400kV power line evaluation – contd.<br />

Alternative 4:<br />

• This route passes through several relatively open areas in the southern parts, although mostly mined.<br />

This area will not be particularly attractive to most bird species.<br />

• During this section it also passes several dams and evaporation ponds. These could attract some bird<br />

species at times although it is unlikely to represent important habitat due to the steep sides of the<br />

dams and other factors.<br />

• In the northern section it is exactly the same as Alternative 1.<br />

Alternative 5:<br />

• This route differs only very slightly from Alternative 2 above.<br />

• In the mid section it runs further east, which does not have a material effect in terms of avifauna.<br />

Preference scores<br />

Alt 1 8<br />

Alt 2 4<br />

Alt 3 2<br />

Alt 4 6<br />

Alt 5 4<br />

It is also strongly recommended that both new lines are constructed on the same corridor. This<br />

consolidates impacts, which is strongly advised in terms of avifauna.