84 SECTION 13<br />

(4) The rates of deviated items shall be determined on the lines of clause 12.2 of Conditions of<br />

Contract for percentage/item rate contracts.<br />

(5) The Junior Engineer and Assistant Engineer shall satisfy themselves that the work has been done<br />

in each stage in conformity to the drawings and specifications contained in the tender documents,<br />

and certify the same before recommending to the Divisional Office for the release of the stage<br />

payment. The Executive Engineer shall conduct test checks to the prescribed levels as under<br />

para 7.10.2.<br />

13.2.10 CPWD Form 47 - Tender for demolition of buildings<br />

This form of tender is adopted for demolition of buildings and removal of debris from the site.<br />

13.2.11 World Bank documents<br />

(1) The Standard Bidding Documents finalised by World Bank are used for works aided by it. Only<br />

work specific changes, acceptable to the Bank, may be made in the conditions of contract. Such<br />

changes may be incorporated through additional conditions or contract-data-sheets and not by<br />

introducing changes in the standard wordings of the Standard Bidding Documents of the World<br />

Bank.<br />

(2) The two authorities for administering the contract for World Bank project, viz. the “Employer” and<br />

the “Engineer” should be substituted with “The <strong>Central</strong> <strong>Public</strong> <strong>Works</strong> <strong>Department</strong> represented by<br />

Chief Engineer/Superintending Engineer” and “The Executive Engineer represented by the Assistant<br />

Engineer/Junior Engineer” respectively in the Additional Conditions of Contract, and should be got<br />

approved by the World Bank representative. It should be mentioned that it shall be open for the<br />

Executive Engineer to invite a third party to inspect the work and advise him on the quality,<br />

workmanship etc. of the work.