Part 3 - Metro Gold Line Foothill Extension
Part 3 - Metro Gold Line Foothill Extension
Part 3 - Metro Gold Line Foothill Extension
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Noise and Vibration Technical Report: <strong>Metro</strong> <strong>Gold</strong> <strong>Line</strong> <strong>Foothill</strong> <strong>Extension</strong>, Azusa to Montclair<br />
July 2012<br />
Page 89<br />
vibration related complaints and take appropriate action to minimize the intrusion. Appropriate vibration<br />
mitigation measures include:<br />
• Minimizing the use of tracked vehicles,<br />
• Avoiding vibratory compaction, and<br />
• Vibration monitoring near residences to ensure thresholds are not exceeded.