02.10.2013 Views

Manual ISR (PDF) The target link is not accessible to ... - PostFinance

Manual ISR (PDF) The target link is not accessible to ... - PostFinance

Manual ISR (PDF) The target link is not accessible to ... - PostFinance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Sundry<br />

5.1 Processing cycle<br />

5.1.1 Working days<br />

Normally, Post workdays are weekdays Monday through Friday.<br />

Exceptions are standard and regional holidays (Berne). If the periodicity of<br />

delivery falls on a holiday, delivery will be made on the next Post workday.<br />

5.1.2 Cycle overview<br />

Post branch<br />

–<br />

5.2 Rejects<br />

Debit + Credit Processing<br />

<strong>ISR</strong> <strong>not</strong> in compliance with <strong>PostFinance</strong> guidelines may cause problems<br />

during processing at the computing centres. <strong>The</strong>se slips can<strong>not</strong> be au<strong>to</strong>matically<br />

processed and additional processing needs <strong>to</strong> be carried out<br />

manually. <strong>PostFinance</strong> recommends the free test run (see Chapter 4) <strong>to</strong><br />

avoid rejects.<br />

Day –1 Day 0 Day +1 Day +2<br />

<strong>The</strong> main reasons for rejected slips are:<br />

• <strong>ISR</strong> whose code line <strong>is</strong> <strong>not</strong> entirely recogn<strong>is</strong>able by the equipment<br />

(e.g. illegible characters)<br />

• <strong>ISR</strong> requiring manual processing (e.g. incorrect check digits, incorrect code<br />

line format, positioning)<br />

• inpayments whose original slips can no longer be au<strong>to</strong>matically processed<br />

(e.g. creased or dirtied slips)<br />

• code line <strong>is</strong> <strong>not</strong> in OCR-B1 characters<br />

• <strong>ISR</strong> cut incorrectly, therefore wrong positioning of the code line<br />

• poor or irregular printing quality<br />

– +<br />

Payment order<br />

(PO) – +<br />

All electronic<br />

payments (e.g. EPO) – +<br />

<strong>Manual</strong> <strong>ISR</strong> Version June 2013 26/33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!