134 SECTION 20A<br />

In case of planned leave of longer duration, another EE/ AE to whom the charge is given may<br />

apply to ITI Ltd. through e-mail and hard copy for his authorization by submitting details of digital<br />

signature and ID etc.<br />

4. Opening of hard copies of the documents by the intending bidders<br />

The contractor can submit documents in a sealed bid box after last date and time of submission of<br />

bid but up to 3.30 PM on ............... (The date as specified in the bid document) and shall be<br />

opened on same day at 4.00 PM in presence of AAO, AE(P) and contractors present.<br />

After opening of the envelope, each sheet submitted by the contractor should be marked with<br />

page number along with total number of pages received such as 2/13 etc. and shall be signed by<br />

Bid Opening Authority.<br />

5. Bids withdrawn before opening not to be considered:<br />

If the bid is withdrawn before due date & time of opening, the same should not be included in the<br />

Comparative Statement. To ensure that such bids are not included even by mistake, a change<br />

has been made in the e-portal of ITI that in case of bidder withdraws his bid, in addition to display<br />

of "withdrawn the bid at dd:mm:yyyy" the option of acceptance of his EMD is also disabled.<br />

This ensures that such bids are not included in the Comparative Statement.<br />

6. Bid opening authority should download schedule of quantities of each bidder duly filled by them<br />

and Comparative Statement. He shall put a seal "downloaded by me on ................" and page<br />

number/ total number of sheets on each sheet downloaded and should sign on each sheet.<br />

7. Bid opening authority should download the full bid document of lowest bidder. He shall put a seal<br />

on each sheet "downloaded by me on ................" and should sign on each sheet.<br />

8. If the time of opening of bid is changed, the bidders may be informed accordingly after opening of<br />

bids. It does not require issue of corrigendum.<br />

20A.9 Preparation/ checking of Comparative Statement<br />

1. The Comparative Statement is generated automatically. The detailed arrangement for proper check<br />

of bids and Comparative Statement are left to the Bid Accepting Authority.<br />

The checking of Comparative Statement is to be carried out under the control of Financial<br />

Officer in the Chief Engineer's office, SE(P) in case F.O. is not available, Executive Engineer<br />

(P)/ AE(P) in SE's Office, Divisional Accountant in Division Office and Sub Divisional Clerk<br />

in the Sub Divisional office. The duties and responsibilities of the Divisional Accountant<br />

mentioned in Para 20A.10 shall be deemed to the duties of the above mentioned officers<br />

under whose control the scrutiny of bids is being done. The officials handling the bid should<br />

work on it in the Branch only, and the bids should not be taken outside the Branch in any<br />

case. The bids and related papers must be kept under lock & key by the officials before<br />

leaving the office.<br />

2. That the officials date and initial all papers the calculations of which they have checked and that all<br />

working sheets are preserved.<br />

3. The Comparative Statement and rates quoted by each bidder are to be downloaded. The Divisional<br />

Accountant or the concerned officer mentioned under Para (1) above shall make satisfactory and<br />

efficient arrangement for checking the Comparative Statement. He should also conduct personally<br />

a test check on Comparative Statement and satisfy himself reasonably that checking work has<br />

been properly done. He should also see that Comparative Statement correctly incorporates the<br />

rate of each item and total as checked in individual bid.