Group 1
Group 1
Group 1
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.6 Sub problem Relationships:<br />
The sub problem relationship of the component Automatic Cruise control System is<br />
the same as problem diagram relationship in Phase 3.<br />
5.7 Validation:<br />
- All machine interfaces of the problem diagrams are captured.<br />
- The signals in the sequence diagrams are the same as in the external interfaces.<br />
- To each programmable component at least one problem diagram is associated.<br />
- All problem diagrams are associated to the ACC.<br />
- All domains in the problem diagrams being part of the machine are associated to<br />
a component.<br />
- Only one machine domain in the context diagram exists. Its structure is given by<br />
the architecture.<br />
- The purpose of each component is consistent to the associated requirements.<br />
Page 19