88 SECTION 15<br />

form part of tender documents. For maintaining uniformity in works carried out by the department,<br />

following deviation limits shall be stipulated by the authorities approving the NIT’s for operation of<br />

Clause 12 of the Form unless there are specific reasons to adopt different deviation limits for a<br />

particular work:<br />

(i) For original works<br />

(a) Superstructure…………………………………………………………………………..30%<br />

(b) Foundation…………………………………………………………………………..…..100%<br />

(ii) For original works of time bound, urgent and emergency nature<br />

(a) Superstructure…………………………………………………………………………..50%<br />

(b) Foundation……………………………………………………………………………....100%<br />

(iii) All maintenance works………………………………………………………………...........50%<br />

(7) The agreement Forms CPWD 7 and 8 contain general conditions of contract for works in CPWD<br />

and shall be applicable both for item rate as well as percentage rate tenders.<br />

(8) For work not covering under the purview of composite tendering, tenders for electrical, and building<br />

works (including sanitary and water supply works) must be invited concurrently, or at an appropriate<br />

stage when they are required to be commenced. Where it is not possible to do so due to some<br />

reasons, the fact should be intimated to the Superintending Engineer and Chief Engineer concerned<br />

explaining the reasons for delay.<br />

15.2 Tender for normal works<br />

15.2.1 Tenders for works costing up to Rs. 15 crores *<br />

(1) The tender documents for works costing up to Rs. 15 crores* shall be inivited only from the<br />

contractors registered in the CPWD in the appropriate category and class. (Modified as per OM/<br />

MAN/160)<br />

(2) However, the Additional Director General of the Region may relax this provision for works costing<br />

up to Rs. 15 crores* for specific Division(s)/Circle(s)/ Zone(s) in his Region for a specific period<br />

that he may consider it necessary, and may allow sale of tenders for such works to contractors<br />

registered with the Railways/MES/BSNL, State PWD’s (B&R) or the departments of state<br />

government dealing with (B&R) in appropriate classes (for CPWD works within that state). Non<br />

CPWD registered contractors shall have to fulfill the criteria of satisfactory execution of works as<br />

given below. (Modified as per OM/MAN/160 & 190)<br />

(i) Three similar works, each of value not less than 40% of the estimated cost put to tender, or<br />

(ii) Two similar works, each of value not less than 50% (Modified as per OM/CON/245) of the<br />

estimated cost, or<br />

(iii) One similar work of value not less than 80% of the estimated cost, all amounts rounded off to<br />

a convenient full figure, in the last 7 years ending on the last day of the month previous to the<br />

one in which the tenders are invited.<br />

(3) “Similar work” shall be properly defined and appropriately indicated in the tender documents by the<br />

NIT approving authority.<br />

(4) For work costing above Rs. 3 crore but up to Rs. 15 crore, when tenders are also inivited from non<br />

CPWD contractors with approval of ADG, tender shall also be open to class II contractors of<br />

CPWD provided they have successfully executed 3 similar works each of value not less than<br />

40% of estimated cost or two similar work each of value not less than 50% of estimated cost or<br />

one work of value not less than 80% of estimated cost (rounded to nearest Rs. 10 lac) in last 7<br />

years ending last day of the month previous to the one in which tenders are invited.<br />

(Added as per OM/MAN/190)<br />

(*The figure of Rs. 3 Crore and Rs. 15 Crores is for Civil/Composite works. For other categories<br />

i.e. electrical, horticulture, funiture it shall be the tendering limit of Class-II and Class-I contractors<br />

respectively of each discipline.) (Modified as per OM/MAN/160)