24.10.2012 Views

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

CONTENTS - Central Public Works Department

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 20A<br />

16. Contractor must ensure to quote rate of each item. The column meant for quoting rate in figures<br />

appears in pink colour and the moment rate is entered, it turns sky blue.<br />

In addition to this, while selecting any of the cells a warning appears that if any cell is left blank the<br />

same shall be treated as "0".<br />

Therefore, if any cell is left blank and no rate is quoted by the bidder, rate of such item shall be<br />

treated as "0" (ZERO).<br />

17. SC/ST contractors enlisted under class V category are exempted from processing fee<br />

payable to ITI.<br />

18. The Draft information and instructions to Contractors may be modified suitably by NIT approving<br />

authority as per requirement.<br />

137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!