon as a tender has been accepted by<br />

the competent authority.<br />

(3) Corrections in the tender papers<br />

(i) The Divisional Officers/Sub-Divisional Officers should see that conditions not existing in the<br />

approved tenders are not in any case allowed to be embodied in the agreements.<br />

(ii) Before signing an agreement it must be ensured that no conditions are inserted which were<br />

inadvertently omitted in the tender papers, though included in the NIT. Similarly, no errors,<br />

which might have inadvertently crept in the NIT should be corrected.<br />

(4) Recording of date of acceptance of tender in the agreement<br />

The date of acceptance of tender as shown in the letters of acceptance of tender and award of<br />

work issued to the contractor, which form part of the agreement, should be indicated in the space<br />

at the bottom portion of Page 2 of agreement Form CPWD 7, 8 etc. as the case may be.<br />

(5) Record of agreements<br />

A record of the agreements drawn up should be kept in Form CPWD 42.<br />

23.3 Supply of copies of contracts to contractors<br />

(1) Two sets of contract documents should be prepared and signed by both the parties on each page.<br />

One of the sets should be stamped “Original” and the other “Duplicate”. The duplicate copy should<br />

be supplied to the contractor free of cost<br />

(2) For any additional copies required by the contractor the following prices be charged for each copy:<br />

(i) <strong>Works</strong> costing upto Rs. 1 lakh. Rs. 150/-<br />

(ii) <strong>Works</strong> costing between Rs. 1 lakh and Rs. 50 lakhs. Rs. 500/-<br />

(iii) <strong>Works</strong> costing more than Rs. 50 lakhs and upto Rs. 2 crores. Rs. 1000/-<br />

(iv) <strong>Works</strong> costing above Rs. 2 crores. Rs. 1500/-<br />

(3) The additional copies should not be marked as “Triplicate”, but should be certified as True copy.<br />

23.4 Certification and safe custody of agreements<br />

(1) Correctness of agreements<br />

The agreements should be properly checked and compared in the office of the Executive Engineer/<br />

Assistant Engineer with the Notice Inviting Tenders as approved by the competent authority. The<br />

Divisional Accountant will be held personally responsible for any mistake that is found subsequently<br />

after the agreement has been formally signed in respect of agreements signed by the Executive<br />

Engineer. Also, he should ensure that before copies of the accepted agreements are forwarded to<br />

the authorities concerned, they are complete in all respects.<br />

(2) Custody of agreements<br />

(i) The original contract documents should be kept in the personal custody of the Engineer-in-<br />

Charge and should be given to the Divisional Accountant whenever required by him after<br />

obtaining acknowledgement.<br />

(3) Supply of certified copies of the agreement<br />

(i) Certified copies of the agreements for which tenders are accepted by an authority higher than<br />

the Divisional Officer should be furnished to that authority, by the Engineer-in-Charge. The<br />

authority which accepted the tender, on receipt of the copy of agreement from the Divisional<br />

Officer, will ensure that the agreement is in accordance with the accepted tender and if mistakes<br />

are found, communicate the same to the Divisional Officer.<br />