132kV power line evaluation:<br />

.<br />

Since the corridors are reasonably close to each other, comparison based on<br />

subjective observations:<br />

Alternative 1: - passes through an area without existing linear infrastructure,<br />

although close to a mining area.<br />

Alternative 2: - adjacent to an existing road, which is an advantage as the road is<br />

an existing source of disturbance in the landscape.<br />

Alternative 3: - adjacent to an existing 132kV power line for its entire length. This is<br />

an advantage as this corridor is already disturbed, and placing a new line adjacent<br />

to an existing line partially mitigates for the impact of collision of birds, since the<br />

more lines that are placed together, the more visible they become.<br />

Preference Rating (1 is no go, 10 is highly preferred)<br />

Alt 1 8<br />

Alt 2 8<br />

Alt 3 9<br />

It is also strongly recommended that both new lines are constructed<br />

on the same corridor. This consolidates impacts, which is strongly<br />

advised in terms of avifauna.