15.06.2012 Views

QUALITY OF LIFE

QUALITY OF LIFE

QUALITY OF LIFE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

new<br />

dimensions<br />

The magazine of the Rhomberg Group<br />

Quality of life<br />

Happy and conTenTed _____________________ 7<br />

Thoughts about quality of life<br />

HoW To cReaTe QUaLITy oF LIFe ____________ 14<br />

The perfect home for every phase of life<br />

MasTeRpIece oF RaILWay TecHnoLoGy _____ 34<br />

Brenner contracts piling up<br />

2011


climate neutral<br />

printed<br />

contents<br />

Editorial 3<br />

News in brief 4 – 5<br />

QUaLITy oF LIFe<br />

Focusing on what matters 6<br />

Happy and contented 7<br />

Statements on quality of life 8 – 9<br />

Strategy: quality of life tomorrow and today 10 – 11<br />

News from the life-cycle optimiser 12<br />

Facility Management at Rhomberg 13<br />

Current housing projects in Vorarlberg 14 – 15<br />

Project developments in the Lake Constance area 16 – 17<br />

Construction and civil engineering project reports 18<br />

Selection of small construction sites 19<br />

Refurbishment advice booklet 20<br />

Diem factory converted and refurbished 21<br />

Rheintal Resource Center offers<br />

improved customer service 22<br />

Two years of Rhomberg Recycling 23<br />

Life-Cycle Tower, urban future with CREE 24 – 25<br />

New nursery schools for Feldkirch 26<br />

Keys for charitable housing handed over 27<br />

Team-building: General Contractor for Housing 28<br />

Masters study course:<br />

Green Building & Life-Cycle Management 29<br />

Human Resources news 30 – 31<br />

Bahntechnik marketing HandraiLIT and ZOKA 32<br />

Rhomberg Rail starts in Great Britain 33<br />

At the Brenner: masterpiece in railway engineering – 34 – 35<br />

Railway engineering: surveying and developing 36<br />

Completion of large long-term BBW projects 37<br />

Track Australia becomes Rhomberg Rail Australia 38 39<br />

Rhomberg-Kalebozan – a success story 40<br />

Goldbeck-Rhomberg expanding 41<br />

Menegola AG full of power 42<br />

Conversions & Renovations<br />

starts operations in Switzerland 43<br />

Housing projects in Switzerland 44 – 45<br />

What the Accounts department does 46<br />

Opportunity and risk management 47<br />

The Rhomberg Environment Team 48 – 49<br />

Review of events in 2010 50 – 51<br />

17<br />

34<br />

45<br />

edIToRIaL| published by Rhomberg Group, Mariahilfstrasse 9, 6900 Bregenz, Austria, Tel +43 5574 / 403-0,<br />

Fax +43 5574 / 403-309, info@rhombergbau.at, www.rhombergbau.at, www.rhombergrail.com photos Shutterstock (Cover),<br />

Creative Learning, Dietmar Walser Photografy, Darko Todorovic, Nursery Schools Feldkirch Im Griesseler, Oberer Riegel and<br />

Alvierstrasse, Rhomberg Group Responsible for the content Gabi Schnell editor-in-chief Gabi Schnell editorial team<br />

Gabi Schnell, Elisabeth Frener, Simone Grabher, Susanne Dünser, Michaela Mölgg, Anna-Lina Kräutler, Sandra Hermes,<br />

Sarah Krenkel, Diana Koplenig, Milena Simonovic, Stefanie Sutterlueti, Jakob Bonomo, Carmen Bösch, Karin Hubalek,<br />

Jürgen Koblinger, Angelika Rhomberg, Madeleine Sargant, Marisa Rusch concept and design die3, Public Relations<br />

Agency, Dornbirn, Austria printed on Galaxy matt declaration pursuant to § 25 Media act NEW DIMENSIONS is<br />

published once a year; German circulation: 4,500 copies; English circulation: 1,500 copies


26<br />

Making quality of<br />

life possible<br />

This last year has been a dynamic one. We have managed the commercial<br />

downturn very well. We have been able to reduce our turnover. I am saying<br />

"able" because to survive a reduction in turnover, a company needs to be<br />

financially healthy. And that’s what we are, thanks to our solid capital base.<br />

The motivation and innovative drive of our members of staff have moved us<br />

on in big strides. However, we are not resting on our laurels but continuing<br />

on our path.<br />

There are huge challenges ahead of us. Ten years ago, our strategy already<br />

included considerations regarding sustainability and efficient use of resources.<br />

What is the price of planet earth? We don’t know its material value. But we all<br />

agree that we need it to survive. Our planet can produce a huge output every<br />

year (timber, CO 2 , fish). But we use up our ration of resources as early as<br />

August in every year. You might say that from then on we live on credit*. How<br />

long can that last? Our politicians would be in a position to set firm guidelines,<br />

but climate conferences and similar actions seem to produce scant effects.<br />

Initiative is called for. Currently, entrepreneurs are more or less punished for<br />

giving people jobs. There should be less tax on work and more on energy and<br />

in future, funding of the social security system should be linked to the use of<br />

resources.<br />

We all need to make our contribution. This is also true for the construction<br />

industry with its enormous throughput of resources. It is responsible for 30 to<br />

45 percent of resources used. While this is a big challenge, it is also the<br />

biggest market opportunity and holds the potential for innovation in many<br />

fields: efficient project management, partnering models, construction systems,<br />

building materials, new solutions for mobility and logistics and, not least,<br />

considerations regarding regional and local development.<br />

We need to give answers. The Rhomberg group has been developing these<br />

opportunities and potentials for many years. Our successful market position<br />

is the result of the farsighted management of my father, Commercial Councillor<br />

Walter-Heinz Rhomberg. Last October, after 47 active years, he retired from<br />

his position as Managing Director of Rhomberg Holding but will continue to<br />

give us his active support as Chairman of the Advisory Board.<br />

Walking the path together. I am proud of all our members of staff, our partners<br />

and our customers who continue with us on our ambitious path. It requires<br />

basic trust in both ourselves and our fellow men. Highly trained members of<br />

staff are the essential factor for success. In the Rhomberg Academy, in our new<br />

Master study course and, not least, while learning on the job, our staff are<br />

given the right opportunities for personal growth.<br />

When we are able to recognise how things work, to handle increasing complexity<br />

and to think holistically, we can create quality of life for all. Why not help,<br />

and join the action!<br />

Hubert Rhomberg<br />

* Source: Mathis Wackernagel, Global Footprint Networks<br />

edIToRIaL | neW dIMensIons<br />

3


news in brief<br />

Away from site and desk<br />

6 th VoRaRLBeRGeR Hypo-BaUHeRRenpReIs 2010 dIsTIncTIon FoR InnoVaTIVe LIVInG<br />

This residential complex, the winner<br />

of the Clients’ Prize and prizes for its<br />

future-oriented design, mobility and<br />

use of timber, attracted a great deal of<br />

interest domestically and abroad.<br />

We celebrated with a communal<br />

completion party for all the owners and<br />

tenants in September 2010. Three<br />

fruit trees were planted as a symbol of<br />

sustainability by the company directors<br />

and representatives of the Owners’<br />

Association.<br />

4 NEW DIMENSIONS | NEWS IN BRIEF<br />

The Vorarlberger Hypo-Bauherrenpreis<br />

(Vorarlberg Hypo Client’s Prize) has<br />

been awarded every year since 1986<br />

in recognition of forward-looking architecture<br />

and exemplary cooperation<br />

between clients and designers. This<br />

year the winners were announced on<br />

28 September 2010 in the Kulturbühne<br />

AMBACH theatre in Götzis.<br />

The international jury of four judges<br />

awarded 10 entries with prizes and<br />

16 with distinctions for impressive,<br />

coMpLeTIon paRTy FoR sandGRUBenWeG ResIdenTIaL deVeLopMenT, BReGenz<br />

neW IMpeTUs FRoM ManaGeMenT cHanGes aT RHoMBeRG HoLdInG GMBH<br />

forward-looking buildings. Rhomberg<br />

Bau and its project partner, architects<br />

DI Hörburger/Kuess/Ritsch/<br />

Schweitzer, received a distinction in the<br />

housing category for the innovative<br />

Sandgrubenweg residential development<br />

in Bregenz.<br />

Kommerzialrat Walter-Heinz Rhomberg<br />

(right) left the board of directors at<br />

Rhomberg Holding GmbH in September.<br />

He is moving to the Rhomberg<br />

Group, along with DI Roland Jurecka<br />

(left), where he will be Chairman of the<br />

Advisory Board. As of 1 October 2010,<br />

DI Hubert Rhomberg (second from the<br />

right) and Mag. Ernst Thurnher<br />

(second from the left) are in charge<br />

of the company management of<br />

Rhomberg Holding GmbH .


socIaL coMMITMenT – RHoMBeRG HeLps THe HaITI eaRTHQUake VIcTIMs<br />

MüHLeHoF UzWIL sWITzeRLand onLy Took 1½ yeaRs FRoM conTRacT aWaRd To HandoVeR<br />

Contracts between Rhomberg Bau and<br />

Credit Suisse for the construction of<br />

the Muhlehof community centre were<br />

signed in February 2009. Shortly<br />

afterwards, we commenced work on<br />

the demolition, shoring and excavation.<br />

The foundation stone for the Mühlehof<br />

was laid on 30 June. The handover to<br />

the client took place after just under<br />

15 months on 2 September 2010.<br />

The Mühlehof is located in the middle<br />

of Uzwil and will provide an important<br />

centre for the community. Rhomberg<br />

Bau AG is proud to have realised and<br />

handed over on time a building so<br />

important and special to the Uzwil<br />

community with the architects Arson<br />

AG and the various design consultants<br />

on behalf of Credit Suisse.<br />

FacILITy ManaGeMenT — UnFoRGeTTaBLe BaRBecUe FoR RHoMBeRG eMpLoyees<br />

The banks of the lakeside camping<br />

site at Bregenz provided the perfect<br />

setting for the Facility Management<br />

Department’s traditional summer event.<br />

55 Rhomberg employees from various<br />

departments accepted the invitation to<br />

the 6 th barbecue. A particular highlight<br />

of this mid-summer July evening<br />

We were very upset by the images of<br />

the earthquake in Haiti on 12 th January<br />

2010. Operations to provide aid were<br />

quickly mobilised. We at Rhomberg<br />

gave a generous donation to the relief<br />

organisation, “Neighbour in need”. Our<br />

contribution financed medical aid, food,<br />

hygiene articles, clean water, tents,<br />

blankets and tools were also bought.<br />

was the team competition in which a<br />

sought after challenge cup was<br />

at stake.<br />

The organisers accepted a well<br />

deserved thank-you on behalf of all<br />

the barbecue guests.<br />

GRoUnd-BReakInG ceReMony FoR neW seescHanze LocHaU MosT oF HoUsInG UnITs soLd<br />

Organised by project partners<br />

Rhomberg Bau and Schertler-Alge, the<br />

official ground-breaking ceremony for the<br />

residential development situated between<br />

the Pfänder and Lake Constance took<br />

place on 3 September 2010. Architect<br />

DI Dietmar Eberle and Mayor Xaver<br />

Sinz were invited to the celebrations as<br />

guests. The last of the 95 residential<br />

units are scheduled to be completed<br />

between autumn 2012 and spring 2013.<br />

NEWS IN BRIEF | NEW DIMENSIONS<br />

5


December 1984: Walter Rhomberg<br />

Contractors receives official State award.<br />

“I never wanted to be anything else but<br />

a master builder” says Kommerzialrat<br />

Walter-Heinz Rhomberg with a smile.<br />

For him, there simply wasn’t a more<br />

attractive profession. In 1892 his<br />

grandfather, Cornelius, founded the<br />

company and managed it very successfully<br />

until his death in 1912. His father<br />

Walter (b. 1911) re-established the<br />

construction company in 1938. Walter-<br />

Heinz Rhomberg joined the company in<br />

the third generation in 1963. He has<br />

now served for 47 active years.<br />

There are many stories from his life in<br />

the business: some are stories of<br />

success and some of failure, with strife<br />

and worry, as happens in every business.<br />

As of 1 October 2010, Kommerzialrat<br />

Walter-Heinz Rhomberg retired from<br />

the management of Rhomberg Holding<br />

GmbH and became Chairman of the<br />

Advisory Board. At the same time, his<br />

son Hubert Rhomberg together with<br />

Ernst Thurnher stepped into the role of<br />

Managing Director of Rhomberg<br />

Holding.<br />

MaInTaInInG a BaLance<br />

“For an independent entrepreneur, it is<br />

not possible to separate business life<br />

from private life”, explains Walter-Heinz<br />

Rhomberg. The two have to be kept in<br />

balance. The time demands of the job<br />

require a steady private life with a lot of<br />

understanding – especially from one’s<br />

partner.<br />

When he was young, Rhomberg heard<br />

6<br />

NEW DIMENSIONS | QUALITy <strong>OF</strong> <strong>LIFE</strong><br />

Successful together: Walter Rhomberg and Walter-Heinz Rhomberg, seen here during an<br />

excursion on Lake Constance, on the occasion of the forty year celebrations in 1978.<br />

Quality of life – focusing on what is important<br />

Kommerzialrat Walter-Heinz Rhomberg looks ahead and reflects on the last 47 years<br />

a lot at the dinner table and learnt to<br />

concentrate on the positive aspects<br />

and to assess risk. That was not<br />

always easy, as the risks in a construction<br />

company in particular are “greater<br />

than you would normally expect”. But<br />

on balance the positive always won<br />

out, which is the only reason why the<br />

company has developed so well.<br />

It is not easy to say exactly which was<br />

his first working day, explains Walter-<br />

Heinz Rhomberg. During the summer<br />

holidays he and his siblings had to<br />

work in the business for three to four<br />

weeks. “We also earned a little money”<br />

adds Rhomberg and recounts that he<br />

was ten years old when he first visited<br />

a building site – where a single-family<br />

dwelling was being built. These<br />

experiences were his foundation and<br />

very instructive. Then in 1963 he<br />

officially joined the company as<br />

Assistant Site Manager. At that time the<br />

Walter Rhomberg construction company<br />

employed a staff of about 200.<br />

From 1973 he was Managing Director<br />

of the Rhomberg companies together<br />

with his father, Kommerzialrat Walter<br />

Rhomberg. Then for many years he<br />

filled this role as sole Managing<br />

Director. Later on, his son Hubert and<br />

other long-serving members of staff<br />

joined in the responsibilities. “For me,<br />

and I believe for all Rhomberg members<br />

of staff, it is fortunate that Hubert,<br />

as the fourth generation, has taken on<br />

the management in an extremely<br />

active and innovative, socially responsible<br />

and competent fashion.”<br />

MoTIVaTIon and<br />

enTRepReneURIaL spIRIT<br />

Core elements for success as an<br />

entrepreneur are a long-term perspective,<br />

analysis and focus, explains<br />

Rhomberg. In addition, there has to be a<br />

strong ability to make things happen<br />

without which nothing comes about, and<br />

staff who are motivated and who tackle<br />

their tasks with entrepreneurial spirit.<br />

Naturally it also needs a solid capital<br />

base to guarantee the company’s<br />

independence and ability to act. For a<br />

manager to be able to perform his or<br />

her duties over the long-term, it is<br />

important that they are very healthconscious<br />

and engage in regular sports<br />

activities. For me this was also a guiding<br />

principle.<br />

pLeasURe In cReaTIon<br />

“Naturally there are things that could<br />

have been done better, but these are<br />

now in the past.” Now Walter-Heinz<br />

Rhomberg enjoys the fact that his daily<br />

schedule is no longer controlled by a<br />

long list of appointments – and that he<br />

has time for his new task as Chairman<br />

of the Advisory Board. And of course he<br />

also enjoys more spare time.<br />

In 1963 the young entrepreneur<br />

Walter-Heinz Rhomberg wanted to<br />

prove that Rhomberg Bau was the<br />

number 1 in Vorarlberg, and one of the<br />

top companies in Austria. Both of these<br />

objectives have been achieved.


Ground-breaking ceremony at Götzis Village<br />

Park in the summer of 1992.<br />

ansWeRs To soMe sHoRT<br />

QUesTIons*<br />

• As a child I always wanted to<br />

become a master builder.<br />

• The book I am currently reading:<br />

Welt mit Zukunft (World with a<br />

future, surviving in the 21 st century)<br />

by Franz Josef Radermacher.<br />

• Present-day heroes, for me, are<br />

people who dedicate their lives to<br />

social issues. For example, Bischof<br />

Kräutler, who is receiving the<br />

alternative Nobel Prize. These are<br />

outstanding people with a special<br />

commitment!<br />

• I am most ready to excuse those<br />

mistakes that are openly admitted<br />

and not hidden.<br />

• Motto: live and let live. Be tolerant.<br />

*loosely based on the Proust Questionnaire<br />

KR Walter-Heinz Rhomberg lives with his<br />

wife Edith in Bregenz. He is an enthusiastic<br />

golfer and skier and is very proud of his three<br />

children, Thomas, Hubert and Cornelia and his<br />

six grandchildren, who are a constant source of<br />

pleasure and stimulation.<br />

Interview with Walter-Heinz Rhomberg<br />

by Anna-Lina Kräutler.<br />

Happy and satisfied<br />

Thoughts about quality of life<br />

“Do you wish to roam farther and farther? See! The good lies so near.<br />

Only learn to seize good fortune, for good fortune’s always here.”<br />

Johann Wolfgang von Goethe<br />

Are we happy – broadly speaking? Or are we lacking something?<br />

What do we need to be happy? What creates the energy that drives<br />

us? And what do we need to maintain this energy?<br />

THe scIence oF HappIness<br />

Research into happiness is something that actually exists. There is the<br />

Dutchman Ruut Venhooven who, for decades, has been trying to find<br />

out what makes us happy and to provide statistical proof of it. Then<br />

there are major opinion poll institutions and magazines, such as the<br />

American Forbes Magazine, who publish their findings regarding the<br />

"happiness of nations". According to those, the Danes are the world<br />

champions of happiness. Austria is placed 14 th out of 155 surveyed<br />

countries. Switzerland and Australia are both placed 8 th and Turkey is<br />

ranked 103 rd . However, there is no place without potential for<br />

improvement.<br />

THoRoUGHLy conTenT<br />

Do we really move between two worlds – the world of work and the<br />

world of living? Or is it the relationships and feelings that impose this<br />

division? How we feel in our professional relationships – with our<br />

customers, colleagues and network partners also affects our feelings<br />

and moods in the supposedly “different world”: sometimes we take<br />

negative stress and dissatisfaction home with us. The number one<br />

feel-good factor in the company is the social interaction between<br />

colleagues. If the climate in the company is good, the company<br />

obviously benefits. Satisfied and happy employees are more productive<br />

and have a positive effect on company culture.<br />

QUaLITy oF LIFe<br />

At Rhomberg we try to combine all those feelings, attitudes and<br />

perceptions under the term “quality of life”<br />

which affect our moods, our actions and thinking and through that the<br />

quality of our work and our productivity. For us, people matter most.<br />

With their strengths and weaknesses. Appreciating each other,<br />

listening, responding to individual needs, friendly and trusting communication,<br />

team spirit and loyalty in challenging situations are just some<br />

of the elements that make up the corporate culture and climate at<br />

Rhomberg. It involves responding to the needs of our staff, customers<br />

and network partners and improving their quality of life in doing so.<br />

That is part of our social responsibility. That’s our daily challenge. We<br />

have asked our staff, customers and network partners to find out what<br />

quality of life means for them personally: you will find the answers on<br />

the next double page.<br />

Anna-Lina Kräutler<br />

QUALITy <strong>OF</strong> <strong>LIFE</strong> | NEW DIMENSIONS<br />

7


“What, for you, does<br />

quality of life mean?”<br />

One question, twelve answers.<br />

8 NEW DIMENSIONS | QUALITy <strong>OF</strong> <strong>LIFE</strong><br />

2 “Quality of life manifests with my family within<br />

our own four walls. This summer, my quality of life<br />

was somewhat reduced due to flooding which also<br />

affected our apartment. For this reason, I could<br />

truly empathise with those people in Pakistan who<br />

lost their homes in the floods. Meanwhile, my quality<br />

of life is back on track.”<br />

Claudia Beer, Receptionist, Rhomberg Bau<br />

3 “For me quality of life means to be able to get up every day in good<br />

health and face the daily tasks, both in my private and professional life:<br />

it means sharing life with a cherished person at your side and enjoying<br />

pleasant and nice things in life every day. It means self-fulfilment and<br />

making my vision a reality. To have a home where I feel comfortable. To<br />

have a home which allows me to meet my needs and desires regarding<br />

wellness and being sociable with friends.”<br />

Gerhard Rauch, Managing Director of Walser GmbH, Rankweil<br />

4 “I feel that my life has quality when I am content<br />

with my situation. Contentedness is a mental attitude<br />

one has to nurture on a daily basis by focusing<br />

on the precious aspects of one’s life. Usually we<br />

do the opposite and think of all the things we are<br />

missing. That makes us feel that we are lacking<br />

something. When we get that feeling of lack, the<br />

quality of our own lives also seems to be lacking.”<br />

Helmut Gassner, Head of Buddhist Centre Letzehof<br />

5 “If I take a look at the world, I consider myself fortunate to<br />

live in a country like Austria. We live in a socially and politically<br />

secure environment, enjoy economic stability and have<br />

been largely spared any natural catastrophies. This, for me,<br />

is the best basis for experiencing quality of life and happiness<br />

in my private and family life, as well as at work for 24<br />

hours, 7 days a week.”<br />

Andreas Eder, Head of Marketing & Corporate<br />

Communication, ALPINE Holding GmbH<br />

1 “Quality of life is based on a number of different<br />

parameters: for me, the values of health, enjoyment,<br />

gratefulness and contentedness are the<br />

most important factors for quality of life – which<br />

requires good sources of energy, industriousness<br />

and a portion of luck. The vital sources for achieving<br />

my ambitious aims in my private and business<br />

life are my family, a successful and interesting<br />

world of work at Rhomberg Bau for over forty<br />

years, and fellow men with whom I can happily<br />

share the beauty of nature, art and culture.”<br />

Franz Goll, for many years Head of Department<br />

for Cost Calculation and Contract Acquisition at<br />

Rhomberg Bau, now retired<br />

2 1<br />

3 5<br />

4 6<br />

6 “Quality of life involves the sense<br />

of having a task which I believe can<br />

contribute to a better world. Material<br />

values don’t really count, and neither<br />

does the quick gratification promised by<br />

consumerism. In addition, quality of life<br />

involves the knowledge that I am rooted<br />

somewhere in this world and that I live<br />

in a social context that I can rely on.”<br />

Hermann Kaufmann, Architect, University<br />

Professor and Managing Director of<br />

Hermann Kaufmann ZT GmbH


12 “From my own personal situation, I would say that ‘maturity’ can be a very<br />

rewarding time of life. An important prerequisite is the absence of disease –<br />

which is another way of defining health. The next point is to maintain a curiosity<br />

and an interest and shared responsibility in this world, with its daily wonders<br />

and catastrophies. Throughout my life I had so many different interests that I<br />

never had enough time to follow them up outside my main profession. Nowadays<br />

I can largely divide my time as I like and follow my own bio-rhythm; that<br />

means staying awake until long after midnight, going to cultural events and<br />

reading, reading, reading.”<br />

Günter Rhomberg, former employee of Rhomberg Bau,<br />

since 1981 President of Bregenzer Festspiele<br />

12 11<br />

8 10<br />

7 9<br />

7 “For me, quality of life means<br />

that I can use of my time flexibly so<br />

that I can satisfactorily coordinate<br />

my passions, family and job<br />

without worries about health and<br />

survival. What I appreciate very<br />

much is also that I can walk from<br />

my home into nature to refresh my<br />

energy.”<br />

Agnes Thurnher, General Practitioner<br />

and Occupational Physician<br />

11 “For me, quality of life means to have time for my family and<br />

friends. And, if there is time, to have a few hours to myself, to slow<br />

down and get some peace as an antidote to my work. Enjoying<br />

the simple things in life, working in the garden, pottering about on<br />

something creative, reading a good book, drinking a glass of wine<br />

or cooking a meal for friends. And in between, simply being myself.”<br />

Martin Summer, Head of Department for Projects and Location<br />

Development, Rhomberg Bau<br />

10 “For me, quality of life means first of all<br />

that my family and friends are healthy. That is<br />

the basis for all other aspects of life. A further<br />

factor in quality of life is the opportunity for<br />

being free to act independently and to find<br />

self-fulfilment and achieve one’s defined<br />

goals. When all this is in place, daily life can<br />

be enjoyed without worry and stress.”<br />

Osman Kabaetli, IMS employee,<br />

Rhomberg Bau<br />

9 Quality of life from one to twelve: (1) Good health for the<br />

whole family (2) Harmony in one’s private and professional<br />

life (3) Financial security (not luxury), so that one does not<br />

have to worry about one’s basic survival. (4) Friendships with<br />

human values (5) A job with challenges, fun and recognition<br />

(6) Having time (7) Sun (8) A living environment that is worth<br />

living in (9) Living in harmony with nature (10) Safety (no<br />

crime) in the private and work spheres (11) Political stability<br />

(12) Mobility<br />

Erich Wutzl, Daniela Regvart, Karl Gneis and Felix Jonkisch<br />

(not in the picture), Vienna branch, Rhomberg Bau<br />

8 “For me, quality of life means that I have a family<br />

that is behind me and which supports me. Another<br />

important aspect is health. And, that everything is<br />

OK privately and at work. I was 23 years old when I<br />

decided to start an apprenticeship with Rhomberg<br />

Bau so that I would gain a different perspective and<br />

can look positively to the future.”<br />

Patrick Scheiber, Apprentice at Rhomberg Bau<br />

QUALITy <strong>OF</strong> <strong>LIFE</strong> | NEW DIMENSIONS<br />

9


Contented staff, happy customers AND successful projects?<br />

sense<br />

A small game:<br />

you are given three wishes. What will you wish for? Note: world peace,<br />

health, good fortune cannot be used.<br />

How long did it take you to sort out your three wishes? To be<br />

quite honest: I am still pondering. A difficult decision.<br />

And now the million dollar question: what does a<br />

company wish for?<br />

Contented staff.<br />

Happy customers.<br />

Successful projects.<br />

But questions remain: how can you tell that<br />

staff are contented? How can we recognise<br />

happy customers? And when is a project<br />

successful? Again, question after question…<br />

There are many studies whose authors have<br />

thought about motivated employees and staff<br />

satisfaction. Tips include such advice as “Are<br />

you the boss? Then why not simply bring<br />

rolls with you to the office once in a while”<br />

to “Clear structures, clear tasks and clear<br />

competencies give your employee a sense<br />

of direction” through to “Trust is good, control<br />

is better”.<br />

I am convinced that these findings are all<br />

correct – in different situations and taking into<br />

account individual backgrounds. But they do not<br />

apply generally. Of course, there are a few trendy<br />

methods and tools. However, every situation needs<br />

to be looked at individually.<br />

For example, the Rhomberg group will intensify its<br />

activities in the international market in the coming<br />

years. There will be projects in nearby and far away<br />

countries and on site we will need, of course, our<br />

members of staff. How can we manage to make<br />

them into contented team members? We have to<br />

admit: we don’t have a cure-all recipe.<br />

BUT we have managers who treat their staff with<br />

10 NEW DIMENSIONS | STRATEGy<br />

appreciation and respect. And<br />

who respond to their needs<br />

as the situation requires. This<br />

needs time and a considerable<br />

amount of sensitivity. It is a constant<br />

challenge. An on-going test. A<br />

tightrope act. But not reaching for the stars.<br />

I aM aLLoWed To Be HUMan<br />

People are the focus – with their strengths<br />

and weaknesses. Accepting weaknesses and<br />

mistakes, perceiving difficult situations at<br />

work and at home, pulling on the same rope,<br />

supporting each other, a healthy amount of<br />

trust and working on tasks that match my<br />

abilities: that’s what makes me content. And is<br />

that not also what makes a project successful,<br />

and finally, the customer happy?<br />

It makes sense.<br />

Oh and before I forget: it is my wish<br />

… that everybody has more laughter in<br />

their life<br />

… that what I do is meaningful for myself<br />

and others<br />

… that we pay more attention to the effects<br />

and consequences of our actions.<br />

If you like, why don’t you send me your<br />

three wishes:<br />

annalina.kraeutler@rhombergbau.at *<br />

Anna-Lina Kräutler


on the road with VLoTTe<br />

One year of electrical power on the roads of Vorarlberg<br />

The sustainability strategy of the Rhomberg group focuses primarily on the efficient use of resources. The electrically<br />

powered Fiat 500, which is part of the “VLOTTE” project for electric mobility in this model region underscores our aim.<br />

A total of 40 publically funded electric vehicles on the roads of Vorarlberg not only create a stir, but also reduce CO 2<br />

emissions. For a year now staff at Rhomberg use the electric car, which is available to all for short trips, and they are<br />

enthusiastic about it. The car has done 4,615 kilometers already, which corresponds to a reduction in CO 2 emissions<br />

of 340 kilogrammes.<br />

Madeleine Sargant<br />

“I use every opportunity to be on<br />

the road with our VLOTTE car, and<br />

thereby spread our company philosophy.<br />

The car drives very well – but in<br />

the mountains or on the motorway its<br />

performance could be better.”<br />

Ulrich Forster, CREE<br />

“I like the quiet and very dynamic<br />

drive (small and nippy). There are<br />

now more and more VLOTTE cars on<br />

the road; even the Bregenz police<br />

have one with blue lights. That tells<br />

me that systematic and sustainable<br />

mobility is popular in Vorarlberg. The<br />

only point I would like to see improved<br />

is the charging process – an<br />

automatic docking station would be<br />

helpful.”<br />

Jakob Bonomo, CREE<br />

In its first year the Rhomberg electric car has<br />

already covered 4,615 kilometers. This corresponds<br />

to a reduction in CO 2 emissions of<br />

340 kilogrammes.<br />

“To drive about with nippy four<br />

wheels and a good conscience –<br />

that’s what it feels like for me to drive<br />

in our 500! Its range is adequate and<br />

its top speed of 100 km/h is perfectly<br />

suited to flowing traffic. What I find<br />

fantastic is the drive characteristics<br />

in winter – due to the weight of the<br />

vehicle, its grip on snow has no<br />

comparison.”<br />

Andreas Karg, Building Solutions<br />

STRATEGy | NEW DIMENSIONS 11


Andreas Karg<br />

What does common sense tell us?<br />

Food for thought on the quality of life<br />

Faced with the increasing complexity of our everyday lives and our specialised working roles, we often forget to look at the<br />

big picture and do not think in terms of the finished article. In this column we attempt to promote the overall view – just as<br />

we optimise the life-cycle in our projects: with a little common sense.<br />

• Increase in life expectancy over the last 30 years 8 years<br />

• Remaining life expectancy of a 60-year-old man in 1970 14 years<br />

• Remaining life expectancy of a 60-year-old man in 2006 21 years<br />

• Proportion of the earth’s surface that is covered in forest is 8 percent<br />

• Proportion of the earth’s surface that is covered in seaborne plastic waste is 25 percent<br />

• Time taken for a plastic bag to decompose 200 years<br />

• Proportion of petrels in northern Europe that have plastic items in their stomachs 95 percent<br />

• Annual fish consumption per head in Austria 8 kilograms<br />

• GDP growth in Austria between 1991 and 2005 34 percent<br />

• Increase in loss of working days through sickness due to psychological problems in the same period 79 percent<br />

• Health-related costs of psychological stress according to EU Commission EUR 20 billion<br />

• Gross domestic product of Lithuania in 2009 EUR 26 billion<br />

• Average number of hours of sunshine in Vienna 1,883 hours/year<br />

• Average number of hours of sunshine in Rome 2,470 hours/year<br />

• Average number of hours of sunshine in Moscow 1,709 hours/year<br />

• Number of deaths by suicide in Austria per 100,000 population 16<br />

• Number of deaths by suicide in Italy per 100,000 population 7<br />

• Number of deaths by suicide in Russia per 100,000 population 29<br />

• Columbia’s ranking in a satisfaction study by sociologist Max Haller (42 countries in total) 1st place<br />

• Russia’s ranking in a satisfaction study by sociologist Max Haller (42 countries in total) 38th place<br />

All these figures were obtained from our own projects and calculations, the press and international studies.<br />

12 NEW DIMENSIONS | <strong>LIFE</strong>-CyCLE OPTIMISER


Building certification in focus<br />

Effects on real estate sales<br />

True to its company strategy, Rhomberg<br />

decided to become a founding member<br />

of the Austrian Council for Sustainable<br />

Real Estate (ÖGNI).<br />

Based on the international DGNB<br />

certification system of the German<br />

Sustainable Building Council, ÖGNI<br />

has systemised the certification of<br />

buildings in Austria. Buildings are<br />

assessed and evaluated against a<br />

number of performance criteria covering<br />

ecology, economy, social aspects,<br />

technology, process and location. The<br />

objective is to optimise buildings during<br />

the planning and design phases and<br />

show the quality of buildings in a transparent<br />

system. The system considers<br />

the whole of the life-cycle of a building.<br />

This approach reduces building<br />

operating costs, creates comfortable,<br />

all-round service for the customer<br />

Building services team on 24-hour standby 365 days a year<br />

Rhomberg facility management<br />

employees complete more than 1,000<br />

jobs per year – from minor repairs to<br />

alterations in leased buildings. The<br />

five operatives from different specialist<br />

areas, such as heating, ventilation,<br />

air-conditioning, sanitary and electrical<br />

engineering are at the service of<br />

over 3000 building users occupying<br />

buildings with over 150,000 m 2 of floor<br />

space.<br />

Professional maintenance of services<br />

installations ensures high availability<br />

and, combined with optimisation measures,<br />

can lower energy consumption<br />

costs and conserve natural resources.<br />

The service hotline (05574 403-403) is<br />

staffed 24 hours, sevend days a week.<br />

Diana Koplenig<br />

resource-saving and functional buildings,<br />

as well as raising the quality of<br />

the design and execution. Moreover,<br />

independent studies have shown that<br />

higher rents and property values can<br />

result.<br />

Rhomberg has appointed three trained<br />

auditors: Andreas Karg, Rainer Strauch<br />

and Tobias Vonach.<br />

They are involved during the planning<br />

and design of sustainable buildings<br />

and are responsible for attaining final<br />

certification – to the benefit of investors<br />

and later users.<br />

Tobias Vonach<br />

Our building services employees are experts in all technical areas.<br />

The Austrian Council for Sustainable<br />

Real Estate (ÖGNI) looks at the whole<br />

life-cycle of a building.<br />

FACILITy MANAGEMENT | NEW DIMENSIONS 13


The right apartment for every phase of life<br />

Rhomberg housing projects in Vorarlberg, Austria<br />

THe neW seescHanze LocHaU<br />

The top-class location and quality of<br />

the NEW SEESCHANZE development<br />

means demand is enormously high for<br />

these properties. That’s why 75 percent<br />

of the 95 dwellings have been sold in<br />

only eight months. These sensational<br />

sales figures are the best indicator that<br />

the decision by both partners,<br />

Rhomberg and Schertler-Alge – to<br />

develop NEW SEESCHANZE together<br />

as a joint project in the Wohnen am<br />

See development corporation – was<br />

absolutely right.<br />

14 NEW DIMENSIONS | HOUSING<br />

Artist’s impression of the high-quality residential development with a view over Lake Constance<br />

soLd oUT: WeIssenBILdsTRasse LaUTeRacH ResIdenTIaL<br />

deVeLopMenT<br />

All the apartments were sold before completion in October 2010. This development<br />

was prepared with empty ducts for retrofitting with photovoltaic panels at<br />

a later date so that the residents can generate their own electricity. Following on<br />

in the context of sustainability, the apartments are connected to the Lauterach<br />

GmbH & Co KG bio-district heating system.<br />

Bio-district heating and the option for retrofitting<br />

of photovoltaics form the sound sustainability<br />

credentials of this residential development.<br />

passIVHaUs MonIToRInG: BLocks a and B In sandGRUBenWeG<br />

ResIdenTIaL deVeLopMenT, BReGenz<br />

Modern, energy-efficient building actual figures for energy consumption.<br />

services technologies are so finely This complex interrelationship between<br />

designed and optimised that even environment, people and technol-<br />

small changes to the overall system ogy leads some people to speak of a<br />

can lead to noticeable increases or play-off between energy efficiency and<br />

reductions in energy consumption. living comfort. Therefore we decided<br />

User behaviour can therefore account to conduct a long-term investigation<br />

for some of the large deviation of the housing blocks on the Sand-<br />

between the design estimates and the grubenweg residential development<br />

at Bregenz to allow us to empirically<br />

determine the factors influencing living<br />

comfort and energy consumption. This<br />

monitoring is being developed working<br />

in cooperation with alp-S and the<br />

Dornbirn University of Applied Science<br />

to ensure the background to the<br />

investigation is objective and based on<br />

sound scientific principles.<br />

This long-term investigation is intended to bring clarity to the interrelationship between living comfort and energy consumption in practice.


BenGeR-paRk WesT BReGenz<br />

Working with the local housing cooperative,<br />

Rhomberg came up with the<br />

concept for the Benger-Park West<br />

housing development.<br />

The residential development was<br />

designed to achieve the Passivhaus<br />

standard. The apartments in one of the<br />

four blocks are sold to owner occupiers,<br />

whereas those in the other three<br />

blocks are let to tenants. This ensures<br />

a social mix and offers a high quality of<br />

living to owners and tenants. The development is constructed to Passivhaus standard and some units are offered for sale and<br />

some for rent.<br />

LUGeR sITe In doRnBIRn<br />

The new building for Haus Mozartstrasse, consisting of 34 dwellings and local<br />

shopping facilities was sold as a complete unit to a private investor. Most of the<br />

housing units in the existing building Haus Bahnhofstrasse, the former Luger<br />

furniture store, are for sale and the commercial space is now being marketed.<br />

The adjacent site is being developed in conjunction with Hotel Martinspark GmbH<br />

as a cooperative venture to form an underground car park and hotel extension.<br />

Commercial floor space and attractive loft and<br />

penthouse apartments are created on several<br />

floors of the Luger furniture store building: with<br />

exclusive room heights and generous terraces.<br />

sUsTaInaBLy desIGned dWeLLInGs ensURe THe<br />

HIGHesT LIVInG QUaLITy<br />

The home is the main stage for private to it that our housing developments<br />

life: a freely available, freely designable always employ the latest technology,<br />

space for a freely moulded life, offering incorporate worthwhile innovations and<br />

the greatest opportunities for personal that they are operated as energy and<br />

happiness.<br />

resource-efficiently as possible.<br />

We integrate the needs of future<br />

residents into the design of a new<br />

housing project as early as the<br />

site purchase stage to ensure that<br />

Rhomberg homes are able to fulfil the<br />

changing requirements throughout our<br />

customers entire life.<br />

Our answer to these diverse demands<br />

is to incorporate an extraordinary<br />

degree of flexibility, which allows our<br />

customers to realise their own personal<br />

ideas for living. Therefore we see<br />

We operate a consistent knowledge<br />

management system and keep<br />

ourselves up to date with new developments<br />

by maintaining an extensive<br />

network of innovative suppliers.<br />

Martin Summer<br />

BasIc InFoRMaTIon HoUsInG<br />

We are continuously looking for plots of land in<br />

the Rhine valley and undertake to develop them<br />

without delay in a professional and fair manner.<br />

To provide our investors with a higher quality of<br />

advice, we have set up an investment concept<br />

that, with the help of independent experts, can be<br />

fine-tuned to the individual needs of our clients.<br />

Housing projects in austria currently at the<br />

marketing stage<br />

• Am Liebenstein-Park, Bregenz<br />

• Am Pfänderhang, Lochau<br />

• Sandgrubenweg residential development,<br />

Bregenz<br />

• Dr.-Anton-Schneider-Strasse, Dornbirn<br />

• Rohrbach Park, Dornbirn<br />

• Höchsterstrasse, Dornbirn<br />

• Frauensteinweg, Feldkirch<br />

• Bahnhofstrasse, Lochau<br />

• Benger-Park, West Bregenz<br />

• NEUE SEESCHANZE, Bregenz-Lochau<br />

• Baumgartstrasse, Schwarzach<br />

For further information please contact<br />

Karl Nussbaumer, Tel. +43 5574 / 403-364<br />

Hans-Peter Sohm, Tel. +43 5572 / 22323-11<br />

www.rhombergbau.at<br />

HOUSING | NEW DIMENSIONS 15


Pure quality of life: at the yacht harbour in Lindau, Germany, a new high-spec residential development is under construction.<br />

having – loving – being<br />

At the Lindau yacht harbour a dream of living on the Lake is coming true<br />

Give every day the opportunity to be the finest of your life*<br />

– clearly this was the maxim of those happy purchasers<br />

of the Lindau yacht harbour project who, already one year<br />

before completion, can look forward to many “finest days”<br />

in their new homes.<br />

A unique residential development is being created which,<br />

with its direct access to the Lake and the inner city, must<br />

be one of the best positions around Lake Constance;<br />

completion is scheduled for the end of 2011. With its 32<br />

well-designed apartments, most of which face directly over<br />

the Lake, and its three prestigious commercial units, the<br />

development is becoming one of the most exclusive residences<br />

on Lake Constance – and promises pure<br />

quality of life.<br />

When we choose an apartment, our own idea and definition<br />

of quality of life plays the most important role. For most of<br />

us, when we buy an apartment, our ambition is that everything<br />

is perfect. After all, in many instances such a purchase<br />

is fulfilling the dream of a lifetime. That means that many<br />

individual requirements and wishes have to be met in the<br />

right proportion. Do I like the position, the location, the<br />

view and the architecture and what is important for me in<br />

terms of sitting out in the open and how much money am I<br />

prepared to spend on my dream? Obtaining support when<br />

answering these questions is important for making the right<br />

decision, that’s where one needs a partner who is reliable<br />

and flexible and has experience and innovative ideas in<br />

equal measure.<br />

For this reason we have opted to create individual residences<br />

in the right locations in connection with a high<br />

standard of living and sustainable user and customer<br />

satisfaction. Our focus in this context is on the selection of<br />

suitable plots and the construction of high quality properties<br />

with sophisticated architectural design and which hold<br />

their value accordingly. Lindau too is an example where<br />

16<br />

NEW DIMENSIONS | PROJECT DEVELOPMENT<br />

innovative ideas and an exceptional construction and space<br />

concept are implemented without compromising comfort<br />

and the feel-good factor. The successful interior designs,<br />

underfloor heating, parking in underground carparks and<br />

a lift provide a high standard of living, as do the immediate<br />

proximity to the inner city and the outstanding regional and<br />

inter-regional transport connections.<br />

* Mark Twain, 30 November 1835 to 21 April 1910<br />

Tobias Kiechle<br />

aT THe yacHT HaRBoUR, LIndaU IsLand, GeRMany<br />

architecture Design: Planungsgruppe<br />

Prof. E. Kasper, Aachen,Germany<br />

execution Elwert & Stottele, Architects, Ravensburg, Germany<br />

scheme two detached blocks (new construction and<br />

refurbishment of existing)<br />

contract value EUR 20.5 million<br />

project development Rhomberg Bau GmbH, Bregenz, Austria<br />

developer & contractor Rhomberg Bau GmbH, Bregenz, Austria<br />

Floor space 3,900 m²<br />

Units 32 residential and 3 commercial<br />

car parking 48 underground spaces, 10 surface spaces<br />

scheduled completion end 2011<br />

Website www.yachthafen-lindau.de


“The service station of the future” in Hörbranz<br />

Creating sustainability with modern architecture and energy efficiency<br />

After working on the Hörbranz Customs Office for several<br />

years, the Project Development Department, led by Bernd<br />

Bischofberger, won the ASFINAG competition for the<br />

construction and operation of the filling and service station<br />

in the summer of 2010. In cooperation with Alpine Bau<br />

GmbH, the Swiss My Stop group and Schindele filling station<br />

operators from Ravensburg, the Department is developing<br />

an attractive service station, which will point the way to<br />

the future. Successful implementation is ensured through<br />

the expertise and competence of the partners involved.<br />

With its modern and yet local Vorarlberg architectural style,<br />

the service station will draw in visitors from home and<br />

abroad. “On the entrance side, the service station comprises<br />

a filling station for cars and HGVs and a curved building<br />

with shop, cafe, fast-food area and restaurant. These<br />

facilities are accommodated under one floating roof. On the<br />

exit side, there is a filling station for HGVs with four pumps<br />

under a generous floating roof.” (Project description by<br />

architect Christian Lenz from Schwarzach, Austria).<br />

The new service station at the border will give drivers of<br />

cars and heavy goods vehicles the opportunity of filling up<br />

directly at the motorway. We hope that this will reduce the<br />

traffic on the secondary road networks of the surrounding<br />

communities.<br />

With its unique architectural style, which uses wood and<br />

concrete as the main materials, the Hörbranz Service Station<br />

is as inspirational as it is attractive. “The current design<br />

and sustainable operating concept contributes to the local<br />

economy, both in construction and operation, and enhances<br />

the identity of the region.” This is how Joachim Nägele,<br />

Head of Project Development, describes the special<br />

features of the project.<br />

Marisa Rusch<br />

An attractive service station is being developed at the former Hörbranz<br />

Customs Office, a traffic intersection between Austria and Germany.<br />

An interesting combination of wood and concrete provides a boost to the<br />

local economy with unique architectural appeal.<br />

HÖRBRanz seRVIce sTaTIon, aUsTRIa<br />

owner and operator Raststation Hörbranz GmbH<br />

Total investment: approx. EUR 15 million<br />

asFInaG looks for interested parties 14 December 2009<br />

to 31 May 2010<br />

design & Build contractor Hörbranz Service Station consortium,<br />

(50 % Alpine Bau GmbH, 50 % Rhomberg Bau GmbH)<br />

project Manager Bernd Bischofberger<br />

start of construction Spring 2011<br />

scheduled completion mid 2012<br />

PROJECT DEVELOPMENT | NEW DIMENSIONS 17


sewer refurbishment at stuben<br />

Completion on time in spite of difficult weather conditions in the Arlberg region<br />

Two years ago, a project commenced to renew the sewers and water supply in Stuben am Arlberg<br />

and also to redesign the layout of roads.<br />

In September of the previous year,<br />

refurbishment work on the sewers<br />

and water supply in Stuben had<br />

already been started. The contract was<br />

placed by the Klösterle Municipality<br />

and includes not only the renewal<br />

and extension of the entire sewer<br />

network, but also the reconstruction<br />

of stormwater drains, the repair of the<br />

water supply system and the upgrade<br />

of the existing road network including<br />

Building owner Manfred Mäser instructed Rhomberg’s<br />

Building Construction team to carry out the work of building<br />

the underground garage, the ground floor and three upper<br />

floors. The building in Mozartstrasse was designed by<br />

Nikolussi/Hänsler Architects and was completed successfully<br />

and to the full satisfaction of the client in a record<br />

period of only four months by the crew under Senior Site<br />

Foreman, Thomas Boch.<br />

The contract also included excavation work, spray concrete<br />

application including ground anchors and borehole drilling<br />

for geothermal energy.<br />

In view of the very restricted space available on the building<br />

site, we were very grateful to the main contractor for allowing<br />

us to install construction containers and materials, etc.<br />

on the adjacent Luger site.<br />

Klaus Chlopik<br />

design features and surface finishes.<br />

As part of the construction work,<br />

Steffen Fritsche and his Minor Works<br />

team also created an underground<br />

link tunnel between two hotels. In<br />

spite of adverse weather conditions,<br />

construction proceeded according to<br />

plan thanks to the team of Werner<br />

Wild, Jürgen Fruhmann, Karl Schmid<br />

and Roland Branner. After the heavy<br />

mudslide in Klösterle in July 2010,<br />

18 NEW DIMENSIONS | CIVIL ENGINEERING, BUILDING CONSTRUCTION<br />

key daTa oF<br />

seWeR neTWoRk aT sTUBen, aUsTRIa<br />

client Municipality of Klösterle, Austria<br />

engineering Ing. Büro Riedmann<br />

construction period September 2009 to<br />

September 2011<br />

contract value EUR 1.8 million<br />

Total material shifted 22,000 m³<br />

demolition 1.500 m of existing sewers<br />

Total length of pipe about 4.000 m<br />

Inspection chambers about 150<br />

asphalt surfacing about 14,000 m²<br />

anti-frost packing material about 7,500 m³<br />

Water pipes about 1,700 m<br />

site Managers Roland Marte, Monika Mandl<br />

our crews were on site straight away<br />

to help the local community with<br />

clearing the stream and subsequent<br />

clearing up work.<br />

Roland Marte<br />

new construction: Mäser residence, dornbirn<br />

Fast and good – the building construction team shows what it can do<br />

key daTa FoR neW MÄseR ResIdence, doRnBIRn,<br />

aUsTRIa<br />

Building owner Ing. Manfred Mäser<br />

design Nikolussi/Hänsler Architects<br />

construction period February 2010 to June 2010<br />

contract value EUR 800,000<br />

excavation work 3,500 m³<br />

spray concrete application including earth anchors 360 m²<br />

Borehole drilling 1,700 m<br />

site Manager Klaus Chlopik


Good cooperation of Rhomberg Building<br />

and Civil Engineering teams provides foundation<br />

for success: the tight programme for<br />

McDonald’s Hard was met and the client’s<br />

special wishes implemented thanks to our<br />

usual flexibility.<br />

civil engineering and Building well coordinated<br />

Perfect teamwork helps to cope with enormous time pressure on small building sites<br />

HaRd, aUsTRIa: FasT-TRack conVeRsIon oF McdonaLd’s<br />

When the program is tight, work must progress speedily – just the job for<br />

Herbert Zitz and his minor works team. McDonald’s in Hard had to be refurbished<br />

and extended with a McCafé in a construction period of only two months.<br />

The new commercial facility occupies the whole length of the building at ground<br />

level. New childrens’ play zones enhance the restaurant, indoors and out. The<br />

outside areas are used for seating and provide green space. Vehicular access<br />

to the drive-thru counter is now very convenient. All the external works – from<br />

demolition through lighting to traffic markings were carried out by our civil<br />

engineers.<br />

doRnBIRn, aUsTRIa: FacToRy<br />

exTensIon<br />

Master baker Ölz depends on the reliability<br />

of the Rhomberg team. This time<br />

it was on the extension of the factory<br />

in Achmühle, Dornbirn. The new wing<br />

with a plant room and social area was<br />

constructed in only five weeks. The<br />

facilities include a rest room, locker<br />

room, wet cell and WC.<br />

kLaUs, aUsTRIa: neW GaRden<br />

Elmar Rist commissioned the minor<br />

works team to enclose his parcel of<br />

land in Klaus and create his dream<br />

garden. The ground had to be retained<br />

with a reinforced concrete wall and in<br />

some places with a blockwork masonry<br />

wall. Our team also redesigned the<br />

area in front of the house: installing<br />

drainage, surfacing with asphalt and<br />

laying cables for post, electricity and<br />

telephone services.<br />

Herbert Zitz<br />

The construction period was kept as short as<br />

possible to cause minimum disruption to the<br />

food manufacturer’s operations.<br />

The garden for this discerning client was<br />

transformed into an idyllic haven for people and<br />

nature.<br />

client AWP Immobilien Verwertung und<br />

Beteiligung GmbH, Dr. Dimitri GmbH, Austria<br />

design Leitner & Marius<br />

Planungsgesellschaft m.b.H./DI Kurt Schuster<br />

contract volume EUR 360,000 (including<br />

EUR 170,000 for external works and demolition)<br />

construction period 26 April to 25 June 2010<br />

site management Herbert Zitz (building) and<br />

Markus Tschurtschenthaler (civil engineering)<br />

Foremen Michael Sponsel (building), Gerd<br />

Engelhardt (civil engineering) and Gerhard<br />

Sailer (civil engineering)<br />

client Master baker Ölz, Dornbirn, Austria<br />

contract value EUR 130,000 for<br />

demolition and builder’s work<br />

construction period 3rd to 28th May 2010 new<br />

building, 9th to 20th August 2010<br />

demolition.<br />

site manager Jürgen Ropele<br />

Foreman Jack Moosmann<br />

client Elmar Rist, Klaus, Austria<br />

contract volume EUR 70,000<br />

construction period March to May 2010<br />

site manager Jürgen Ropele<br />

Foreman Steffen Fritsche<br />

MINOR WORKS | NEW DIMENSIONS 19


20<br />

ReFURBIsHMenT<br />

FoR MoRe<br />

adVIce BookLeT FoR<br />

InFoRMaTIon Go To<br />

ResIdenTIaL BUILdInGs<br />

WWW.RHoMBeRGBaU.aT<br />

Housing refurbishment advice booklet<br />

Practical tips from the experts<br />

We have produced our refurbishment advice<br />

booklet in conjunction with the Vorarlberg<br />

Home-Owners Association (VEV) and Austrian<br />

Real Estate Agents Association (ÖVI).<br />

In future, this advice booklet on refurbishment<br />

can be downloaded from www.rhombergbau.at.<br />

NEW DIMENSIONS | CONVERSION & MODERNISATION<br />

ReFURBIsHInG exIsTInG<br />

BUILdInGs: expeRIence pays<br />

As a leading general contractor in the<br />

field of conversion and modernisation,<br />

Rhomberg has more than ten years’<br />

experience in the refurbishment of<br />

housing properties. In total to date we<br />

have dealt with more than 150 housing<br />

properties – taking most of them<br />

from the initial idea, through planning<br />

and design to realisation. This creates<br />

experience and our advisors are<br />

pleased to pass on the benefit of this<br />

experience to our clients.<br />

GReaT need FoR InFoRMaTIon<br />

Different legislation applies to the<br />

refurbishment of condominiums than<br />

to renovating non-commonhold properties.<br />

Other points of difference include<br />

the building, the resident profile and<br />

therefore the residents’ wishes. Many<br />

refurbishment projects fail not because<br />

of financial viability, but because of<br />

defective decision-making processes<br />

and tools, often combined with lack of<br />

or one-sided information. Our objective<br />

is to ensure that owners, builders<br />

and refurbishment designers all benefit<br />

from the content of our advice booklet.<br />

"Through this advice<br />

booklet, we<br />

would like to offer<br />

our knowledge and<br />

practical experience,<br />

and positively support the decisionmaking<br />

process with helpful tips. "<br />

Gerhard Vonbank<br />

BUILdInG LIFe-cycLe<br />

Rhomberg has been concerned with<br />

sustainability and life-cycle optimisation<br />

of buildings for years.<br />

In the refurbishment phase, we pay<br />

closest attention to retaining and<br />

optimising the original, and bringing<br />

the building up to the current state of<br />

technology. By early consideration of<br />

the possible future uses, the type of<br />

energy used, including how existing<br />

energy usage might be made more<br />

efficient, we seek to positively influence<br />

operating costs at this preliminary<br />

stage.<br />

Gerhard Vonbank


conversion and refurbishment<br />

Apartment and office block of Diemwerke Lochau, Austria, modernised<br />

to incorporate top energy conservation standards<br />

This recently-completed apartment and office<br />

block in Lochau is a good example of a commercially<br />

viable modernisation which includes<br />

optimum energy conservation measures. The<br />

building had been converted a number of times<br />

but nevertheless was showing its age so that a<br />

number of extensive modernisation measures<br />

had to be carried out. The building owner knew<br />

that this was a unique opportunity to add sustainable<br />

value to the building and to create a better<br />

quality of life for its residents.<br />

Rhomberg was asked to research the best refurbishment<br />

option for the building. Top priorities<br />

were longevity, energy efficiency and commercial<br />

viability. A number of different variants were<br />

studied and evaluated using life-cycle analyses.<br />

In this way, the best solution for the building<br />

owner could be found quite quickly: it involved<br />

an upwards extension of one floor, comprehensive<br />

refurbishment of the interior, renewal of the<br />

services installations and upgrading the facade to<br />

high energy conservation standards.<br />

The project was developed using the so-called<br />

GMP (Guaranteed Maximum Price) model. This<br />

is a design and build model which ensures a winwin<br />

situation through teamwork and transparency.<br />

The guaranteed maximum price provides an<br />

additional measure of security.<br />

Daniel Mohr<br />

InTeRVIeW WITH danIeL MoHR, THe sITe<br />

ManaGeR ResponsIBLe FoR THe pRojecT:<br />

What was unusual about this project?<br />

We had an intensive preparation period and looked<br />

very carefully at the energy conservation potential of<br />

the building. As the Design and Build contractor, we were<br />

responsible for all designs and calculations.<br />

It also fell to us to obtain all approvals, including the Energy and<br />

Building Certificates. The project was concluded when we handed<br />

over the keys and a special User Manual which we had produced<br />

for the owner and tenants.<br />

What challenges did you have to face in this refurbishment project?<br />

During the construction period, two whole floors remained occupied,<br />

which made demolition work extremely challenging. Here it<br />

was helpful that this work was carried out by our specially trained<br />

in-house refurbishment team. Also, it was not easy to comply with<br />

all requirements by the authorities, both technically and architecturally,<br />

on this existing building.<br />

daTes & FacTs<br />

The apartment and office<br />

block before and<br />

after modernisation:<br />

with the help of the<br />

extremely long-lasting<br />

aluminium sandwich<br />

panels used for the<br />

facades, this “ugly<br />

duckling” was turned<br />

into a bulding of the<br />

highest architectural<br />

quality.<br />

design Rhomberg Bau<br />

Total floor space, residential and offices 1,100 m²<br />

Reduction of co2 emissions 60 tonnes per year<br />

construction period 7 months<br />

space heating requirement, before 91 kWh/m²a<br />

space heating requirement, after 23 kWh/m²a<br />

CONVERSION & MODERNISATION | NEW DIMENSIONS 21


Two separate weighbridges for HGVs entering and leaving the site facilitate efficient processing of journeys in and out of the<br />

Rheintal Resource Center, Dornbirn/Hohenems, Austria<br />

Rheintal Resource center<br />

New weighbridge improves customer service<br />

Following the renewal of the access road to the Resource<br />

Center last year, the old weighing facility was demolished<br />

and replaced by a new one, as the Centre wanted to<br />

improve processing efficiency for its hauliers. Now customers<br />

are welcomed at an attractive reception counter. There<br />

are two separate weighbridges for incoming and outgoing<br />

vehicles, which considerably speeds up the weighing<br />

process, as lorries have to queue less, which saves drivers<br />

valuable time.<br />

The new weighing software collects and manages the data<br />

and records all transport jobs for Rhomberg Recycling. In<br />

addition, this central location is used for monitoring the<br />

automatic loading of HGVs with sand and chipping materials.<br />

There is also the option of communicating with the<br />

quarry workers via radio.<br />

Carmen Bösch<br />

22 NEW DIMENSIONS | RHEINTAL RESOURCE CENTRE<br />

The strings of the Rheintal Resource Centre are pulled from<br />

Albert Niedermaier’s desk. Functions include weighing, loading<br />

and communicating.


young and incredibly dynamic<br />

Rhomberg Recycling in Dornbirn Stöcken, Austria, has been going for two years<br />

A lot has happened in the two years since the formation<br />

of Rhomberg Recycling at Stöcken. The Management is<br />

backed up by a team of motivated and competent members<br />

of staff who advise Rhomberg clients regarding waste management<br />

and related legal matters.<br />

The continuing upgrade of the Stöcken facility is particularly<br />

rewarding. As business development is very encouraging,<br />

the facility is continually being expanded. Recent additions<br />

were a floating roof above the recycling boxes, asphalt<br />

surfacing of various areas on site and new plant and<br />

equipment.<br />

Members of staff have the benefit of specialised training<br />

combined with the background experience of the whole<br />

Rhomberg group, and are highly committed and well prepared<br />

to give comprehensive advice to recycling customers<br />

to their fullest satisfaction. Economical and practical<br />

solutions can be found for very specific individual customer<br />

requirements.<br />

Another plus: in spite of the fact that the company has only<br />

been in existence for a short while, it uses resources carefully<br />

and orientates its work towards customers to reflect<br />

Rhomberg’s sustainability strategy.<br />

To improve customer service, opening times were recently<br />

extended. Rhomberg Recycling is now also open on<br />

Saturday mornings. This option is used primarily by private<br />

customers who can dispose of their waste materials comfortably<br />

and without stress.<br />

Eva Huber<br />

daTes & FacTs<br />

• Company formation: April 2008<br />

• Majority owner: Rhomberg Steinbruch GmbH & Co OG<br />

• Number of staff: 7<br />

• Serves industrial and commercial companies<br />

• Provides specialised disposal services<br />

• Waste materials include: household waste, wood, scrap metal, paper,<br />

plastics, glass, construction rubble, construction waste materials and<br />

concrete<br />

• Opening times: quarry and recycling Monday to Friday from<br />

7.00 to 17.00 hours and Saturday from 7.30 to 12.00 hours<br />

Our team in Dornbirn, Stöcken (from left to right): Markus Sommergut,<br />

Eva Huber, Albert Niedermaier, Carmen Bösch, Gerhard Elbs from the<br />

Höfle company, Martin Elbs and Walter Hermann<br />

Rhomberg Recycling keeps developing: in recent months the floating roof<br />

was extended and an asphalt surface applied to the yard.<br />

Schwarzach Offset Printers disposes its waste materials using a<br />

stationary press at Rhomberg Recycling.<br />

These different kinds of waste disposal containers make a strong<br />

contribution to Rhomberg Recycling’s turnover.<br />

RECyCLING | NEW DIMENSIONS 23


From metropolis to megacity<br />

Rhomberg’s Life-Cycle Tower is part of our urban future<br />

The usual rush-hour traffic jams, smog<br />

warnings on the radio, congested inner<br />

city streets: everyone who lives in the<br />

centre of a major city is well acquainted<br />

with this scenario. This is just a tiny<br />

foretaste of the future. Today’s metropolis<br />

is possibly only about 40 years<br />

away from being described as a<br />

“megacity” – so innovative ideas for<br />

urban living space are more urgently<br />

required than ever before.<br />

By 2007 more than half of the world’s<br />

population was living in cities with<br />

more than a million inhabitants.<br />

Scientists all over the world are predicting<br />

that in 2050 the figure could<br />

be three-quarters. And all the time,<br />

our planet’s natural resources are<br />

becoming increasingly more scarce,<br />

energy more expensive and more in<br />

demand. If you take a few minutes to<br />

think about these two developments, it<br />

becomes clear that providing the conditions<br />

for working, living and life for<br />

people in the megacity of the future<br />

will become an almost insurmountable<br />

challenge for town planners without<br />

innovative technologies and ecological<br />

concepts.<br />

sUsTaInaBILITy Is noT jUsT a<br />

TeMpoRaRy Fad<br />

In view of the fact that over three-quarters<br />

of the world’s energy consumption<br />

takes place in cities, there is surely no<br />

need to ask why the term sustainability<br />

is on everyone’s lips. A move to using<br />

the earth’s renewable resources is<br />

not only sensible, it is important to life<br />

24 NEW DIMENSIONS | CREE<br />

– and this applies above all in architecture.<br />

The idea of multistorey green<br />

buildings that do not waste resources<br />

and provide large numbers of people<br />

with an environmentally friendly urban<br />

living space has become more than<br />

just a global trend. The Life-Cycle<br />

Tower, developed under Rhomberg’s<br />

leadership, is one of those projects<br />

that is capable of not only keeping<br />

up with but setting new international<br />

standards, because its basic material<br />

is a quick-growing natural substance:<br />

wood.<br />

an Idea To sHape THe FUTURe<br />

Short construction times through innovative<br />

system building methods, clear<br />

cost management, top construction<br />

quality and hence better living quality –<br />

the concept for the world’s current tallest<br />

20-storey wooden hybrid building<br />

is impressive down to the last detail.<br />

The construction of energy-efficient<br />

towers, like the Life-Cycle Tower, is not<br />

only an expansion to the Rhomberg<br />

range of products and services and<br />

a major commercial opportunity for<br />

the company; it also provides a simple<br />

answer to the question of whether<br />

the world of tomorrow needs sustainable<br />

building concepts in order to face<br />

the future with confidence. And the<br />

answer is “yes”.<br />

Construction phase 1 Construction phase 2 Construction phase 3<br />

The completed Life-Cycle Tower


cRee – a vision becomes reality<br />

A new Rhomberg group company<br />

looks to the future<br />

A wooden hybrid building system for<br />

multistorey towers that can be individually<br />

designed and built in the shortest<br />

possible time – and above all uses<br />

a minimum of resources and energy<br />

over its whole life-cycle. The Life-Cycle<br />

Tower is a yardstick for the building<br />

methods of the future. And it will soon<br />

become reality.<br />

Good concepts always come from a<br />

good home. A new company closely<br />

associated with the Life-Cycle Tower<br />

project and with a great deal of knowhow<br />

devoted to establishing wood as a<br />

building material in the urban context<br />

has been established in the Rhomberg<br />

Group: the company’s name is CREE<br />

and it has borrowed its ideas from<br />

only those who move<br />

can make progress.<br />

We’ve got big plans: the next steps.<br />

From the website to the mail drop:<br />

communication in all its forms is indispensable<br />

to CREE. But of course there<br />

is nothing better than the creation of<br />

an actual building demonstrating the<br />

CREE principals. That’s why the first<br />

two storeys of a Life-Cycle Tower<br />

are to be built in spring 2011 on the<br />

Rhomberg site in Dornbirn. This opens<br />

up a range of possibilities: final testing<br />

and technical optimisation of the<br />

The new company logo for CREE GmbH<br />

the philosophy and lifestyle of one of<br />

the First Nations of North America,<br />

the Cree. Their close relationship with<br />

nature has inspired us to continue this<br />

way of life in a modern context:<br />

CREE stands for Creative Renewable<br />

Energy & Efficiency.<br />

As part of the Rhomberg Group, CREE<br />

is the logical result of four generations<br />

of high-rise building experience since<br />

1892 – arising out of the necessity to<br />

set an example of measures to counter<br />

climate change and to engender a sustainable<br />

shift in our approach to urban<br />

architecture.<br />

We can take a communal step forward:<br />

into a future of treating nature and its<br />

resources with proper respect.<br />

facades, floors and items of building<br />

services equipment, as well as the official<br />

fire resistance requirements. Later<br />

the Life-Cycle Tower can be leased<br />

out as offices at no additional cost to<br />

the project budget and further storeys<br />

added at any time.<br />

Jakob Bonomo<br />

CREE | NEW DIMENSIONS 25


new nursery schools for Feldkirch<br />

Modular nursery school system: high flexibility, short construction time,<br />

ecologically sound performance<br />

Floors, walls and ceilings were built with solid<br />

wooden elements, the large windows extend<br />

from floor to ceiling in some places.<br />

At the heart of the Vorarlberg education<br />

policy is the earliest possible<br />

provision of comprehensive play<br />

activities to our children. The need for<br />

nursery school group accommodation<br />

has risen sharply with the adoption by<br />

the regional government of its latest<br />

The young artists each create an image of a beautiful life.<br />

26<br />

NEW DIMENSIONS| GENERAL CONTRACTOR<br />

forward-looking nursery school education<br />

and teaching plan. In conjunction<br />

with the local Feldkirch council and<br />

architects Atelier Rainer + Amann, our<br />

response has been the development of<br />

a modular system for the cost-effective<br />

and rapid construction of nursery<br />

school rooms.<br />

pILoT pRojecT sUccessFULLy<br />

coMpLeTed<br />

Three new modular nursery schools<br />

have already been erected in Feldkirch<br />

by Rhomberg as the general contractor.<br />

The buildings are built entirely of<br />

wood. Work on site started in June,<br />

completion followed in October 2010.<br />

specIaL cHaRacTeRIsTIcs<br />

The wooden construction involved<br />

the use of prefabricated wall panels<br />

with a high-quality natural finish. This<br />

allowed the entire wooden construction<br />

(floors, walls and ceilings) for each<br />

nursery school to be assembled in only<br />

two weeks. All recesses, penetrations<br />

and empty ducts for cables and pipes<br />

(electrical and heating, ventilation and<br />

sanitary fittings) were made and preinstalled<br />

in the factory.<br />

Elisabeth Frener<br />

"The whole building<br />

was constructed<br />

using dry materials –<br />

long drying out or curing<br />

times were therefore<br />

avoided. A detailed construction<br />

programme allowed different trades<br />

to work in parallel in confined spaces<br />

and ensured the smooth progress of<br />

the works in the shortest possible<br />

time. The repetition factor in the three<br />

nursery schools led to an optimisation<br />

of construction time and quality."<br />

Jürgen Heinlein<br />

daTes & FacTs<br />

scope of work Construction of three nursery<br />

schools in wooden construction as a general<br />

contractor including detailed design<br />

nursery school “oberer Riegel” one exercise<br />

and three group rooms, social rooms, office<br />

nursery school “Im Grisseler” one exercise<br />

and two group rooms, social rooms, office<br />

nursery school “alvierstrasse” Extension<br />

to existing building, two group rooms, social<br />

rooms, office<br />

construction period June to September 2010,<br />

three months per nursery school<br />

contract value about EUR 2.4 million in total<br />

project manager Jürgen Heinlein<br />

"WHaT do yoU need To Be Happy?"<br />

RHoMBeRG seeks dIaLoGUe WITH nURseRy<br />

scHooLs<br />

We wanted to ask the youngest in our communities for<br />

their opinions, suggestions and ideas on the theme of living<br />

quality to cast light on this edition of New Dimensions from<br />

all sides.<br />

The Feldkirch nursery school helped us in our project. The<br />

children answered our questions about the criteria for living<br />

quality with innumerable fascinating paintings – which did<br />

not make it easy for us to choose the best eight for our<br />

postcards.<br />

We would like to express our sincere thanks to all our little<br />

artists, the organisers and nursery school teachers.


In the centre of the “Wohnen im Park” residential development is a<br />

communication facility of generous proportions for the residents.<br />

keys handed over for “Wohnen im park”<br />

This is the largest community project ever created through Alpenländische Heimstätte<br />

On a sunny Monday in July 2010<br />

the prime residential development<br />

“Wohnen im Park”<br />

was opened by Prok. Muzyczyn<br />

(Alpenländische Heimstätte) to the<br />

future residents during a hand-over<br />

ceremony. In addition to the 180<br />

guests, we were pleased to welcome<br />

Mayor Markus Linhart, State Official<br />

Karlheinz Rüdisser, KR Walter-Heinz<br />

Rhomberg as well as the architects DI<br />

Markus Dorner and DI Andrea Niehoff.<br />

The “Wohnen im Park” project is the<br />

largest ever community project resulting<br />

from the long-standing cooperation<br />

between Alpenländische Heimstätte<br />

and Rhomberg Bau.<br />

The development, which is located<br />

in Arlbergstrasse near the entrance<br />

of Bregenz, has raised much interest<br />

amongst the press as modern technologies<br />

and aspects of sustainability<br />

key daTa<br />

"WoHnen IM paRk" ResIdenTIaL deVeLopMenT<br />

aT BReGenz, aUsTRIa<br />

• Public funding for ecological housing, level 5<br />

• Controlled ventilation<br />

• External air is pre-warmed by a solar system<br />

• Pre-warmed intake air ensures that there is no<br />

feeling of draft from cold air<br />

• High-quality heat recovery reduces the need<br />

for space heating<br />

• Filtering of the intake air reduces noxious<br />

substances and dust, which is important for<br />

allergy sufferers<br />

• Controlled air exchange prevents problems<br />

with humidity<br />

• Continuous air exchange reduces unpleasant<br />

odours<br />

lift this community project out of the<br />

ordinary.<br />

In its projects, Alpenländische Heimstätte<br />

places a lot of emphasis on<br />

freedom from barriers, family-friendly<br />

design, qualification for public funds<br />

and of course, commercial viability. All<br />

these aspects were successfully implemented<br />

in the “Wohnen im Park” prime<br />

residential development, which was<br />

completed in the period from October<br />

2008 to July 2010. The development<br />

stands on a site area of 7,052 m² and<br />

comprises four<br />

“The apartment is lovely and light and<br />

the rooms are well proportioned. I<br />

find the ventilation system very comfortable<br />

because it means that I can<br />

close the windows at night.”<br />

Guests of honour (left to right): Landesrat Karlheinz<br />

Rüdisser, Prok. Ing. Wilhelm Muzyczyn and<br />

Mayor Markus Linhart<br />

blocks with a total of 74 apartments for<br />

rent. Each apartment has a generous<br />

balcony and its own cellar space.<br />

There are bicycle stores for a total<br />

of 90 bicycles and, the central<br />

underground carpark provides space<br />

for 77 cars.<br />

In order to provide amenities for children,<br />

the development features three<br />

protected playgrounds which are well<br />

equipped for children and teenagers.<br />

Sarah Krenkel<br />

“I love the peace and quiet and like<br />

going barefoot because the parquet<br />

flooring feels so good. Although I live<br />

right in the city, wherever I look I see<br />

greenery.”<br />

Alexandra Bitschnau Rosemarie Kettenmeier<br />

The residents are very pleased with the successful project (from left to right): a new tenant,<br />

Alexandra Schalegg, from Alpenländische Heimstätte, State Official Karlheinz Rüdisser and<br />

Mayor Markus Linhart.<br />

GENERAL CONTRACTOR | NEW DIMENSIONS 27


Trusting the other team members not only<br />

helps the crew to progress faster, it is also<br />

fun:<br />

members of staff of the General Contractor<br />

for Housing department have demonstrated<br />

that they are a successful sailing crew.<br />

28 NEW DIMENSIONS | GENERAL CONTRACTOR<br />

We are “building” a team<br />

Teambuilding on Lake Constance near Langenargen<br />

On Friday 10 September 2010, the<br />

Housing / General Contractor department<br />

made its way to Langenargen<br />

in Germany. The idea was to bring the<br />

team, which is already pretty much in<br />

tune, even closer together.<br />

Members took to the Lake in three<br />

sailing boats. Of course each team<br />

wanted to be faster and better than<br />

the “competition”. This meant that all<br />

those on board had to be coordinated<br />

and work as a crew. After a short<br />

introduction by the skipper, the teams<br />

were able to steer their sailing boats<br />

themselves – without prior knowledge.<br />

It was not the wind that determined the<br />

direction of our boat, but us as a team,<br />

and how we placed the sails. In the<br />

end, the most courageous of us took a<br />

swim in the 17 °C-cold lake, or opted<br />

to go water-skiing or wakeboarding.<br />

The exhausting and very successful<br />

day on the water was concluded with a<br />

barbecue around a campfire.<br />

Teambuilding is a process intended to<br />

improve the performance of all<br />

involved. Success comes from many<br />

factors including; better loyalty within<br />

the group, articulate communication<br />

and a motivating working ambiance.<br />

A central element is that people trust<br />

each other, which is something the<br />

team was able to experience during<br />

this sailing trip – not least thanks to<br />

the perfect organisation of the event<br />

by Michael Gierer – all of the crew<br />

express their heartfelt thanks to him.<br />

“This was my first<br />

time on a sailing boat<br />

and I hope that it was<br />

not the last time. It is<br />

a good thing to get<br />

to know your colleagues outside the<br />

workplace. I have really enjoyed the<br />

day.”<br />

Thomas Feuerstein<br />

“With my colleagues,<br />

I had the opportunity<br />

to experience a very<br />

special and exclusive<br />

form of teambuilding.<br />

Not only did we get to know each<br />

other away from work, but we were<br />

also able to prove that we harmonise<br />

well in the sailing team. A successful<br />

excursion, finishing off with wakeboarding<br />

and a barbecue and<br />

campfire.”<br />

Bernhard Fink<br />

Plato<br />

“In a game you can get<br />

to know people better in<br />

an hour’s time than you<br />

can by talking to them<br />

for a whole year.”<br />

“Every day I am on<br />

the construction site<br />

at the Lindau yacht<br />

harbour and therefore<br />

do not often come to<br />

the office. For me, this teambuilding<br />

excursion was a good opportunity to<br />

get to know my colleagues (some of<br />

whom I didn’t know). We had a really<br />

cool time – I would like to thank the<br />

organisers for the fact that we all, at<br />

least myself, went home without being<br />

hungry or thirsty.”<br />

Franz Sutterlüty


"Life-cycle management – construction:<br />

Master study course starts in april 2011<br />

Rhomberg group initiates new course at Danube University Krems<br />

Demand for new educational opportunities, which are part of the technological<br />

and social changes of our times, motivated the Rhomberg group to initiate the<br />

development of a Master course specialising in the subjects of Life-Cycle<br />

Management and sustainable construction management, and, in this way, to<br />

encourage a closer study of the issues involved in green building construction.<br />

After several years of preparation, this<br />

project has now become a reality: from<br />

April 2011, mature students from the<br />

construction industry will have the<br />

opportunity to get to know all aspects<br />

of sustainable construction management<br />

and to build on their existing<br />

knowledge in this 20 module study<br />

course. “Theory and practice meet:<br />

we are passing on our comprehensive<br />

experience in construction management,<br />

energy efficiency, life-cycle optimisation<br />

and careful use of resources<br />

to the students. In turn, we will be able<br />

to incorporate the latest findings into<br />

our work” explains Hubert Rhomberg,<br />

Managing Director of Rhomberg<br />

Holding. The course curriculum is<br />

based on life-cycle study.<br />

“Due to its vocational<br />

orientation, the Master<br />

study course ’Life-<br />

Cycle Management in<br />

Construction’ initiated<br />

by us is a leader in the educational<br />

post-graduate landscape of Europe.”<br />

Hubert Rhomberg<br />

The 20 modules cover all important<br />

questions to be answered by a future<br />

construction project manager who<br />

wants to successfully develop and<br />

implement construction projects. These<br />

are the core elements of sustainable<br />

construction and life-cycle management,<br />

green building issues such as<br />

resource management and climate<br />

engineering as well as the classical<br />

subjects of project management<br />

and project development (cost, time<br />

and risk management) and general<br />

construction management covering<br />

contract and tender procedures through<br />

to strategic claim management. It is<br />

intended that the students will also<br />

develop their general management<br />

skills. Other aspects are team building,<br />

negotiation skills, communication,<br />

innovation management and leadership<br />

skills. The four-semester-long course<br />

finishes off with a Master thesis which<br />

is intended to be of highly practical<br />

relevance. A Masters (MSc) is awarded<br />

on completion of the course.<br />

MasTeR sTUdy coURse<br />

LIFe-cycLe ManaGeMenT<br />

duration 20 modules, 4 semesters<br />

extra-occupational including Master thesis<br />

start April 2011<br />

partners<br />

• Rhomberg group, Bregenz<br />

• Danube University Krems – Department for<br />

Building and the Environment<br />

• Stempkowski Building & Construction<br />

Management, Vienna/Graz<br />

• Building Academy of the Chamber of<br />

Commerce, Austria<br />

• The State of Vorarlberg – Schloss Hofen, Lochau<br />

Information<br />

Rhomberg group<br />

Contact: Mag. Jürgen Jussel<br />

Telephone: +43 5574 403-0<br />

Email: juergen.jussel@rhombergbau.at<br />

www.rhombergbau.at<br />

danube University krems<br />

department for Building and the environment<br />

Head of Studies:<br />

Dipl.-Ing (FH) Maria Wallner-Kleindienst MSc.<br />

Email: lcm-bau@donau-uni.ac.at<br />

www.donau-uni.ac.at/de/department/bauenumwelt<br />

coMpeTenT paRTneRs In scIence,<br />

BUsIness and poLITIcs<br />

Back in 2007 the Rhomberg group<br />

was able to commission Rainer Stempkowski,<br />

an expert on life-cycle optimisation<br />

and Professor at the Joanneum<br />

University of Applied Sciences<br />

in Graz, with devising the concept for<br />

this extra-occupational Master study<br />

course. The company was able to take<br />

the Danube University Krems (DUK)<br />

on board to provide the academic<br />

framework for this project.<br />

The Building Academy of the Chamber<br />

of Commerce also takes part in<br />

the project – the reason being that<br />

this new postgraduate study course<br />

emphasises practical orientation in<br />

the education of future construction<br />

industry professionals. The Vorarlberg<br />

State – Schloss Hofen – also provides<br />

support for the newly-created Master<br />

study course right from the beginning.<br />

The modules will alternate between<br />

Krems and Vienna and the educational<br />

centre at Schloss Hofen (Lochau).<br />

RHOMBERG ACADEMy | NEW DIMENSIONS 29


Manuela and Mona Rhomberg’s apprentices learn more than just their specific trade.<br />

Quality of life at work<br />

Focus on people<br />

HoW can I BesT deVeLop<br />

My sTRenGTHs?<br />

WoRkInG-sTyLe-anaLysIs (Wsa)<br />

and LeaRnInG-sTyLe-anaLysIs (Lsa)<br />

Working-style-analysis helps our staff to become more<br />

familiar with their personal working style and therefore to<br />

fulfill their duties more effectively, efficiently and with less<br />

stress.<br />

WSA is an important aid for us in personnel development<br />

in order to ensure that staff are given tasks that best suit<br />

their abilities. In addition, this analysis helps us to improve<br />

the efficiency of team selection, as it indicates to us what<br />

members of staff need for their optimum development.<br />

Learning style analysis helps pupils to become more<br />

familiar with their personal learning style in order to be able<br />

to learn more effectively with the least possible stress, and<br />

under optimum conditions.<br />

In spring and autumn we have organised workshops with<br />

the youngest forms of HTL college at Rankweil. The aim<br />

was to support pupils in becoming familiar with their personal<br />

learning style to help them cope better with everyday<br />

learning situations at school and at home. Regarding the<br />

learning process, we think there is still an enormous<br />

potential for improvement in our schools.<br />

With these workshops, we have the opportunity to make a<br />

contribution so that we have access to motivated and welleducated<br />

employees in the future.<br />

30 NEW DIMENSIONS | HUMAN RESOURCES<br />

Being aware of one’s personal working and learning style brings<br />

many benefits.<br />

So that they can use these tools even more efficiently,<br />

Jürgen Jussel and Karin Hubalek successfully passed a<br />

qualifying examination in August this year.<br />

neW TeaM MeMBeR<br />

Manuela Polki-Akrouti has been a member of the Human<br />

Resources team since May 2010. Manuela supports our<br />

Head of Human Resources, Jürgen Jussel, as his Personnel<br />

Assistant and also provides valuable support to the whole<br />

team.<br />

As Manuela is the proud mum of Mona (3 years), she works<br />

for us on a part-time basis. Before her maternity leave,<br />

Manuela had been very successful in hotel management in<br />

Vienna.


By working collaboratively, personal and social competencies are strengthened in the Rhomberg apprenticeship programmes.<br />

appRenTIce poWeR<br />

Whether we are training apprentices to become ground<br />

workers, mechanics or bricklayers – for us, good apprentice<br />

education includes more than the respective trade training<br />

and mentoring from the person responsible for apprentices<br />

– equally important is the systematic development of<br />

personal and social competence. In cooperation with the<br />

Vorarlberg Kinderdorf, we have developed a special<br />

apprentice programme which consists of special apprentice<br />

days, an apprentice camp and educational adventure<br />

components.<br />

For example, this year our apprentices became chefs for<br />

a day and learnt that cooking “tasty and healthy” dishes is<br />

very easy. The second apprentice day focuses on safety at<br />

work on the building site and addiction.<br />

This year’s apprentice camp is held under the motto<br />

“getting underway”. The camp lasts for two and a half days<br />

and is aimed at promoting the personal and social<br />

competence of our apprentices. At the same time, having<br />

fun together and getting to know each other are also part<br />

of the experience.<br />

Karin Hubalek<br />

neW LoGo RHoMBeRG acadeMy<br />

Since the beginning of this year, the Rhomberg Academy<br />

has its own logo.<br />

The curriculum offered by the Rhomberg Academy is varied<br />

and focuses on practical application. “Knowledge becomes<br />

more when we share it.” Therefore we are pleased to say<br />

that this year, some of the 60 modules were not presented<br />

by external speakers, but by Rhomberg members of staff.<br />

sTaFF coacHInG<br />

For those of our staff who are interested in, and indicate<br />

a need for, we provide qualified coaching. This gives them<br />

support for their personal development, to help them grow<br />

into new responsibilities and to achieve their personal<br />

objectives (both professionally and privately).<br />

This also touches on the balance between professional and<br />

private life – because it is becoming increasingly difficult<br />

to achieve a good work/life balance, which is an important<br />

prerequisite for our staff to be able to perform.<br />

ModULes oFFeRed By THe RHoMBeRG acadeMy:<br />

This year’s modules focus on the subjects Leadership and<br />

Communication. Successfully completed modules:<br />

• Carrying out staff reviews successfully<br />

• Appearance and presence<br />

• Managing sub-contractors successfully<br />

• We lead I, II and III<br />

• Conflict management<br />

• Target and time management<br />

• Stress management<br />


<br />

HUMAN RESOURCES | NEW DIMENSIONS 31


The handrail, with its light-emitting diodes (LEDs), was developed by Rhomberg Bahntechnik in cooperation with EPS Soltec and is intended for<br />

installation at the Brenner approach line.<br />

HandraiLIT: a handrail with illumination<br />

The Bahntechnik Department shows the way<br />

This illuminated handrail has been<br />

specified for installation in Austrian<br />

railway tunnels for some time. The<br />

handrail features integrated LED lighting<br />

to help people find escape routes<br />

in emergencies or during maintenance<br />

work. HandraiLIT, which is the name of<br />

the handrail, was developed together<br />

with development partners EPS Soltec<br />

from Hörbranz, Austria.<br />

Currently, the handrail is undergoing<br />

the approval process by the ÖBB<br />

approval authority, with official approval<br />

expected in the coming weeks for<br />

32<br />

Zone Zone 44<br />

Zone Zone 22<br />

Zone Zone 1<br />

Zone 3<br />

The ZOKA system has been deployed at the<br />

Brenner (Lower Inn Valley) approach line sites<br />

and the side tunnels to the Brenner base tunnel<br />

and has proved to be very valuable there.<br />

NEW DIMENSIONS | RAIL ENGINEERING<br />

installation in ÖBB tunnels. We are<br />

making every effort to ensure that this<br />

handrail will be used in future railway<br />

projects at home and abroad.<br />

HandraiLIT comes with two different<br />

types of lighting. There is an extremely<br />

robust version in which a completely<br />

enclosed LED lightbar is inserted into<br />

the stainless steel handrail profile. The<br />

second version uses point lighting<br />

elements. These are inserted individually<br />

and clipped into place. Cabling for<br />

both systems relies on a simple plug<br />

system. The handrail system has been<br />

designed for external applications<br />

(IP 66) but can also be used in other<br />

areas. HandraiLIT provides a safe solution<br />

for stair railings, guide systems in<br />

public buildings and balcony railings.<br />

For more information please visit our<br />

homepage at www.handrailit.com<br />

Stephan Ottersbach<br />

zoka for large building sites<br />

Safety comes first<br />

ZOKA refers to access, localisation, communication and alarm and is the name<br />

of a system which significantly improves safety provisions and coordination on<br />

large building sites. The system combines various components and bundles them<br />

to form a central monitoring tool, for example, for use at the control station.<br />

Communication and distribution cabinets are equipped with the required components<br />

and connected with each other using a redundant optical fibre data<br />

network. These include items such as an emergency telephone, alarm system<br />

components, such as rotating lights or horns, data and communication equipment<br />

such as Switch, including media converters and WLAN transmitters, on/off<br />

servers (I/O module), localisation systems, battery systems for no-break power<br />

supplies, video cameras and much more.<br />

This system can be used to monitor and control barrier systems, localise persons<br />

and vehicles, for internal and external communication via radio and landlines,<br />

alarm systems via distribution cabinets or the control station, and to control and<br />

monitor external equipment such as ventilation or pump systems.<br />

you can find further information in our report “Masterpiece of railway technology”<br />

below and on our website www.rhombergrail.com under “Download Systemfolder<br />

ZOKA”.<br />

Stephan Ottersbach


Green light for RHoMBeRG RaIL Uk<br />

Rhomberg Rail opens up a new subsidiary in London<br />

After two years of intensive<br />

planning a new subsidiary<br />

called Rhomberg Rail UK Limited was<br />

formed in Great Britain with effect<br />

from 1 September 2010. The company<br />

has its offices in London and is an<br />

independent subsidiary with close links<br />

to the Rhomberg Rail group in Austria.<br />

In the years to come the company<br />

anticipates strong demand for the construction<br />

and renewal of slab track.<br />

Already, the company was able to use<br />

Rhomberg’s services and technologies<br />

for the renewal of points at Piccadilly<br />

Circus and in the London Underground.<br />

In addition, Rhomberg was<br />

“The new office in<br />

London brings us<br />

closer to our customers.<br />

We can now<br />

serve our existing<br />

customers in Great Britain and Ireland<br />

even better and more efficiently<br />

and at the same time, increase the<br />

awareness of Rhomberg Rail UK in<br />

Great Britain.”<br />

Christoph Grill<br />

able to demonstrate its capabilities,<br />

together with its local partner 1stinrail,<br />

at the stations of the extension of the<br />

Docklands Light Railway, which runs<br />

throught the Olympic Village to service<br />

the 2012 Olympics.<br />

There is also hope for new projects<br />

such as Crossrail, where a 6m diameter<br />

twin bore tunnel will run east<br />

– west under London for a length of<br />

approximately 21 kilometers, giving 42<br />

kilometers of tunnel in total, and the<br />

new 175-kilometer-long High Speed 2<br />

line between London and Birmingham<br />

in the years to come. In addition, the<br />

company focuses on repair work to the<br />

Renewal of points at Piccadilly Circus, London Underground<br />

RHOMBERG<br />

RAIL UK<br />

With the help of the new office in<br />

London and its experienced railway<br />

engineering crew, we are closer to<br />

our customers in Great Britain and<br />

Ireland and in a better position to<br />

provide them with a better service.<br />

In the picture: track alignment work<br />

for the Docklands Light Railway<br />

project, London, England<br />

London Underground, track renewal in<br />

old tunnels as well as the extension of<br />

tramway networks throughout the UK.<br />

Rhomberg also pushes services such<br />

as the provision of systems for<br />

surveying and track alignment. In<br />

addition, Rhomberg Rail UK plans to<br />

further strengthen the awareness of<br />

its presence in Great Britain.<br />

The company’s team is looking forward<br />

to its new challenges.<br />

RHOMBERG RAIL UK | NEW DIMENSIONS 33


Masterpiece of railway technology<br />

Rhomberg Bahntechnik covers all aspects of railway engineering<br />

structure at the northern Brenner approach line<br />

In the Lower Inn Valley in Tyrol, Austria, the northern Brenner approach line is under construction, which is<br />

currently the largest new ÖBB railway project. Rhomberg Bahntechnik was awarded the contract for the basic<br />

railway engineering infrastructure in 2008. But that was not all. Several departments in the project business<br />

division under Dirk Diederich have are successfully undertaking work packages: Robert Kumpusch as Major<br />

Project Leader for basic railway infrastructure (Lot A1), Andreas Förster for electrical engineering (Lot A2) and<br />

Christian Schreiber for overhead contact wire installations (Lot A5).<br />

“All together, we are responsible for the entire railway engineering infrastrucure in the Lower Inn Valley” reflects<br />

Dirk Diederich with satisfaction. “Works are in operation at full throttle. More than 250 members of staff provide<br />

top quality work and play a vital part in the success of the project. The total value of the contract is over EUR<br />

300 million.”<br />

The project team of the Alptransit Brenner<br />

consortium with Major Project Leader Robert<br />

Kumpusch (1st row, blue shirt)<br />

InsTaLLaTIon and opeRaTIon oF<br />

consTRUcTIon sITe eQUIpMenT<br />

With 60 site and tunnel access points<br />

and a construction site length of 41 km,<br />

the installation and operation of the<br />

construction site equipment is particularly<br />

demanding.<br />

Site electricity with a no-break emergency<br />

power supply has been provided<br />

for the entire length of the construction<br />

site, which includes 35 km of tunnels.<br />

Site communication has been installed<br />

in the form of redundant optical fibre<br />

conductors. The entire tunnel has<br />

been equipped with alarm systems<br />

and emergency telephones. There is<br />

a localisation system for persons and<br />

vehicles throughout the tunnel area.<br />

For this pupose, Rhomberg Bahntechnik<br />

has developed the ZOKA<br />

system – a completely new system<br />

for controlling access, localisation,<br />

communication and alarms. The ZOKA<br />

system has been successfully used on<br />

the construction site since 2009.<br />

34 NEW DIMENSIONS | RAIL ENGINEERING<br />

The new line with the Terfens gallery and the<br />

existing line.<br />

aLL WoRk Is pRoGRessInG accoRdInG<br />

To scHedULe and coMpLeTIon and<br />

Hand-oVeR Is pLanned FoR 2012.<br />

ITeMs coMpLeTed as oF ocToBeR 2010:<br />

• 42 km side walkways<br />

• 15 km mass-spring systems<br />

• 21 km slab track<br />

• 571 km cable installation<br />

• 19 km water pipe for firefighting<br />

• 11 shafthead buildings and lateral tunnels<br />

zoka – access, LocaLIsaTIon,<br />

coMMUnIcaTIon, aLaRM<br />

sysTeMs<br />

ZOKA has been specially developed<br />

for the northern Brenner approach<br />

line. Access control and localisation of<br />

persons and vehicles can be carried<br />

out from the central control station.<br />

All persons and vehicles are initially<br />

registered with the control station and<br />

are kitted out with active badges or<br />

tags with RFID technology.<br />

The tunnel sections are equipped with a<br />

mass-spring system.<br />

Access points to the construction site<br />

and the tunnels are equipped with barriers<br />

and video cameras. These barriers<br />

will open automatically for cars with<br />

access authorisation. In the tunnels,<br />

tag readers have been installed at<br />

500 m intervals to allow the localisation<br />

of persons and vehicles with an<br />

accuracy of 250 m. In emergencies,<br />

alarms will be activated via the central<br />

control station. Alarms are activated in<br />

the form of rotating lights and horns.<br />

RaILWay enGIneeRInG<br />

eQUIpMenT FoR THe sTans<br />

exIsTInG TUnneL<br />

The railway engineering infrastructure<br />

for the existing Stans tunnel includes<br />

the construction of 1,260 m of side<br />

walkways, 824 m of heavy- and<br />

medium-duty mass-spring systems as<br />

vibration protection and the construction<br />

of 1,160 m of slab track. This<br />

required 800 m 3 of mass concrete.<br />

Construction work started in October


Lower Inn Valley, Austria<br />

All access points to the building site are<br />

automatically controlled by barrier systems.<br />

2009 and the project was completed<br />

to the required quality standard in the<br />

record time of just seven months.<br />

InsTaLLaTIon oF eneRGy sUppLy<br />

and TeLecoMMUnIcaTIon<br />

sysTeMs<br />

One of the four contracts of the<br />

Brenner project is for the installation of<br />

energy supply and telecommunication<br />

systems. Work started in August 2010.<br />

The contract covers the entire electricity<br />

supply for the northern Brenner<br />

approach line, electricity supply to<br />

72 service buildings, 41 km of tunnel<br />

safety lighting and the installation of<br />

68 km of illuminated handrail in the<br />

tunnel. The work involves the installation<br />

of a total of 26 transformer<br />

stations and 650 km of various types<br />

of cable – of which 100 km are radio<br />

cable. Completion and handover is<br />

expected in 2012.<br />

A total length of 71 km of slab tracks is under<br />

construction.<br />

InsTaLLaTIon oF oVeRHead<br />

LIne eQUIpMenT<br />

The contract for the railway engineering<br />

infrastructure includes the<br />

complete installation of 80 km of type<br />

2.1 overhead line including supports,<br />

return conductor, guard wire, supply<br />

wire and suspensions. It also includes<br />

the installation of the power feed-in,<br />

including switching systems, earth<br />

wires and two protective sections.<br />

Works started in September 2010.<br />

Completion and handover is expected<br />

in 2012.<br />

Reiner Meuschke<br />

80 km of overhead line system including supports,<br />

return conductors, guard wires, supply<br />

line and suspension wires are being installed.<br />

key daTa oF THe BasIc RaILWay<br />

enGIneeRInG InFRasTRUcTURe oF THe<br />

noRTHeRn BRenneR appRoacH LIne<br />

dId yoU knoW THaT RHoMBeRG…?<br />

… is using up 290,000 m3 of concrete in 70 km<br />

of side walkways, 71 km of slab track and<br />

27,000 m2 of noise protection walls?<br />

… is installing about 24 km of heavy and<br />

medium mass-spring-systems as vibration<br />

protection?<br />

… is laying about 35 km of fire-fighting water<br />

pipe and over 1,000 km of different types of<br />

cable?<br />

… is equipping 43 service buildings and<br />

providing a wide range of site equipment<br />

(site electricity, communication technology,<br />

alarm systems, access control, localisation<br />

and ventilation)?<br />

… is in charge of the overall coordination of<br />

installations and logistics?<br />

RAIL ENGINEERING | NEW DIMENSIONS 35


RHoMBeRG RaIL sUccessFUL as desIGn & BUILd conTRacToR<br />

THe ReLIaBILITy oF THe LÖTscHBeRG TUnneL exceeds aLL expecTaTIons<br />

For just over a year the expanded team of RTE Technologie<br />

GmbH, together with Rhomberg Rail Consult (RRC), has<br />

been working from the Teisenberggasse premises in<br />

Salzburg. The team offers services and development in<br />

railway engineering both at home and abroad.<br />

RTE sees itself as a competent partner for technical development,<br />

patent administration and surveying services. The<br />

team comprises four surveyors, two structural engineers<br />

and one electronics and programming engineer.<br />

In 2010, the team successfully completed two large external<br />

projects: it developed track survey systems for Messrs.<br />

Doppelmayr Cable Car and a comprehensive software<br />

package for Steinbichler Optics.<br />

In the Rhomberg Bahntechnik group, the team supported<br />

the Malmö project and also optimised the Alptransit<br />

Brenner project from the organisational point of view. In<br />

August 2010 a Turkish surveyor was specially trained in<br />

the track measuring technology used in the Kadiköy-Kartal<br />

project in Istanbul. This project will provide further challenges<br />

for RTE in the future. A further project is in preparation<br />

for the city railway in Monterey in Mexico to provide<br />

track corrections and its own monitoring system.<br />

The team’s development work focuses on the HERGIE and<br />

PLASMA track measuring systems as well as a number of<br />

36<br />

NEW DIMENSIONS | RTE SALZBURG<br />

“The 35-km-long Lötschberg base tunnel is more than 2,000 m<br />

deep within the mountain. It is a railway tunnel of the latest<br />

generation, with high safety requirements and train speeds of up<br />

to 250 km/h.<br />

The tunnel has been in successful operation since June 2007 and<br />

has exceeded all expectations right from the beginning. More than<br />

90,000 trains have already traversed the tunnel. Its average utilisation<br />

is about 80 % and the maximum capacity of 110 trains per day<br />

has been reached on several occasions. The proportion of goods<br />

traffic, including the ’rolling motorway’ (transport of HGVs) is about<br />

40 %. In spite of the complexity of all safety installations of the new<br />

ETCS Level 2 signal concept, the reliability of the entire installed<br />

railway infrastructure is 99.82 %. A top achievement! It is proof that<br />

the enormous effort of all involved was worth it!”<br />

Peter Teuscher, former Director of BLS AlpTransit AG<br />

Railway engineering: surveying and developing<br />

The RTE team expands its capacity and services in Salzburg<br />

solutions for slab track construction. Other activities include<br />

geo-monitoring systems for tunnel construction, slope<br />

monitoring and building deformation. These intelligent<br />

systems are based on an automatic measuring process,<br />

including data transfer and alarm systems.<br />

Helge Grafinger<br />

RTE’s developers and surveyors test the new equipment on the tracks<br />

which are immediately adjacent to their offices in Salzburg, Austria.


Major long-term projects<br />

Complex projects nearing successful completion<br />

conVeRsIon oF sT. pÖLTen<br />

RaILWay sTaTIon<br />

On 10 September 2010 the modernised<br />

main railway station at St. Pölten<br />

had its opening ceremony in the presence<br />

of Infrastructure Minister Doris<br />

Bures and numerous other guests of<br />

honour. The ceremony marked the end<br />

of extensive remodelling work at the<br />

St. Pölten main railway station. Since<br />

Railway crane<br />

Kirow KRC 1200<br />

FoUR-TRack UpGRade oF WesTeRn LIne<br />

asTen – LInz – kLeInMüncHen<br />

The extensive work for upgrading the western railway line<br />

to four tracks will be completed at the end of December<br />

2010. The implementation of this complex construction<br />

project took six years and provided a range of challenges<br />

for all parties involved. Nevertheless, it has been possible to<br />

meet the exacting specifications set by the clients and their<br />

April 2007, all tracks were dismantled<br />

step by step and then reinstated with<br />

new track material. In order to be able<br />

to complete the work on time and to<br />

the fullest satisfaction of the client,<br />

sophisticated logistics, flexible<br />

working hours and motivated crews<br />

from the companies involved in the<br />

project were required. In addition to the<br />

work already completed, there is also<br />

Universal ballast regulating and profiling<br />

machine USP 2010 SWS<br />

the three-track link to the west of<br />

St. Pölten through the newly<br />

constructed Eisberg Tunnel and the<br />

renewal of the entire St. Pölten freight<br />

station, which are scheduled for<br />

completion by the end of 2011.<br />

Gerhard Hochreiter<br />

representatives and to complete the contract on time and<br />

to a high quality standard. Now the whole team is looking<br />

forward to new challenges.<br />

Michael Wolfsteiner<br />

key daTa FoR conVeRsIon<br />

oF RaILWay sTaTIon In sT. pÖLTen,<br />

aUsTRIa<br />

• 75,000 tonnes of track ballast<br />

• 10,000 m track dismantled<br />

• 15,000 m track laid<br />

• 8,000 m 2 of sub-ballast mats<br />

• 60 points dismantled<br />

• 45 points reinstalled so far (mostly by crane)<br />

construction period<br />

April 2007 to December 2011<br />

key daTa – UpGRade oF WesTeRn<br />

RaILWay LIne, aUsTRIa<br />

• 160,000 m3 track ballast<br />

• 32,500 m track dismantled<br />

• 50,000 m track installed<br />

• 40 points installed<br />

construction period<br />

July 2004 to December 2010<br />

From design to execution: Bahnbau Wels impresses<br />

with its competence and dedication.<br />

BAHNBAU WELS | NEW DIMENSIONS 37


expansion of services in australia<br />

Track Australia rebranded to Rhomberg Rail Australia<br />

Rhomberg’s team at the official re-branding launch in Sydney (from left to right): Michael Match,<br />

Richard Morgan, Alan Pollard, David Madlener, Garry Thuer, Shane Whitehouse and Sabrina Vonach<br />

Changing the name from Track Australia to Rhomberg Rail Australia<br />

is a logical step that links the many years of experience of the<br />

Rhomberg Rail group with knowledge of the complex Australian market. It is<br />

forging a successful symbiosis of European expertise and local know-how.<br />

In addition, the company’s employees have the opportunity to expand their<br />

knowledge and skills in an international market.<br />

“The rebranding will ensure that Rhomberg Rail Australia receives the innovation,<br />

project expertise and financial strength that the European Rhomberg<br />

Group has to offer”, said Managing Director Garry Thuer. “This gives<br />

Rhomberg Rail Australia expanded service capability for rail projects,<br />

starting from concept, right through to its completion and maintenance.”<br />

Michael Match<br />

RHoMBeRG capaBILITIes In aUsTRaLIa<br />

TRACK DESIGN<br />

• Feasibility<br />

• Concept Design<br />

• Detailed Design<br />

• Technical Advisory<br />

TOTAL PROJECT SOLUTION<br />

• Design & Construct<br />

• Alliance Partnering<br />

• Rail Systems Interface<br />

• Operational Readiness<br />

and Commissioning<br />

FROM CONCEPT TO COMPLETION AND MAINTENANCE<br />

TRACK CONSTRUCTION TRACK RESURFACING<br />

• Ballasted Track<br />

• Plain Line Tamping<br />

• Track Slab<br />

• Turnout Tamping<br />

• Turnouts & Crossovers • Ballast Management<br />

• Flashbutt Welding • Track Stabilisation<br />

38 NEW DIMENSIONS| RHOMBERG RAIL AUSTRALIA<br />

TRACK MAINTENANCE<br />

• Asset Management<br />

• Routine Maintenance<br />

• Major Periodic<br />

Maintenance<br />

RAIL STRUCTURES<br />

• Rail Bridges and<br />

Culverts<br />

• Level Crossings<br />

• Drainage Structures<br />

At the official re-branding ceremony, Managing<br />

Director Garry Thuer (right) welcomes the<br />

Austrian Ambassador in Australia Dr. Hannes<br />

Porias (left) in Sydney<br />

HIsToRy oF coMpany GRoWTH<br />

Since being acquired by the Rhomberg Group<br />

in 2005, Rhomberg Rail Australia has developed<br />

at an extraordinary pace through a dynamic management<br />

approach. Achievements include:<br />

• From a base of only 12 employees, the company<br />

now has 125 highly skilled and dedicated<br />

rail professionals.<br />

• The company has continually developed its<br />

railway infrastructure services. It was already a<br />

market leader in mechanised track maintenance<br />

and has built up its expertise in track and bridge<br />

building.<br />

• Rhomberg has recently acquired a highly<br />

qualified and dynamic track design team and is<br />

therefore in a position to offer complete railway<br />

engineering solutions – from inception to the<br />

implementation and maintenance of railway<br />

projects.<br />

• Investment in new high-tech large construction<br />

machinery underpins the company’s presence<br />

in the market – one of the new machines is the<br />

Plasser & Theurer SSP 303 ballast regulating<br />

machine for tracks and points – the largest<br />

machine of its kind in the southern hemisphere,<br />

which was delivered in 2010.<br />

• The expansion of the company’s headquarters<br />

in Sydney was followed by the establishment<br />

of a branch in the Hunter Valley of New South<br />

Wales, to better service the highest volume coal<br />

network in the country.<br />

• With involvement in prestigious projects such<br />

as the refurbishment of the Epping to Chatswood<br />

line, the completion of the Fortescue<br />

Metals Group railway line in Western Australia,<br />

the upgrading of the ARTC interstate freight<br />

lines. Rhomberg Rail Australia has rapidly<br />

become a reliable partner in the burgeoning<br />

Australian rail market.


adelaide metropolitan upgrade project<br />

New rail track design team a success right from the start<br />

In May 2010, Rhomberg was able to<br />

announce the successful acquisition of<br />

the premier rail design team in NSW,<br />

Delkor Track Design. In June 2010,<br />

the team was awarded the first of the<br />

track alignment design packages for<br />

the upgrade of lines in the Adelaide<br />

Metropolitan Rail Network.<br />

The contract was allocated as part of<br />

the “TrackSure” consortium and comprises<br />

a first package of design and<br />

construction activities. In detail the task<br />

includes the renewal of three separate<br />

lines with more than 60 km section<br />

length and double tracks over a period<br />

of six months. This amounts to a total<br />

of 120 km of track.<br />

Rhomberg Rail Australia has augmented<br />

its fleet with another high<br />

performance track construction and<br />

maintenance machine. n August 2010,<br />

Rhomberg’s Resurfacing team were<br />

happy to take delivery of a new<br />

SSP 303 Ballast Regulating and Profiling<br />

Machine fromPlasser & Theurer,<br />

Australia.<br />

Important features of this machine,<br />

which has been specially developed for<br />

the Australian market, are the lengths<br />

of the ballast plows and the ballast<br />

hopper for working on points, which<br />

reduces the amount of new ballast<br />

needed for maintenance. The new<br />

electrical monitoring system should<br />

have a positive effect on the reliability<br />

of the machine.<br />

Garry Thuer<br />

In addition to the electrification of<br />

the line, important challenges are<br />

presented by the increase of the city<br />

railway speed from 90km/h to<br />

110 km/h and the increased thickness<br />

of the ballast to allow for the installation<br />

of concrete sleepers, which makes<br />

it necessary to raise the superstructure<br />

by about 300 mm.<br />

Alan Pollard<br />

RHoMBeRG seRVIces<br />

MeTRo adeLaIde, aUsTRaLIa<br />

• Line design and adaptation of engineering<br />

structures<br />

• Securing adequate clearance between rolling<br />

stock and structures such as platforms,<br />

bridges, level crossings, etc.<br />

• Coordination with civil engineering design<br />

services and contractors<br />

new ballast regulator commissioned<br />

The largest machine of this type in the southern hemisphere is owned by Rhomberg<br />

The new ballast levelling machine helps to reduce the quantity of ballast needed in maintenance.<br />

The Rhomberg team taking delivery of the machine (from left to right): Darren Tuxford, Dave Bowe,<br />

Glenn Henderson, Shane Whitehouse, Oswald Ortner, Garry Thuer and Michael Match.<br />

RHOMBERG RAIL AUSTRALIA | NEW DIMENSIONS 39


The success story goes on…<br />

Rhomberg-Kalebozan strengthens its market position in Turkey<br />

FLasH BUTT WeLd-<br />

InG FoR THe TURkIsH<br />

sTaTe RaILWay (Tcdd)<br />

In future, the State Railway will<br />

continue to place its contracts for<br />

flash butt welding with Rhomberg-<br />

Kalebozan. The contract involves flash<br />

butt welding of 3,500 steel components,<br />

including the respective grinding,<br />

clamping and careful ultrasonic<br />

testing. The work will be carried out on<br />

the already upgraded Karalıköy-Sivas-<br />

Tecer main line and will take about<br />

four months. The equipment used for<br />

this EUR 700,000 project (1.4 million<br />

Turkish Lira) is a mobile AMS 60 rail<br />

welding machine.<br />

RepaIR oF HIGH-speed LIne<br />

ankaRa – eskIŞeHIR<br />

In autumn 2010 after a two-months<br />

summer break that included Ramadan,<br />

the month of fasting and related festivities,<br />

the team for machine maintenance<br />

re-started work with fresh<br />

enthusiasm: the 250 km/h high-speed<br />

line between Ankara and Eskişehir<br />

was surveyed and maintenance work<br />

carried out. Since the line opened<br />

eighteen months ago, Rhomberg has<br />

40 NEW DIMENSIONS | RHOMBERG-KALEBOZAN<br />

been responsible for the maintenance<br />

of this high-speed line and, with its<br />

work, has set new standards in Turkey.<br />

Initially, all maintenance work was carried<br />

out by staff from Bahnbau Wels,<br />

with support from several Australian<br />

resurfacing professionals. Over this<br />

period, enough Turkish workers have<br />

been trained so that the Rhomberg-<br />

Kalebozan team has been working<br />

exclusively with Turkish members of<br />

staff under the management of<br />

Abdullah Gündogdu since the middle<br />

of May.<br />

Technical difficulties are overcome<br />

through the team that is expertly<br />

supported by Andreas Stoppel. He is<br />

a specialist for the repair of railway<br />

superstructure and is therefore a<br />

welcome visitor with the State Railway<br />

management. With his enormous<br />

specialist knowledge and his straightforward<br />

approach he is able to solve<br />

problems quickly and efficiently.<br />

Supported by the comprehensive competence<br />

of all track construction companies making up<br />

Rhomberg Bahntechnik, Rhomberg-Kalebozan<br />

sets new benchmarks for maintenance and<br />

repair work in Turkey.<br />

TaMpInG neW BaLLasT FRoM<br />

THe GReek/BULGaRIan<br />

BoRdeR To edIRne<br />

The line between Edirne and the<br />

Greek/Bulgarian border consists of<br />

125 kilometres of conventional track.<br />

Rhomberg-Kalebozan was given the<br />

contract for tamping the line to the<br />

exact specification, after the superstructure<br />

had already been renewed.<br />

In order to optimally plan the construction<br />

sequence and process, the<br />

first step was to newly survey and<br />

evaluate the entire line. This required<br />

some persuasion of the responsible<br />

people to adequately demonstrate the<br />

merits of the preparatory work for the<br />

overall benefit of the project, with the<br />

final results confirming the Rhomberg<br />

concept.<br />

The team was able to set new standards<br />

for tamping new track ballast.<br />

As a consequence, new minimum<br />

technical requirements for maintenance<br />

and upgrade work are being defined in<br />

cooperation with the TCDD.<br />

Gökhan Ipek


An architecturally appealing Park & Ride facility has been constructed for the city of Graz.<br />

strong growth<br />

Goldbeck-Rhomberg expands contract volume and market presence<br />

With the formation of Goldbeck-<br />

Rhomberg AG and business premises<br />

in St. Gallen, the Group has expanded<br />

into Switzerland. In 2008, the company<br />

opened-up a new branch in Vienna,<br />

Austria : in this way Goldbeck-<br />

Rhomberg secured strong growth in<br />

recent years. In spite of the economic<br />

downturn and strong pressure on<br />

costs, the company was able to gain<br />

market share with the help of well<br />

thought-out systems.<br />

One of the Austrian highlights is the<br />

construction of Factory III for the<br />

Kohlbach company in Bleiburg. This<br />

project has a value of nearly EUR 8<br />

million and creates a production facility<br />

for the communal biomass heating<br />

station. The important argument<br />

that swayed decision-makers against<br />

tendering for individual trades was the<br />

extensive engineering know-how of<br />

the company. In Vienna, the first multistorey<br />

car park was erected for the<br />

company’s regular customer Porsche;<br />

a contract for the next multi-storey car<br />

park in Wehlistrasse has already been<br />

secured.<br />

In Graz we have constructed a Park<br />

& Ride facility which meets the most<br />

demanding architectural requirements.<br />

It was due to the systems employed by<br />

Goldbeck-Rhomberg that the company<br />

was able to keep within the preset<br />

budget for this project which was<br />

the winning entry of an architectural<br />

competition.<br />

The company has also successfully<br />

completed several large contracts in<br />

Switzerland. The largest project was<br />

a logistics centre with 10,000 m² of<br />

storage space and 1,600 m² of offices<br />

for the drugstore chain Müller, in<br />

Oberentfelden. In Buchs near Zurich,<br />

a parcel distribution centre for DPD<br />

valued at about EUR 6 million, a timber<br />

storage facility for Hiag costing about<br />

EUR 4.5 million and a storage facility<br />

with offices for System Air costing<br />

about EUR 1.9 million were constructed<br />

within a 500 m radius. A wine<br />

storage facility with retail shop and<br />

head office was constructed for Baur<br />

au Lac in Zurich. This building provides<br />

space for the storage of one million<br />

wine bottles at controlled air temperature<br />

and relative humidity.<br />

Now with 50 staff members in four<br />

locations, Goldbeck-Rhomberg is looking<br />

forward to future developments.<br />

Georg Vallaster<br />

The parcel distribution centre for DPD is<br />

in the direct vicinity of two other buildings<br />

built by Goldbeck-Rhomberg in Buchs,<br />

Switzerland.<br />

The largest construction project by<br />

Goldbeck-Rhomberg in Switzerland: a<br />

logistics centre with 10,000 m² of storage<br />

space for the Müller drugstore chain.<br />

GOLDBECK-RHOMBERG | NEW DIMENSIONS 41


powerful tunnelling<br />

Menegola AG confirms its special competence<br />

in steel-frame ramming<br />

Menegola AG are specialists<br />

in crossing roads and<br />

railtracks underground in a highly<br />

cost-effective way and maintains well<br />

trained staff and efficient machinery.<br />

With its five machines with Terra and<br />

Tracto technology, pipes with a diameter<br />

of between 20 cm and 1.6 m can<br />

be rammed through the ground for<br />

distances of up to 60 m.<br />

Even in difficult situations, the people<br />

from Menegola know how to solve<br />

problems, as was demonstrated<br />

recently: in order to open up an old<br />

stream and install a duct for amphibians<br />

to Lake Constance, two steel<br />

pipes with a diameter of 80 cm had<br />

to be pressed through beneath the<br />

SBB lake line. These steel pipes have<br />

a wall thickness of 30 mm and are<br />

placed just under 1 m below the top<br />

edge of the rails. This required special<br />

dispensation from SBB. Menegola AG<br />

obtained this dispensation on condition<br />

that pressing under the tracks was<br />

carried out only at night, when there is<br />

no rail traffic.<br />

To provide services for a campsite,<br />

two more pipes with a diameter of<br />

50 cm were inserted underneath the<br />

tracks. This made it possible to provide<br />

holidaymakers with electricity, gas and<br />

water – within a very short period of<br />

construction time.<br />

Emil Rusch<br />

42 NEW DIMENSIONS | MENEGOLA SWITZERLAND<br />

Ducts for amphibians and services: steel pipes are used for crossing the SBB tracks with a<br />

ramming process, thus keeping costs to a minimum.<br />

Menegola AG specialises<br />

in trenchless<br />

pipe technologies<br />

and offers economic<br />

solutions for any type<br />

of project.


MSE Residential and Business Park, Eschen, Liechtenstein<br />

Rhomberg, switzerland branches out<br />

Conversions and renovations<br />

Owing to the strong demand<br />

for refurbishment work in<br />

Switzerland in connection with the<br />

public funding that has been available<br />

for some years, there is strong market<br />

potential for conversions and<br />

renovations.<br />

The targeted market includes eastern<br />

Switzerland up to Zurich and the<br />

Schweizer Mittelland. The target<br />

customers are primarily large private or<br />

commercial property owners such as<br />

insurance companies, banks and<br />

pension funds. Owner-occupation of<br />

apartments and houses is not very<br />

common in Switzerland. The annual<br />

construction volume in Switzerland<br />

has been about EUR 38 billion since<br />

2005, of which in 2008 and 2009<br />

about EUR 11 billion was invested<br />

in refurbishment work – a tendency<br />

which is on the increase. Construction<br />

activity is largely limited to the<br />

conurbations.<br />

peRFecT LaUncH InTo THe neW<br />

BUsIness FIeLd<br />

In spite of a highly competitive market,<br />

the company has managed to acquire<br />

its first project. It is an apartment<br />

building that requires renovation with<br />

complete inside refurbishment, repairs<br />

to the facade and redesign of external<br />

works. A particular challenge is the<br />

fact that kitchens and bathrooms will<br />

be completely modernised while the<br />

tenants remain in the apartments.<br />

Reinhard Moosmann<br />

key daTa oF MULTI-FaMILy-dWeLLInG In<br />

WaLdHoFsTRasse In UzWIL/cH<br />

start of construction 13 September 2010<br />

scheduled completion 10 December 2010<br />

contract value SF 1.6 million or<br />

EUR 1.2 million<br />

CONVERSIONS AND RENOVATIONS IN SWITZERLAND| NEW DIMENSIONS<br />

43


Multi-purpose hall at salenstein<br />

First project by Rhomberg Bau AG in the Swiss Lake Constance region<br />

In November 2009,<br />

Rhomberg Bau AG was<br />

appointed as design & build<br />

contractor for the design and construction<br />

of a multi-purpose hall to<br />

MINERGIE ® standards for the Municipality<br />

of Salenstein, Thurgau. The<br />

contract involves the demolition of the<br />

old building and the construction of<br />

a new functional multi-purpose hall<br />

with a large foyer, a stage and associated<br />

facilities such as a kitchen and<br />

canteen.<br />

Two thirds of the hall will be constructed<br />

in timber and the facade will<br />

be clad with Eternit. Detailed plans<br />

were drawn up by architects Stefan<br />

Schärer and Constans Roth from<br />

Rubin Architects.<br />

On 21 April 2010 the<br />

foundation stone was laid<br />

for the “Wangenmatt Residence –<br />

sheltered accommodation” project.<br />

The ceremony was attended by the<br />

representatives of the client, Senevita<br />

AG, the architects Gaschen & Partners<br />

and a representative of the Director for<br />

Health and Care for the Elderly of the<br />

city of Bern.<br />

Rhomberg Bau AG was commissioned<br />

as General Contractor for the<br />

construction of this project. Construction<br />

started in January 2010 and<br />

completion of the project is scheduled<br />

for the end of December 2011. The<br />

foundation stone laying ceremony was<br />

preceded by the traditional speeches,<br />

which again touched on the long<br />

design and preparation time which had<br />

become necessary due to a change<br />

The ground-breaking ceremony took<br />

place at the beginning of June 2010 in<br />

the presence of Community President<br />

Peter Forster, School President Ewa<br />

Zwick, all members of the Building<br />

Commission and the members of staff<br />

of Rhomberg Bau AG. The ceremony<br />

was rounded off with a reception<br />

with drinks and specialities of the<br />

region which had been organised by<br />

Madeleine Nothhelfer, the wife of the<br />

President of the Building Commission.<br />

The Project Manager for the project<br />

is Ricardo Spycher and we wish him<br />

every success for the construction of<br />

the multi-purpose hall in Salenstein,<br />

and look forward to a new reference<br />

project in the Swiss region around<br />

Lake Constance.<br />

Josef Jenny<br />

of operating company. However, the<br />

time problem was solved by the flexibility<br />

of the team: during the additional<br />

preparation period, internal processes<br />

and specifications by the operating<br />

company were optimised and adapted,<br />

which will benefit the future residents<br />

of this sheltered housing project.<br />

The concept of the Wangenmatt<br />

Residence is based on the idea of<br />

“self-determined living”. The Residence<br />

is located in a quiet location in Bern<br />

– Bümpliz which is well served by<br />

transport facilities. The accommodation<br />

comprises 40 one- to three-room<br />

apartments for senior residents and<br />

70 single rooms for those in need of<br />

care. The comfortable apartments are<br />

an attractive alternative to the traditional<br />

old people’s and care homes,<br />

and offer residents support and various<br />

44 NEW DIMENSIONS | RHOMBERG CONSTRUCTION SWITZERLAND<br />

key daTa<br />

MULTI-pURpose HaLL aT saLensTeIn/<br />

sWITzeRLand<br />

design & Build contractor<br />

Rhomberg Bau AG, St. Gallen/Switzerland<br />

project Manager Ricardo Spycher<br />

contract volume 12,400 m 3 ground and upper<br />

floors, 2,000 m 3 cellar area<br />

contract value: SF 8.1 million or EUR 6 million<br />

construction period 14 months<br />

sheltered accommodation at Wangenmatt, Bern<br />

Foundation stone for sheltered accommodation laid<br />

services round the clock. The project<br />

also takes account of older people’s<br />

need for security.<br />

Josef Jenny<br />

key daTa<br />

WanGenMaTT ResIdence sHeLTeRed<br />

accoMModaTIon, sWITzeRLand<br />

client ibc Innova AG, Wilen near Wil/Switzerland<br />

architects Gaschen Partner AG, Bern<br />

construction period<br />

January 2010 to December 2011


LineaaR, aarau<br />

Working and living successfully combined<br />

In the direct vicinity of the recently opened Aarau Railway Station,<br />

Rhomberg Bau AG is currently the Design & Build contractor in<br />

charge of the “LineAAR” residential and commercial development. Work started<br />

on construction following the foundation stone laying ceremony in October 2009<br />

and today, 13 months later, the shell construction has been largely completed so<br />

that the geometric shape of the project is clearly recognisable.<br />

One of the tough challenges was the severly restricted space between the railway<br />

lines of the SBB and WSB. Today we are happy to say that progress on the<br />

fitting-out of the station hall and all works to the facade and the interior fitting-out<br />

is on schedule. This means that it will be possible to occupy the offices in the<br />

spring of 2011 and the commercial premises and apartments in the summer<br />

of 2011.<br />

Josef Jenny<br />

Residential project, Beringen<br />

Construction start: autumn 2011<br />

The winning project in the competition for a residential development in Beringen combines<br />

functional apartment layouts with a very attractive inner courtyard design.<br />

The objective of the competition<br />

was an attractive<br />

residential development for the Municipality<br />

of Beringen. Five architectural<br />

practices were invited to take part<br />

in the competition and had until mid<br />

July 2010 to submit their proposals to<br />

Rhomberg Bau AG. The projects were<br />

assessed by a jury consisting of four<br />

members of staff of Rhomberg Bau<br />

AG and two external property experts.<br />

After intensive consultations and the<br />

revision of two projects, the jury recommended<br />

that the project by<br />

Frei Architects in Aarau go forward.<br />

The project appeals with its clear overall<br />

concept, its modern architectural<br />

design, functional apartment layouts<br />

and a very attractive inner courtyard<br />

design. Further work on the project is<br />

key daTa FoR LIneaaR deVeLopMenT In<br />

aaRaU, sWITzeRLand<br />

project developer and design & build<br />

contractor Rhomberg Bau AG,<br />

St. Gallen, Switzerland<br />

client ASGA Pension Fund,<br />

St. Gallen/Switzerland<br />

architect Dietrich Untertrifaller,<br />

St. Gallen/Switzerland<br />

construction period June 2009 to June 2011<br />

Building volume 59,600 m3 Use 48 rental apartments, 2,150 m2 of office<br />

and retail area<br />

contract value SF 28.2 million or<br />

EUR 21.3 million<br />

key daTa<br />

ResIdenTIaL pRojecT BeRInGen,<br />

sWITzeRLand<br />

project development Rhomberg Bau AG,<br />

St. Gallen, Switzerland<br />

architects Frei Architekten AG,<br />

Aarau, Switzerland<br />

Use 63 rental apartments<br />

contract value<br />

SF 23.5 million or EUR 17.72 million<br />

to be completed by the end of 2010<br />

when application should be made for<br />

planning approval. Work on the project<br />

is scheduled for the autumn of 2011.<br />

Marcel Maier<br />

RHOMBERG CONSTRUCTION SWITZERLAND | NEW DIMENSIONS 45


What do we need bookkeepers for?<br />

After all, is this not what computers and book shelves are for?<br />

The history of bookkeeping goes back<br />

a very long way. A simple system was<br />

discovered in the old Mesopotamia<br />

around 9,000 BC. In Egypt, records of<br />

debit and credit accounting on papyrus<br />

scrolls were found dating from<br />

3,000 BC. The practice of bookkeeping<br />

was always imposed by church or<br />

government authorities for the purpose<br />

of taxation. In 1494, the Franciscan<br />

friar Luca Pacioli gives the first complete<br />

explanation of the double-entry<br />

accounting system in his book “Summa<br />

de arithmetica”. The basic principle of<br />

the double-entry accounting system<br />

has remained unchanged to this day<br />

and is applied worldwide.<br />

Today, all business processes of the<br />

Rhomberg group are documented on<br />

the basis of receipts to produce a full<br />

record structured by time sequence<br />

and headings. This includes a subdivision<br />

of types of cost and cost<br />

centres and also provides the basis<br />

for cost calculation. The professional<br />

profile of bookkeepers has changed<br />

significantly in recent years. Where we<br />

previously had clerks with their typical<br />

protective sleeves entering long lists<br />

of numbers into books, we now have<br />

balance sheet experts, tax experts and<br />

business administrators.<br />

The strong growth and international<br />

orientation of the Rhomberg goup and<br />

the numerous changes in tax legislation<br />

as part of the harmonisation of<br />

the turnover tax laws in the European<br />

Union, require complex professional<br />

expertise of our staff. The company<br />

has to submit its tax return in Austria<br />

46 NEW DIMENSIONS | ACCOUNTS DEPARTMENT<br />

but, in the case of building projects in<br />

other countries, tax declarations have<br />

to be made in those countries.<br />

We are particularly proud of the successful<br />

cooperation with our accounting<br />

colleagues in Australia, Switzerland,<br />

Turkey and Wels. In 1986 the company<br />

changed over to the BDS construction<br />

package. At the beginning, the<br />

programme dealt with seven users,<br />

but over the years it was continuously<br />

expanded. Today, 250 users use the<br />

AS400 in Bregenz, Wels and<br />

Switzerland.<br />

Starting two years ago, the accounts<br />

department has been producing not<br />

only the end-of-year reports and<br />

consolidation at the end of the business<br />

year, but also quarterly statements<br />

as of 31 March, 30 September<br />

and 31 December. The Accounts<br />

Department reflects the Rhomberg<br />

group in figures and is an important<br />

source of information for decisionmaking;<br />

in addition, it is an important<br />

prerequisite for complying with the<br />

official requirements for providing<br />

information.<br />

Another important function of the<br />

annual accounts is to provide banks<br />

with the information they need for<br />

funding the company/projects. With<br />

the help of the Annual Report it is<br />

possible to establish various indicators<br />

regarding liquidity, investments and<br />

capital. This means that each project<br />

and construction contract requires an<br />

orderly system of receipts.<br />

The Accounts Department oversees the<br />

commercial side of the entire Rhomberg group<br />

(from left to right): Angela Wautsche, Hermine<br />

Schaffgotsch, Herbert Mittringer, Irmgard<br />

Mayerhofer, Stefan Greussing, Marjeta Ulmer,<br />

Inge Jäger, Sandra Stankovic and Brigitte Flatz.<br />

sTaFF and THeIR ResponsIBILITIes<br />

Brigitte Flatz Responsible for Rhomberg<br />

Geschäftsführungs GmbH, W. Rhomberg<br />

Bauunternehmung GmbH & Co, TR Beteiligungs<br />

GmbH & Co KG, Benger-Park West<br />

Immobilien GmbH, DLZ Kampus Krems<br />

Beteiligungs GmbH, Storchengrund GmbH,<br />

Storchengrund GmbH & Co KG<br />

stefan Greussing Responsible for<br />

Rhomberg Bau GmbH, GFI Immobilienmanagement<br />

Bauteil A, R&S Projektentwicklungs<br />

GmbH and various consortiums<br />

Inge jäger Responsible for RTE Technologie<br />

GmbH, Rhomberg Bau and Gruber GmbH,<br />

GFI Immobilienmanagement, Migu Asphalt<br />

BaugesellschaftmbH, Rhombus Errichtungsund<br />

Verwertungs GmbH, Rhomberg Bahntechnik<br />

GmbH, Rhomberg Rail Consult GmbH and<br />

various consortiums<br />

Irmgard Mayerhofer Overall responsibility and<br />

consolidated accounts<br />

Herbert Mittringer Responsible for Wirkungsgrad<br />

Energieservice GmbH, Rhomberg BT<br />

Holding GmbH, Rhomberg Holding GmbH,<br />

Steinbruch GmbH & Co OG, Steinbruch<br />

GmbH, Rhomberg Recycling GmbH, GFI<br />

Beteiligungs GmbH, Projekt Eins GmbH,<br />

Aspermont Holding GmbH, BDS Systembetreuung<br />

and various consortiums<br />

Hermine schaffgotsch Invoice recording in<br />

Rhomberg Bau GmbH<br />

sandra stankovic Responsible for parts of<br />

Rhomberg Bau GmbH, HT-Josef Huber’s<br />

Erben und Co OEG, Liegenschafts GmbH &<br />

Co KG, CSR Beteiligungs GmbH and various<br />

consortiums<br />

Marjeta Ulmer Responsible for SBS GmbH,<br />

Bauschutt- und Aushubverwertung GmbH,<br />

"HAH" Immobilien GmbH, BBW GmbH,<br />

BBWVermietung GmbH, Rhomberg Gleisbau<br />

GmbH, Bittner Bahn und Gleisbau GmbH and<br />

various consortiums<br />

angela Wautsche Responsible for Express<br />

Beton GmbH and Express Beton GmbH & Co<br />

KG as well as parts of Rhomberg Bau GmbH<br />

Irmgard Mayerhofer


Minimising risks and increasing efficiency<br />

Compliance is an important subject both externally and internally<br />

The term “compliance” refers to acting in accordance with<br />

current regulations. At the beginning of this business year<br />

the subject was taken up by the “Opportunity and Risk<br />

Management” group service team.<br />

The Rhomberg Compliance Guideline contains fundamental<br />

provisions for our fair, open and honest behaviour within the<br />

Rhomberg group and with its business partners, suppliers<br />

and competitors. Subjects include social responsibility,<br />

protection of the environment, confidentiality, competition<br />

rules, conflicts of interest and corruption.<br />

Today, a clear committment regarding these issues is<br />

expected with increasing urgency by banks and in public<br />

tender procedures. In accordance with our company<br />

philosophy, we want to reduce risks and strengthen our<br />

competitive edge and position in the market through strict<br />

compliance with ethical standards and a loyal company and<br />

management culture.<br />

Markus Eder, Compliance Officer<br />

Markus Eder and Angelika Rhomberg<br />

Angelika Rhomberg,<br />

Deputy Compliance Officer<br />

What do lawyers do in the Rhomberg group?<br />

At Rhomberg, lawyers work in a number of different capacities<br />

Rhomberg’s company lawyers look forward to interesting challenges in<br />

a varied, multi-disciplinary field of activities (from left to right): Angelika<br />

Rhomberg, Markus Eder, Oliver Tabarelli, Manfred Hirner and Christina<br />

Holzer.<br />

The company lawyers at Rhomberg cover a number of<br />

different tasks and today are active in more than just the<br />

classic legal field. They are involved in projects right from<br />

the beginning in order to give advice and support at the<br />

early stages.<br />

Apart from legal subjects, commercial aspects play a major<br />

role and have to be taken into account. This means that<br />

activities include contract negotiations, dealing with legal<br />

questions, support for innovation and grant projects through<br />

to insurance issues and the recording and analysis of<br />

opportunities and risks.<br />

The “Opportunities and Risk Management” group service is<br />

headed by Markus Eder and covers the following areas:<br />

• Opportunity and risk management<br />

• Legal questions<br />

• Innovation and grant management<br />

• Insurance<br />

• Compliance<br />

• Company acquisition and integration<br />

OPPORTUNITy AND RISK MANAGEMENT | NEW DIMENSIONS 47


The Rhomberg environment Team<br />

Exemplary, sustainable, committed<br />

MIssIon: sUsTaInaBILITy & pRoTecTInG THe enVIRonMenT<br />

Sustainability has been an essential component of the Rhomberg philosophy for<br />

some time now. The aim is to run the business to sustainable principles and take<br />

care of the environment in the context of systematic operations.<br />

Since 2004 Rhomberg employees have been pursuing additional activities in<br />

a number of environmental teams in order to support this philosophy. From the<br />

initial number of 7 staff, this has grown to 22. Now the Rhomberg group has<br />

three environmental teams – one each for the office buildings in Bregenz, the<br />

Rheintal Resource Centre and for Switzerland; the teams convene every three<br />

months in order to discuss, plan and implement current events, future requirements<br />

and opportunities for improvement. This year’s annual environmental team<br />

meeting will take place at the end of the year; the three teams will meet in order<br />

to exchange experiences, benefit from other people’s outlook and collect new<br />

input and ideas. The committment and performance of the team members will be<br />

celebrated with a joint excursion to one of the relevant sites.<br />

sUccessFULLy IMpLeMenTed pRojecTs & caMpaIGns<br />

Over the years, many projects and campaigns initiated by the environment teams<br />

were successfully carried out and implemented in routine activities. Here is a<br />

short list of our activities:<br />

• Building sustainably – sustainably mobile All members of staff have access to<br />

a pool of bicycles as well as an electric scooter.<br />

• VLOTTE E-FIAT 500 An electrically operated Fiat 500 was added to<br />

Rhomberg’s vehicle fleet.<br />

• Rhomberg mobility campaigns By changing over to the bicycle or to public<br />

transport, or by clubbing together to share vehicles, Rhomberg staff has been<br />

able to save about 160,000 km of travel by private motor car. This equates to<br />

a reduction of 26 tonnes of CO 2 emissions.<br />

• Modernising the machine fleet Diesel as a fuel reduces consumption by<br />

up to 50 %.<br />

• Carwash system with water recycling<br />

• Improved separation and pre-sorting of construction waste at the various<br />

construction sites; construction materials are recycled and the quantity of<br />

residual waste reduced.<br />

• Reducing paper consumption In spite of the growth of the company, it was<br />

possible to significantly reduce paper consumption (by about 10 percent) by<br />

encouraging people to print paper on both sides.<br />

• Sustainable production We ensure that Rhomberg brochures and publicity<br />

material is produced sustainably and with responsible use of resources.<br />

• ... and much more!<br />

Osman Kabaetli<br />

48 NEW DIMENSIONS| IMS<br />

“Those who do not<br />

consider the future will<br />

soon be in serious trouble.”<br />

Confucius<br />

As the Rhomberg Group, we want to set a<br />

good example and not forget our duty to the<br />

environment.<br />

The PEFC mark is proof that products such<br />

as the paper for this magazine is sourced from<br />

sustainably managed forests.


Environment-friendly travel: for short distances the Rhomberg members of staff have access to<br />

several pool bicycles. For longer distances an electric scooter or an electrically operated Fiat 500<br />

are available.<br />

ManaGInG dIRecToR In cHaRGe<br />

Ernst Thurnher<br />

enVIRonMenTaL TeaM:<br />

oFFIce BUILdInG<br />

Formed in 2004<br />

Members 7<br />

Andreas Karg<br />

Angelika Rhomberg<br />

Anna-Lina Kräutler<br />

Jürgen Jussel<br />

Karin Hubalek<br />

Lucia Mündle<br />

Robert Franz<br />

enVIRonMenTaL TeaM: sWITzeRLand<br />

Formed in 2009<br />

Members 4<br />

Alexia Frischknecht<br />

Andreas Ditte<br />

Philip Riklin<br />

Stefanie Sutterlüti<br />

enVIRonMenTaL TeaM FoR RHeInTaL<br />

ResoURce cenTeR<br />

Formed in 2005<br />

Members 6<br />

Christian Düringer<br />

Gerd Oprießnig<br />

Gerhard Kalb<br />

Helmut Bernard<br />

Michael Huber<br />

Stefanie Lechleitner<br />

enVIRonMenTaL TeaM: Head oFFIce<br />

(included in all environmental teams)<br />

Members 4<br />

Jürgen Koblinger<br />

Osman Kabaetli<br />

Agnes Thurnher (occupational physician)<br />

Hubertus Thurnher<br />

(waste officer & safety expert)<br />

IMS | NEW DIMENSIONS 49


We look back...<br />

...over a very eventful, interesting 2010<br />

“The time is right for reducing consumption” – interview<br />

with Prof. Friedrich Schmidt-Bleek<br />

In June 2010, Hubert Rhomberg invited all interested members<br />

of staff to an exclusive interview with Prof. Friedrich<br />

Schmidt-Bleek. The environmental researcher and author<br />

was given the nickname “Bio” to reflect the fact that he has<br />

created the term “ecological rucksack” – which could be<br />

seen as the ecological counterpart to a product’s price in<br />

the shop. His very informative presention was concluded<br />

with an interesting discussion about sustainability – the<br />

central subject of our strategy.<br />

p End-of-year party 2009/2010<br />

It is traditional that the Rhomberg group comes together<br />

for an end-of-year celebration on the last day<br />

of the year. The owner family, the group coordinators<br />

and many employees came together in the foyer of<br />

the office building in Bregenz, Austria. Ernst Thurnher<br />

gave a summary of the business year as well as an<br />

outlook for the coming year. He emphasised that<br />

“The Rhomberg group is on solid ground: compared<br />

with the industry standard, the company has a better<br />

equity base than most. This puts the Rhomberg<br />

group in a secure position, even if times are difficult<br />

from a business point of view.” Both hosts and<br />

guests concluded the evening with culinary delights.<br />

50 NEW DIMENSIONS | EVENTS<br />

Innotrans Berlin<br />

Innotrans Germany, the “International Trade Fair for<br />

Traffic Engineering – Innovative Components, Vehicles,<br />

Systems” which ran from 21 to 24 September 2010,<br />

attracted over 106,000 visitors from 110 countries to<br />

its 150,000 square metres of exhibition space. The<br />

Bahntechnik group was one of the 2,242 exhibitors<br />

from 45 countries and was represented by staff from<br />

all branches. This year there was a real rush of visitors:<br />

customers, partners, suppliers and interested parties<br />

from all over the world came to the stand to discuss<br />

cooperation and future projects. Presentations about<br />

ZOKA and HandraiLIT were much appreciated.<br />

p Cocktail at REAL VIENNA<br />

Real Vienna in Austria is an exhibition for Austrian, Central and Eastern<br />

European property professionals dealing with commercial property and<br />

investment. This year, in May, the Vienna exhibition ground opened its<br />

doors for the fifth time to almost 7,000 visitors and 220 exhibitors. The<br />

programme included a range of high-profile lectures and discussion<br />

forums and there was plenty of opportunity for forging new contacts and<br />

renewing old ones. Rhomberg Bau did not have a stand at the exhibition<br />

but used it for another event aimed at a specific target group. In cooperation<br />

with the PKF hotel experts, we invited a number of hotel investors<br />

to a cocktail party where we presented the “Storchengrund” project in<br />

Vienna.


p Dornbirn Autumn Exhibition: the RCR was there!<br />

This traditional exhibition at Dornbirn took place from 8 to<br />

12 September 2010. Rhomberg Recycling and Rhomberg<br />

Steinbruch had a stand in the open exhibition area in order<br />

to present the Vorarlberg public and visitors from neighbouring<br />

countries with the wide range of services offered by<br />

RCR. The Dornbirn Autumn Exhibition is an ideal platform<br />

for reaching private customers from the region. Our stone<br />

baskets were a major focus of our exhibit; they can be used<br />

in a number of applications such as in garden design or for<br />

the fortification of slopes and banks. At our stone basket<br />

counter we were happy to welcome many familiar faces from<br />

our company. The sand pit was a major attraction for the<br />

little visitors. There was a lot of interest from customers and<br />

we were glad to receive a number of enquiries.<br />

t Housing Exhibition 2010<br />

At the construction and housing exhibition organised in<br />

the Kulturhaus Dornbirn in Austria in March 2010, the<br />

most prominent Vorarlberg developers presented their<br />

current and planned projects. The exhibits ranged from<br />

owner-occupier apartments to terraced houses through to<br />

detached houses – there is nowhere else that interested<br />

parties can find so many housing projects for comparison.<br />

Experts such as the Sparkasse Dornbirn were available<br />

for questions of finance, representatives from the Landes-<br />

Wohnbauförderungsstelle and notaries gave talks and<br />

offered information in individual consultations.<br />

This was an ideal setting for the Rhomberg housing team<br />

not only to showcase its housing projects, but also to find<br />

interested customers for its investor package.<br />

t “Building with timber in the city” – symposium<br />

On 17 June 2010 the Festspielhaus Bregenz in Austria hosted a number of interesting<br />

lectures by prominent speakers. The organisers, Vorarlberger Holzbau-Kunst, were able<br />

to enlist Prof. Dr. Friedrich Schmidt-Bleek, Prof. DI Arch. Hermann Kaufmann and DI<br />

Hubert Rhomberg for the event which covered the subjects of sustainability and future<br />

resources. One of the projects presented was the Life-Cycle Tower project by<br />

Rhomberg, which was very popular with the visitors.<br />

p Get-together celebration of the Alptransit<br />

Energie consortium<br />

The official start of the project took place in Terfens, Tirol,<br />

Austria on 26 August 2010 to which numerous guests were<br />

invited. The Alptransit Energie (ATE) consortium consists of<br />

Rhomberg Bahntechnik GmbH and DB Bahnbau GmbH.<br />

The contract for railway engineering installations on the<br />

section from Kundl/Radfeld to Baumkirchen was placed by<br />

ÖBB Infrastruktur AG.<br />

Both clients and the contractors met at the marquee in Terfens<br />

under a blue and sunny sky. After welcome addresses<br />

by Dirk Diederich (Rhomberg), Johann Herdina (ÖBB),<br />

Hubert Rhomberg (Rhomberg) and Michael Saischek (ÖBB)<br />

the get-together got off to a good start. The buffet was<br />

opened and proceedings went on into the early hours while<br />

the representatives of the Österreichische Bundesbahnen,<br />

the local Building Control officers and the ATE team were<br />

entertained by a fantastic showband.<br />

EVENTS | NEW DIMENSIONS 51


<strong>LIFE</strong> WORTH LIVING<br />

There is no certificate of achievement, there is no educational<br />

institution award nor any standardised seal for quality of life.<br />

Yet when we have it, we know it and so do the people around us:<br />

it shows in the sparkle of our eyes, our friendliness and<br />

attentiveness. As members of staff at Rhomberg we are therefore,<br />

in a sense, doubly capable of encouraging quality of life: through<br />

our work of building homes and railway links AND the way in<br />

which we communicate with others.<br />

www.rhombergbau.at<br />

www.rhombergrail.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!