17.09.2013 Views

en Sociale Effectenanalyse inzake het Surgold Merian Project in ...

en Sociale Effectenanalyse inzake het Surgold Merian Project in ...

en Sociale Effectenanalyse inzake het Surgold Merian Project in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SCOPING-RAPPORT EN<br />

TAAKOMSCHRIJVING:<br />

Milieu- <strong>en</strong> <strong>Sociale</strong> Effect<strong>en</strong>analyse<br />

<strong><strong>in</strong>zake</strong> <strong>het</strong> <strong>Surgold</strong> <strong>Merian</strong> <strong>Project</strong> <strong>in</strong><br />

Sur<strong>in</strong>ame<br />

September 2011<br />

Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t<br />

1001 Connecticut Ave. N.W. Suite 1115<br />

Wash<strong>in</strong>gton, DC 20036<br />

www.erm.com


INHOUDSOPGAVE<br />

INHOUDSOPGAVE I<br />

LIJST VAN AFBEELDINGEN III<br />

LIJST VAN BIJLAGEN IV<br />

LIJST VAN ACRONIEMEN EN AFKORTINGEN V<br />

1.0 INLEIDING 1<br />

1.1 ACHTERGROND 1<br />

1.2 DOEL 2<br />

1.3 ESIA-ONDERZOEKS TEAM 2<br />

2.0 PROJECTBESCHRIJVING 6<br />

2.1 PROJECTLOCATIE 6<br />

2.2 HAVEN EN TRANSPORTCORRIDOR 6<br />

2.3 GEOLOGIE EN MINERALOGIE VAN DE LOCATIE 7<br />

2.4 MIJNLOCATIE 8<br />

3.0 WETTELIJK EN REGELGEVEND KADER EN BEDRIJFSTANDAARDEN 13<br />

3.1 INLEIDING 13<br />

3.2 WETTELIJK KADER 14<br />

3.3 REGELGEVEND KADER IN SURINAME 29<br />

3.4 INTERNATIONALE STANDAARDEN EN RICHTLIJNEN 33<br />

3.5 BEDRIJFSVEREISTEN EN -RICHTLIJNEN 36<br />

4.0 HET ESIA-PROCES 38<br />

4.1 SCREENINGSFASE 40<br />

4.2 SCOPINGSFASE 40<br />

ERM i CONCEPT AUGUSTUS 2011


4.3 FASE VAN EFFECTENANALYSE 41<br />

4.4 DE FASE VAN OPENBAARMAKING 42<br />

4.5 DE GEINTEGREERDE ESIA-BENADERING M.B.T. HET MERIAN<br />

PROEJCT 43<br />

5.0 OVERLEG MET HET PUBLIEK 46<br />

5.1 DOELEN EN DOELSTELLINGEN VAN HET OPENBAAR OVERLEG 47<br />

5.2 CONCEPT PLAN VOOR OVERLEG 47<br />

6.0 VOORLOPIGE LIJST VAN VRAAGSTUKKEN 51<br />

7.0 AFBAKENING VAN DE ESIA-WERKZAAMHEDEN 53<br />

7.1 VOORGESTELDE STUDIES 56<br />

7.1.1 Specialistisch milieuonderzoek 56<br />

7.1.2 Socio-economische <strong>en</strong> Gezondheidgerelateerd Specialistisch<br />

Onderzoek 67<br />

7.1.3 Overig Desktoponderzoek om de ESIA van <strong>in</strong>formatie te voorzi<strong>en</strong> 71<br />

7.2 METHODIEK INZAKE DE EFFECTENANALYSE 73<br />

7.2.1 Stapp<strong>en</strong> van effect<strong>en</strong>analyse 74<br />

7.2.2 Waarom e<strong>en</strong> Systeem voor Effect<strong>en</strong>classificatie? 74<br />

7.2.3 Criteria voor <strong>het</strong> classificer<strong>en</strong> van de effect<strong>en</strong> 75<br />

7.2.4 Het vaststell<strong>en</strong> van de classificatie 79<br />

7.3 PLAN VOOR MILIEU- EN SOCIAAL MANAGEMENT 79<br />

8.0 PROJECTSCHEMA 81<br />

9.0 NASLAGWERKEN 82<br />

ERM ii CONCEPT AUGUSTUS 2011


Lijst van Tabell<strong>en</strong><br />

Tabel 1-1 ESIA-Kernteam ................................................................. 3<br />

Tabel 3-1. Wettelijk Kader voor Nationaal Milieumanagem<strong>en</strong>t <strong>in</strong><br />

Sur<strong>in</strong>ame ............................................................................................................. 18<br />

Tabel 3-2. Verantwoordelijkhed<strong>en</strong> <strong><strong>in</strong>zake</strong> milieumanagem<strong>en</strong>t<br />

van de belangrijkste <strong>in</strong>stanties <strong>in</strong> Sur<strong>in</strong>ame . ................................................ 31<br />

Tabel 3-3. Internationale Overe<strong>en</strong>komst<strong>en</strong> van belang voor<br />

Milieu- <strong>en</strong> Sociaal-maatschappelijke Vraagstukk<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame............... 33<br />

Tabel 5-1. Concept Plan voor Overleg - <strong>Merian</strong> <strong>Project</strong> ............. 49<br />

Tabel 7-1. Criteria <strong><strong>in</strong>zake</strong> de ernst van negatieve Milieu-effect<strong>en</strong><br />

75<br />

Tabel 7-2. Criteria <strong><strong>in</strong>zake</strong> de ernst van Negatieve <strong>Sociale</strong> of<br />

Gezondheidgerelateerde Effect<strong>en</strong>.................................................................... 76<br />

Tabel 7-3. Verbeter<strong>in</strong>gscriteria (Positieve Milieueffect<strong>en</strong>) ......... 77<br />

Tabel 7-4. Verbeter<strong>in</strong>gscriteria (Positieve <strong>Sociale</strong> <strong>en</strong><br />

Gezondheidgerelateerde Effect<strong>en</strong>) .................................................................. 78<br />

Tabel 7-5. Classificatiematrix .......................................................... 79<br />

Tabel 8-1. Uitvoer<strong>in</strong>gsschema van de ESIA i.v.m. <strong>het</strong> <strong>Merian</strong><br />

<strong>Project</strong> 81<br />

LIJST VAN AFBEELDINGEN<br />

Afbeeld<strong>in</strong>g 1-1. Het <strong>Merian</strong> ESIA-<strong>Project</strong>team ........................................ 5<br />

Afbeeld<strong>in</strong>g 2-1. Locatie <strong>Merian</strong> <strong>Project</strong> <strong>en</strong> Transportcorridor ............... 7<br />

Afbeeld<strong>in</strong>g 2-2. Belangrijkste compon<strong>en</strong>t<strong>en</strong> van de Mijnlocatie ......... 10<br />

Afbeeld<strong>in</strong>g 2-3. Conceptuele flowchart van <strong>het</strong> Proces – <strong>Merian</strong> Gold<br />

<strong>Project</strong> 11<br />

Afbeeld<strong>in</strong>g 4-1. Het ESIA-proces <strong>in</strong> Sur<strong>in</strong>ame <strong>en</strong> <strong>het</strong> <strong>Merian</strong> <strong>Project</strong> 39<br />

Afbeeld<strong>in</strong>g 4-2. Cyclus van Effect<strong>en</strong>analyse .......................................... 44<br />

ERM iii CONCEPT AUGUSTUS 2011


Afbeeld<strong>in</strong>g 7-1. Gebied voor milieuonderzoek ..................................... 54<br />

Afbeeld<strong>in</strong>g 7-2. Gebied voor sociaal onderzoek .................................... 55<br />

LIJST VAN BIJLAGEN<br />

Bijlage A Curriculum Vitae van <strong>het</strong> ESIA-team<br />

Bijlage B Verslag Op<strong>en</strong>bare Bije<strong>en</strong>komst<strong>en</strong><br />

Bijlage C K<strong>en</strong>nisgev<strong>in</strong>g<strong>en</strong> <strong><strong>in</strong>zake</strong> Op<strong>en</strong>bare Bije<strong>en</strong>komst<strong>en</strong><br />

Bijlage D Materiaal Op<strong>en</strong>bare Bije<strong>en</strong>komst<strong>en</strong><br />

ERM iv CONCEPT AUGUSTUS 2011


LIJST VAN ACRONIEMEN EN AFKORTINGEN<br />

ARD Acid Rock Dra<strong>in</strong>age – Afvoer Zuurhoud<strong>en</strong>d Geste<strong>en</strong>te<br />

ATM M<strong>in</strong>isterie van Arbeid, Technologische Ontwikkel<strong>in</strong>g <strong>en</strong> Milieu<br />

BBS Nationaal Herbarium van Sur<strong>in</strong>ame<br />

CCD Counter Curr<strong>en</strong>t Decantation (teg<strong>en</strong>stroomdecantatiecircuit)<br />

CITES Conv<strong>en</strong>tion on the International Trade of Endangered Species of Wild Fauna<br />

and Flora – Overe<strong>en</strong>komst <strong><strong>in</strong>zake</strong> de Internationale Handel <strong>in</strong> Bedreigde <strong>in</strong><br />

<strong>het</strong> Wild Lev<strong>en</strong>de Dier- <strong>en</strong> Plant<strong>en</strong>soort<strong>en</strong><br />

CIL Carbon-<strong>in</strong>-Leach<br />

CSNR C<strong>en</strong>traal Sur<strong>in</strong>ame Natuurreservaat<br />

DS Desktop Study - Desktoponderzoek<br />

EA Environm<strong>en</strong>tal Assessm<strong>en</strong>t – Milieu-analyse<br />

EC Electric conductivity – Electrische geleid<strong>in</strong>g<br />

EHS Environm<strong>en</strong>tal Health Statem<strong>en</strong>t – Verklar<strong>in</strong>g <strong><strong>in</strong>zake</strong> Milieuhygiëne<br />

ERM Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t, Inc.<br />

ESIA Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t – Milieu- <strong>en</strong> <strong>Sociale</strong><br />

Effect<strong>en</strong>analyse<br />

ESMP Environm<strong>en</strong>tal and Social Managem<strong>en</strong>t Plan – Plan voor Milieu- <strong>en</strong> Sociaal<br />

Managem<strong>en</strong>t<br />

ESS Environm<strong>en</strong>tal Specialist Study – Specialistisch Milieu-onderzoek<br />

FIV Family Importance Value – De belangrijkheid van Aanverwante Soort<strong>en</strong><br />

GoS Governm<strong>en</strong>t of Sur<strong>in</strong>ame – Overheid/Reger<strong>in</strong>g van Sur<strong>in</strong>ame<br />

ha hectar<strong>en</strong><br />

HIA Human Health Impact Assessm<strong>en</strong>t – Effect<strong>en</strong>analyse <strong><strong>in</strong>zake</strong> de Gezondheid<br />

van de M<strong>en</strong>s<br />

IFC International F<strong>in</strong>ance Corporation – Internationale<br />

F<strong>in</strong>ancier<strong>in</strong>gsondernem<strong>in</strong>g<br />

IUCN International Union for Conservation of Nature and Natural Resources –<br />

Internationale Unie voor <strong>het</strong> Behoud van de Natuur <strong>en</strong> de Natuurlijke<br />

Hulpbronn<strong>en</strong><br />

JV Jo<strong>in</strong>t V<strong>en</strong>ture<br />

km Kilometers<br />

km 2 Vierkante kilometers<br />

LBB Di<strong>en</strong>st ‘sLands Bosbeheer <strong>en</strong> Bostoezicht<br />

LVV M<strong>in</strong>isterie van Landbouw, Veeteelt <strong>en</strong> Visserij<br />

m Meters<br />

masl Meters above sea level – meters bov<strong>en</strong> de zeespiegel<br />

MNH M<strong>in</strong>isterie van Natuurlijke Hulpbronn<strong>en</strong><br />

ERM v CONCEPT AUGUSTUS 2011


Moz Million ounces – miljo<strong>en</strong> (Amerikaanse) ons<br />

Mtpa Million tonnes per annum – Miljo<strong>en</strong> ton per jaar<br />

MRD M<strong>in</strong>istry of Regional Developm<strong>en</strong>t – M<strong>in</strong>isterie van Regionale Ontwikkel<strong>in</strong>g<br />

MW Megawatt<br />

NAAQS National Ambi<strong>en</strong>t Air Quality Standard – Nationale Kwaliteitsstandaard<br />

<strong><strong>in</strong>zake</strong> de Luchtkwaliteit van de Omgev<strong>in</strong>g<br />

NCD Nature Conservation Division – Afdel<strong>in</strong>g Natuurbehoud<br />

NEAP National Environm<strong>en</strong>tal Action Plan – Nationaal Milieu-Actieplan<br />

NGO Niet-Gouvernem<strong>en</strong>tele Organizatie<br />

NIMOS Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame<br />

NMR Nationale Milieuraad<br />

NTFPs Non-Timber Forest Products - Bosbijproduct<strong>en</strong><br />

PA Participatory Appraisal – Waardebepal<strong>in</strong>g met <strong>in</strong>br<strong>en</strong>g van de Betrokk<strong>en</strong><strong>en</strong><br />

PRA Participatory Rural Appraisal – Rurale Waardebepal<strong>in</strong>g met <strong>in</strong>br<strong>en</strong>g van de<br />

Betrokk<strong>en</strong><strong>en</strong><br />

PCDP Public Consultation and Disclosure Plan – Plan voor Overleg met <strong>en</strong><br />

Op<strong>en</strong>baarmak<strong>in</strong>g aan <strong>het</strong> Publiek<br />

RAP Rapid Assessm<strong>en</strong>t Program – Programma voor Snelle Beoordel<strong>in</strong>g<br />

RGB M<strong>in</strong>isterie van Ruimtelijke Ord<strong>en</strong><strong>in</strong>g, Grond- <strong>en</strong> Bosbeheer<br />

PRA Participatory Rural Appraisal (translator: repetition)<br />

RBA Rapid Biological Assessm<strong>en</strong>t – Snelle Biologische Beoordel<strong>in</strong>g<br />

RRE Restricted Range Endemic – Alle<strong>en</strong> op e<strong>en</strong> Bepaalde Plaats Voorkom<strong>en</strong>d<br />

SBB Sur<strong>in</strong>ame Forest Control Foundation – Sticht<strong>in</strong>g Bosbeheer <strong>en</strong> Bostoezicht<br />

Sur<strong>in</strong>ame<br />

SCF Sur<strong>in</strong>ame Conservation Foundation – Sticht<strong>in</strong>g Natuur Sur<strong>in</strong>ame<br />

SES Socio-economic Specialist Study – Socio-economisch Specialistisch<br />

Onderzoek<br />

SIA Social Impact Assessm<strong>en</strong>t – <strong>Sociale</strong> Effect<strong>en</strong>analyse<br />

STIs Sexually Transmitted Infections – Sexueel Overdraagbare Infecties<br />

STINASU Sticht<strong>in</strong>g Natuurbehoud Sur<strong>in</strong>ame<br />

ToR Scop<strong>in</strong>g (ofwel afbak<strong>en</strong><strong>in</strong>g) <strong>en</strong> Onderzoeksopdracht<br />

UNESCO United Nations Educational, Sci<strong>en</strong>tific and Cultural Organization –<br />

Organisatie van de Ver<strong>en</strong>igde Naties voor Onderwijs, Wet<strong>en</strong>schap <strong>en</strong><br />

Cultuur<br />

UNFCC United Nations Framework Conv<strong>en</strong>tion on Climate Change – Raamverdrag<br />

van de Ver<strong>en</strong>igde Naties <strong><strong>in</strong>zake</strong> Klimaatsverander<strong>in</strong>g<br />

WAD Weak Acid Dissociation – Dissociatie van Zwak Zuur<br />

ERM vi CONCEPT AUGUSTUS 2011


1.0 INLEIDING<br />

1.1 ACHTERGROND<br />

Sur<strong>in</strong>ame Gold Company, LLC (<strong>Surgold</strong>) is e<strong>en</strong> naamloze v<strong>en</strong>nootschap<br />

waarvan Newmont Overseas Exploration Limited de eig<strong>en</strong>aar is. Alcoa<br />

World Alum<strong>in</strong>a, LLC. Newmont is de manager van <strong>Surgold</strong> <strong>en</strong> <strong>Surgold</strong> is<br />

houder van <strong>het</strong> Recht op Exploratie <strong>in</strong> <strong>Merian</strong>, de locatie van <strong>het</strong> <strong>Project</strong>.<br />

<strong>Surgold</strong> begon <strong>in</strong> 2004 met haar exploratiewerkzaamhed<strong>en</strong> te <strong>Merian</strong> <strong>en</strong><br />

<strong>in</strong> 2007 di<strong>en</strong>de zij haar aanvraag <strong>in</strong> ter verkrijg<strong>in</strong>g van exploitatierecht<strong>en</strong>.<br />

Het bedrijf staat op <strong>het</strong> punt onderhandel<strong>in</strong>g<strong>en</strong> aan te gaan met de Staat<br />

om de Delfstoff<strong>en</strong>overe<strong>en</strong>komst af te rond<strong>en</strong>. Deze overe<strong>en</strong>komst zal de<br />

voorwaard<strong>en</strong> vastlegg<strong>en</strong> m.b.t. <strong>het</strong> verl<strong>en</strong><strong>en</strong> van <strong>het</strong> exploitatierecht.<br />

Overe<strong>en</strong>komstig de richtlijn<strong>en</strong> van <strong>het</strong> Nationaal Instituut voor Milieu <strong>en</strong><br />

Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame (NIMOS), is <strong>Surgold</strong> verplicht e<strong>en</strong><br />

Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t i (ESIA – ofwel Milieu- <strong>en</strong><br />

<strong>Sociale</strong> Effect<strong>en</strong>analyse) op te stell<strong>en</strong>. Te di<strong>en</strong> e<strong>in</strong>de heeft <strong>Surgold</strong>,<br />

Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t (ERM), e<strong>en</strong> onafhankelijke<br />

<strong>in</strong>ternationale milieuconsultancy, aangetrokk<strong>en</strong>. Middels dit onderzoek<br />

zal getracht word<strong>en</strong> de negatieve effect<strong>en</strong> op de lokale<br />

leefgeme<strong>en</strong>schapp<strong>en</strong> <strong>en</strong> <strong>het</strong> milieu te id<strong>en</strong>tificer<strong>en</strong>, te verm<strong>in</strong>der<strong>en</strong> of te<br />

vermijd<strong>en</strong> <strong>en</strong> de positieve effect<strong>en</strong> te bevorder<strong>en</strong>.<br />

Het <strong>Merian</strong> Gold <strong>Project</strong> bev<strong>in</strong>dt zich <strong>in</strong> <strong>het</strong> noordoostelijke deel van<br />

Sur<strong>in</strong>ame, ongeveer 66 km t<strong>en</strong> zuid<strong>en</strong> van Mo<strong>en</strong>go. De voorgestelde<br />

mijnlocatie bestaande uit drie, mogelijk vier op<strong>en</strong> mijn<strong>en</strong>, alsook uit e<strong>en</strong><br />

verwerk<strong>in</strong>gsbedrijf, e<strong>en</strong> faciliteit voor <strong>het</strong> managem<strong>en</strong>t van afvalgeste<strong>en</strong>te<br />

<strong>en</strong> e<strong>en</strong> faciliteit voor <strong>het</strong> managem<strong>en</strong>t van afvalslik, e<strong>en</strong> afdel<strong>in</strong>g voor<br />

brandstoftanks, electriciteitsopwekk<strong>in</strong>gs- <strong>en</strong><br />

waterbehandel<strong>in</strong>gsfaciliteit<strong>en</strong>, onderhoudsfaciliteit<strong>en</strong> <strong>en</strong><br />

kantoorgebouw<strong>en</strong> alsook arbeidersaccommodaties. De totale opbr<strong>en</strong>gst<br />

van <strong>het</strong> project zal naar schatt<strong>in</strong>g 3,5 miljo<strong>en</strong> ounces (Moz) goud<br />

bedrag<strong>en</strong>. Het grootste deel van de constructiematerial<strong>en</strong> <strong>en</strong> bevoorrad<strong>in</strong>g<br />

voor de operationele werkzaamhed<strong>en</strong> (bijv. bedrijfsmaterieel <strong>en</strong> reag<strong>en</strong>tia)<br />

zull<strong>en</strong> via de Nieuwe Hav<strong>en</strong> <strong>in</strong> Paramaribo word<strong>en</strong> geïmporteerd.<br />

Hoofdstuk 2.0 geeft e<strong>en</strong> gedetailleerde <strong>Project</strong>beschrijv<strong>in</strong>g waaronder de<br />

i Het ‘sociale’ compon<strong>en</strong>t van de ESIA richt zich op zowel de sociale als de gezondheid-<br />

gerelateerde effect<strong>en</strong> van <strong>het</strong> <strong>Project</strong><br />

ERM 1 CONCEPT AUGUSTUS 2011


1.2 DOEL<br />

mijnlocatie, <strong>het</strong> verwerk<strong>in</strong>gsbedrijf, de hav<strong>en</strong> <strong>en</strong> de transportcorridor,<br />

alsook de m<strong>in</strong>eralogie <strong>en</strong> geologie.<br />

Het doel van dit Scop<strong>in</strong>gsrapport (ofwel <strong>het</strong> rapport ter afbak<strong>en</strong><strong>in</strong>g van<br />

<strong>het</strong> <strong>Project</strong>) <strong>en</strong> de Terms of Refer<strong>en</strong>ce (ToR ofwel de Taakomschrijv<strong>in</strong>g) is<br />

de doelstell<strong>in</strong>g<strong>en</strong> vast te legg<strong>en</strong>, de aard <strong>en</strong> omvang (afbak<strong>en</strong><strong>in</strong>g) te<br />

def<strong>in</strong>iër<strong>en</strong> <strong>en</strong> de strategie <strong>en</strong> <strong>het</strong> schema vast te stell<strong>en</strong> om e<strong>en</strong> ESIA te<br />

ontwikkel<strong>en</strong>, te beoordel<strong>en</strong> <strong>en</strong> goed te keur<strong>en</strong> voor de constructie- <strong>en</strong><br />

exploitatie van <strong>het</strong> <strong>Merian</strong> <strong>Project</strong>, als hierbov<strong>en</strong> omschrev<strong>en</strong> <strong>en</strong> wel op de<br />

<strong>Merian</strong>-goudafzett<strong>in</strong>g <strong>in</strong> oost-Sur<strong>in</strong>ame. <strong>Surgold</strong> is als de<br />

projectvoorsteller verantwoordelijk voor <strong>het</strong> opstell<strong>en</strong> van de ESIA.<br />

De ESIA is noodzakelijk om de milieu- <strong>en</strong> socio-economische effect<strong>en</strong> te<br />

evaluer<strong>en</strong> van project-gerelateerde activiteit<strong>en</strong> tijd<strong>en</strong>s de constructie- <strong>en</strong><br />

exploitatiefase van <strong>het</strong> <strong>Merian</strong> <strong>Project</strong>. <strong>Surgold</strong> zal met <strong>in</strong>zet van de<br />

consultancy ERM, de ESIA opstell<strong>en</strong> om de milieu- <strong>en</strong> socio-economische<br />

effect<strong>en</strong> van de project<strong>en</strong> te analyser<strong>en</strong>.<br />

Hieronder volg<strong>en</strong> de belangrijkste doelstell<strong>in</strong>g<strong>en</strong> van <strong>het</strong> ToR-docum<strong>en</strong>t:<br />

• de belangrijkste vraagstukk<strong>en</strong> <strong>en</strong> zorgpunt<strong>en</strong> die naar vor<strong>en</strong> word<strong>en</strong><br />

gebracht door stakeholders te id<strong>en</strong>tificer<strong>en</strong>, om deze mee te kunn<strong>en</strong><br />

nem<strong>en</strong> bij <strong>het</strong> ontwikkel<strong>en</strong> van <strong>het</strong> ESIA-onderzoek; <strong>en</strong><br />

• de brongebied<strong>en</strong> te id<strong>en</strong>tificer<strong>en</strong> die mogelijkerwijs zull<strong>en</strong> word<strong>en</strong><br />

aangetast <strong>en</strong> de milieuvraagstukk<strong>en</strong> die ev<strong>en</strong>tueel nader onderzoek<br />

b<strong>in</strong>n<strong>en</strong> de ESIA vereis<strong>en</strong>.<br />

1.3 ESIA-ONDERZOEKS TEAM<br />

Het ESIA-team is sam<strong>en</strong>gesteld uit personeel met uitgebreide<br />

<strong>in</strong>ternationale ervar<strong>in</strong>g op <strong>het</strong> gebied van mijnbouw, analyse van<br />

natuurlijke hulpbronn<strong>en</strong> <strong>en</strong> ESIA’s gecomb<strong>in</strong>eerd met verschill<strong>en</strong>de goedgekwalificeerde<br />

<strong>in</strong>ternationale <strong>en</strong> lokale deskundig<strong>en</strong> op <strong>het</strong> gebied van<br />

terrestrische <strong>en</strong> aquatische ecologie, sociaal-maatschappelijke<br />

vraagstukk<strong>en</strong> <strong>en</strong> geotechnische aangeleg<strong>en</strong>hed<strong>en</strong>. In Tabel 1-1 zijn de<br />

voornaamste teamled<strong>en</strong> opg<strong>en</strong>om<strong>en</strong>, alsook de lokale deskundig<strong>en</strong> op <strong>het</strong><br />

gebied van <strong>het</strong> milieu-, sociaal-maatschappelijke aspect<strong>en</strong> <strong>en</strong> techniek. De<br />

CV’s van deze personeelsled<strong>en</strong> zijn aangehecht <strong>in</strong> Bijlage A.<br />

ERM 2 CONCEPT AUGUSTUS 2011


Tabel 1-1 ESIA-Kernteam<br />

Naam Bedrijf Rol <strong>en</strong> Specialistisch<br />

Onderzoek<br />

Jar<strong>en</strong> ervar<strong>in</strong>g Opleid<strong>in</strong>g<br />

PROJECT MANAGEMENT TEAM<br />

David Blaha ERM <strong>Project</strong> Director 30 jaar M.S. Environm<strong>en</strong>tal<br />

Managem<strong>en</strong>t<br />

Sunrita Sarkar ERM <strong>Project</strong> Manager 12 jaar MA Sociology and<br />

History;<br />

TECHNISCH ADVISEUR<br />

Al Trippel ERM Mijnprocess<strong>en</strong>,<br />

Mijnsluit<strong>in</strong>g <strong>en</strong><br />

Rehabilitatie,<br />

Internationale Cyanide<br />

Code, DS1 <strong>en</strong> 2<br />

Alistair Gow-<br />

Smith<br />

Salomon<br />

Emanuels<br />

Matthew<br />

Kuniholm<br />

> 25 jaar M.S. Geology<br />

SOCIALE /GEZONDHEID- / CULTURELE DIENSTEN<br />

ERM <strong>Sociale</strong> Analyse, SES 1 < 5 jaar MS., Environm<strong>en</strong>tal<br />

Impact Assessm<strong>en</strong>t<br />

and Managem<strong>en</strong>t<br />

Equalance <strong>Sociale</strong> Analyse, SES 1 30 jaar MSc., Cultural and<br />

Foundation,<br />

Sur<strong>in</strong>ame<br />

Social Anthropology<br />

ERM <strong>Sociale</strong> Analyse, SES 1 < 5 jaar B.A., (1) Biology, (2)<br />

International Relations<br />

S<strong>in</strong>ang Lee ERM Gezondheidseffect<strong>en</strong>analyse,<br />

SES 2<br />

Eml<strong>en</strong> Myers<br />

Maggie<br />

Cawley<br />

ERM Archeologisch <strong>en</strong><br />

Historisch Erfgoed, SES<br />

3<br />

B<strong>en</strong> Sussman ERM Verkeersanalyses,<br />

Grondgebruik <strong>en</strong><br />

Visuele hulpbronn<strong>en</strong>;<br />

SES1 <strong>en</strong> DS 5<br />

Dorothy<br />

Trippel<br />

8 jaar MPH, Environm<strong>en</strong>tal and<br />

Occupational Health<br />

Sci<strong>en</strong>ces<br />

30 jaar PhD., Anthropology<br />

ERM GIS, SES 1 7 jaar MS., Urban and<br />

Regional Plann<strong>in</strong>g<br />

10 jaar M.S. City and Regional<br />

Plann<strong>in</strong>g<br />

ERM <strong>Sociale</strong> Analyse, SES 1 5 jaar B.A., Anthropology,<br />

Sociology and Religious<br />

Studies<br />

FYSIEKE DIENSTEN / TECHNIEK<br />

Y<strong>in</strong>ka Afon ERM Luchtkwaliteit <strong>en</strong><br />

klimaat,<br />

koolstofvoorraad, stank,<br />

geluid, trill<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

natuurlijke gevar<strong>en</strong>; ESS<br />

3 <strong>en</strong> 4, <strong>en</strong> DS 3, 4, <strong>en</strong> 6<br />

Emma<br />

McK<strong>en</strong>nirey<br />

ERM Watervoorrad<strong>en</strong> <strong>en</strong><br />

Afvalbeheer; ESS 1 <strong>en</strong> 2<br />

Paul Wh<strong>in</strong>cup ERM Geologie,<br />

watervoorzi<strong>en</strong><strong>in</strong>g <strong>en</strong><br />

waterbeheer; DS 1 <strong>en</strong> 2,<br />

<strong>en</strong> ESS 1 <strong>en</strong> 2<br />

8 jaar M.S.E Environm<strong>en</strong>tal<br />

Process Eng<strong>in</strong>eer<strong>in</strong>g<br />

8 jaar BSc., Civil Eng<strong>in</strong>eer<strong>in</strong>g,<br />

Water Resources<br />

Specialization<br />

40 jaar BSc., Geology<br />

ERM 3 CONCEPT AUGUSTUS 2011


Naam Bedrijf Rol <strong>en</strong> Specialistisch<br />

Onderzoek<br />

Andres ERM Geologie <strong>en</strong><br />

Meglioli<br />

Mijnreg<strong>en</strong>eratie <strong>en</strong> –<br />

Sluit<strong>in</strong>g; DS 1 <strong>en</strong> 2.<br />

Gabe Luna ERM Geologie <strong>en</strong><br />

watervoorrad<strong>en</strong>; ESS 2 <strong>en</strong><br />

DS 1<br />

James Nalv<strong>en</strong> ERM Hydrogeologie <strong>en</strong><br />

waterbeheer; ESS 2, DS 1<br />

<strong>en</strong> 2.<br />

George Krallis ERM Oppervlakte- <strong>en</strong><br />

grondwatermodeller<strong>in</strong>g;<br />

ESS 1, <strong>en</strong> 2<br />

Rom<strong>in</strong>a ERM Plann<strong>en</strong> <strong><strong>in</strong>zake</strong><br />

Aramburu<br />

milieubeheer <strong>en</strong> –<br />

monitor<strong>in</strong>g alsook due<br />

dilig<strong>en</strong>ce<br />

BIOLOGISCHE DIENSTEN / BIODIVERSITEIT<br />

Jason Willey ERM Aquatische Ecologie;<br />

ESS 9<br />

Sarah Piper ERM Onderzoek <strong><strong>in</strong>zake</strong><br />

bov<strong>en</strong>grondse fauna,<br />

biodiversiteit, bodems:<br />

ESS 6 <strong>en</strong> 7<br />

Rutger De<br />

Wolf<br />

Environm<strong>en</strong>tal<br />

Services &<br />

Support,<br />

Sur<strong>in</strong>ame<br />

Bart De Dijn Environm<strong>en</strong>tal<br />

Services &<br />

Support,<br />

Sur<strong>in</strong>ame<br />

Jan Mol Zoology and<br />

biodiversity<br />

(Consultant –<br />

Anton de Kom<br />

University of<br />

Sur<strong>in</strong>ame)<br />

Paul Ouboter Zoology and<br />

biodiversity<br />

(Consultant –<br />

University of<br />

Sur<strong>in</strong>ame)<br />

Verklar<strong>in</strong>g:<br />

Bosbouw <strong>en</strong> Vegetatie;<br />

ESS 5<br />

In <strong>het</strong> wild lev<strong>en</strong>de<br />

dier<strong>en</strong> <strong>en</strong> vegetatie; ESS<br />

5 <strong>en</strong> 8<br />

Zoölogie <strong>en</strong><br />

biodiversiteit; ESS 9<br />

Zoölogie <strong>en</strong><br />

biodiversiteit; ESS 5 <strong>en</strong> 8<br />

Jar<strong>en</strong> ervar<strong>in</strong>g Opleid<strong>in</strong>g<br />

25 jaar PhD., Geology; MBA<br />

Global Managem<strong>en</strong>t<br />

6 jaar BSc., Environm<strong>en</strong>tal<br />

Geosci<strong>en</strong>ce<br />

> 30 jaar MSc., Applied Geology<br />

20 jaar PhD., Civil<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

8 jaar BSc., Environm<strong>en</strong>tal<br />

Eng<strong>in</strong>eer<strong>in</strong>g<br />

11 jaar MS., Environm<strong>en</strong>tal<br />

Sci<strong>en</strong>ce and Policy<br />

9 jaar B.A., Biological<br />

Sci<strong>en</strong>ces<br />

5 jaar M.S., Forestry<br />

> 20 jaar PhD., Zoology<br />

> 25 jaar PhD., Biology<br />

> 30 jaar PhD., Biology<br />

ESS = Environm<strong>en</strong>tal Specialty Study (Milieu-specialistisch Onderzoek);<br />

SES = Socio-economic Specialty Study (Socio-economisch Specialistisch Onderzoek);<br />

DS = Desktop Study (Desktoponderzoek)<br />

a Geeft participatie aan/ verantwoordelijk voor e<strong>en</strong> bepaald Specialistisch Onderzoek; zie<br />

Paragraaf 7.1<br />

ERM 4 CONCEPT AUGUSTUS 2011


Het kern-ESIA-team is aangegev<strong>en</strong> <strong>in</strong> Afbeeld<strong>in</strong>g 1. De <strong>Project</strong> Manager<br />

<strong>en</strong> de <strong>Project</strong> Director zull<strong>en</strong> zorg<strong>en</strong> voor de algehele coörd<strong>in</strong>atie van de<br />

verschill<strong>en</strong>de onderzoek<strong>en</strong>. Elk veldonderzoek staat onder leid<strong>in</strong>g van<br />

e<strong>en</strong> bevoegde deskundige. Lokale Sur<strong>in</strong>aamse consultants vorm<strong>en</strong> e<strong>en</strong><br />

belangrijk onderdeel van de onderzoeksteams <strong>en</strong> zull<strong>en</strong> zorg<strong>en</strong> voor de<br />

vereiste lokale k<strong>en</strong>nis. Deze lokale deskundig<strong>en</strong> zijn algeme<strong>en</strong> bek<strong>en</strong>d op<br />

hun gebied <strong>in</strong> Sur<strong>in</strong>ame <strong>en</strong> zijn ook door <strong>het</strong> NIMOS aanbevol<strong>en</strong> als<br />

deskundig<strong>en</strong> op <strong>het</strong> gebied van de betreff<strong>en</strong>de materie.<br />

Afbeeld<strong>in</strong>g 1-1. Het <strong>Merian</strong> ESIA-<strong>Project</strong>team ii<br />

Bron: ERM<br />

ii<br />

ERM-personeel <strong>in</strong> zwart gehighlight<br />

Sub-contractors <strong>in</strong> Blauw gehighlight<br />

ERM 5 CONCEPT AUGUSTUS 2011


2.0 PROJECTBESCHRIJVING<br />

2.1 PROJECTLOCATIE<br />

Het <strong>Merian</strong> Gold <strong>Project</strong> bev<strong>in</strong>dt zich <strong>in</strong> <strong>het</strong> noordoostelijk deel van<br />

Sur<strong>in</strong>ame, ongeveer 66 kilometer (km) t<strong>en</strong> zuid<strong>en</strong> van Mo<strong>en</strong>go <strong>en</strong> is<br />

toegankelijk via de weg van Mo<strong>en</strong>go naar Langatabiki (Afbeeld<strong>in</strong>g 2-1).<br />

De projectlocatie is op de waterscheid<strong>in</strong>g tuss<strong>en</strong> de stroomgebied<strong>en</strong> van<br />

de Marowijne <strong>en</strong> de Commewijne. De Marowijnerivier vormt de gr<strong>en</strong>s<br />

tuss<strong>en</strong> Sur<strong>in</strong>ame <strong>en</strong> Frans-Guyana, terwijl <strong>het</strong> stroomgebied van de<br />

Commewijne b<strong>in</strong>n<strong>en</strong> Sur<strong>in</strong>ame valt. De dichtstbijzijnde perman<strong>en</strong>te<br />

bevolk<strong>in</strong>g bev<strong>in</strong>dt zich op <strong>het</strong> eiland Langa Tabiki <strong>en</strong> bestaat uit<br />

ongeveer 500 m<strong>en</strong>s<strong>en</strong>. Deze vestig<strong>in</strong>g ligt op e<strong>en</strong> afstand van pakweg 35<br />

km verwijderd van de <strong>Project</strong>locatie. Naar schatt<strong>in</strong>g zal de<br />

constructieperiode van <strong>het</strong> project 20 maand<strong>en</strong> <strong>in</strong> beslag nem<strong>en</strong> <strong>en</strong> de<br />

huidige verwachte lev<strong>en</strong>sduur van de mijn is 11 jaar. De totale opbr<strong>en</strong>gst<br />

van <strong>het</strong> project zal naar schatt<strong>in</strong>g 3,5 miljo<strong>en</strong> ounces (Moz) goud<br />

bedrag<strong>en</strong>.<br />

2.2 HAVEN EN TRANSPORTCORRIDOR<br />

De meeste constructiematerial<strong>en</strong> <strong>en</strong> de bevoorrad<strong>in</strong>g van de operationele<br />

werkzaamhed<strong>en</strong> (bijv. bedrijfsmaterieel <strong>en</strong> reag<strong>en</strong>tia) zull<strong>en</strong> via de<br />

Nieuwe Hav<strong>en</strong> <strong>in</strong> Paramaribo word<strong>en</strong> geïmporteerd. Deze hav<strong>en</strong>faciliteit<br />

zal naar behoefte word<strong>en</strong> opgewaardeerd om aan de projecteis<strong>en</strong> te<br />

kunn<strong>en</strong> voldo<strong>en</strong>. Vanaf de hav<strong>en</strong>, zull<strong>en</strong> deze material<strong>en</strong> <strong>en</strong> reag<strong>en</strong>tia<br />

middels trucks vanuit Paramaribo via de Oost-Westverb<strong>in</strong>d<strong>in</strong>g naar<br />

Mo<strong>en</strong>go word<strong>en</strong> vervoerd <strong>en</strong> vervolg<strong>en</strong>s via de weg naar Langatabiki<br />

naar de locatie zoals aangegev<strong>en</strong> <strong>in</strong> 2-1. De weg van Paramaribo naar<br />

Mo<strong>en</strong>go wordt mom<strong>en</strong>teel gerehabiliteerd door de overheid van<br />

Sur<strong>in</strong>ame, terwijl de weg vanuit Mo<strong>en</strong>go naar de projectlocatie door<br />

<strong>Surgold</strong> zal word<strong>en</strong> gerehabiliteerd. Er zal vanuit de weg van Mo<strong>en</strong>go<br />

naar Langatabiki e<strong>en</strong> nieuwe zijweg, zog<strong>en</strong>oemde ‘spur road’ van 16 km<br />

lang word<strong>en</strong> aangelegd als verb<strong>in</strong>d<strong>in</strong>gsweg naar de <strong>Merian</strong>-projectlocatie.<br />

ERM 6 CONCEPT AUGUSTUS 2011


Afbeeld<strong>in</strong>g 2-1. Locatie <strong>Merian</strong> <strong>Project</strong> <strong>en</strong> Transportcorridor<br />

Bron: ERM<br />

2.3 GEOLOGIE EN MINERALOGIE VAN DE LOCATIE<br />

De geologie van <strong>het</strong> vaste geste<strong>en</strong>te van <strong>het</strong> gebied omvat geplooide <strong>en</strong> <strong>in</strong><br />

afwissel<strong>en</strong>de lag<strong>en</strong> voorkom<strong>en</strong>de verschov<strong>en</strong> grauwakk<strong>en</strong> (ofwel donker<br />

klastisch afzett<strong>in</strong>gsgeste<strong>en</strong>te), kleiste<strong>en</strong>, siltgeste<strong>en</strong>te <strong>en</strong> zandste<strong>en</strong>.<br />

Langdurige chemische verwer<strong>in</strong>g als gevolg van e<strong>en</strong> semi-aride, tropisch<br />

paleo-klimaat van deze relatief zachte geste<strong>en</strong>t<strong>en</strong> heeft e<strong>en</strong> laag lateriet /<br />

saproliet geproduceerd die zich vanaf de oppervlakte tot e<strong>en</strong> diepte van<br />

circa 80-100 meter (m) bev<strong>in</strong>dt. E<strong>en</strong> overgangszone van gedeeltelijk<br />

verweerde of geoxideerd geste<strong>en</strong>te (dat sapgeste<strong>en</strong>te g<strong>en</strong>oemd wordt)<br />

bev<strong>in</strong>dt zich onder de saprolietlaag. De overgangszone kan uitermate<br />

onregelmatig zijn <strong>en</strong> varieert van 0-20 m <strong>in</strong> dikte. Onder <strong>het</strong> sapgeste<strong>en</strong>te<br />

bev<strong>in</strong>dt zich jong (niet verweerd) of niet-geoxideerd geste<strong>en</strong>te. Op <strong>het</strong><br />

<strong>Merian</strong>project v<strong>in</strong>dt goudm<strong>in</strong>eralisatie plaats <strong>in</strong> al deze drie lag<strong>en</strong> van<br />

geste<strong>en</strong>t<strong>en</strong>, te wet<strong>en</strong> de saproliet, <strong>het</strong> sapgeste<strong>en</strong>te <strong>en</strong> <strong>het</strong> jong, nietgeoxideerde<br />

geste<strong>en</strong>te. Op basis van <strong>het</strong> tot op hed<strong>en</strong> verrichte<br />

ERM 7 CONCEPT AUGUSTUS 2011


geologisch onderzoek wordt <strong>het</strong> gem<strong>in</strong>eraliseerde goud gevond<strong>en</strong> <strong>in</strong> wat<br />

e<strong>en</strong> algeme<strong>en</strong> voorkom<strong>en</strong>de kwartsader zou kunn<strong>en</strong> zijn, die harder is dat<br />

<strong>het</strong> omligg<strong>en</strong>de geste<strong>en</strong>te.<br />

2.4 MIJNLOCATIE<br />

De voorgestelde mijnlocatie, mogelijk bestaande uit vier op<strong>en</strong> mijn<strong>en</strong>,<br />

alsook uit e<strong>en</strong> verwerk<strong>in</strong>gsbedrijf, e<strong>en</strong> faciliteit voor <strong>het</strong> managem<strong>en</strong>t van<br />

afvalgeste<strong>en</strong>te <strong>en</strong> e<strong>en</strong> faciliteit voor <strong>het</strong> managem<strong>en</strong>t van afvalslik, e<strong>en</strong><br />

afdel<strong>in</strong>g voor brandstoftanks, electriciteitsopwekk<strong>in</strong>gs- <strong>en</strong><br />

waterbehandel<strong>in</strong>gsfaciliteit<strong>en</strong>, onderhoudsfaciliteit<strong>en</strong> <strong>en</strong><br />

kantoorgebouw<strong>en</strong> alsook arbeidersaccommodaties. De mijnschacht<strong>en</strong> <strong>en</strong><br />

de stortplaats<strong>en</strong> voor afvalgeste<strong>en</strong>te zull<strong>en</strong> zich bev<strong>in</strong>d<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

stroomgebied van de Marowijnerivier, terwijl <strong>het</strong> verwerk<strong>in</strong>gsbedrijf <strong>en</strong><br />

de opslagfaciliteit voor afvalslik zich <strong>in</strong> <strong>het</strong> stroomgebied van de<br />

Commewijnerivier zull<strong>en</strong> bev<strong>in</strong>d<strong>en</strong>. Afbeeld<strong>in</strong>g 2-2 toont de locatie van<br />

de belangrijkste compon<strong>en</strong>t<strong>en</strong> van de locatie.<br />

Het mijn<strong>en</strong> zal geschied<strong>en</strong> met gebruikmak<strong>in</strong>g van e<strong>en</strong> truck- <strong>en</strong><br />

laadschopoperatie (hydraulische graafmach<strong>in</strong>es met e<strong>en</strong> capaciteit van 15<br />

<strong>en</strong> 16 m 3 <strong>en</strong> vrachttrucks met e<strong>en</strong> capaciteit van 140 ton (t). Deze zull<strong>en</strong><br />

word<strong>en</strong> ondersteund door dozers <strong>en</strong> graders, waarbij ‘blast<strong>in</strong>g’ ofwel<br />

‘schiet<strong>en</strong>’ alle<strong>en</strong> vereist zal zijn <strong>in</strong>geval van jong, niet-geoxideerd<br />

geste<strong>en</strong>te <strong>en</strong> hard saprolieterts. Alle mijnequipem<strong>en</strong>t zal met diesel<br />

word<strong>en</strong> aangedrev<strong>en</strong>. Naar verwacht<strong>in</strong>g zull<strong>en</strong> deze mijn<strong>en</strong> tot e<strong>en</strong> diepte<br />

van ongeveer 170 meter gaan <strong>en</strong> e<strong>en</strong> totaal oppervlakte van ongeveer 300<br />

hectar<strong>en</strong> (ha) beslaan.<br />

Het afvalgeste<strong>en</strong>te zal word<strong>en</strong> opgeslag<strong>en</strong> op twee locaties: één grotere<br />

managem<strong>en</strong>tfaciliteit t<strong>en</strong> noord<strong>en</strong> van <strong>Merian</strong> II t.b.v. de <strong>Merian</strong> II-mijn<br />

<strong>en</strong> de Maraba-mijn<strong>en</strong> <strong>en</strong> e<strong>en</strong> tweede, kle<strong>in</strong>ere faciliteit nabij de <strong>Merian</strong> Imijn.<br />

Op basis van voorlopige geo-chemische analyses, is <strong>het</strong><br />

afvalgeste<strong>en</strong>te naar verwacht<strong>in</strong>g <strong>in</strong>ert <strong>en</strong> zal deze ge<strong>en</strong> afvoer van zure<br />

stoff<strong>en</strong> veroorzak<strong>en</strong>. E<strong>en</strong> algem<strong>en</strong>e hell<strong>in</strong>g van 3:1 is toegestaan met<br />

hell<strong>en</strong>de harde lag<strong>en</strong> van 15 m hoogte om te help<strong>en</strong> bij de dra<strong>in</strong>age <strong>en</strong><br />

operationele effectiviteit. Voorts is er e<strong>en</strong> ruimte vrijgehoud<strong>en</strong> op de<br />

dumplocatie <strong>in</strong> <strong>het</strong> noord<strong>en</strong> voor de opslag van erts met e<strong>en</strong> laag<br />

goudgehalte voor verwerk<strong>in</strong>g aan <strong>het</strong> e<strong>in</strong>d van de lev<strong>en</strong>sduur van de<br />

mijn.<br />

De verwerk<strong>in</strong>g zal beg<strong>in</strong>n<strong>en</strong> met ‘gr<strong>in</strong>d<strong>in</strong>g’ ofwel vermal<strong>en</strong> van <strong>het</strong><br />

erts/geste<strong>en</strong>te, gevolgd door e<strong>en</strong> comb<strong>in</strong>atie van terugw<strong>in</strong>n<strong>in</strong>g middels<br />

zwaartekracht (zwaartekrachtcircuit) <strong>en</strong> cyanide-extractie middels e<strong>en</strong><br />

Carbon-<strong>in</strong>-Leach (CIL)-circuit met e<strong>en</strong> nom<strong>in</strong>ale verwerk<strong>in</strong>gscapaciteit<br />

ERM 8 CONCEPT AUGUSTUS 2011


van 8 Mtpa. Wanneer <strong>het</strong> sapgeste<strong>en</strong>te <strong>en</strong> niet-verweerde<br />

geste<strong>en</strong>tematerial<strong>en</strong> de voornaamste voed<strong>in</strong>gsmaterial<strong>en</strong> word<strong>en</strong>, zou er<br />

e<strong>en</strong> Ball Mill ofwel Kogelmol<strong>en</strong> <strong>en</strong> Pebble Crusher ofwel Ste<strong>en</strong>breker<br />

word<strong>en</strong> toegevoegd aan <strong>het</strong> bedrijf om de productiecapaciteit van<br />

nom<strong>in</strong>aal 8 Mtpa te handhav<strong>en</strong>. Er zal goud word<strong>en</strong> gewonn<strong>en</strong> van <strong>het</strong><br />

CIL-circuit <strong>en</strong> de zwaartekrachtcircuit middels de standaardtechnologie<br />

van <strong>het</strong> uitwass<strong>en</strong> van <strong>het</strong> zuur, <strong>het</strong> scheid<strong>en</strong> <strong>en</strong> <strong>het</strong> w<strong>in</strong>n<strong>en</strong> van goud<br />

middels electrotechniek. De verdunn<strong>in</strong>g van de cyanide zal word<strong>en</strong><br />

bewerkstelligd middels <strong>het</strong> wass<strong>en</strong> van de leach tails slurry <strong>in</strong> e<strong>en</strong><br />

counter curr<strong>en</strong>t decantation (CCD)-circuit met twee fas<strong>en</strong> (ofwel e<strong>en</strong><br />

teg<strong>en</strong>stroom-decantatiecircuit) om e<strong>en</strong> Weak Acid Dissociable (WAD)<br />

cyanide discharge (ofwel Zwakke Zuur Afscheidbare cyanideloz<strong>in</strong>g)<br />

naar de opslagfaciliteit voor afvalslik te bewerkstellig<strong>en</strong>. In Afbeeld<strong>in</strong>g<br />

2-3 is e<strong>en</strong> flowdiagram afgebeeld.<br />

ERM 9 CONCEPT AUGUSTUS 2011


Afbeeld<strong>in</strong>g 2-2. Belangrijkste compon<strong>en</strong>t<strong>en</strong> van de Mijnlocatie<br />

Bron: ERM Exploitatiegr<strong>en</strong>s getoond zoals deze is voorgesteld <strong>in</strong> de Aanvraag voor <strong>het</strong><br />

Recht op Exploitatie<br />

ERM 10 CONCEPT AUGUSTUS 2011


Afbeeld<strong>in</strong>g 2-3. Conceptuele flowchart van <strong>het</strong> Proces – <strong>Merian</strong> Gold <strong>Project</strong><br />

ERM 11 DRAFT - AUGUSTUS 2011


Het voorstel is om de tail<strong>in</strong>gsfacilteit te plaats<strong>en</strong> <strong>in</strong> de bov<strong>en</strong>loop van e<strong>en</strong><br />

zijrivier van de Commewijnerivier. De faciliteit zal e<strong>en</strong> dam omvatt<strong>en</strong><br />

over deze kreek om e<strong>en</strong> reservoir voor afvalslik te vorm<strong>en</strong>. Er zull<strong>en</strong> ook<br />

<strong>en</strong>kele kle<strong>in</strong>ere zadeldamm<strong>en</strong> vereist zijn om <strong>het</strong> afvalslik te omsluit<strong>en</strong>.<br />

De afvalslikfaciliteit ofwel de faciliteit voor <strong>het</strong> mijnafval (de zog<strong>en</strong>oemde<br />

‘tail<strong>in</strong>gs storage facility’) zal naarmate de mijnwerkzaamhed<strong>en</strong> vorder<strong>en</strong>,<br />

<strong>in</strong> fas<strong>en</strong> word<strong>en</strong> aangelegd. Naar verwacht<strong>in</strong>g zal de afvoer naar de<br />

Tail<strong>in</strong>gs Storage Facility voor de eerste 10,8 miljo<strong>en</strong> ton afvalslik<br />

geschied<strong>en</strong> middels zwaartekrachtstrom<strong>in</strong>g, maar naar verwacht<strong>in</strong>g<br />

zull<strong>en</strong> er tail<strong>in</strong>gs pumps (ofwel afvalslikpomp<strong>en</strong>) vereist zijn als<br />

onderdeel van de tweede fase voor <strong>het</strong> vull<strong>en</strong> van <strong>het</strong> reservoir. Het<br />

afvalslik zal vanaf <strong>het</strong> eerste jaar, word<strong>en</strong> gepompt naar de TSF. Het<br />

afzett<strong>en</strong> van <strong>het</strong> afvalslik zal gedeeltelijk <strong>in</strong> de op<strong>en</strong> lucht geschied<strong>en</strong>, met<br />

e<strong>en</strong> cyclische afzett<strong>in</strong>g op verschill<strong>en</strong>de locaties om <strong>het</strong> afgezette materiaal<br />

de kans te gev<strong>en</strong> één massa te word<strong>en</strong> <strong>en</strong> te drog<strong>en</strong>. Er zal water van de<br />

bov<strong>en</strong>drijv<strong>en</strong>de vijver word<strong>en</strong> teruggevoerd naar de verwerk<strong>in</strong>gsplant<br />

om <strong>het</strong> verwerk<strong>in</strong>gswater aan te vull<strong>en</strong> of om gezuiverd te word<strong>en</strong>.<br />

Overtollig behandeld water zou <strong>in</strong> <strong>het</strong> milieu word<strong>en</strong> geloosd.<br />

De mijn zal e<strong>en</strong>maal 24 uur per dag <strong>in</strong> bedrijf zijn <strong>en</strong> de arbeiders zull<strong>en</strong><br />

tijd<strong>en</strong>s de constructie- <strong>en</strong> de operationsfase word<strong>en</strong> gehuisvest op de<br />

locatie <strong>in</strong> arbeidersaccommodaties. Naar schatt<strong>in</strong>g zal <strong>het</strong><br />

werknemersbestand tijd<strong>en</strong>s de operations 900 werknemers bedrag<strong>en</strong>,<br />

terwijl er tijd<strong>en</strong>s de constructiefase naar schatt<strong>in</strong>g 1.500 – 2.000<br />

werknemers zull<strong>en</strong> word<strong>en</strong> <strong>in</strong>gezet. Naar verwacht<strong>in</strong>g zull<strong>en</strong> de<br />

werknemers belast met de constructie <strong>in</strong> juli – augustus 2012 e<strong>en</strong> aanvang<br />

mak<strong>en</strong> met hun werkzaamhed<strong>en</strong>. Het project zal beschikk<strong>en</strong> over zijn<br />

eig<strong>en</strong> waterzuiver<strong>in</strong>gs<strong>in</strong>stallatie voor dr<strong>in</strong>kwater <strong>en</strong> zijn eig<strong>en</strong> faciliteit<br />

voor <strong>het</strong> verwerk<strong>en</strong> van afvalwater.<br />

De electriciteitsbehoefte van <strong>het</strong> <strong>Project</strong> wordt geprojecteerd op 30<br />

megawatts (MW) <strong>en</strong> zal ter plekke word<strong>en</strong> opgewekt middels<br />

gebruikmak<strong>in</strong>g van zware stookolieg<strong>en</strong>erator<strong>en</strong>.<br />

ERM 12 DRAFT AUGUSTUS 2011


3.0 WETTELIJK EN REGELGEVEND KADER EN BEDRIJFSTANDAARDEN<br />

3.1 INLEIDING<br />

Sur<strong>in</strong>ame wordt beheerst door de Grondwet van de Republiek Sur<strong>in</strong>ame<br />

van 1987. Sur<strong>in</strong>ame heeft ge<strong>en</strong> goedgekeurd milieubeleid <strong>en</strong> er is ge<strong>en</strong><br />

wetgev<strong>in</strong>g die specifiek handelt over milieubeheer. Mom<strong>en</strong>teel wordt er<br />

echter e<strong>en</strong> milieuwetgev<strong>in</strong>g opgesteld <strong>en</strong> er zijn concept-voorschrift<strong>en</strong><br />

voor milieuanalyse gepubliceerd. Voorts zijn er verschill<strong>en</strong>de<br />

overheidsbeleidsmaatregel<strong>en</strong> die te mak<strong>en</strong> hebb<strong>en</strong> met duurzame<br />

ontwikkel<strong>in</strong>g <strong>en</strong> biologische hulpbronn<strong>en</strong>, waaronder de<br />

Reger<strong>in</strong>gsverklar<strong>in</strong>g, <strong>het</strong> Meerjar<strong>en</strong> Ontwikkel<strong>in</strong>gsplan <strong>en</strong> de Nationale<br />

Strategie <strong><strong>in</strong>zake</strong> Biodiversiteit. Het voorgestelde <strong>Merian</strong> <strong>Project</strong> <strong>en</strong> <strong>het</strong><br />

ESIA-proces zull<strong>en</strong> de concept-voorschrift<strong>en</strong> <strong>en</strong> andere terzake bestaande<br />

wetgev<strong>in</strong>g nalev<strong>en</strong>, waaronder beleidsdocum<strong>en</strong>t<strong>en</strong> van de overheid. De<br />

verantwoordelijkheid voor <strong>het</strong> beheer van <strong>het</strong> milieu <strong>en</strong> de natuurlijke<br />

hulpbronn<strong>en</strong> is verspreid over verschill<strong>en</strong>de wetgev<strong>in</strong>gsproduct<strong>en</strong> <strong>en</strong><br />

valt onder verschill<strong>en</strong>de overheids<strong>in</strong>stell<strong>in</strong>g<strong>en</strong><br />

Behalve de nationale regelgev<strong>en</strong>de voorschrift<strong>en</strong> van Sur<strong>in</strong>ame, zull<strong>en</strong> <strong>het</strong><br />

project <strong>en</strong> <strong>het</strong> ESIA-proces <strong>in</strong> overe<strong>en</strong>stemm<strong>in</strong>g zijn met terzake<br />

<strong>in</strong>ternationale standaard<strong>en</strong> <strong>en</strong> voorschrift<strong>en</strong> (<strong>in</strong> zoverre van toepass<strong>in</strong>g).<br />

Deze zijn o.a. <strong>in</strong>ternationale verdrag<strong>en</strong> <strong>en</strong> conv<strong>en</strong>ties die Sur<strong>in</strong>ame<br />

ondertek<strong>en</strong>d heeft, waaronder die verdrag<strong>en</strong> <strong>en</strong> conv<strong>en</strong>ties die handel<strong>en</strong><br />

over de biodiversiteit, klimaatsverander<strong>in</strong>g<strong>en</strong> <strong>en</strong> verontre<strong>in</strong>ig<strong>in</strong>g van de<br />

zee.<br />

Voorts zull<strong>en</strong> <strong>het</strong> project <strong>en</strong> <strong>het</strong> ESIA-proces word<strong>en</strong> begeleid door<br />

<strong>in</strong>ternationale ‘best practices’, <strong>in</strong> <strong>het</strong> bijzonder standaard<strong>en</strong> <strong>en</strong> richtlijn<strong>en</strong><br />

zoals IFC Performance Standards (ofwel Prestatiestandaard<strong>en</strong>) welke de<br />

milieu- <strong>en</strong> sociale praktijk<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>in</strong>vester<strong>in</strong>g<strong>en</strong> <strong>in</strong> de particuliere sector<br />

beheers<strong>en</strong>, alsook de EIA-richtlijn<strong>en</strong> van <strong>het</strong> NIMOS. Er moet rek<strong>en</strong><strong>in</strong>g<br />

word<strong>en</strong> gehoud<strong>en</strong> met <strong>het</strong> feit dat <strong>het</strong> voorgestelde project volledig<br />

gef<strong>in</strong>ancierd wordt door <strong>Surgold</strong> <strong>en</strong> niet door <strong>en</strong>ige f<strong>in</strong>ancier<strong>in</strong>gs<strong>in</strong>stell<strong>in</strong>g<br />

<strong>en</strong> zodo<strong>en</strong>de word<strong>en</strong> de standaard<strong>en</strong> toegepast als ‘good practices’ <strong>en</strong> niet<br />

als <strong>in</strong>vester<strong>in</strong>gsvereist<strong>en</strong>. Het voorgestelde project zal daarom ‘best<br />

practices’, <strong>in</strong>ternationale standaard<strong>en</strong> <strong>en</strong> verdrag<strong>en</strong> aanpass<strong>en</strong> aan de<br />

specifieke context van <strong>het</strong> project om te voldo<strong>en</strong> aan de doelstell<strong>in</strong>g<strong>en</strong><br />

<strong><strong>in</strong>zake</strong> duurzaamheid.<br />

Als dochterondernem<strong>in</strong>g van e<strong>en</strong> <strong>in</strong>ternationaal delfstoff<strong>en</strong>bedrijf moet<br />

<strong>Surgold</strong> zich houd<strong>en</strong> aan al de bedrijfsstandaard<strong>en</strong> <strong>en</strong> gedragslijn<strong>en</strong> m.b.t.<br />

ERM 13 DRAFT AUGUSTUS 2011


<strong>het</strong> managem<strong>en</strong>t van Newmont, waaronder de standaard van Newmont<br />

<strong><strong>in</strong>zake</strong> Maatschappelijke Verantwoordelijkheid.<br />

De wetgev<strong>en</strong>de, regelgev<strong>en</strong>de <strong>en</strong> <strong>in</strong>stitutionele vereist<strong>en</strong> die <strong>het</strong><br />

<strong>Merian</strong>project <strong>en</strong> <strong>het</strong> ESIA-proces begeleid<strong>en</strong> zoals hierbov<strong>en</strong><br />

omschrev<strong>en</strong>, word<strong>en</strong> hieronder nader gespecificeerd. Let wel dat er ook<br />

andere vereist<strong>en</strong> betrekk<strong>in</strong>g kunn<strong>en</strong> hebb<strong>en</strong> op <strong>het</strong> voorgestelde project,<br />

maar id<strong>en</strong>tificatie <strong>en</strong> <strong>in</strong>terpretatie hiervan vall<strong>en</strong> buit<strong>en</strong> <strong>het</strong> kader van<br />

deze studie. Als zodanig is de lijst die hieronder is opg<strong>en</strong>om<strong>en</strong> niet<br />

def<strong>in</strong>itief <strong>en</strong> niet volledig, <strong>en</strong> di<strong>en</strong>t zij slechts om de belangrijkste<br />

milieuwetgev<strong>in</strong>g <strong>en</strong> –verplicht<strong>in</strong>g<strong>en</strong> te belicht<strong>en</strong>.<br />

3.2 WETTELIJK KADER<br />

De Sur<strong>in</strong>aamse wetgev<strong>in</strong>g wordt op nationaal niveau uitgevoerd middels<br />

e<strong>en</strong> reeks van wetgev<strong>en</strong>de <strong>in</strong>strum<strong>en</strong>t<strong>en</strong>, waaronder Wett<strong>en</strong> (vóór 1975<br />

ook wel Verord<strong>en</strong><strong>in</strong>g<strong>en</strong> <strong>en</strong> Landsverord<strong>en</strong><strong>in</strong>g<strong>en</strong> g<strong>en</strong>oemd), Decret<strong>en</strong> iii ,<br />

Staatsbesluit<strong>en</strong>, Resoluties, Presid<strong>en</strong>tiële Besluit<strong>en</strong>, <strong>en</strong> M<strong>in</strong>isteriële<br />

Beschikk<strong>in</strong>g<strong>en</strong> die betrekk<strong>in</strong>g hebb<strong>en</strong> op verschill<strong>en</strong>de sector<strong>en</strong><br />

waaronder <strong>in</strong>dustrie, toerisme, natuurbehoud, etc.<br />

De H<strong>in</strong>derwet (H<strong>in</strong>drance Act) 1930, 1944, <strong>en</strong> 1972 legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

voor de controle op geluidsoverlast <strong>en</strong> luchtverontre<strong>in</strong>ig<strong>in</strong>g middels<br />

vergunn<strong>in</strong>gsvoorwaard<strong>en</strong> voor <strong>in</strong>dustriële ontwikkel<strong>in</strong>gsproject<strong>en</strong>. De<br />

districtscommissariss<strong>en</strong> zijn verantwoordelijk voor de nalev<strong>in</strong>g <strong>en</strong> <strong>het</strong><br />

verstrekk<strong>en</strong> van milieuvergunn<strong>in</strong>g<strong>en</strong> (Buurs<strong>in</strong>k, 2005; SRK, 2007);<br />

Achterhaalde <strong>en</strong> <strong>in</strong>adequate voorschrift<strong>en</strong> betreff<strong>en</strong>de o.a.<br />

verontre<strong>in</strong>ig<strong>in</strong>gsnorm<strong>en</strong> <strong>en</strong> afvalmanagem<strong>en</strong>t, alsook e<strong>en</strong> gebrek aan<br />

voldo<strong>en</strong>de middel<strong>en</strong> om de controles uit te voer<strong>en</strong>, hebb<strong>en</strong> negatieve<br />

gevolg<strong>en</strong> gehad op de effectiviteit van de H<strong>in</strong>derwet (Buurs<strong>in</strong>k, 2005,<br />

SRK, 2007).<br />

De Natuurbescherm<strong>in</strong>gswet, 1954 (Nature Conservation Act) legt<br />

bepal<strong>in</strong>g<strong>en</strong> vast voor <strong>het</strong> <strong>in</strong>stell<strong>en</strong> <strong>en</strong> <strong>het</strong> beher<strong>en</strong> van beschermde<br />

gebied<strong>en</strong> <strong>en</strong> de bescherm<strong>in</strong>g van <strong>in</strong> <strong>het</strong> wild lev<strong>en</strong>de dier<strong>en</strong>. De<br />

Natuurbescherm<strong>in</strong>gswet verbiedt elke activiteit die e<strong>en</strong> negatieve <strong>in</strong>vloed<br />

zou kunn<strong>en</strong> hebb<strong>en</strong> op beschermde gebied<strong>en</strong>, met uitzonder<strong>in</strong>g van<br />

activiteit<strong>en</strong> van wet<strong>en</strong>schappelijk, educatief of cultureel belang.<br />

Beschermde gebied<strong>en</strong> kunn<strong>en</strong> alle<strong>en</strong> middels Resolutie word<strong>en</strong> <strong>in</strong>gesteld<br />

<strong>en</strong> word<strong>en</strong> beheerd door de Afdel<strong>in</strong>g Natuurbescherm<strong>in</strong>g van de Di<strong>en</strong>st ‘s<br />

iii Decret<strong>en</strong> dater<strong>en</strong> van de periode 1980 – 1986 <strong>en</strong> hebb<strong>en</strong> dezelfde status als wett<strong>en</strong> <strong>in</strong> de periode<br />

daarvoor of daarna.<br />

ERM 14 DRAFT AUGUSTUS 2011


Lands Bosbeheer (LBB). Er is ge<strong>en</strong> bepal<strong>in</strong>g voor de bescherm<strong>in</strong>g van<br />

natuurgevoelige gebied<strong>en</strong> buit<strong>en</strong> de <strong>in</strong>gestelde beschermde gebied<strong>en</strong>.<br />

Bosexploitatie <strong>en</strong> –bescherm<strong>in</strong>g word<strong>en</strong> gereguleerd door de Wet<br />

Bosbeheer van 1992 (Forest Managem<strong>en</strong>t Act). Deze wet kwam <strong>in</strong> de<br />

plaats van de Houtwet van 1947. Ingevolge deze wet mag e<strong>en</strong> bos word<strong>en</strong><br />

geclassificeerd als e<strong>en</strong> perman<strong>en</strong>t bos, e<strong>en</strong> tijdelijk bos (dat voor e<strong>en</strong><br />

bepaalde periode behoud<strong>en</strong> wordt) of e<strong>en</strong> e<strong>en</strong>malig exploitatiebos<br />

(<strong>het</strong>ge<strong>en</strong> <strong>in</strong>houdt bosland bestemd voor e<strong>en</strong> ander gebruik <strong>en</strong> dat volledig<br />

ontbost zal word<strong>en</strong>). Exploitatie van op<strong>en</strong>bare boss<strong>en</strong> (op dome<strong>in</strong>grond)<br />

is alle<strong>en</strong> toegestaan met e<strong>en</strong> vergunn<strong>in</strong>g of bosconcessie, verle<strong>en</strong>d door<br />

<strong>het</strong> M<strong>in</strong>isterie van Ruimtelijke Ord<strong>en</strong><strong>in</strong>g, Grond- <strong>en</strong> Bosbeheer (RGB).<br />

Het RGB heeft e<strong>en</strong> aantal voorschrift<strong>en</strong> voor houtw<strong>in</strong>n<strong>in</strong>g, ontboss<strong>in</strong>g <strong>en</strong><br />

daaraan gerelateerde activiteit<strong>en</strong>. De Wet Bosbeheer legt ook bepal<strong>in</strong>g<strong>en</strong><br />

vast voor <strong>het</strong> <strong>in</strong>stell<strong>en</strong> van beschermde boss<strong>en</strong> door de Sur<strong>in</strong>aamse<br />

reger<strong>in</strong>g.<br />

De belangrijkste wett<strong>en</strong>, resoluties, decret<strong>en</strong> <strong>en</strong> verord<strong>en</strong><strong>in</strong>g<strong>en</strong> <strong><strong>in</strong>zake</strong><br />

milieumanagem<strong>en</strong>t <strong>in</strong> Sur<strong>in</strong>ame zijn nader omschrev<strong>en</strong> <strong>in</strong> Tabel 3-1.<br />

De concept Milieuwet van 2002 die mom<strong>en</strong>teel door de Raad van<br />

M<strong>in</strong>isters wordt bestudeerd, legt regels vast voor <strong>het</strong> behoud, <strong>het</strong><br />

managem<strong>en</strong>t <strong>en</strong> de bescherm<strong>in</strong>g van <strong>het</strong> milieu, terwijl tegelijkertijd<br />

duurzame ontwikkel<strong>in</strong>g wordt bevorderd. De bepal<strong>in</strong>g<strong>en</strong> van de wet<br />

verschaff<strong>en</strong> richtlijn<strong>en</strong> voor <strong>het</strong> uitvoer<strong>en</strong> van e<strong>en</strong> ESIA <strong>in</strong> Sur<strong>in</strong>ame<br />

waaronder:<br />

• de mogelijkheid voor <strong>het</strong> opzett<strong>en</strong> <strong>en</strong> uitvoer<strong>en</strong> van e<strong>en</strong> alomvatt<strong>en</strong>d<br />

milieubeleid <strong>en</strong> plann<strong>in</strong>gproces;<br />

• <strong>het</strong> vaststell<strong>en</strong> van <strong>het</strong> belang van milieubescherm<strong>in</strong>g <strong>en</strong> <strong>het</strong> <strong>in</strong><br />

overweg<strong>in</strong>g nem<strong>en</strong> van milieugerelateerde vraagstukk<strong>en</strong> bij <strong>het</strong><br />

overweg<strong>en</strong> van alle andere zak<strong>en</strong>;<br />

• <strong>het</strong> <strong>in</strong>stell<strong>en</strong> van <strong>het</strong> NIMOS als de Milieu-autoriteit <strong>in</strong> Sur<strong>in</strong>ame;<br />

• uitvoer<strong>in</strong>g gev<strong>en</strong> b<strong>in</strong>n<strong>en</strong> Sur<strong>in</strong>ame aan vele <strong>in</strong>ternationaal<br />

geaccepteerde pr<strong>in</strong>cipes van Milieurecht, waaronder <strong>het</strong><br />

voorzorgspr<strong>in</strong>cipe, <strong>het</strong> beg<strong>in</strong>sel dat de vervuiler betaalt <strong>en</strong> <strong>het</strong><br />

concept van milieu-effect<strong>en</strong>analyse;<br />

• <strong>het</strong> <strong>in</strong>voer<strong>en</strong> <strong>en</strong> <strong>in</strong> werk<strong>in</strong>g do<strong>en</strong> tred<strong>en</strong> van Richtlijn<strong>en</strong> <strong><strong>in</strong>zake</strong><br />

Milieu-Effect<strong>en</strong>analyse;<br />

• <strong>het</strong> koester<strong>en</strong> van de beg<strong>in</strong>sel<strong>en</strong> <strong><strong>in</strong>zake</strong> toegang tot <strong>in</strong>formatie,<br />

participatie <strong>en</strong> juridische bescherm<strong>in</strong>g t.b.v. de Sur<strong>in</strong>aamse<br />

geme<strong>en</strong>schap;<br />

ERM 15 DRAFT AUGUSTUS 2011


• de mogelijkheid creër<strong>en</strong> voor <strong>het</strong> <strong>in</strong>voer<strong>en</strong> van geschikte<br />

voorschrift<strong>en</strong> om specifieke vraagstukk<strong>en</strong> op <strong>het</strong> gebied van<br />

milieubescherm<strong>in</strong>g <strong>in</strong> te voer<strong>en</strong>; <strong>en</strong><br />

• <strong>het</strong> vastlegg<strong>en</strong> van e<strong>en</strong> raamwerk voor de uitvoer<strong>in</strong>g van<br />

milieuwetgev<strong>in</strong>g <strong>en</strong> –voorschrift<strong>en</strong>, alsook beboet<strong>in</strong>g.<br />

Mom<strong>en</strong>teel is er ge<strong>en</strong> wetgev<strong>en</strong>de basis voor de analyse van milieueffect<strong>en</strong><br />

van ontwikkel<strong>in</strong>gsvoorstell<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame; <strong>het</strong> NIMOS heeft<br />

echter Richtlijn<strong>en</strong> voor Milieuanalyse (2009) gepubliceerd (waaronder<br />

begrep<strong>en</strong> de sociale aspect<strong>en</strong>) <strong>in</strong> Sur<strong>in</strong>ame <strong>en</strong> van projectontwikkelaars<br />

wordt verwacht dat deze handel<strong>en</strong> naar de geest van bedoelde richtlijn<strong>en</strong>.<br />

Deze Richtlijn<strong>en</strong> verschaff<strong>en</strong> ook e<strong>en</strong> leidraad aan de Sur<strong>in</strong>aamse<br />

overheid bij <strong>het</strong> bepal<strong>en</strong> of ontwikkel<strong>in</strong>gs-ESIAs al dan niet geschikt zijn.<br />

Voor e<strong>en</strong> nadere beschrijv<strong>in</strong>g van <strong>het</strong> ESIA-proces, verwijz<strong>en</strong> wij naar<br />

Hoofdstuk 3.0 van dit rapport.<br />

Er zijn verschill<strong>en</strong>de overheidsbeleidsmaatregel<strong>en</strong> ontwikkeld die te<br />

mak<strong>en</strong> hebb<strong>en</strong> met duurzame ontwikkel<strong>in</strong>g <strong>en</strong> biologische hulpbronn<strong>en</strong>,<br />

waaronder de Reger<strong>in</strong>gsverklar<strong>in</strong>g, <strong>het</strong> Meerjar<strong>en</strong> Ontwikkel<strong>in</strong>gsplan<br />

2006-2011, <strong>en</strong> <strong>het</strong> Nationaal Actieplan <strong><strong>in</strong>zake</strong> Biodiversiteit (2006).<br />

De Reger<strong>in</strong>gsverklar<strong>in</strong>g 2005-2010 stelt e<strong>en</strong> efficiënte <strong>en</strong> effectieve<br />

b<strong>en</strong>ader<strong>in</strong>g <strong><strong>in</strong>zake</strong> milieumanagem<strong>en</strong>t verplicht. De doel<strong>en</strong> van de<br />

Reger<strong>in</strong>gsverklar<strong>in</strong>g omvatt<strong>en</strong> <strong>het</strong> vastlegg<strong>en</strong> van duurzame<br />

ontwikkel<strong>in</strong>gspraktijk<strong>en</strong> middels de ontwikkel<strong>in</strong>g van e<strong>en</strong> nationaal<br />

milieubeleid <strong>en</strong> <strong>het</strong> <strong>in</strong>tegrer<strong>en</strong> van <strong>het</strong> milieubeleid <strong>in</strong> <strong>het</strong> sectoraal<br />

ontwikkel<strong>in</strong>gsbeleid. De Reger<strong>in</strong>gsverklar<strong>in</strong>g pleit ook voor <strong>het</strong><br />

bevorder<strong>en</strong> van milieubewustzijn <strong>en</strong> duurzame productie.<br />

Om de vijf jaar wordt er e<strong>en</strong> Meerjar<strong>en</strong> Ontwikkel<strong>in</strong>gsplan (MOP)<br />

opgesteld <strong>en</strong> aan <strong>het</strong> Parlem<strong>en</strong>t <strong>in</strong>gedi<strong>en</strong>d ter goedkeur<strong>in</strong>g. Het Plan dat<br />

onlangs is opgesteld voor <strong>het</strong> periode 2006-2011, is e<strong>en</strong> overheidsbeleid<br />

dat e<strong>en</strong> nationale ontwikkel<strong>in</strong>gsstrategie omvat voor duurzame<br />

ontwikkel<strong>in</strong>g <strong>en</strong> <strong>het</strong> gebruik van biologische hulpbronn<strong>en</strong>, alsook<br />

budgettaire overweg<strong>in</strong>g<strong>en</strong>.<br />

De Nationale Strategie <strong><strong>in</strong>zake</strong> Biodiversiteit (NBS) legt doelstell<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

strategische doel<strong>en</strong> vast die moet<strong>en</strong> word<strong>en</strong> nagestreefd t<strong>en</strong>e<strong>in</strong>de de<br />

biodiversiteit <strong>en</strong> biologische hulpbronn<strong>en</strong> van Sur<strong>in</strong>ame te bescherm<strong>en</strong> <strong>en</strong><br />

deze op duurzame wijze te gebruik<strong>en</strong>. De NBS verschaft e<strong>en</strong> basis <strong>en</strong> e<strong>en</strong><br />

raamwerk voor de ontwikkel<strong>in</strong>g van e<strong>en</strong> Actieplan <strong><strong>in</strong>zake</strong> Biodiversiteit<br />

(Biodiversity Action Plan – BAP). Dit Plan zal de activiteit<strong>en</strong>, tak<strong>en</strong>,<br />

resultat<strong>en</strong>, mijlpal<strong>en</strong> <strong>en</strong> verantwoordelijke actor<strong>en</strong> id<strong>en</strong>tificer<strong>en</strong>, om de<br />

strategische doel<strong>en</strong>, waaronder de mijnwerkzaamhed<strong>en</strong>, uit te voer<strong>en</strong>.<br />

ERM 16 DRAFT AUGUSTUS 2011


ERM 17 DRAFT AUGUSTUS 2011


Tabel 3-1. 4 Wettelijk Kader voor Nationaal Milieumanagem<strong>en</strong>t <strong>in</strong> Sur<strong>in</strong>ame<br />

Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

ALGEMEEN<br />

‘Kruispunt ‘ Algem<strong>en</strong>e strategie <strong><strong>in</strong>zake</strong> Reger<strong>in</strong>gsverklar<strong>in</strong>g<br />

Reger<strong>in</strong>gsverklar<strong>in</strong>g nationale duurzame<br />

Mijndecreet 1986 S.B.<br />

1986 no. 28<br />

ontwikkel<strong>in</strong>g<br />

MINERALE HULPBRONNEN<br />

1. Beheerst exploratie <strong>en</strong><br />

exploitatie van m<strong>in</strong>erale<br />

hulpbronn<strong>en</strong>.<br />

2. Artikel 2 bepaalt dat<br />

alle grondstoff<strong>en</strong> <strong>in</strong> <strong>en</strong><br />

bov<strong>en</strong> de grond, <strong>in</strong>clusief<br />

de territoriale water<strong>en</strong>,<br />

eig<strong>en</strong>dom zijn van de<br />

Staat.<br />

MNH 1. Artikel<strong>en</strong> 2, 4, 16,<br />

43, 45 zijn van<br />

toepass<strong>in</strong>g op<br />

milieubescherm<strong>in</strong>g<br />

2. Ze vervatt<strong>en</strong><br />

vereist<strong>en</strong> voor <strong>het</strong><br />

rek<strong>en</strong><strong>in</strong>g houd<strong>en</strong> met<br />

getroff<strong>en</strong> Inheemse<br />

geme<strong>en</strong>schapp<strong>en</strong>.<br />

3. Verschill<strong>en</strong>de<br />

uitvoer<strong>in</strong>gsvoorschrift<strong>en</strong><br />

zijn <strong>in</strong>gevolge dit<br />

decreet uitgegev<strong>en</strong>.<br />

Beschrijft de<br />

ontwikkel<strong>in</strong>gsstrategie van<br />

<strong>het</strong> land geschikt voor alle<br />

<strong>in</strong>dustrieën <strong>en</strong> project<strong>en</strong><br />

Verschaft wettelijke<br />

verwacht<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> om delfstoff<strong>en</strong> op<br />

nationaal niveau te<br />

exploiter<strong>en</strong>, waaronder <strong>het</strong><br />

rek<strong>en</strong><strong>in</strong>g houd<strong>en</strong> met<br />

milieu- <strong>en</strong> sociale effect<strong>en</strong><br />

4 Dit is e<strong>en</strong> lijst van wett<strong>en</strong> <strong>en</strong> verdrag<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame <strong>en</strong> slechts <strong>en</strong>kele hiervan zijn ev<strong>en</strong>tueel van toepass<strong>in</strong>g op <strong>het</strong> project<br />

ERM 18 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Staatsbesluit <strong><strong>in</strong>zake</strong><br />

Mijn<strong>in</strong>stallaties S.B.<br />

1989 no. 38<br />

Oliewet 1990 S.B. 1991<br />

no. 7<br />

Boorwet G.B. 1952 no.<br />

93<br />

Brokopondoovere<strong>en</strong>komst<br />

1958<br />

Gross Rosebelovere<strong>en</strong>komst<br />

S.B. 1994<br />

no. 22<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

offshore-mijn<strong>in</strong>stallaties.<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

de exploratie <strong>en</strong><br />

exploitatie van<br />

koolwaterstoff<strong>en</strong>.<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

boorwerkzaamhed<strong>en</strong> <strong>in</strong><br />

Sur<strong>in</strong>ame<br />

Overe<strong>en</strong>komst tuss<strong>en</strong> de<br />

Reger<strong>in</strong>g van Sur<strong>in</strong>ame<br />

<strong>en</strong> de Suralco LLD<br />

betreff<strong>en</strong>de de opwekk<strong>in</strong>g<br />

van <strong>en</strong>ergie d.m.v.<br />

waterkracht .<br />

Overe<strong>en</strong>komst tuss<strong>en</strong> de<br />

Reger<strong>in</strong>g van Sur<strong>in</strong>ame,<br />

Grassalco N.V. <strong>en</strong> Gold<strong>en</strong><br />

Star Resources Limited<br />

voor de exploratie <strong>en</strong><br />

exploitatie van m<strong>in</strong>eral<strong>en</strong>.<br />

MNH 1. Geformuleerd<br />

overe<strong>en</strong>komstig:<br />

UNCLOS, SOLAS,<br />

MARPOL conv<strong>en</strong>ties<br />

(zie paragraaf Error!<br />

Refer<strong>en</strong>ce source not<br />

found. over<br />

Internationale<br />

Verdrag<strong>en</strong>).<br />

2. Hoofdstuk 3 handelt<br />

over<br />

milieubescherm<strong>in</strong>g.<br />

MNH Artikel 6e handelt over<br />

<strong>het</strong> aanpakk<strong>en</strong> van<br />

negatieve effect<strong>en</strong> op<br />

<strong>het</strong> milieu.<br />

Verschaft wettelijke<br />

verwacht<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> om delfstoff<strong>en</strong> te<br />

exploiter<strong>en</strong><br />

Legt specifieke vereist<strong>en</strong><br />

vast voor <strong>het</strong> aanpakk<strong>en</strong><br />

van milieu-effect<strong>en</strong><br />

Hoofd van MNH Legt specifieke vereist<strong>en</strong><br />

vast voor<br />

boorprogramma’s<br />

MNH Ge<strong>en</strong> bepal<strong>in</strong>g m.b.t.<br />

milieubeheer.<br />

MNH 1. Milieueffect<strong>en</strong>rapport<br />

is vereist.<br />

2/ Alle activiteit<strong>en</strong><br />

moet<strong>en</strong> <strong>in</strong><br />

overe<strong>en</strong>stemm<strong>in</strong>g zijn<br />

met de wetgev<strong>in</strong>g van<br />

Californië.<br />

Verschaft e<strong>en</strong> context voor<br />

eerder bestaande<br />

delfstoff<strong>en</strong>overe<strong>en</strong>komst<strong>en</strong><br />

<strong>in</strong> Sur<strong>in</strong>ame<br />

Verschaft e<strong>en</strong> context voor<br />

eerder bestaande<br />

delfstoff<strong>en</strong>overe<strong>en</strong>komst<strong>en</strong><br />

<strong>in</strong> Sur<strong>in</strong>ame<br />

ERM 19 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Planwet 1973 G.B. 1973<br />

no. 89<br />

Wet <strong><strong>in</strong>zake</strong> de uitgifte<br />

van dome<strong>in</strong>grond 1937<br />

G.B. 1937 no. 53<br />

Bouwwet 1956 G.B.1956<br />

no. 30<br />

Sted<strong>en</strong>bouwkundige<br />

Wet G.B. 1972 no. 96<br />

Wet op ecologische<br />

omstandighed<strong>en</strong> <strong>in</strong><br />

woongebied<strong>en</strong> S.B.<br />

1980 no. 68<br />

Politie Strafwet G.B.<br />

1915 no. 77 zoals<br />

gewijzigd<br />

Burgerlijk Wetboek<br />

G.B. 1860 no. 4<br />

GROND / GRONDGEBRUIK<br />

Bepal<strong>in</strong>g<strong>en</strong> voor nationale<br />

<strong>en</strong> regionale plann<strong>in</strong>g<br />

bijv. beleidskwesties<br />

<strong><strong>in</strong>zake</strong> grondgebruik.<br />

Legt algem<strong>en</strong>e<br />

voorschrift<strong>en</strong> vast m.b.t.<br />

de uitgifte van<br />

dome<strong>in</strong>grond.<br />

Legt vereist<strong>en</strong> vast voor<br />

de constructie van<br />

gebouw<strong>en</strong>.<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

sted<strong>en</strong>bouw.<br />

Verbeter<strong>en</strong> van de<br />

ecologische<br />

omstandighed<strong>en</strong> <strong>in</strong><br />

bewoonde gebied<strong>en</strong><br />

M<strong>in</strong>ister van Plann<strong>in</strong>g,<br />

Plann<strong>in</strong>g Coörd<strong>in</strong>atie<br />

Commissie <strong>en</strong><br />

Planbureau<br />

Vervat <strong>het</strong> mechanisme<br />

om Speciale<br />

Beheersgebied<strong>en</strong> <strong>in</strong> te<br />

stell<strong>en</strong>, die als MUMA’s<br />

moet<strong>en</strong> word<strong>en</strong><br />

ontwikkeld.<br />

De Presid<strong>en</strong>t Ingevolge deze wet<br />

werd <strong>het</strong> Brownsberg<br />

Natuurpark <strong>in</strong> erfpacht<br />

aan STINASU<br />

afgestaan.<br />

M<strong>in</strong>isterie van Op<strong>en</strong>bare<br />

Werk<strong>en</strong><br />

M<strong>in</strong>isterie van Op<strong>en</strong>bare<br />

Werk<strong>en</strong><br />

Legt plann<strong>in</strong>g <strong>en</strong> vereist<strong>en</strong><br />

vast <strong><strong>in</strong>zake</strong> grondgebruik<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast om<br />

dome<strong>in</strong>grond te verkrijg<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast om<br />

gebouw<strong>en</strong> op te zett<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast om van<br />

<strong>in</strong>vloed te zijn op de<br />

ontwikkel<strong>in</strong>g<br />

Districtscommissariss<strong>en</strong> Legt voorschrift<strong>en</strong> vast<br />

voor ecologische<br />

omstandighed<strong>en</strong> <strong>in</strong><br />

bewoonde gebied<strong>en</strong><br />

M<strong>in</strong>isterie van Justitie <strong>en</strong><br />

Politie<br />

Artikel 39a stelt <strong>het</strong><br />

stort<strong>en</strong> van afval op<br />

op<strong>en</strong>bare plaats<strong>en</strong><br />

strafbaar<br />

Artikel 625 handelt over<br />

eig<strong>en</strong>aarschap /<br />

eig<strong>en</strong>domsrecht<strong>en</strong><br />

alsook onteig<strong>en</strong><strong>in</strong>g <strong>in</strong><br />

<strong>het</strong> algeme<strong>en</strong> belang<br />

bov<strong>en</strong> <strong>het</strong> toek<strong>en</strong>n<strong>en</strong><br />

van e<strong>en</strong> comp<strong>en</strong>satie.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast voor<br />

afvalverwijder<strong>in</strong>g<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

onteig<strong>en</strong><strong>in</strong>g<br />

ERM 20 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

H<strong>in</strong>derwet G.B. 1930 no.<br />

64 zoals gewijzigd<br />

Wet op<br />

Watervoorzi<strong>en</strong><strong>in</strong>g G.B.<br />

1938 no. 33<br />

Wet op Waterschapp<strong>en</strong><br />

G.B. 1932 no. 32 zoals<br />

gewijzigd<br />

Hav<strong>en</strong>decreet 1981 S.B.<br />

1981 no. 86<br />

Wet <strong><strong>in</strong>zake</strong> Maritieme<br />

Veiligheid SB 2004 No.<br />

90<br />

LUCHTKWALITEIT EN GELUIDSOVERLAST<br />

Controleert <strong>in</strong>dustriële<br />

verontre<strong>in</strong>ig<strong>in</strong>g (geluid <strong>en</strong><br />

lucht).<br />

WATER / MARITIEM<br />

Legt verbodsbepal<strong>in</strong>g<strong>en</strong><br />

vast met betrekk<strong>in</strong>g tot<br />

waterbronn<strong>en</strong>, etc. die als<br />

watervoorzi<strong>en</strong><strong>in</strong>gsbronn<strong>en</strong><br />

di<strong>en</strong><strong>en</strong>.<br />

Om waterschapp<strong>en</strong> <strong>in</strong> te<br />

stell<strong>en</strong>, belast met <strong>het</strong><br />

onderhoud van<br />

waterweg<strong>en</strong> <strong>en</strong> de<br />

watervoorzi<strong>en</strong><strong>in</strong>g b<strong>in</strong>n<strong>en</strong><br />

daartoe aangewez<strong>en</strong><br />

gebied<strong>en</strong>.<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

<strong><strong>in</strong>zake</strong> hav<strong>en</strong>activiteit<strong>en</strong><br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

<strong><strong>in</strong>zake</strong> de veiligheid van<br />

schep<strong>en</strong> <strong>en</strong> hav<strong>en</strong>s<br />

Districtscommissaris<br />

verstrekt vergunn<strong>in</strong>g <strong>in</strong><br />

overleg met <strong>het</strong><br />

M<strong>in</strong>isterie van<br />

Volksgezondheid<br />

MNH, M<strong>in</strong>isterie van<br />

Volksgezondheid<br />

Uitvoer<strong>in</strong>g door<br />

waterschapp<strong>en</strong>, nam<strong>en</strong>s<br />

MRD<br />

Maritieme Autoriteit<br />

Sur<strong>in</strong>ame <strong>en</strong><br />

Districtscommissariss<strong>en</strong>,<br />

bijgestaan door <strong>het</strong><br />

Op<strong>en</strong>baar M<strong>in</strong>isterie <strong>en</strong><br />

<strong>het</strong> M<strong>in</strong>isterie van<br />

Handel <strong>en</strong> Industrie<br />

Maritieme Autoriteit<br />

Sur<strong>in</strong>ame, <strong>het</strong> M<strong>in</strong>isterie<br />

van Handel <strong>en</strong> Industrie,<br />

Raad voor Maritieme<br />

Veiligheid<br />

Vergunn<strong>in</strong>g vereist<br />

voor <strong>in</strong>dustriële<br />

ontwikkel<strong>in</strong>gsproject<strong>en</strong>.<br />

Ingevolge deze wet is<br />

de Presid<strong>en</strong>t<br />

verantwoordelijk voor<br />

de uitvoer<strong>in</strong>g hiervan,<br />

maar <strong>in</strong> de praktijk<br />

nem<strong>en</strong> de m<strong>in</strong>isteries<br />

die rol op zich.<br />

De manier waarop<br />

waterschapp<strong>en</strong> hun<br />

tak<strong>en</strong> uitvoer<strong>en</strong>, is<br />

belangrijk voor de<br />

bescherm<strong>in</strong>g, de<br />

verbeter<strong>in</strong>g van de<br />

leefomstandighed<strong>en</strong> <strong>en</strong><br />

<strong>het</strong> behoud van de<br />

kwaliteit van de<br />

natuurlijke omgev<strong>in</strong>g.<br />

Verbiedt <strong>het</strong> loz<strong>en</strong> van<br />

afval, olie <strong>en</strong> door olie<br />

verontre<strong>in</strong>igd water <strong>en</strong><br />

afgekeurde goeder<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast om<br />

<strong>in</strong>dustriële verontre<strong>in</strong>ig<strong>in</strong>g<br />

te bestrijd<strong>en</strong><br />

Legt bepal<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

waterverontre<strong>in</strong>ig<strong>in</strong>g<br />

Legt bepal<strong>in</strong>g<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

onderhoud van<br />

waterschapp<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

loz<strong>en</strong> van water <strong>en</strong> olie<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast voor<br />

scheepsverkeer<br />

ERM 21 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Decreet <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

Beheer van <strong>het</strong> Multi-<br />

Purpose Corantijn<br />

<strong>Project</strong> S.B. 1984 no. 14<br />

Politie Strafwet G.B.<br />

1915 no. 77 zoals<br />

gewijzigd<br />

Wetboek van Strafrecht<br />

G.B. 1911 no.1 zoals<br />

gewijzigd<br />

Staatsbesluit <strong><strong>in</strong>zake</strong><br />

mijn<strong>in</strong>stallaties<br />

Om toezicht te houd<strong>en</strong> op<br />

de waterhuishoud<strong>in</strong>g <strong>en</strong><br />

om landbouwactiviteit<strong>en</strong> <strong>in</strong><br />

<strong>het</strong> noordwest<strong>en</strong> van<br />

Sur<strong>in</strong>ame te ontwikkel<strong>en</strong>,<br />

te stimuler<strong>en</strong> <strong>en</strong> te<br />

beher<strong>en</strong>.<br />

Bepal<strong>in</strong>g<strong>en</strong> voor offshore<br />

mijn<strong>in</strong>stallaties<br />

Multi-Purpose Corantijn<br />

<strong>Project</strong> Managem<strong>en</strong>t<br />

nam<strong>en</strong>s LVV<br />

M<strong>in</strong>isterie van Justitie <strong>en</strong><br />

Politie<br />

M<strong>in</strong>isterie van Justitie <strong>en</strong><br />

Politie<br />

Kracht<strong>en</strong>s artikel 51 is<br />

<strong>het</strong> verontre<strong>in</strong>ig<strong>en</strong> van<br />

e<strong>en</strong> waterbron of<br />

waterput aan e<strong>en</strong> boete<br />

onderhevig.<br />

Kracht<strong>en</strong>s de artikel<strong>en</strong><br />

224 <strong>en</strong> 225, is<br />

verontre<strong>in</strong>ig<strong>in</strong>g van<br />

waterbronn<strong>en</strong> strafbaar<br />

gesteld<br />

MNH Het is verbod<strong>en</strong> om<br />

substanties te loz<strong>en</strong> of<br />

overboord te gooi<strong>en</strong> <strong>in</strong><br />

conc<strong>en</strong>traties die<br />

gevaarlijk zijn voor <strong>het</strong><br />

mari<strong>en</strong>e milieu. Tijd<strong>en</strong>s<br />

de ontmantel<strong>in</strong>gswerkzaamhed<strong>en</strong><br />

di<strong>en</strong>t<br />

rek<strong>en</strong><strong>in</strong>g te word<strong>en</strong><br />

gehoud<strong>en</strong> met de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

mari<strong>en</strong>e milieu<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast om de<br />

waterhuishoud<strong>in</strong>g <strong><strong>in</strong>zake</strong><br />

landbouwactiviteit<strong>en</strong> te<br />

controler<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

waterverontre<strong>in</strong>ig<strong>in</strong>g<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

waterverontre<strong>in</strong>ig<strong>in</strong>g<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

loz<strong>in</strong>g<strong>en</strong> <strong>in</strong> <strong>het</strong> mari<strong>en</strong>e<br />

milieu<br />

ERM 22 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Staatsbesluit <strong><strong>in</strong>zake</strong><br />

Pesticid<strong>en</strong> G.B. 1974 no.<br />

89 zoals gewijzigd<br />

Ter uitvoer<strong>in</strong>g van artikel<br />

13 van de Wet op<br />

Pesticid<strong>en</strong><br />

LVV, ATM, M<strong>in</strong>isterie<br />

van Op<strong>en</strong>bare<br />

Gezondheidszorg<br />

Artikel 13 lid 2<br />

verbiedt de verwijder<strong>in</strong>g<br />

of verniel<strong>in</strong>g van lege<br />

conta<strong>in</strong>ers of restant<strong>en</strong><br />

van onverdunde<br />

pesticid<strong>en</strong> op zodanige<br />

wijze dat dit leidt tot<br />

verontre<strong>in</strong>ig<strong>in</strong>g van<br />

waterw<strong>in</strong>n<strong>in</strong>gsgebied<strong>en</strong><br />

of van <strong>het</strong><br />

oppervlaktewater.<br />

NATUURLIJKE ECOSYSTEMEN (VEGETATIE, VISSEN EN IN HET WILD LEVENDE DIEREN)<br />

Wet Bosbeheer S.B.<br />

1992 no. 80<br />

(kwam <strong>in</strong> de plaats van<br />

de Houtwet van 1947)<br />

Verschaft e<strong>en</strong> raamwerk<br />

voor <strong>het</strong> bosbeheer, de<br />

exploitatie <strong>en</strong> aan de<br />

houtkap gerelateerde<br />

activiteit<strong>en</strong> (bijv. primaire<br />

verwerk<strong>in</strong>g <strong>en</strong> export) om<br />

duurzaam gebruik van<br />

hulpbronn<strong>en</strong> <strong>in</strong> <strong>het</strong> bos te<br />

garander<strong>en</strong>.<br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

<strong>het</strong> <strong>in</strong>stell<strong>en</strong> van<br />

beschermde boss<strong>en</strong>.<br />

MNH, SBB 1. Vergunn<strong>in</strong>g vereist<br />

voor de exploitatie van<br />

op<strong>en</strong>bare boss<strong>en</strong>.<br />

2. Mom<strong>en</strong>teel zijn er<br />

13 uitvoer<strong>in</strong>gsbesluit<strong>en</strong><br />

<strong>in</strong>gevolge deze wet<br />

geslag<strong>en</strong>.<br />

3. De wet legt ook e<strong>en</strong><br />

vereiste vast m.b.t. de<br />

traditionele recht<strong>en</strong> van<br />

<strong>in</strong> stamverband<br />

lev<strong>en</strong>de<br />

geme<strong>en</strong>schapp<strong>en</strong>.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

pesticideverwijder<strong>in</strong>g<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

bosbeheer<br />

ERM 23 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Natuurbescherm<strong>in</strong>gswet<br />

van 1954 G.B. 1954 no.<br />

26 zoals gewijzigd<br />

Staatsbesluit van 1998<br />

<strong><strong>in</strong>zake</strong><br />

Natuurbescherm<strong>in</strong>g<br />

S.B. 1998 no. 65<br />

Balatawet G.B 1914 no.<br />

51<br />

Bescherm<strong>in</strong>g van <strong>in</strong> <strong>het</strong><br />

wild lev<strong>en</strong>de dier<strong>en</strong> <strong>en</strong><br />

beheer van beschermde<br />

gebied<strong>en</strong>.<br />

Verbiedt elke activiteit die<br />

e<strong>en</strong> negatieve <strong>in</strong>vloed zou<br />

kunn<strong>en</strong> hebb<strong>en</strong> op<br />

beschermde gebied<strong>en</strong>,<br />

met uitzonder<strong>in</strong>g van<br />

activiteit<strong>en</strong> van<br />

wet<strong>en</strong>schappelijk,<br />

educatief of cultureel<br />

belang.<br />

LBB beheert de<br />

natuurreservat<strong>en</strong> met de<br />

Commissie<br />

Natuurbescherm<strong>in</strong>g als<br />

adviser<strong>en</strong>d orgaan.<br />

1. Vormt de basis voor<br />

de <strong>in</strong>stell<strong>in</strong>g van<br />

natuurreservat<strong>en</strong>.<br />

2. Verschill<strong>en</strong>de<br />

dome<strong>in</strong>grond<strong>en</strong> zijn bij<br />

staatsbesluit<br />

aangewez<strong>en</strong> als<br />

natuurreservat<strong>en</strong>.<br />

3. Ge<strong>en</strong> bepal<strong>in</strong>g voor<br />

de bescherm<strong>in</strong>g van<br />

natuurgevoelige<br />

gebied<strong>en</strong> buit<strong>en</strong> de<br />

gevestigde<br />

beschermde<br />

natuurgebied<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>in</strong> <strong>het</strong><br />

wild lev<strong>en</strong>de dier<strong>en</strong><br />

Instell<strong>in</strong>g van <strong>het</strong> CSNR. MNH, NCD Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

Natuurreservat<strong>en</strong><br />

Legt bepal<strong>in</strong>g<strong>en</strong> vast voor<br />

onderzoek naar de<br />

beschikbaarheid van<br />

bolletriebom<strong>en</strong><br />

(balatabom<strong>en</strong>) <strong>en</strong> de<br />

exploitatie van balata op<br />

dome<strong>in</strong>grond <strong>en</strong><br />

particuliere grond.<br />

De Presid<strong>en</strong>t <strong>en</strong> de<br />

M<strong>in</strong>ister van F<strong>in</strong>anciën<br />

(implem<strong>en</strong>tatie), met de<br />

Staatsraad als<br />

adviesorgaan<br />

Mom<strong>en</strong>teel ge<strong>en</strong><br />

balata (rubber)<br />

exploitatie-activiteit<strong>en</strong><br />

<strong>in</strong> Sur<strong>in</strong>ame.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van<br />

balatabom<strong>en</strong><br />

ERM 24 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Wet op<br />

plant<strong>en</strong>bescherm<strong>in</strong>g<br />

G.B. 1965 no. 102 zoals<br />

gewijzigd<br />

Politie strafwet G.B.<br />

1942 no. 152 zoals<br />

gewijzigd<br />

Wet op de Territoriale<br />

water<strong>en</strong> <strong>en</strong> de<br />

aangr<strong>en</strong>z<strong>en</strong>de<br />

Economische Zone 1978<br />

S.B. 1978 no. 26<br />

1. Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

voor de bestrijd<strong>in</strong>g van<br />

ziekt<strong>en</strong> <strong>en</strong> plag<strong>en</strong> die<br />

plant<strong>en</strong> aantast<strong>en</strong>.<br />

2. Verbiedt de import van<br />

plant<strong>en</strong>, compost, aarde,<br />

etc. zonder toestemm<strong>in</strong>g<br />

daartoe.<br />

3. Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

voor <strong>het</strong> <strong>in</strong>stell<strong>en</strong> van<br />

beschermde gebied<strong>en</strong><br />

voor de bescherm<strong>in</strong>g van<br />

plant<strong>en</strong>.<br />

Bepaalt de economische<br />

zone (200 zeemijl) <strong>en</strong> de<br />

uitbreid<strong>in</strong>g van de<br />

territoriale water<strong>en</strong> tot 12<br />

zeemijl <strong>in</strong> relatie tot de<br />

exploratie <strong>en</strong> exploitatie,<br />

<strong>het</strong> onderhoud <strong>en</strong> <strong>het</strong><br />

beheer van lev<strong>en</strong>de <strong>en</strong><br />

niet-lev<strong>en</strong>de natuurlijke<br />

hulpbronn<strong>en</strong>.<br />

LVV Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van plant<strong>en</strong><br />

Artikel 44 vereist e<strong>en</strong><br />

vergunn<strong>in</strong>g t<strong>en</strong>e<strong>in</strong>de te<br />

jag<strong>en</strong> op wilde dier<strong>en</strong><br />

of deze te vang<strong>en</strong> <strong>in</strong><br />

bepaalde gebied<strong>en</strong> van<br />

<strong>het</strong> land die de<br />

bescherm<strong>in</strong>g van deze<br />

gebied<strong>en</strong> toestaan.<br />

MNH, LVV De bepal<strong>in</strong>g<strong>en</strong> van<br />

deze wet <strong>en</strong> de daarop<br />

berust<strong>en</strong>de bepal<strong>in</strong>g<strong>en</strong><br />

kunn<strong>en</strong> bij staatsbesluit<br />

van toepass<strong>in</strong>g op de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

zeemilieu word<strong>en</strong><br />

verklaard.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>in</strong> <strong>het</strong><br />

wild lev<strong>en</strong>de dier<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

mari<strong>en</strong>e milieu<br />

ERM 25 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Decreet <strong><strong>in</strong>zake</strong><br />

Zeevisvangst S.B. 1980<br />

no. 144<br />

(trekt de Verord<strong>en</strong><strong>in</strong>g op<br />

Vissersvaartuig<strong>en</strong> van<br />

1971 <strong>in</strong>)<br />

Staatsbesluit <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van de<br />

visstand G.B. 1961 no.<br />

144 zoals gewijzigd<br />

Wet op jachtdier<strong>en</strong> 1954<br />

G.B. 1954 no. 25 zoals<br />

gewijzigd<br />

1. Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

voor <strong>het</strong> registrer<strong>en</strong>, <strong>het</strong><br />

verl<strong>en</strong><strong>en</strong> van vergunn<strong>in</strong>g,<br />

certificer<strong>in</strong>g van de<br />

zeewaardigheid <strong>en</strong><br />

andere vereist<strong>en</strong> voor<br />

vissersvaartuig<strong>en</strong>.<br />

2. Legt bepal<strong>in</strong>g<strong>en</strong> vast<br />

voor <strong>het</strong> vastlegg<strong>en</strong> van<br />

voorschrift<strong>en</strong> ter<br />

bescherm<strong>in</strong>g van de<br />

visstand<br />

Bescherm<strong>in</strong>g van de<br />

visstand <strong>in</strong> de<br />

b<strong>in</strong>n<strong>en</strong>water<strong>en</strong>.<br />

Bescherm<strong>in</strong>g van fauna<br />

<strong>en</strong> <strong>het</strong> beheer van<br />

jachtdier<strong>en</strong>.<br />

Jachtwet Act 1954 1. Verbiedt de jacht op<br />

bepaalde beschermde<br />

dier<strong>en</strong>.<br />

2. Reguleert de jacht <strong>en</strong><br />

de visvangst.<br />

Jachtdecreet 2002 Bepal<strong>in</strong>g<strong>en</strong> voor<br />

verschill<strong>en</strong>de diersoort<strong>en</strong>,<br />

waaronder jachtseizo<strong>en</strong><strong>en</strong><br />

<strong>en</strong> toegestane aantall<strong>en</strong>.<br />

LVV Vergunn<strong>in</strong>g vereist<br />

voor <strong>het</strong> viss<strong>en</strong> <strong>in</strong> de<br />

territoriale water<strong>en</strong> <strong>en</strong><br />

de economische zone<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

loz<strong>en</strong> <strong>in</strong> <strong>het</strong> mari<strong>en</strong>e milieu<br />

LVV Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van de<br />

visstand<br />

MNH De Wet op<br />

Economische Delict<strong>en</strong><br />

is ook van toepass<strong>in</strong>g.<br />

LBB 1. Toestemm<strong>in</strong>g /<br />

vergunn<strong>in</strong>g vereist om<br />

op bepaalde soort<strong>en</strong> te<br />

jag<strong>en</strong>.<br />

2. Houdt <strong>in</strong> dat<br />

Inheems<strong>en</strong><br />

toestemm<strong>in</strong>g nodig<br />

hebb<strong>en</strong> om op<br />

dome<strong>in</strong>grond te jag<strong>en</strong><br />

<strong>en</strong> te viss<strong>en</strong>.<br />

Omvat ook e<strong>en</strong><br />

bescherm<strong>in</strong>gsclausule<br />

voor Inheems<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

zuid<strong>en</strong> van Sur<strong>in</strong>ame.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van de fauna<br />

<strong>en</strong> jachtdier<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van de fauna<br />

<strong>en</strong> <strong>in</strong> <strong>het</strong> wild lev<strong>en</strong>de<br />

dier<strong>en</strong><br />

ERM 26 DRAFT - AUGUSTUS 2011


Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Wet op Historische<br />

Monum<strong>en</strong>t<strong>en</strong> G.B. 1963<br />

no. 23<br />

Verord<strong>en</strong><strong>in</strong>g van 7<br />

februari 1952 G.B. 1952<br />

no. 14<br />

Wet op<br />

Beroepsveiligheid<br />

G.B. 1947 no. 142 zoals<br />

gewijzigd<br />

Wet op Arbeids<strong>in</strong>spectie<br />

S.B. 1983 no. 42<br />

Wet op Pesticid<strong>en</strong> GB<br />

1972 no. 151 zoals<br />

gewijzigd<br />

Bepal<strong>in</strong>g<strong>en</strong> voor de<br />

bescherm<strong>in</strong>g van<br />

historische monum<strong>en</strong>t<strong>en</strong>,<br />

kunst <strong>en</strong> architectuur <strong>in</strong><br />

Sur<strong>in</strong>ame.<br />

CULTUREEL ERFGOED<br />

Controleert de export van<br />

voorwerp<strong>en</strong> die<br />

historische, culturele <strong>en</strong><br />

wet<strong>en</strong>schappelijke waarde<br />

hebb<strong>en</strong><br />

M<strong>in</strong>isterie van Onderwijs<br />

<strong>en</strong> Volksontwikkel<strong>in</strong>g<br />

M<strong>in</strong>isterie van Onderwijs<br />

<strong>en</strong> Volksontwikkel<strong>in</strong>g<br />

BEROEPSGEZONDHEID EN -VEILIGHEID / VOLKSGEZONDHEID<br />

Om veiligheid <strong>en</strong> hygiëne<br />

<strong>in</strong> ondernem<strong>in</strong>g<strong>en</strong> te<br />

bevorder<strong>en</strong> zodat de kans<br />

op ongelukk<strong>en</strong> <strong>en</strong><br />

beroepsziekt<strong>en</strong> tot e<strong>en</strong><br />

m<strong>in</strong>imum kan word<strong>en</strong><br />

beperkt.<br />

Geeft e<strong>en</strong> opsomm<strong>in</strong>g van<br />

de tak<strong>en</strong> <strong>en</strong><br />

verantwoordelijkhed<strong>en</strong><br />

van de Inspecteur van<br />

Arbeid<br />

Reguleert de handel <strong>in</strong> <strong>en</strong><br />

<strong>het</strong> gebruik van agrochemicaliën.<br />

Er is vergunn<strong>in</strong>g vereist<br />

om voorwerp<strong>en</strong> van<br />

historische, culturele <strong>en</strong><br />

wet<strong>en</strong>schappelijke<br />

waarde te exporter<strong>en</strong>.<br />

M<strong>in</strong>isterie van Arbeid Er zijn 9 voorschrift<strong>en</strong><br />

uitgegev<strong>en</strong> voor de<br />

implem<strong>en</strong>tatie van<br />

deze wet<br />

M<strong>in</strong>isterie van Arbeid In gevall<strong>en</strong> waarbij de<br />

veiligheid van person<strong>en</strong><br />

<strong>in</strong> gevaar is, is de<br />

Inspecteur bevoegd om<br />

de ondernem<strong>in</strong>g <strong>in</strong><br />

kwestie te sluit<strong>en</strong>.<br />

LVV <strong>en</strong> <strong>het</strong> M<strong>in</strong>isterie<br />

van Volksgezondheid<br />

Legt verbod op <strong>het</strong><br />

verkop<strong>en</strong>, <strong>het</strong> <strong>in</strong><br />

voorraad hebb<strong>en</strong> of<br />

<strong>het</strong> gebruik<strong>en</strong> van<br />

agro-chemicaliën die<br />

niet overe<strong>en</strong>komstig<br />

deze wet zijn<br />

geïmporteerd.<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

cultureel erfgoed<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

cultureel erfgoed<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

gezondheid <strong>en</strong> veiligheid<br />

op de werkplaats<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van <strong>het</strong><br />

cultureel erfgoed<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

gebruik van agrochemicaliën<br />

ERM 27 DRAFT - AUGUSTUS 2011


Bron:<br />

Titel Doelstell<strong>in</strong>g Uitvoer<strong>en</strong>d orgaan Opmerk<strong>in</strong>g<strong>en</strong> Relevantie<br />

Wet op<br />

Muskiet<strong>en</strong>bestrijd<strong>in</strong>g<br />

Wet op<br />

Watervoorzi<strong>en</strong><strong>in</strong>g G.B.<br />

1938 no. 33<br />

Wetboek van Strafrecht<br />

G.B. 1911 no. 1<br />

Wet op <strong>het</strong><br />

Goeder<strong>en</strong>verkeer S.B.<br />

2003 no. 74<br />

Staatsbesluit Negatieve<br />

Lijst 2003 S.B. no. 74<br />

Om muskiet<strong>en</strong> <strong>en</strong> andere<br />

<strong>in</strong>sect<strong>en</strong> te bestrijd<strong>en</strong><br />

waarvan m<strong>en</strong> heeft<br />

vastgesteld dat zij<br />

schadelijk voor de<br />

gezondheid van m<strong>en</strong>s<strong>en</strong><br />

<strong>en</strong> dier<strong>en</strong> zijn.<br />

Legt verbod vast m.b.t.<br />

waterbronn<strong>en</strong>, etc. die als<br />

watervoorzi<strong>en</strong><strong>in</strong>gsbronn<strong>en</strong><br />

di<strong>en</strong><strong>en</strong>.<br />

Geeft algem<strong>en</strong>e regels<br />

voor de <strong>in</strong>ternationale<br />

handel<br />

Reguleert <strong>het</strong><br />

<strong>in</strong>ternationale<br />

goeder<strong>en</strong>verkeer.<br />

MNH, M<strong>in</strong>isterie van<br />

Volksgezondheid<br />

M<strong>in</strong>isterie van Handel<br />

<strong>en</strong> Industrie<br />

M<strong>in</strong>isterie van Handel<br />

<strong>en</strong> Industrie<br />

Ingevolge deze wet is<br />

de Presid<strong>en</strong>t<br />

verantwoordelijk voor<br />

de uitvoer<strong>in</strong>g hiervan,<br />

maar <strong>in</strong> de praktijk<br />

nem<strong>en</strong> de m<strong>in</strong>isteries<br />

die rol op zich.<br />

Artikel<strong>en</strong> 226 <strong>en</strong> 227<br />

handel<strong>en</strong> over<br />

schadelijke product<strong>en</strong>.<br />

Artikel 393 heeft<br />

betrekk<strong>in</strong>g op<br />

nagemaakte<br />

voedselproduct<strong>en</strong> <strong>en</strong><br />

medicijn<strong>en</strong>.<br />

Import <strong>en</strong> export van<br />

chemisch afval,<br />

pesticid<strong>en</strong>, dier<strong>en</strong>,<br />

kwik, radio-actief<br />

materiaal, etc. zijn pas<br />

na goedkeur<strong>in</strong>g van de<br />

desbetreff<strong>en</strong>de<br />

overheid toegestaan<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bestrijd<strong>in</strong>g van muskiet<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g van<br />

waterbronn<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

bescherm<strong>in</strong>g m<strong>en</strong>selijke<br />

consumptie van<br />

voed<strong>in</strong>gsmiddel<strong>en</strong><br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> de<br />

<strong>in</strong>ternationale handel<br />

Legt voorschrift<strong>en</strong> <strong>en</strong><br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong> <strong>het</strong><br />

verschep<strong>en</strong> van goeder<strong>en</strong><br />

MNH (GMD) - Geologisch Mijnbouwkundige Di<strong>en</strong>st (Geological M<strong>in</strong><strong>in</strong>g Service); MNH - M<strong>in</strong>isterie van Natuurlijke Hulpbronn<strong>en</strong> (M<strong>in</strong>istry of Natural Resources); MRD –<br />

M<strong>in</strong>isterie van Regionale Ontwikkel<strong>in</strong>g (M<strong>in</strong>istry of Regional Developm<strong>en</strong>t) ; LVV - M<strong>in</strong>isterie van Landbouw, Veeteelt <strong>en</strong> Visserij (M<strong>in</strong>istry of Agriculture, Animal<br />

Husbandry and Fisheries); LBB - Lands Bosbeheer <strong>en</strong> Bostoezicht (Forestry Service).<br />

ERM 28 DRAFT - AUGUSTUS 2011


3.3 REGELGEVEND KADER IN SURINAME<br />

De Republiek Sur<strong>in</strong>ame heeft verschill<strong>en</strong>de aparte wett<strong>en</strong>,<br />

wetsontwerp<strong>en</strong> <strong>en</strong> voorschrift<strong>en</strong> die te mak<strong>en</strong> hebb<strong>en</strong> met <strong>het</strong> beheer van<br />

<strong>het</strong> milieu <strong>en</strong>/of de natuurlijke hulpbronn<strong>en</strong>; er is echter ge<strong>en</strong> nationale<br />

wet <strong><strong>in</strong>zake</strong> milieubeheer. De Grondwet van de Republiek Sur<strong>in</strong>ame<br />

(1987) stelt als e<strong>en</strong> van haar sociale doelstell<strong>in</strong>g<strong>en</strong> <strong>het</strong> creër<strong>en</strong> <strong>en</strong><br />

verbeter<strong>en</strong> van “voorwaard<strong>en</strong> die noodzakelijk zijn voor de bescherm<strong>in</strong>g<br />

van de natuur <strong>en</strong> voor <strong>het</strong> behoud van de ecologische balans”. Als<br />

zodanig biedt de grondwet e<strong>en</strong> wettelijke basis voor e<strong>en</strong> nationaal<br />

milieubeleid. In 1996 werd er e<strong>en</strong> National Environm<strong>en</strong>tal Action Plan<br />

(NEAP) (Nationaal Milieu-Actieplan) opgesteld <strong>en</strong> hoewel dit plan niet<br />

officieel is goedgekeurd, zijn <strong>en</strong>kele van de voorstell<strong>en</strong> hiervan<br />

geïmplem<strong>en</strong>teerd, bijv. <strong>het</strong> opzett<strong>en</strong> van e<strong>en</strong> <strong>in</strong>stitutioneel raamwerk voor<br />

milieubeheer <strong>en</strong> e<strong>en</strong> duurzaam gebruik van natuurlijke hulpbronn<strong>en</strong>.<br />

De Nationale Milieuraad (NMR - National Council for the Environm<strong>en</strong>t)<br />

werd <strong>in</strong> 1997 <strong>in</strong>gesteld met e<strong>en</strong> mandaat om de reger<strong>in</strong>g van Sur<strong>in</strong>ame te<br />

adviser<strong>en</strong> <strong><strong>in</strong>zake</strong> de ontwikkel<strong>in</strong>g <strong>en</strong> de implem<strong>en</strong>tatie van nationale<br />

milieugedragslijn<strong>en</strong>. De NMR bestaat uit e<strong>en</strong> voorzitter <strong>en</strong> vijf tot ti<strong>en</strong><br />

led<strong>en</strong> die de overheid, de particuliere sector, de Inheemse <strong>en</strong><br />

Marrongeme<strong>en</strong>schapp<strong>en</strong>, de vakbeweg<strong>in</strong>g, consum<strong>en</strong>t<strong>en</strong>organisaties <strong>en</strong><br />

andere Niet-gouvernem<strong>en</strong>tele Organisaties (NGO’s) verteg<strong>en</strong>woordig<strong>en</strong>.<br />

Qua uitvoer<strong>in</strong>g wordt de NMR ondersteund door <strong>het</strong> Nationaal Instituut<br />

voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame (NIMOS – National Institute for<br />

Environm<strong>en</strong>t and Developm<strong>en</strong>t <strong>in</strong> Sur<strong>in</strong>ame). Het NIMOS was<br />

oorspronkelijk <strong>in</strong> 1998 bij Presid<strong>en</strong>tieel Besluit <strong>in</strong>gesteld als e<strong>en</strong> <strong>en</strong>titeit die<br />

ondergeschikt was aan <strong>het</strong> kab<strong>in</strong>et van de Presid<strong>en</strong>t, maar werd <strong>in</strong> 2001<br />

officieel overgeheveld naar <strong>het</strong> M<strong>in</strong>isterie van ATM als zijn technische<br />

afdel<strong>in</strong>g. Het NIMOS is <strong>het</strong> belangrijkste beleids- <strong>en</strong> adviesorgaan m.b.t.<br />

milieumanagem<strong>en</strong>t <strong>en</strong> fungeert ook als e<strong>en</strong> onderzoeks<strong>in</strong>stituut.<br />

Het Actieplan <strong><strong>in</strong>zake</strong> Biodiversiteit van Sur<strong>in</strong>ame wordt beheerd door <strong>het</strong><br />

NIMOS onder begeleid<strong>in</strong>g van <strong>het</strong> M<strong>in</strong>isterie van ATM <strong>en</strong> de Stuurgroep<br />

voor Biodiversiteit (Biodiversity Steer<strong>in</strong>g Committee - BSC). Het NIMOS<br />

speelde e<strong>en</strong> rol bij de uitvoer<strong>in</strong>g van <strong>het</strong> Actieplan <strong><strong>in</strong>zake</strong> Biodiversiteit. Het<br />

m<strong>in</strong>isterie van ATM is de focal po<strong>in</strong>t.<br />

De Verklar<strong>in</strong>g van de Sur<strong>in</strong>aamse Reger<strong>in</strong>g (zog<strong>en</strong>oemde<br />

‘Reger<strong>in</strong>gsverklar<strong>in</strong>g’ 2005-2010) <strong>en</strong> <strong>het</strong> Meerjar<strong>en</strong> Ontwikkel<strong>in</strong>gsplan<br />

(2006-2011) legg<strong>en</strong> beleidsmaatregel<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>het</strong> milieu, maar zijn <strong>in</strong> de<br />

beg<strong>in</strong>fase van ontwikkel<strong>in</strong>g <strong>en</strong> gericht op doelstell<strong>in</strong>g<strong>en</strong> van <strong>het</strong> nationaal<br />

milieubeleid. Aangezi<strong>en</strong> er ge<strong>en</strong> specifiek daartoe bestemde nationale<br />

ERM 29 DRAFT - AUGUSTUS 2011


milieuwetgev<strong>in</strong>g is, blijft de verantwoordelijkheid voor milieu (<strong>en</strong> sociaalmaatschappelijke)<br />

vraagstukk<strong>en</strong> verspreid over e<strong>en</strong> aantal <strong>in</strong>stanties <strong>en</strong><br />

afdel<strong>in</strong>g<strong>en</strong> op andere m<strong>in</strong>isteries. Deze <strong>in</strong>stanties <strong>en</strong> afdel<strong>in</strong>g<strong>en</strong> <strong>en</strong> hun rol<br />

<strong><strong>in</strong>zake</strong> milieu (<strong>en</strong> sociaal-maatschappelijke ) vraagstukk<strong>en</strong>, zijn nader<br />

omschrev<strong>en</strong> <strong>in</strong> Tabel 3-2.<br />

ERM 30 DRAFT - AUGUSTUS 2011


Tabel 3-2. Verantwoordelijkhed<strong>en</strong> <strong><strong>in</strong>zake</strong> milieumanagem<strong>en</strong>t van de belangrijkste <strong>in</strong>stanties <strong>in</strong> Sur<strong>in</strong>ame .<br />

Aspect<strong>en</strong> van<br />

milieumanagem<strong>en</strong>t<br />

Natuurbehoud <strong>en</strong> –<br />

beheer<br />

ESIA-process<strong>en</strong> E<strong>in</strong>dbesluit<br />

over<br />

milieuvereist<strong>en</strong><br />

Industriële<br />

verontre<strong>in</strong>ig<strong>in</strong>g<br />

Instanties<br />

ATM Sectorale M<strong>in</strong>isteries NIMOS STINASU SCF Districtscommissariss<strong>en</strong><br />

Goedkeur<strong>in</strong>g van<br />

ontwikkel<strong>in</strong>gsproject<strong>en</strong><br />

<strong>en</strong> nalev<strong>in</strong>g<br />

Faciliter<strong>en</strong> van<br />

Strategie <strong><strong>in</strong>zake</strong><br />

Nationale<br />

Biodiversiteit<br />

Begeleid<strong>in</strong>g <strong>en</strong><br />

evaluatie van<br />

rapport<strong>en</strong><br />

Verschaft advies<br />

<strong><strong>in</strong>zake</strong><br />

milieuplann<strong>in</strong>g,<br />

maar de<br />

e<strong>in</strong>dbesliss<strong>in</strong>g is<br />

nog steeds de<br />

verantwoordelijkheid<br />

van de vergunn<strong>in</strong>g-<br />

verl<strong>en</strong><strong>en</strong>de <strong>in</strong>stantie<br />

Technisch advies<br />

Monitor<strong>in</strong>g<br />

Monitor<strong>in</strong>g Implem<strong>en</strong>tatie Supervisie;<br />

handhav<strong>in</strong>g<br />

Milieuplann<strong>in</strong>g<br />

(Managem<strong>en</strong>tplann<strong>en</strong>)<br />

Goedkeur<strong>in</strong>g Participatie <strong>in</strong> ontwerp<br />

<strong>en</strong> uitvoer<strong>in</strong>g van <strong>het</strong><br />

plan<br />

Coörd<strong>in</strong>atie van<br />

ontwerp <strong>en</strong><br />

uitvoer<strong>in</strong>g van <strong>het</strong><br />

plan<br />

Brownsberg<br />

Natuurpark<br />

CSNR<br />

<strong>en</strong><br />

Sipaliw<strong>in</strong>i<br />

Natuurreservaat<br />

Goedkeur<strong>in</strong>g<br />

vergunn<strong>in</strong>g<br />

NCD (LBB) SBB<br />

Instell<strong>en</strong> van<br />

nieuwe<br />

beschermde<br />

gebied<strong>en</strong>,<br />

managem<strong>en</strong>t<br />

<strong>en</strong> controle<br />

Beheer van<br />

boss<strong>en</strong><br />

ERM 31 DRAFT - AUGUSTUS 2011<br />

Nalev<strong>in</strong>g<br />

Implem<strong>en</strong>tatie Implem<strong>en</strong>tatie<br />

Participatie <strong>in</strong><br />

ontwerp <strong>en</strong><br />

implem<strong>en</strong>tatie<br />

van <strong>het</strong> plan


Aspect<strong>en</strong> van<br />

milieumanagem<strong>en</strong>t<br />

Instanties<br />

ATM Sectorale M<strong>in</strong>isteries NIMOS STINASU SCF Districtscommissariss<strong>en</strong><br />

Milieuvoorschrift<strong>en</strong> Goedkeur<strong>in</strong>g Nalev<strong>in</strong>g Opstell<strong>en</strong> <strong>en</strong><br />

overleg met<br />

stakeholders<br />

Bosontwikkel<strong>in</strong>g Begeleid<strong>in</strong>g <strong>en</strong><br />

evaluatie van<br />

rapport<strong>en</strong><br />

Voornaamste <strong>in</strong>stanties:<br />

NCD (LBB) SBB<br />

Goedkeur<strong>in</strong>g<br />

vergunn<strong>in</strong>g<strong>en</strong><br />

<strong>en</strong> controle<br />

op plann<strong>en</strong><br />

<strong><strong>in</strong>zake</strong><br />

bosbeheer<br />

Monitor<strong>in</strong>g<br />

van houtkapactiviteit<strong>en</strong><br />

ATM – M<strong>in</strong>isterie van Arbeid, Technologische Ontwikkel<strong>in</strong>g <strong>en</strong> Milieu; NIMOS – Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame; CSNR - C<strong>en</strong>traal<br />

Sur<strong>in</strong>ame Natuurreservaat; STINASU – Sticht<strong>in</strong>g Natuurbehoud <strong>in</strong> Sur<strong>in</strong>ame; SCF – Sur<strong>in</strong>ame Conservation Foundation; NCD – Afdel<strong>in</strong>g Natuurbehoud LBB –<br />

Di<strong>en</strong>st ’s Lands Bosbeheer <strong>en</strong> Bostoezicht: SBB – Sticht<strong>in</strong>g Bosbeheer <strong>en</strong> Bostoezicht<br />

ERM 32 DRAFT - AUGUSTUS 2011


3.4 INTERNATIONALE STANDAARDEN EN RICHTLIJNEN<br />

Sur<strong>in</strong>ame heeft e<strong>en</strong> aantal <strong>in</strong>ternationale overe<strong>en</strong>komst<strong>en</strong> <strong>en</strong> conv<strong>en</strong>ties<br />

die betrekk<strong>in</strong>g hebb<strong>en</strong> op milieubeheer, recht<strong>en</strong> van leefgeme<strong>en</strong>schapp<strong>en</strong><br />

<strong>en</strong> Inheemse volker<strong>en</strong> ondertek<strong>en</strong>d. De <strong>in</strong>ternationale verdrag<strong>en</strong> word<strong>en</strong><br />

niet altijd omgezet tot nationale wetgev<strong>in</strong>g. Enkele van de belangrijkste<br />

overe<strong>en</strong>komst<strong>en</strong> zijn hieronder <strong>in</strong> tabel 3–3 aangegev<strong>en</strong>.<br />

Tabel 3-3. Internationale Overe<strong>en</strong>komst<strong>en</strong> van belang voor Milieu- <strong>en</strong> Sociaalmaatschappelijke<br />

Vraagstukk<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame<br />

Overe<strong>en</strong>komst /<br />

Conv<strong>en</strong>tie/Verdrag<br />

Vi<strong>en</strong>na Conv<strong>en</strong>tion for the<br />

Protection of the Ozone Layer,<br />

1985 - Verdrag van W<strong>en</strong><strong>en</strong> ter<br />

Bescherm<strong>in</strong>g van de Ozonlaag<br />

Montreal Protocol on<br />

Substances that Deplete the<br />

Ozone Layer, 1989 – Protocol<br />

van Montreal <strong><strong>in</strong>zake</strong> Stoff<strong>en</strong> die<br />

de Ozonlaag uitdunn<strong>en</strong><br />

United Nations Framework<br />

Conv<strong>en</strong>tion on Climate Change<br />

(UNFCC), 1994 -<br />

Raamwerkverdrag van de<br />

Ver<strong>en</strong>igde Naties <strong><strong>in</strong>zake</strong><br />

Klimaatsverander<strong>in</strong>g<br />

Kyoto Protocol, 1997- Protocol<br />

van Kyoto<br />

Aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> / Comm<strong>en</strong>taar Status Relevantie<br />

KLIMAATSVERANDERING / LUCHTKWALITEIT<br />

Bescherm<strong>in</strong>g van de ozonlaag,<br />

werd <strong>in</strong> 1988 van kracht.<br />

Sur<strong>in</strong>ame sloot zich aan <strong>in</strong><br />

1997.<br />

Bescherm<strong>in</strong>g van de ozonlaag. Sur<strong>in</strong>ame sloot zich <strong>in</strong><br />

1997 aan, maar de<br />

daaropvolg<strong>en</strong>de<br />

wijzig<strong>in</strong>g<strong>en</strong> zijn nog niet<br />

geratificeerd.<br />

Controle op de uitstoot van<br />

broeikasgass<strong>en</strong>.<br />

Doel<strong>en</strong> van de uitstoot van<br />

broeikasgass<strong>en</strong>.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1997.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 2006.<br />

BIODIVERSITEIT / BESCHERMDE GEBIEDEN<br />

Legt <strong>in</strong>ternationale<br />

standaard<strong>en</strong> vast ter<br />

bescherm<strong>in</strong>g van de<br />

ozonlaag; uitstoot van<br />

<strong>het</strong> project kan<br />

mogelijk de ozonlaag<br />

aantast<strong>en</strong><br />

Als hierbov<strong>en</strong><br />

aangegev<strong>en</strong><br />

Legt <strong>in</strong>ternationale<br />

richtlijn<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

beperk<strong>in</strong>g<strong>en</strong> van de<br />

uitstoot van GHG<br />

t<strong>en</strong>e<strong>in</strong>de klimaatsverander<strong>in</strong>g<br />

te<br />

voorkom<strong>en</strong>; Het<br />

<strong>Project</strong> zal de uitstoot<br />

van broeikasgass<strong>en</strong><br />

als gevolg van de<br />

<strong>en</strong>ergie-opwekk<strong>in</strong>g<br />

middels de<br />

verbrand<strong>in</strong>g van zware<br />

stookolie, uitsluit<strong>en</strong><br />

Als hierbov<strong>en</strong><br />

aangegev<strong>en</strong><br />

ERM 33 SEPTEMBER 2011


Overe<strong>en</strong>komst /<br />

Conv<strong>en</strong>tie/Verdrag<br />

Conv<strong>en</strong>tion on Nature<br />

Protection and Wildlife<br />

Preservation <strong>in</strong> the Western<br />

Hemisphere (Western<br />

Hemisphere Conv<strong>en</strong>tion), 1942<br />

– Verdrag <strong><strong>in</strong>zake</strong> <strong>het</strong> behoud<br />

van wilde dier<strong>en</strong> <strong>en</strong> plant<strong>en</strong> op<br />

<strong>het</strong> Westelijk Halfrond (Verdrag<br />

van <strong>het</strong> Westelijk Halfrond)<br />

Conv<strong>en</strong>tion on Wetlands of<br />

International Importance<br />

especially as Waterfowl Habitat<br />

(Ramsar Conv<strong>en</strong>tion), 1971 –<br />

Verdrag <strong><strong>in</strong>zake</strong><br />

moerasgebied<strong>en</strong> die van<br />

nationaal belang zijn, <strong>in</strong> <strong>het</strong><br />

bijzonder als natuurlijke<br />

leefomgev<strong>in</strong>g van de<br />

watervogels<br />

Conv<strong>en</strong>tion on the International<br />

Trade of Endangered Species<br />

of Wild Fauna and Flora<br />

(CITES), 1973 – Verdrag<br />

<strong><strong>in</strong>zake</strong> de <strong>in</strong>ternationale handel<br />

<strong>in</strong> bedreigde fauna <strong>en</strong> flora<br />

species die <strong>in</strong> <strong>het</strong> wild<br />

lev<strong>en</strong>/voorkom<strong>en</strong><br />

United Nations Conv<strong>en</strong>tion on<br />

Biological Diversity, 1992 –<br />

Verdrag <strong><strong>in</strong>zake</strong> de biologische<br />

diversiteit<br />

Aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> / Comm<strong>en</strong>taar Status Relevantie<br />

Bepal<strong>in</strong>g<strong>en</strong> om e<strong>en</strong> aantal<br />

beschermde gebied<strong>en</strong> <strong>in</strong> te<br />

stell<strong>en</strong>; nationale park<strong>en</strong> om<br />

recreatie- <strong>en</strong> educatieve<br />

faciliteit<strong>en</strong> te verschaff<strong>en</strong>; puur<br />

natuurgebied dat ongeschond<strong>en</strong><br />

moet blijv<strong>en</strong>; sam<strong>en</strong>werk<strong>in</strong>g op<br />

<strong>het</strong> gebied van onderzoek tuss<strong>en</strong><br />

overhed<strong>en</strong>; species apart<br />

opgesomd (<strong>in</strong> bijlage) die<br />

speciale bescherm<strong>in</strong>g moet<strong>en</strong><br />

g<strong>en</strong>iet<strong>en</strong> <strong>en</strong> controles die moet<strong>en</strong><br />

word<strong>en</strong> uitgevoerd op de handel<br />

<strong>in</strong> beschermde fauna <strong>en</strong> flora<br />

De bescherm<strong>in</strong>g <strong>en</strong> <strong>het</strong> duurzame<br />

gebruik van moerasgebied<strong>en</strong><br />

(wetlands), d.w.z. de aantast<strong>in</strong>g<br />

<strong>en</strong> <strong>het</strong> verlies van<br />

moerasgebied<strong>en</strong> nu <strong>en</strong> <strong>in</strong> de<br />

toekomst te stuit<strong>en</strong>, waarbij de<br />

fundam<strong>en</strong>tele ecologische<br />

functies van deze<br />

moerasgebied<strong>en</strong> <strong>en</strong> hun<br />

economische, culturele,<br />

wet<strong>en</strong>schappelijke <strong>en</strong> recreatieve<br />

waarde wordt erk<strong>en</strong>d.<br />

Om te garander<strong>en</strong> dat de<br />

<strong>in</strong>ternationale handel <strong>in</strong> wilde<br />

plant- <strong>en</strong> diersoort<strong>en</strong> ge<strong>en</strong><br />

bedreig<strong>in</strong>g vormt voor hun<br />

voortbestaan <strong>en</strong> <strong>het</strong> bevestigt e<strong>en</strong><br />

uite<strong>en</strong>lop<strong>en</strong>de mate van<br />

bescherm<strong>in</strong>g aan meer dan<br />

33.000 plant- <strong>en</strong> diersoort<strong>en</strong>.<br />

Bevordert de ontwikkel<strong>in</strong>g van<br />

nationale strategieën voor de<br />

bescherm<strong>in</strong>g <strong>en</strong> <strong>het</strong> duurzame<br />

gebruik van biologische diversiteit.<br />

Wordt vaak gezi<strong>en</strong> als <strong>het</strong><br />

belangrijkste docum<strong>en</strong>t m.b.t.<br />

duurzame ontwikkel<strong>in</strong>g.<br />

Ondertek<strong>en</strong>d door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1985.<br />

Sur<strong>in</strong>ame heeft drie<br />

reservat<strong>en</strong> voor<br />

waadvogels <strong>in</strong>gesteld,<br />

t.w.:<br />

1. Copp<strong>en</strong>amemond<strong>in</strong>g<br />

2. Bigi Pan<br />

3. Wia Wia<br />

Trad <strong>in</strong> 1985 <strong>in</strong> werk<strong>in</strong>g <strong>in</strong><br />

Sur<strong>in</strong>ame. De<br />

Copp<strong>en</strong>amemond<strong>in</strong>g is<br />

e<strong>en</strong> Ramsar-locatie (<strong>en</strong><br />

reservaat voor<br />

waadvogels op <strong>het</strong><br />

Westelijk Halfrond)<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1980. In<br />

2002 werd<strong>en</strong> er nieuwe<br />

voorschrift<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>in</strong> <strong>het</strong><br />

wild lev<strong>en</strong>de dier<strong>en</strong><br />

bekrachtigd,<br />

overe<strong>en</strong>komstig de<br />

CITES-vereist<strong>en</strong>.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1996. Er is <strong>in</strong><br />

2006 e<strong>en</strong> nationale<br />

strategie voor biodiversiteit<br />

opgesteld als raamwerk<br />

voor e<strong>en</strong> Nationaal<br />

Actieplan voor<br />

Biodiversiteit<br />

Legt <strong>in</strong>ternationale<br />

richtlijn<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

de bescherm<strong>in</strong>g <strong>en</strong> <strong>het</strong><br />

behoud van de natuur /<br />

<strong>in</strong> <strong>het</strong> wild lev<strong>en</strong>de<br />

dier<strong>en</strong>; <strong>het</strong> project<br />

bev<strong>in</strong>dt zich <strong>in</strong> e<strong>en</strong><br />

gebied dat rijk is aan<br />

biodiversiteit <strong>en</strong> zal<br />

mogelijkerwijs van<br />

<strong>in</strong>vloed zijn op de<br />

lokale <strong>in</strong> <strong>het</strong> wild<br />

lev<strong>en</strong>de dier<strong>en</strong> <strong>en</strong> de<br />

natuur<br />

Legt <strong>in</strong>ternationale<br />

vereist<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

de bescherm<strong>in</strong>g van<br />

moerasgebied<strong>en</strong>; <strong>het</strong><br />

project kan<br />

mogelijkerwijs van<br />

<strong>in</strong>vloed zijn op de<br />

lokale moerasgebied<strong>en</strong><br />

Legt <strong>in</strong>ternationale<br />

beperk<strong>in</strong>g<strong>en</strong> /<br />

verbod<strong>en</strong> vast <strong><strong>in</strong>zake</strong><br />

de handel <strong>in</strong> bepaalde<br />

<strong>in</strong> <strong>het</strong> wild lev<strong>en</strong>de<br />

dier<strong>en</strong> <strong>en</strong> <strong>in</strong> <strong>het</strong> wild<br />

voorkom<strong>en</strong>de plant<strong>en</strong>.<br />

Het project zal word<strong>en</strong><br />

uitgevoerd <strong>in</strong> e<strong>en</strong><br />

gebied dat rijk is aan<br />

biodiversiteit<br />

Legt richtlijn<strong>en</strong> vast<br />

voor de bescherm<strong>in</strong>g<br />

<strong>en</strong> de bevorder<strong>in</strong>g van<br />

de biologische<br />

diversiteit. Het project<br />

wordt uitgevoerd <strong>in</strong><br />

e<strong>en</strong> gebied dat rijk is<br />

aan biodiversiteit.<br />

ERM 34 SEPTEMBER 2011


Overe<strong>en</strong>komst /<br />

Conv<strong>en</strong>tie/Verdrag<br />

United Nations Conv<strong>en</strong>tion to<br />

Combat Desertification, 1994 –<br />

Verdrag van de Ver<strong>en</strong>igde<br />

Naties om woestijnvorm<strong>in</strong>g<br />

teg<strong>en</strong> te gaan.<br />

• International Tropical Timber<br />

Agreem<strong>en</strong>t, 1994 (Tropical<br />

Timber 94) – Internationaal<br />

verdrag <strong><strong>in</strong>zake</strong> tropisch hout<br />

American Conv<strong>en</strong>tion on<br />

Human Rights, 1969 –<br />

Amerikaanse conv<strong>en</strong>tie <strong><strong>in</strong>zake</strong><br />

m<strong>en</strong>s<strong>en</strong>recht<strong>en</strong><br />

UNESCO Conv<strong>en</strong>tion<br />

Concern<strong>in</strong>g the Protection of<br />

the World Cultural and Natural<br />

Heritage, 1972 (World Heritage<br />

Conv<strong>en</strong>tion) UNESCO-Verdrag<br />

betreff<strong>en</strong>de de Bescherm<strong>in</strong>g<br />

van <strong>het</strong> Cultureel <strong>en</strong> Natuurlijk<br />

Werelderfgoed, 1972<br />

(Conv<strong>en</strong>tie <strong><strong>in</strong>zake</strong><br />

Werelderfgoed)<br />

Aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> / Comm<strong>en</strong>taar Status Relevantie<br />

Om woestijnvorm<strong>in</strong>g teg<strong>en</strong> te<br />

gaan <strong>en</strong> de effect<strong>en</strong> van droogte<br />

te verm<strong>in</strong>der<strong>en</strong> middels nationale<br />

actieprogramma’s die langetermijn<br />

strategieën <strong>in</strong>houd<strong>en</strong> die<br />

ondersteund word<strong>en</strong> door<br />

<strong>in</strong>ternationale sam<strong>en</strong>werk<strong>in</strong>gs- <strong>en</strong><br />

partnerschapverdrag<strong>en</strong>.<br />

BOSBEHEER<br />

Om te garander<strong>en</strong> dat (uiterlijk<br />

2000) de export van tropisch hout<br />

afkomstig is van duurzaam<br />

beheerde bronn<strong>en</strong> <strong>en</strong> om e<strong>en</strong><br />

fonds op te zett<strong>en</strong> om<br />

produc<strong>en</strong>t<strong>en</strong> van tropisch hout te<br />

assister<strong>en</strong> bij <strong>het</strong> verkrijg<strong>en</strong> van<br />

middel<strong>en</strong> die nodig zijn om dit<br />

doel te bereik<strong>en</strong>.<br />

Internationaal <strong>in</strong>strum<strong>en</strong>t <strong><strong>in</strong>zake</strong><br />

m<strong>en</strong>s<strong>en</strong>recht<strong>en</strong> om e<strong>en</strong> systeem<br />

te vestig<strong>en</strong> van persoonlijke<br />

vrijheid <strong>en</strong> sociale<br />

rechtvaardigheid op basis van<br />

respect voor de fundam<strong>en</strong>tele<br />

recht<strong>en</strong> van de m<strong>en</strong>s, b<strong>in</strong>n<strong>en</strong> <strong>het</strong><br />

raamwerk van democratische<br />

<strong>in</strong>stell<strong>in</strong>g<strong>en</strong>. De licham<strong>en</strong> die<br />

verantwoordelijk zijn voor de<br />

nalev<strong>in</strong>g zijn de Inter-<br />

Amerikaanse<br />

M<strong>en</strong>s<strong>en</strong>recht<strong>en</strong>commissie <strong>en</strong> <strong>het</strong><br />

Inter-Amerikaans Gerechtshof<br />

voor m<strong>en</strong>s<strong>en</strong>recht<strong>en</strong>; beide zijn<br />

organ<strong>en</strong> van de Organisatie van<br />

Amerikaanse Stat<strong>en</strong>.<br />

CULTUREEL ERFGOED<br />

Bevordert de sam<strong>en</strong>werk<strong>in</strong>g<br />

tuss<strong>en</strong> land<strong>en</strong> om dat erfgoed<br />

over de gehele wereld te<br />

bescherm<strong>en</strong> dat van zo e<strong>en</strong><br />

universele waarde is dat <strong>het</strong><br />

behoud hiervan belangrijk is voor<br />

de huidige <strong>en</strong> toekomstige<br />

g<strong>en</strong>eraties.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 2000. Als<br />

deel van de implem<strong>en</strong>tatie<br />

van dit verdrag, werd er<br />

e<strong>en</strong> nationaal rapport<br />

opgesteld. Thans word<strong>en</strong><br />

er discussies op gang<br />

gebracht m.b.t. hoe <strong>het</strong><br />

verdrag op e<strong>en</strong><br />

effectievere <strong>en</strong> efficiëntere<br />

manier kan word<strong>en</strong><br />

geïmplem<strong>en</strong>teerd. De<br />

ontwikkel<strong>in</strong>g van e<strong>en</strong><br />

nationaal actieplan is e<strong>en</strong><br />

eerste vereiste hiertoe.<br />

Sur<strong>in</strong>ame sloot zich aan <strong>in</strong><br />

1998.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1987.<br />

Geratificeerd door<br />

Sur<strong>in</strong>ame <strong>in</strong> 1997.<br />

Sur<strong>in</strong>ame heeft twee<br />

Werelderfgoedlocaties:<br />

1.Het C<strong>en</strong>traal Sur<strong>in</strong>ame<br />

Natuurreservaat<br />

2.De historische<br />

b<strong>in</strong>n<strong>en</strong>stad van<br />

Paramaribo<br />

Legt richtlijn<strong>en</strong> vast om<br />

woestijnvorm<strong>in</strong>g te<br />

bestrijd<strong>en</strong>. Het project<br />

kan mogelijkerwijs van<br />

<strong>in</strong>vloed zijn op de<br />

lokale waterbronn<strong>en</strong><br />

<strong>en</strong> de waterkwaliteit<br />

alsook op <strong>het</strong><br />

grondgebruik<br />

Legt <strong>in</strong>ternationale<br />

doel<strong>en</strong> vast voor de<br />

duurzame export van<br />

tropisch hout; <strong>het</strong><br />

project kan<br />

mogelijkerwijs van<br />

<strong>in</strong>vloed zijn op de<br />

lokale bosgebied<strong>en</strong><br />

Legt e<strong>en</strong> raamwerk<br />

vast voor de<br />

bescherm<strong>in</strong>g van<br />

m<strong>en</strong>s<strong>en</strong>recht<strong>en</strong>; <strong>het</strong><br />

project kan van <strong>in</strong>vloed<br />

zijn op <strong>het</strong> lev<strong>en</strong> van<br />

de lokale leefgeme<strong>en</strong>schapp<strong>en</strong><br />

Legt richtlijn<strong>en</strong> vast<br />

voor de bescherm<strong>in</strong>g<br />

van locaties die van<br />

belang zijn voor <strong>het</strong><br />

cultureel erfgoed<br />

ERM 35 SEPTEMBER 2011


Overe<strong>en</strong>komst /<br />

Conv<strong>en</strong>tie/Verdrag<br />

UN formulation of<br />

Declaration on Rights of<br />

Indig<strong>en</strong>ous People, 1994<br />

– VN-formuler<strong>in</strong>g van de<br />

Verklar<strong>in</strong>g <strong><strong>in</strong>zake</strong> de<br />

Recht<strong>en</strong> van Inheemse<br />

Volker<strong>en</strong><br />

UN approval of<br />

Declaration on Rights of<br />

Indig<strong>en</strong>ous People, 2007<br />

– VN-goedkeur<strong>in</strong>g van<br />

de Verklar<strong>in</strong>g <strong><strong>in</strong>zake</strong> de<br />

Recht<strong>en</strong> van Inheemse<br />

Volker<strong>en</strong><br />

Amazon Cooperation Treaty,<br />

1978 (gewijzigd <strong>in</strong> 1998) –<br />

Sam<strong>en</strong>werk<strong>in</strong>gsverdrag <strong><strong>in</strong>zake</strong><br />

<strong>het</strong> Amazonegebied<br />

Constitution of the International<br />

Labour Organisation – Verdrag<br />

van de Internationale<br />

Arbeidsorganisatie<br />

Constitution of the Pan<br />

American Health Organisation<br />

– Verdrag van de Pan-<br />

Amerikaanse<br />

Gezondheidsorganisatie<br />

Bron: SRK, 2007<br />

Aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> / Comm<strong>en</strong>taar Status Relevantie<br />

INHEEMSE VOLKEREN<br />

Bevordert de recht<strong>en</strong> van<br />

<strong>in</strong>heemse volker<strong>en</strong><br />

REGIONALE ONTWIKKELING / SAMENWERKING<br />

Gericht op de bevorder<strong>in</strong>g van<br />

duurzame ontwikkel<strong>in</strong>g van <strong>het</strong><br />

Amazonebekk<strong>en</strong>. Lidland<strong>en</strong> zijn<br />

Bolivia, Brazilië, Colombia,<br />

Equador, Guyana, Peru,<br />

Sur<strong>in</strong>ame <strong>en</strong> V<strong>en</strong>ezuela.<br />

ARBEID / GEZONDHEID / VEILIGHEID<br />

Bevordert kans<strong>en</strong> voor vrouw<strong>en</strong><br />

<strong>en</strong> mann<strong>en</strong> om degelijk <strong>en</strong><br />

productief werk te verkrijg<strong>en</strong>,<br />

onder omstandighed<strong>en</strong> van<br />

vrijheid, gelijkheid, veiligheid <strong>en</strong><br />

m<strong>en</strong>selijke waardigheid.<br />

Om de gezondheid <strong>en</strong><br />

lev<strong>en</strong>standaard van de land<strong>en</strong> van<br />

de Amerika’s te verbeter<strong>en</strong><br />

3.5 BEDRIJFSVEREISTEN EN -RICHTLIJNEN<br />

Getek<strong>en</strong>d door Sur<strong>in</strong>ame Legt standaard<strong>en</strong> vast<br />

voor de bescherm<strong>in</strong>g<br />

van Inheemse<br />

volker<strong>en</strong>. Het project<br />

kan van <strong>in</strong>vloed zijn op<br />

<strong>in</strong> stamverband<br />

lev<strong>en</strong>de volker<strong>en</strong>.<br />

Sur<strong>in</strong>ame is e<strong>en</strong> van de<br />

grondleggers.<br />

Sur<strong>in</strong>ame is lid vanaf<br />

1976.<br />

Sur<strong>in</strong>ame is lid vanaf<br />

1976.<br />

Legt richtlijn<strong>en</strong> vast om<br />

de duurzame<br />

ontwikkel<strong>in</strong>g van <strong>het</strong><br />

Amazonebekk<strong>en</strong> te<br />

bevorder<strong>en</strong>; <strong>het</strong> project<br />

wordt uitgevoerd <strong>in</strong> <strong>het</strong><br />

Amazonegebied<br />

Legt <strong>in</strong>ternationale<br />

arbeidsstandaard<strong>en</strong><br />

vast; <strong>het</strong> project zal<br />

grote groep<strong>en</strong><br />

werkkracht<strong>en</strong> <strong>in</strong>zett<strong>en</strong><br />

Legt richtlijn<strong>en</strong> vast ter<br />

verbeter<strong>in</strong>g van de<br />

gezondheids- <strong>en</strong><br />

leefstandaard<strong>en</strong>; <strong>het</strong><br />

project kan<br />

mogelijkerwijs van<br />

<strong>in</strong>vloed zijn op de<br />

gezondheid <strong>en</strong> de<br />

lev<strong>en</strong>sstandaard van<br />

de lokale<br />

geme<strong>en</strong>schapp<strong>en</strong><br />

<strong>Surgold</strong> is onderworp<strong>en</strong> aan de bedrijfsvereist<strong>en</strong> van haar moedermaatschappij<br />

Newmont M<strong>in</strong><strong>in</strong>g Corporation. Overleg met de geme<strong>en</strong>schap is e<strong>en</strong> belangrijk<br />

compon<strong>en</strong>t van elk nieuw project dat Newmont waar ter wereld dan ook<br />

onderneemt, waaronder <strong>in</strong>begrep<strong>en</strong> die project<strong>en</strong> die zijn voorgesteld i.v.m. <strong>het</strong><br />

<strong>Merian</strong> <strong>Project</strong>.<br />

ERM 36 SEPTEMBER 2011


Newmont heeft <strong>in</strong>terne standaard<strong>en</strong> vastgesteld die de b<strong>en</strong>ader<strong>in</strong>g van <strong>het</strong><br />

bedrijf uite<strong>en</strong>zett<strong>en</strong> m.b.t. haar opzet <strong>en</strong> aanpak van aspect<strong>en</strong> van haar bedrijf die<br />

van <strong>in</strong>vloed kunn<strong>en</strong> zijn op m<strong>en</strong>s <strong>en</strong> milieu, <strong>en</strong> de m<strong>in</strong>imale vereist<strong>en</strong><br />

vastlegg<strong>en</strong> zodat de gezondheid van m<strong>en</strong>s <strong>en</strong> milieu beschermd is. De<br />

bedrijfsstandaard<strong>en</strong> pakk<strong>en</strong> aspect<strong>en</strong> aan zoals:<br />

• Managem<strong>en</strong>t van luchtkwaliteit<br />

• Watermanagem<strong>en</strong>t<br />

• Afvalmanagem<strong>en</strong>t<br />

• Managem<strong>en</strong>t van afvalgeste<strong>en</strong>te<br />

• Managem<strong>en</strong>t van afvalslik<br />

• Kwikmanagem<strong>en</strong>t<br />

• Cyanidemanagem<strong>en</strong>t<br />

• Managem<strong>en</strong>t van chemische stoff<strong>en</strong><br />

• Managem<strong>en</strong>t van koolwaterstoff<strong>en</strong><br />

• Plann<strong>in</strong>g <strong><strong>in</strong>zake</strong> mijnsluit<strong>in</strong>g <strong>en</strong> rehabilitatie<br />

• Standaard<strong>en</strong> <strong><strong>in</strong>zake</strong> sociaal-maatschappelijke verantwoordelijkheid<br />

Deze standaard<strong>en</strong> zijn opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> projectontwerp;<br />

managem<strong>en</strong>tsystem<strong>en</strong> <strong>en</strong> monitor<strong>in</strong>gprogramma’s zijn er om te garander<strong>en</strong><br />

dat de milieu- <strong>en</strong> sociale effect<strong>en</strong> op de juiste wijze word<strong>en</strong> aangepakt <strong>en</strong><br />

waar nodig gemitigeerd.<br />

ERM 37 SEPTEMBER 2011


4.0 HET ESIA-PROCES<br />

Om de pot<strong>en</strong>tiële effect<strong>en</strong> die gepaard gaan met <strong>het</strong> <strong>Merian</strong> <strong>Project</strong> aan te<br />

pakk<strong>en</strong>, alsook de vraagstukk<strong>en</strong> <strong>en</strong> zorgpunt<strong>en</strong> die naar vor<strong>en</strong> word<strong>en</strong> gebracht<br />

door stakeholders, zal er e<strong>en</strong> ESIA word<strong>en</strong> verricht m.b.t. <strong>het</strong> <strong>Merian</strong> <strong>Project</strong>.<br />

Deze ESIA zal:<br />

• <strong>het</strong> NIMOS help<strong>en</strong> bij <strong>het</strong> opstell<strong>en</strong> van aanbevel<strong>in</strong>g<strong>en</strong> voor evaluatie van<br />

<strong>het</strong> voorgestelde project, alsook voortgaand milieumanagem<strong>en</strong>t van <strong>het</strong><br />

project;<br />

• di<strong>en</strong><strong>en</strong> als onderbouw<strong>in</strong>g van de besluit<strong>en</strong> van Newmont <strong><strong>in</strong>zake</strong><br />

<strong>in</strong>vester<strong>in</strong>g<strong>en</strong> <strong>in</strong> <strong>het</strong> project overe<strong>en</strong>komstig de beleidsmaatregel<strong>en</strong> <strong>en</strong> de<br />

standaard<strong>en</strong> van Newmont; <strong>en</strong><br />

• stakeholders op z<strong>in</strong>volle wijze betrekk<strong>en</strong> bij <strong>het</strong> hele proces, om te<br />

garander<strong>en</strong> dat de besluitvormers rek<strong>en</strong><strong>in</strong>g houd<strong>en</strong> met de standpunt<strong>en</strong><br />

van <strong>het</strong> publiek <strong><strong>in</strong>zake</strong> <strong>het</strong> project.<br />

Betrokk<strong>en</strong>heid van stakeholders, overleg met stakeholders <strong>en</strong> op<strong>en</strong>baarmak<strong>in</strong>g<br />

van <strong>in</strong>formatie aan alle stakeholders, waaronder alle geme<strong>en</strong>schapp<strong>en</strong> van<br />

Inheems<strong>en</strong> <strong>en</strong> Marrons waarop <strong>het</strong> project van <strong>in</strong>vloed zal zijn, zal e<strong>en</strong><br />

voortdur<strong>en</strong>d <strong>en</strong> belangrijk onderdeel van <strong>het</strong> proces vorm<strong>en</strong>. Nadere<br />

bijzonderhed<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>het</strong> proces van betrokk<strong>en</strong>heid van stakeholders zijn<br />

vervat <strong>in</strong> Hoofdstuk 5.0 van dit rapport.<br />

De b<strong>en</strong>ader<strong>in</strong>g m.b.t. de ESIA omvat vier fas<strong>en</strong> die <strong>in</strong> de Richtlijn<strong>en</strong> van <strong>het</strong><br />

NIMOS <strong><strong>in</strong>zake</strong> Milieuanalyses zijn vervat (NIMOS 2009; NIMOS, 2005a):<br />

Scre<strong>en</strong><strong>in</strong>g (ofwel gedeg<strong>en</strong> onderzoek), Scop<strong>in</strong>g (ofwel afbak<strong>en</strong><strong>in</strong>g),<br />

Effect<strong>en</strong>analyse <strong>en</strong> Op<strong>en</strong>baarmak<strong>in</strong>g. De scre<strong>en</strong><strong>in</strong>gsfase is e<strong>en</strong> eerste id<strong>en</strong>tificatie<br />

van de voornaamste vraagstukk<strong>en</strong> waarmee <strong>het</strong> project geconfronteerd zal<br />

rak<strong>en</strong>. Tijd<strong>en</strong>s de scop<strong>in</strong>gsfase zull<strong>en</strong> de volledige parameters van de ‘basel<strong>in</strong>e’<br />

studies (ofwel studies van de uitgangssituatie) <strong>en</strong> de effect<strong>en</strong>analyse word<strong>en</strong><br />

geïd<strong>en</strong>tificeerd. De fase van Effect<strong>en</strong>analyse id<strong>en</strong>tificeert de basel<strong>in</strong>econdities<br />

voor <strong>het</strong> project, meet de effect<strong>en</strong> op basis van die basel<strong>in</strong>esituatie <strong>en</strong> ontwikkelt<br />

waar nodig, mitiger<strong>in</strong>gsmaatregel<strong>en</strong>. Tijd<strong>en</strong>s de fase van Op<strong>en</strong>baarmak<strong>in</strong>g<br />

word<strong>en</strong> de resultat<strong>en</strong> van de ESIA met <strong>het</strong> publiek, de overheid <strong>en</strong> andere<br />

stakeholders gedeeld <strong>en</strong> wordt comm<strong>en</strong>taar van h<strong>en</strong> ontvang<strong>en</strong>. Deze<br />

b<strong>en</strong>ader<strong>in</strong>g maakt <strong>het</strong> mogelijk voor <strong>Surgold</strong> om zich te houd<strong>en</strong> aan de<br />

wettelijke vereist<strong>en</strong> voor e<strong>en</strong> milieu-analyse <strong>in</strong> Sur<strong>in</strong>ame alsook aan de terzake<br />

<strong>in</strong>ternationale <strong>en</strong> bedrijfsstandaard<strong>en</strong> <strong>en</strong> –vereist<strong>en</strong> (vide Hoofdstuk 3.0 van dit<br />

rapport). Het ESIA-proces is sam<strong>en</strong>gevat <strong>in</strong> Afbeeld<strong>in</strong>g 4-1.<br />

ERM 38 SEPTEMBER 2011


Afbeeld<strong>in</strong>g 4-1. Het ESIA-proces <strong>in</strong> Sur<strong>in</strong>ame <strong>en</strong> <strong>het</strong> <strong>Merian</strong> <strong>Project</strong><br />

Interface with <strong>Surgold</strong> ESIA Facilitation/Design Team<br />

Basel<strong>in</strong>e data gather<strong>in</strong>g & analysis<br />

Bron: ERM<br />

Sc re<strong>en</strong><strong>in</strong>g by NIMOS<br />

ESIA required<br />

Propon<strong>en</strong>t publis hes<br />

N otific ation of Int<strong>en</strong>t<br />

<strong>Surgold</strong> prepared<br />

T oR<br />

Rev iew of T oR<br />

by N IM OS<br />

NIMOS is sues<br />

guidel<strong>in</strong>es for ESIA<br />

<strong>Surgold</strong> undertak es<br />

ESIA<br />

ESIA report<br />

submitted to N IM OS<br />

N IM OS &<br />

Stak eholder<br />

review of ESIA<br />

STA K EHO L DER EN G AG E ME NT<br />

Option for NIMOS to seek views<br />

from g<strong>en</strong>eral public , ac ademics ,<br />

specialis ts<br />

Public , Gov ernm<strong>en</strong>t ag<strong>en</strong>cies,<br />

<strong>Surgold</strong> can appe al aga<strong>in</strong>s t<br />

dec ision<br />

Public has opportunity to mak e<br />

writt<strong>en</strong> com m<strong>en</strong>ts on<br />

issues /c onc erns to be <strong>in</strong>cluded<br />

<strong>in</strong> the EIA<br />

<strong>Surgold</strong> m us t obta<strong>in</strong> views of<br />

stak eholders at public meet<strong>in</strong>gs ,<br />

work shops, etc.<br />

<strong>Surgold</strong> must m ake non- technical<br />

Sum mary easily available at<br />

locations <strong>in</strong> regions<br />

<strong>Surgold</strong> mus t provide <strong>in</strong>formation<br />

about im pacts to the m edia<br />

NIMOS will rec eive public<br />

comm <strong>en</strong>ts and c oncerns<br />

C onduc t disc losure m eet<strong>in</strong>g w ith<br />

<strong>Surgold</strong> and N IMOS att<strong>en</strong>d<strong>in</strong>g<br />

ERM 39 SEPTEMBER 2011<br />

Scre<strong>en</strong><strong>in</strong>g Phase<br />

Scop<strong>in</strong>g Phase<br />

Impact Assessm<strong>en</strong>t Phase<br />

Review Phase


4.1 SCREENINGSFASE<br />

De Scre<strong>en</strong><strong>in</strong>gsfase is de beg<strong>in</strong>fase van <strong>het</strong> proces dat nader omschrev<strong>en</strong> is <strong>in</strong> de<br />

concept Milieuwet van Sur<strong>in</strong>ame om te besluit<strong>en</strong> of e<strong>en</strong> Milieu-analyse (EA) al<br />

dan niet vereist is voor <strong>het</strong> voorgestelde <strong>Project</strong>, <strong>en</strong> om de omvang van de<br />

vereiste milieu-analyse vast te stell<strong>en</strong>. De EA-richtlijn<strong>en</strong> van <strong>het</strong> NIMOS<br />

id<strong>en</strong>tificer<strong>en</strong> drie projectcategorieën (A, B, and C) <strong>en</strong> gev<strong>en</strong> aan dat e<strong>en</strong> EA<br />

verplicht is voor alle Categorie A project<strong>en</strong>. Categorie A project<strong>en</strong> “zull<strong>en</strong> zeer<br />

waarschijnlijk negatieve effect<strong>en</strong> hebb<strong>en</strong> die omvangrijk, onomkeerbaar <strong>en</strong><br />

divers kunn<strong>en</strong> zijn. De omvang <strong>en</strong> de schaal van de milieu-effect<strong>en</strong> kunn<strong>en</strong><br />

slechts word<strong>en</strong> vastgesteld na e<strong>en</strong> grondige milieu-analyse.” Overe<strong>en</strong>komstig de<br />

richtlijn<strong>en</strong> van <strong>het</strong> NIMOS voor de scre<strong>en</strong><strong>in</strong>g van project<strong>en</strong> is elk niet-metaal<br />

mijnproject dat meer dan 20 hectar<strong>en</strong> land zal aantast<strong>en</strong>, e<strong>en</strong> Categorie A project<br />

waarvoor er e<strong>en</strong> alomvatt<strong>en</strong>de milieu-analyse (ESIA <strong>in</strong> dit geval) verplicht is.<br />

Het <strong>Merian</strong> <strong>Project</strong> bev<strong>in</strong>dt zich mom<strong>en</strong>teel <strong>in</strong> <strong>het</strong> proces van afrond<strong>in</strong>g van de<br />

Scre<strong>en</strong><strong>in</strong>gsfase, maar gezi<strong>en</strong> de richtlijn<strong>en</strong> van <strong>het</strong> NIMOS, werd verondersteld<br />

dat <strong>het</strong> project gescre<strong>en</strong>d zal word<strong>en</strong> als e<strong>en</strong> Categorie A. Om deze red<strong>en</strong> is<br />

<strong>Surgold</strong> doorgegaan met ESIA-proces van <strong>het</strong> project.<br />

4.2 SCOPINGSFASE<br />

In de Scop<strong>in</strong>gsfase, zull<strong>en</strong> de belangrijkste vraagstukk<strong>en</strong> die tijd<strong>en</strong>s de Scre<strong>en</strong><strong>in</strong>g<br />

geïd<strong>en</strong>tificeerd zijn, verder onderzocht word<strong>en</strong> middels desktop-analyse <strong>en</strong><br />

<strong>in</strong>terviews met stakeholders, om vast te stell<strong>en</strong> of er additionele <strong>in</strong>formatie nodig<br />

is om de basel<strong>in</strong>econdities <strong>en</strong> de pot<strong>en</strong>tiële effect<strong>en</strong> b<strong>in</strong>n<strong>en</strong> <strong>het</strong> <strong>Project</strong>gebied te<br />

evaluer<strong>en</strong>. De desktop-evaluatie omvat <strong>het</strong> beoordel<strong>en</strong> van toepasselijke milieu<br />

– <strong>en</strong> sociaal-maatschappelijke gegev<strong>en</strong>s verzameld uit externe bronn<strong>en</strong> met<br />

gepubliceerde <strong>in</strong>formatie <strong>en</strong> eerder onderzoek <strong>in</strong> <strong>het</strong> <strong>Project</strong>gebied. De Sponsors<br />

van <strong>het</strong> <strong>Project</strong> zull<strong>en</strong> bije<strong>en</strong>komst<strong>en</strong> hebb<strong>en</strong> met stakeholdersgroep<strong>en</strong> (bijv.<br />

<strong>in</strong>stanties van de c<strong>en</strong>trale overheid, <strong>in</strong>stanties <strong>en</strong> functionariss<strong>en</strong> van de<br />

district<strong>en</strong> <strong>en</strong> NGO’s), alsook verteg<strong>en</strong>woordigers van lokale<br />

leefgeme<strong>en</strong>schapp<strong>en</strong>, om de aard <strong>en</strong> omvang van de studies die mom<strong>en</strong>teel<br />

voorgesteld zijn, te besprek<strong>en</strong>, waaronder <strong>in</strong>begrep<strong>en</strong> alternatiev<strong>en</strong> <strong>en</strong> de criteria<br />

voor effect<strong>en</strong>analyse, <strong>en</strong> om vast te stell<strong>en</strong> of additionele basel<strong>in</strong>egegev<strong>en</strong>s<br />

vereist zull<strong>en</strong> zijn voor e<strong>en</strong> allesomvatt<strong>en</strong>de analyse. De belangrijkste doel<strong>en</strong><br />

van de Scop<strong>in</strong>gsfase zijn als volgt:<br />

• id<strong>en</strong>tificatie van stakeholders <strong>en</strong> h<strong>en</strong> op de hoogte stell<strong>en</strong> van <strong>het</strong><br />

voorgestelde <strong>Project</strong> <strong>en</strong> <strong>het</strong> ESIA-proces;<br />

• stakeholders de geleg<strong>en</strong>heid gev<strong>en</strong> om welk vraagstuk <strong>en</strong> zorgpunt dan ook<br />

die te mak<strong>en</strong> heeft met <strong>het</strong> voorgestelde <strong>Project</strong>, te id<strong>en</strong>tificer<strong>en</strong>;<br />

• Id<strong>en</strong>tificatie van gebied<strong>en</strong> die zeer waarschijnlijk beïnvloed zull<strong>en</strong> word<strong>en</strong><br />

<strong>en</strong> milieu- <strong>en</strong> sociale vraagstukk<strong>en</strong> die ev<strong>en</strong>tueel nader onderzoek vereis<strong>en</strong><br />

ERM 40 SEPTEMBER 2011


ij <strong>het</strong> verricht<strong>en</strong> van de ESIA (waaronder de eerste resultat<strong>en</strong> van de<br />

scre<strong>en</strong><strong>in</strong>gsfase);<br />

• Vaststell<strong>in</strong>g van de ToR voor specialistische basel<strong>in</strong>estudies <strong>en</strong><br />

effect<strong>en</strong>analyse als respons op de <strong>in</strong>itiële <strong>in</strong>br<strong>en</strong>g van stakeholders; <strong>en</strong><br />

• Vrijgave van <strong>het</strong> Scop<strong>in</strong>gsfaserapport, waaronder <strong>in</strong>begrep<strong>en</strong> de concept<br />

ToR voor specialistische studies, voor evaluatie met <strong>en</strong> comm<strong>en</strong>taar van<br />

stakeholders.<br />

4.3 FASE VAN EFFECTENANALYSE<br />

De fase van effect<strong>en</strong>analyse produceert <strong>het</strong> basel<strong>in</strong>e (pre-project) milieu,<br />

analyseert <strong>het</strong> belang van de pot<strong>en</strong>tiële effect<strong>en</strong> die tijd<strong>en</strong>s de scop<strong>in</strong>gsfase<br />

geïd<strong>en</strong>tificeerd zijn, waaronder <strong>in</strong>begrep<strong>en</strong> de cumulatieve effect<strong>en</strong>, <strong>en</strong><br />

id<strong>en</strong>tificeert mitiger<strong>in</strong>gsmaatregel<strong>en</strong> die de negatieve effect<strong>en</strong> zoud<strong>en</strong> kunn<strong>en</strong><br />

m<strong>in</strong>imaliser<strong>en</strong> <strong>en</strong>/of de voordel<strong>en</strong> zoud<strong>en</strong> kunn<strong>en</strong> versterk<strong>en</strong>. De biofysische <strong>en</strong><br />

sociaal-maatschappelijke bev<strong>in</strong>d<strong>in</strong>g<strong>en</strong> zull<strong>en</strong> <strong>in</strong> de ESIA word<strong>en</strong> opg<strong>en</strong>om<strong>en</strong>.<br />

Dit rapport zal <strong>het</strong> belangrijkste docum<strong>en</strong>t zijn waarop milieu-gerelateerde<br />

besliss<strong>in</strong>g<strong>en</strong> met betrekk<strong>in</strong>g tot <strong>het</strong> project zijn gebaseerd. Tijd<strong>en</strong>s de fase van<br />

effect<strong>en</strong>analyse, zull<strong>en</strong> ev<strong>en</strong>e<strong>en</strong>s Plann<strong>en</strong> voor Milieu- <strong>en</strong> Sociaal Managem<strong>en</strong>t<br />

(ESMP's) word<strong>en</strong> opgesteld om de vraagstukk<strong>en</strong> <strong><strong>in</strong>zake</strong> milieu- <strong>en</strong> sociaal<br />

managem<strong>en</strong>t tijd<strong>en</strong>s de operationele <strong>en</strong> daaropvolg<strong>en</strong>de fas<strong>en</strong> van <strong>het</strong> <strong>Project</strong> te<br />

begeleid<strong>en</strong>. De voorgestelde ESMP’s omvatt<strong>en</strong> o.a. e<strong>en</strong> Plan voor Milieu<br />

Managem<strong>en</strong>t, e<strong>en</strong> Plan voor Sociaal Managem<strong>en</strong>t, e<strong>en</strong> Ramp<strong>en</strong>plan, e<strong>en</strong> Plan<br />

voor Mijnsluit<strong>in</strong>g <strong>en</strong> Rehabilitatie <strong>en</strong> e<strong>en</strong> Monitor<strong>in</strong>g Plan (zie Paragraaf 7.3).<br />

Deze Plann<strong>en</strong> zull<strong>en</strong> word<strong>en</strong> opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> ESIA-rapport. De belangrijkste<br />

doel<strong>en</strong> van de ESIA zijn om:<br />

• de ecologische <strong>en</strong> socio-economische basel<strong>in</strong>econdities van <strong>het</strong><br />

onderzoeksgebied <strong>en</strong> de leefgeme<strong>en</strong>schapp<strong>en</strong> waarop <strong>het</strong> project van<br />

<strong>in</strong>vloed zal zijn, vast te legg<strong>en</strong> <strong>en</strong> b<strong>in</strong>n<strong>en</strong> e<strong>en</strong> bepaalde context te plaats<strong>en</strong>;<br />

• stakeholders <strong>in</strong>formatie te verschaff<strong>en</strong> <strong>en</strong> bijdrag<strong>en</strong> te verkrijg<strong>en</strong> van deze<br />

stakeholders, waaronder overheidsautoriteit<strong>en</strong>, <strong>het</strong> publiek <strong>en</strong> <strong>in</strong>heemse<br />

geme<strong>en</strong>schapp<strong>en</strong>, <strong>en</strong> hun vraagstukk<strong>en</strong> <strong>en</strong> zorgpunt<strong>en</strong> <strong>in</strong> dez<strong>en</strong>, aan te<br />

pakk<strong>en</strong>;<br />

• de milieu- <strong>en</strong> sociale effect<strong>en</strong> die uit <strong>het</strong> project kunn<strong>en</strong> voortvloei<strong>en</strong>, <strong>in</strong><br />

detail te analyser<strong>en</strong>;<br />

• milieu-gerelateerde <strong>en</strong> sociale mitiger<strong>in</strong>gsmaatregel<strong>en</strong> te id<strong>en</strong>tificer<strong>en</strong> om<br />

de geanalyseerde effect<strong>en</strong> aan te pakk<strong>en</strong>;<br />

• De ESMP’s zoals hierbov<strong>en</strong> besprok<strong>en</strong>, te ontwikkel<strong>en</strong>, op basis van de<br />

mitiger<strong>in</strong>gsmaatregel<strong>en</strong> die <strong>in</strong> de ESIA zijn ontwikkeld;<br />

ERM 41 SEPTEMBER 2011


• te voldo<strong>en</strong> aan de vereist<strong>en</strong> <strong><strong>in</strong>zake</strong> de milieuvoorschrift<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame;<br />

• te word<strong>en</strong> geleid door <strong>het</strong> beleid, de richtlijn<strong>en</strong> <strong>en</strong> procedures van de<br />

Equator-Pr<strong>in</strong>cipes; <strong>en</strong><br />

• <strong>in</strong> overe<strong>en</strong>stemm<strong>in</strong>g te zijn met <strong>het</strong> beleid <strong>en</strong> de bedrijfsmaatstav<strong>en</strong> van<br />

Newmont.<br />

4.4 DE FASE VAN OPENBAARMAKING<br />

Het doel van de Fase van Op<strong>en</strong>baarmak<strong>in</strong>g <strong>en</strong> Evaluatie is om <strong>het</strong> NIMOS,<br />

andere overheids<strong>in</strong>stanties, de betreff<strong>en</strong>de geme<strong>en</strong>schapp<strong>en</strong>, belanghebb<strong>en</strong>de<br />

NGO’s <strong>en</strong> andere stakeholders de geleg<strong>en</strong>heid te kunn<strong>en</strong> gev<strong>en</strong> om de concept<br />

ESIA te bestuder<strong>en</strong> <strong>en</strong> te becomm<strong>en</strong>tariër<strong>en</strong>. Dit is e<strong>en</strong> cruciale periode voor <strong>het</strong><br />

project.<br />

De fase beg<strong>in</strong>t met e<strong>en</strong> Voorlopig Concept-ESIA dat zal word<strong>en</strong> geëvalueerd<br />

door Newmont <strong>en</strong> daarna word<strong>en</strong> <strong>in</strong>gedi<strong>en</strong>d bij <strong>het</strong> NIMOS <strong>en</strong> beschikbaar<br />

word<strong>en</strong> gesteld voor op<strong>en</strong>baarmak<strong>in</strong>g aan <strong>het</strong> publiek. Het project zal<br />

exemplar<strong>en</strong> distribuer<strong>en</strong> aan alle belangrijkste stakeholders (er zal tijd<strong>en</strong>s <strong>het</strong><br />

hele ESIA-proces e<strong>en</strong> lijst van stakeholders word<strong>en</strong> ontwikkeld). Normaliter<br />

zoud<strong>en</strong> <strong>het</strong> NIMOS, andere overheids<strong>in</strong>stanties <strong>en</strong> belanghebb<strong>en</strong>de NGO’s<br />

volledige exemplar<strong>en</strong> ontvang<strong>en</strong> van de concept-ESIA (5 hard copies van <strong>het</strong><br />

concept ESIA-rapport <strong>en</strong> e<strong>en</strong> soft copy zull<strong>en</strong> bij <strong>het</strong> NIMOS word<strong>en</strong> <strong>in</strong>gedi<strong>en</strong>d).<br />

De meeste andere stakeholders zull<strong>en</strong> de Zakelijke Sam<strong>en</strong>vatt<strong>in</strong>g <strong>in</strong> <strong>het</strong><br />

Nederlands ontvang<strong>en</strong>. <strong>Surgold</strong> zal ook zowel de volledige concept-ESIA als de<br />

Nederlandse versie van de Zakelijke Sam<strong>en</strong>vatt<strong>in</strong>g op de website van haar<br />

<strong>Project</strong> plaats<strong>en</strong>.<br />

De voertaal op de bije<strong>en</strong>komst<strong>en</strong> voor Op<strong>en</strong>baarmak<strong>in</strong>g aan <strong>het</strong> Publiek zal of<br />

Nederlands of Sranan Tongo zijn. Zoals <strong>het</strong> er mom<strong>en</strong>teel uitziet, zull<strong>en</strong> er<br />

ev<strong>en</strong>veel bije<strong>en</strong>komst<strong>en</strong> word<strong>en</strong> gehoud<strong>en</strong> op over <strong>het</strong> algeme<strong>en</strong> dezelfde<br />

locaties als tijd<strong>en</strong>s de Scop<strong>in</strong>gsfase. Normaliter di<strong>en</strong><strong>en</strong> deze bije<strong>en</strong>komst<strong>en</strong> te<br />

word<strong>en</strong> gehoud<strong>en</strong> vóór de vrijgave (b<strong>in</strong>n<strong>en</strong> ongeveer 20 dag<strong>en</strong> vóór de<br />

verwachte publicatie) van de concept-ESIA, zodat <strong>het</strong> publiek naar de<br />

pres<strong>en</strong>taties kan luister<strong>en</strong> <strong>en</strong> vele van hun vrag<strong>en</strong> beantwoord kan krijg<strong>en</strong><br />

alvor<strong>en</strong>s er comm<strong>en</strong>taar wordt geleverd. Normaliter word<strong>en</strong> op- <strong>en</strong><br />

aanmerk<strong>in</strong>g<strong>en</strong> gedur<strong>en</strong>de e<strong>en</strong> periode van 30-45 dag<strong>en</strong> na op<strong>en</strong>baarmak<strong>in</strong>g aan<br />

<strong>het</strong> publiek geaccepteerd.<br />

Op basis van de becomm<strong>en</strong>tariër<strong>in</strong>g van de zijde van <strong>het</strong> NIMOS, de lokale<br />

leefgeme<strong>en</strong>schapp<strong>en</strong> <strong>en</strong> andere stakeholders, zal <strong>het</strong> ERM e<strong>en</strong> E<strong>in</strong>d-ESIA<br />

opstell<strong>en</strong> waar<strong>in</strong> dit comm<strong>en</strong>taar wordt behandeld. Twee hard copies <strong>en</strong> e<strong>en</strong><br />

ERM 42 SEPTEMBER 2011


soft copy van <strong>het</strong> E<strong>in</strong>d ESIA-rapport zull<strong>en</strong> officieel aan <strong>het</strong> NIMOS word<strong>en</strong><br />

overhandigd.<br />

4.5 DE GEINTEGREERDE ESIA-BENADERING M.B.T. HET MERIAN PROEJCT<br />

<strong>Surgold</strong> heeft beslot<strong>en</strong> om e<strong>en</strong> geïntegreerde b<strong>en</strong>ader<strong>in</strong>g toe te pass<strong>en</strong> m.b.t. <strong>het</strong><br />

ESIA-proces aangezi<strong>en</strong> er e<strong>en</strong> onderl<strong>in</strong>g verband bestaat tuss<strong>en</strong> de milieu-, de<br />

sociale <strong>en</strong> de gezondheidgerelateerde effect<strong>en</strong>. Van nature beïnvloed<strong>en</strong> deze<br />

effect<strong>en</strong> elkaar over <strong>en</strong> weer zijn, bijvoorbeeld e<strong>en</strong> milieu-effect, zoals e<strong>en</strong><br />

verander<strong>in</strong>g <strong>in</strong> de biodiversiteit, wordt e<strong>en</strong> sociaal-economisch of<br />

gezondheidgerelateerd effect, zodra dit van <strong>in</strong>vloed is op <strong>het</strong> welzijn van m<strong>en</strong>s<strong>en</strong><br />

die afhankelijk zijn van natuurlijke hulpbronn<strong>en</strong> als middel van bestaan. Veel<br />

sociale <strong>en</strong> gezondheidgerelateerde effect<strong>en</strong> zijn secundaire effect<strong>en</strong> van milieueffect<strong>en</strong>.<br />

<strong>Sociale</strong> effect<strong>en</strong> (bijv. de toevloed van werkzoek<strong>en</strong>d<strong>en</strong> <strong>en</strong> de grotere<br />

economische mogelijkhed<strong>en</strong>) kunn<strong>en</strong> ev<strong>en</strong>e<strong>en</strong>s milieu-effect<strong>en</strong> tot gevolg<br />

hebb<strong>en</strong>. Voorts moet bij alle mitiger<strong>in</strong>gsstrategieën die word<strong>en</strong> ontwikkeld,<br />

rek<strong>en</strong><strong>in</strong>g word<strong>en</strong> gehoud<strong>en</strong> met gevolg<strong>en</strong> die dwars lop<strong>en</strong> door milieu-, sociale<br />

<strong>en</strong> gezondheidgerelateerde vraagstukk<strong>en</strong>. E<strong>en</strong> geïntegreerde b<strong>en</strong>ader<strong>in</strong>g<br />

voorkomt bijvoorbeeld dat e<strong>en</strong> milieudeskundige e<strong>en</strong> op zichzelf staande<br />

mitiger<strong>in</strong>gsmaatregel ontwikkelt, die niet-geïd<strong>en</strong>tificeerde onaang<strong>en</strong>ame sociale<br />

gevolg<strong>en</strong> zou kunn<strong>en</strong> hebb<strong>en</strong>, of twee deskundig<strong>en</strong> ontwikkel<strong>en</strong> maatregel<strong>en</strong> die<br />

met elkaar <strong>in</strong> strijd blijk<strong>en</strong> te zijn. Vandaar dat e<strong>en</strong> allesomvatt<strong>en</strong>d <strong>in</strong>zicht <strong>in</strong> de<br />

effect<strong>en</strong> van <strong>het</strong> project e<strong>en</strong> multi-discipl<strong>in</strong>aire analyse vereist.<br />

De b<strong>en</strong>ader<strong>in</strong>g die <strong>Surgold</strong> hanteert, is e<strong>en</strong> weerspiegel<strong>in</strong>g van de vereist<strong>en</strong> van<br />

e<strong>en</strong> geïntegreerde b<strong>en</strong>ader<strong>in</strong>g:<br />

• Het ESIA-team omvat milieutechnische, technische, sociale <strong>en</strong><br />

gezondheidgerelateerde specialist<strong>en</strong> die met elkaar hebb<strong>en</strong> sam<strong>en</strong>gewerkt<br />

bij verschill<strong>en</strong>de andere geïntegreerde ESIA’s.<br />

• Onderwerp<strong>en</strong>, zoals <strong>het</strong> geme<strong>en</strong>schapsgebruik van de natuurlijke<br />

hulpbronn<strong>en</strong> <strong>in</strong> <strong>het</strong> gebied, die dwars lop<strong>en</strong> door milieu-, sociale <strong>en</strong><br />

gezondheidgerelateerde vraagstukk<strong>en</strong>, zull<strong>en</strong> op e<strong>en</strong> multi-discipl<strong>in</strong>aire<br />

wijze door alle terzake specialist<strong>en</strong> word<strong>en</strong> geanalyseerd. Ze zull<strong>en</strong> tijd<strong>en</strong>s<br />

de hele effect<strong>en</strong>analyse sam<strong>en</strong>werk<strong>en</strong> om te garander<strong>en</strong> dat <strong>het</strong> betreff<strong>en</strong>de<br />

vraagstuk op e<strong>en</strong> daadwerkelijk geïntegreerde wijze wordt geanalyseerd.<br />

• Overleg zal alle facett<strong>en</strong> van de betreff<strong>en</strong>de vraagstukk<strong>en</strong> beslaan. De<br />

ESIA-teamled<strong>en</strong> die betrokk<strong>en</strong> zijn bij de stakeholderbije<strong>en</strong>komst<strong>en</strong>, zull<strong>en</strong><br />

<strong>in</strong> staat zijn aspect<strong>en</strong> van alle vraagstukk<strong>en</strong> te besprek<strong>en</strong> die ev<strong>en</strong>tueel naar<br />

vor<strong>en</strong> word<strong>en</strong> gebracht door e<strong>en</strong> of meerdere stakeholders. ERM beschouwt<br />

overleg met <strong>het</strong> publiek niet als e<strong>en</strong> op zichzelf staande exercitie of ESIAactiviteit,<br />

maar ziet dit als de rode draad door de hele ESIA gebeur<strong>en</strong>,<br />

waarbij er e<strong>en</strong> verband wordt gebracht tuss<strong>en</strong>, <strong>en</strong> er <strong>in</strong>teractie bestaat met<br />

ERM 43 SEPTEMBER 2011


de kernelem<strong>en</strong>t<strong>en</strong> van <strong>het</strong> proces. De b<strong>en</strong>ader<strong>in</strong>g van ERM m.b.t. de<br />

effect<strong>en</strong>analyse is om middels overleg de stakeholders te betrekk<strong>en</strong> bij <strong>het</strong><br />

id<strong>en</strong>tificer<strong>en</strong> van effect<strong>en</strong>, <strong>het</strong> ontwikkel<strong>en</strong> van de juiste<br />

mitiger<strong>in</strong>gsmaatregel<strong>en</strong> voor negatieve effect<strong>en</strong> <strong>en</strong> <strong>het</strong> versterk<strong>en</strong> van de<br />

positieve effect<strong>en</strong>, <strong>en</strong> <strong>het</strong> evaluer<strong>en</strong> van <strong>het</strong> belang van residu-effect<strong>en</strong>.<br />

• Integratie tuss<strong>en</strong> <strong>het</strong> projectontwerpteam <strong>en</strong> de milieu- <strong>en</strong> sociale teams zal<br />

<strong>in</strong> dez<strong>en</strong> vereist zijn. Afbeeld<strong>in</strong>g 3-2 geeft aan hoe de cyclus van de<br />

effect<strong>en</strong>analyse b<strong>in</strong>n<strong>en</strong> <strong>het</strong> ESIA-proces verloopt, met e<strong>en</strong> duidelijke l<strong>in</strong>k<br />

met de besluitvorm<strong>in</strong>g <strong>en</strong> de opzet van <strong>het</strong> project. E<strong>en</strong> nauwe<br />

sam<strong>en</strong>werk<strong>in</strong>g tuss<strong>en</strong> de ESIA <strong>en</strong> de ontwerpteams maakt dat de<br />

aanvankelijke opzet van <strong>het</strong> project voortdur<strong>en</strong>d wordt getoetst aan de<br />

ontwikkel<strong>in</strong>g<strong>en</strong> <strong>en</strong> de realiteit <strong>en</strong> ev<strong>en</strong>tueel waar nodig aangepast, waar<br />

zulks redelijkerwijs mogelijk is.<br />

Afbeeld<strong>in</strong>g 4-2. Cyclus van Effect<strong>en</strong>analyse<br />

Bron: ERM<br />

ERM 44 SEPTEMBER 2011


ERM 45 SEPTEMBER 2011


5.0 OVERLEG MET HET PUBLIEK<br />

Overleg met stakeholders is e<strong>en</strong> zeer belangrijk aspect van <strong>het</strong> ESIA-proces. Het<br />

overlegproces stelt stakeholders namelijk <strong>in</strong> de geleg<strong>en</strong>heid om comm<strong>en</strong>taar te<br />

lever<strong>en</strong> op <strong>het</strong> voorgestelde project alsook op de rapport<strong>en</strong> die tijd<strong>en</strong>s elke fase<br />

van de ESIA word<strong>en</strong> geproduceerd. Hierdoor word<strong>en</strong> de betrokk<strong>en</strong><br />

leefgeme<strong>en</strong>schapp<strong>en</strong> <strong>in</strong> staat gesteld om daadwerkelijk onderdeel te vorm<strong>en</strong> van<br />

de oploss<strong>in</strong>g<strong>en</strong> wanneer <strong>het</strong> gaat om <strong>het</strong> mitiger<strong>en</strong> van effect<strong>en</strong> of <strong>het</strong><br />

implem<strong>en</strong>ter<strong>en</strong> van managem<strong>en</strong>tmaatregel<strong>en</strong>. Bij de veldonderzoek<strong>in</strong>g<strong>en</strong> zal<br />

gebruik word<strong>en</strong> gemaakt van de PRA, wat staat voor Participatory Rural<br />

Appraisal (ofwel Rurale Classificatie met <strong>in</strong>br<strong>en</strong>g van de Betrokk<strong>en</strong><strong>en</strong>). De PRA<br />

gebruikt hierbij techniek<strong>en</strong> die participatie bevorder<strong>en</strong> middels<br />

focusgroepdiscussies, br<strong>en</strong>gt hulpbronn<strong>en</strong> <strong>in</strong> kaart <strong>en</strong> gebruikt de<br />

dwarsdoorsnede-analyse.<br />

Er zal overleg word<strong>en</strong> gepleegd met lokale <strong>en</strong> traditionele leiders,<br />

verteg<strong>en</strong>woordigers van de leefgeme<strong>en</strong>schapp<strong>en</strong>, pot<strong>en</strong>tieel kwetsbare groep<strong>en</strong>,<br />

zoals vrouw<strong>en</strong> <strong>en</strong> jonger<strong>en</strong> om e<strong>en</strong> <strong>in</strong>zicht te krijg<strong>en</strong> <strong>in</strong> hun specifieke<br />

vraagstukk<strong>en</strong> <strong>en</strong> zorgpunt<strong>en</strong>. Dit zal e<strong>en</strong> z<strong>in</strong>volle participatie mogelijk mak<strong>en</strong><br />

van de betreff<strong>en</strong>de onderdel<strong>en</strong> van de leefgeme<strong>en</strong>schapp<strong>en</strong> <strong>in</strong> de studies. De<br />

bev<strong>in</strong>d<strong>in</strong>g<strong>en</strong> <strong>en</strong> aanbevel<strong>in</strong>g<strong>en</strong> zull<strong>en</strong> op e<strong>en</strong> op<strong>en</strong> <strong>en</strong> transparante wijze met de<br />

betrokk<strong>en</strong><strong>en</strong> word<strong>en</strong> besprok<strong>en</strong> <strong>en</strong> op<strong>en</strong>baar word<strong>en</strong> gemaakt om hun<br />

comm<strong>en</strong>taar <strong>en</strong> voorstell<strong>en</strong> m.b.t. de studies te hor<strong>en</strong> te krijg<strong>en</strong>.<br />

Het materiaal dat gepres<strong>en</strong>teerd zal word<strong>en</strong> tijd<strong>en</strong>s de op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong><br />

zal o.a. omvatt<strong>en</strong> Powerpo<strong>in</strong>t pres<strong>en</strong>taties <strong>in</strong> de traditionele taal/tal<strong>en</strong> met de<br />

belangrijkste project<strong>in</strong>formatie, waaronder:<br />

• Verwacht<strong>in</strong>g<strong>en</strong> m.b.t. <strong>het</strong> managem<strong>en</strong>t <strong><strong>in</strong>zake</strong> capaciteitsopbouw<br />

(werkgeleg<strong>en</strong>heid, aanschaff<strong>en</strong>, contracter<strong>en</strong>)<br />

• Ontwikkel<strong>in</strong>g <strong>in</strong>frastructuur<br />

<strong>Surgold</strong> heeft reeds <strong>in</strong>spann<strong>in</strong>g<strong>en</strong> gepleegd om stakeholders te betrekk<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

proces, <strong>in</strong> <strong>het</strong> bijzonder de Marrondorp<strong>en</strong> die vall<strong>en</strong> b<strong>in</strong>n<strong>en</strong> <strong>het</strong> sociaal<br />

onderzoeksgebied van <strong>het</strong> <strong>Project</strong>. <strong>Surgold</strong> beschikt over e<strong>en</strong> Community<br />

Relations Team dat verantwoordelijk is voor activiteit<strong>en</strong> <strong><strong>in</strong>zake</strong> betrokk<strong>en</strong>heid <strong>en</strong><br />

ontwikkel<strong>in</strong>g van de geme<strong>en</strong>schapp<strong>en</strong>, vooral <strong>in</strong> de Marrondorp<strong>en</strong> langs de<br />

rivier. Gedur<strong>en</strong>de de afgelop<strong>en</strong> jar<strong>en</strong> zijn er verschill<strong>en</strong>de stakeholdergerelateerde<br />

activiteit<strong>en</strong> gehoud<strong>en</strong>, zoals:<br />

• Studies <strong><strong>in</strong>zake</strong> Gezondheid (NewFields Consult<strong>in</strong>g)<br />

• Formuler<strong>in</strong>g van e<strong>en</strong> Platform voor Geme<strong>en</strong>schapsontwikkel<strong>in</strong>g<br />

• Regelmatige bije<strong>en</strong>komst<strong>en</strong> <strong>in</strong> dorp<strong>en</strong> met de Granman <strong>en</strong> bredere lag<strong>en</strong><br />

van de leefgeme<strong>en</strong>schapp<strong>en</strong><br />

ERM 46 SEPTEMBER 2011


• Lokale werkgeleg<strong>en</strong>heid voor <strong>en</strong>kele dorpbewoners<br />

• Overleg b<strong>in</strong>n<strong>en</strong> de artisanale mijnbouw<br />

• Voortgaande communicatie over verwacht<strong>in</strong>g<strong>en</strong> <strong>en</strong> vraagstukk<strong>en</strong> b<strong>in</strong>n<strong>en</strong><br />

<strong>het</strong> project.<br />

Het overlegproces zal voortbouw<strong>en</strong> op de bestaande activiteit<strong>en</strong> die hierbov<strong>en</strong><br />

omschrev<strong>en</strong> zijn <strong>en</strong> zull<strong>en</strong> zodanig word<strong>en</strong> ontwikkeld dat deze voldo<strong>en</strong> aan de<br />

vereist<strong>en</strong> <strong><strong>in</strong>zake</strong> overleg met <strong>het</strong> publiek als voorgeschrev<strong>en</strong> <strong>in</strong> de concept<br />

Milieuwetgev<strong>in</strong>g van Sur<strong>in</strong>ame (NIMOS, 2005b) <strong>en</strong> de richtlijn<strong>en</strong> van de IFC<br />

Performance Standard <strong><strong>in</strong>zake</strong> betrokk<strong>en</strong>heid van stakeholders. De<br />

basispr<strong>in</strong>cipes van <strong>het</strong> overleg zull<strong>en</strong> di<strong>en</strong><strong>en</strong> als garantie dat de ESIA <strong>en</strong> <strong>het</strong><br />

proces voor betrokk<strong>en</strong>heid <strong>in</strong>clusief zijn, alsook cultureel-gevoelig <strong>en</strong><br />

transparant.<br />

5.1 DOELEN EN DOELSTELLINGEN VAN HET OPENBAAR OVERLEG<br />

Het doel van overleg met <strong>het</strong> publiek tijd<strong>en</strong>s de ESIA is te garander<strong>en</strong> dat er<br />

rek<strong>en</strong><strong>in</strong>g wordt gehoud<strong>en</strong> met de standpunt<strong>en</strong>, de belang<strong>en</strong> <strong>en</strong> de zorgpunt<strong>en</strong><br />

van stakeholders van <strong>het</strong> <strong>Project</strong> bij <strong>het</strong> analyser<strong>en</strong> van de pot<strong>en</strong>tiële effect<strong>en</strong><br />

van <strong>het</strong> project alsook bij de besluitvorm<strong>in</strong>g <strong><strong>in</strong>zake</strong> <strong>het</strong> project, vooral bij <strong>het</strong><br />

ontwikkel<strong>en</strong> van mitiger<strong>in</strong>gsmaatregel<strong>en</strong>. Verder is de bedoel<strong>in</strong>g van dit<br />

op<strong>en</strong>baar overleg, de communicatie tuss<strong>en</strong> <strong>het</strong> project <strong>en</strong> de betrokk<strong>en</strong><strong>en</strong> of<br />

belanghebb<strong>en</strong>d<strong>en</strong> te verbeter<strong>en</strong>. De voornaamste focus is daarom:<br />

• Id<strong>en</strong>tificatie <strong>en</strong> analyse van stakeholders;<br />

• Soort overlegactiviteit<strong>en</strong> die ontplooid moet<strong>en</strong> word<strong>en</strong> <strong><strong>in</strong>zake</strong> elke categorie<br />

stakeholders;<br />

• Op<strong>en</strong>baarmak<strong>in</strong>g <strong>in</strong>formatie, <strong>in</strong> dez<strong>en</strong> specifiek <strong>het</strong> verschaff<strong>en</strong> van tijdige<br />

<strong>en</strong> z<strong>in</strong>volle <strong>in</strong>formatie die toegankelijk is voor alle stakeholders;<br />

• De b<strong>en</strong>ader<strong>in</strong>g <strong>en</strong> de mechanism<strong>en</strong> om feedback ofwel terugkoppel<strong>in</strong>g van<br />

de stakeholders te krijg<strong>en</strong> over de verschafte <strong>in</strong>formatie;<br />

• Pr<strong>in</strong>cipes <strong>en</strong> basisregels die als leidraad di<strong>en</strong><strong>en</strong> bij <strong>het</strong> overleg met lokale<br />

leefgeme<strong>en</strong>schapp<strong>en</strong>; <strong>en</strong><br />

• Het programma voor overleg om tijdige bek<strong>en</strong>dmak<strong>in</strong>g van<br />

overlegactiviteit<strong>en</strong> te garander<strong>en</strong> <strong>en</strong> de relatie te legg<strong>en</strong> tuss<strong>en</strong> de<br />

belangrijkste fas<strong>en</strong> b<strong>in</strong>n<strong>en</strong> <strong>het</strong> ESIA-proces.<br />

5.2 CONCEPT PLAN VOOR OVERLEG<br />

In onderstaande tabel 5-1 is e<strong>en</strong> sam<strong>en</strong>vatt<strong>in</strong>g opg<strong>en</strong>om<strong>en</strong> van <strong>het</strong> Plan voor<br />

Overleg. Het Plan voor Overleg geeft e<strong>en</strong> overzicht van <strong>het</strong> proces voor<br />

ERM 47 SEPTEMBER 2011


etrokk<strong>en</strong>heid van stakeholders b<strong>in</strong>n<strong>en</strong> elke fase van de ESIA. Het Plan kan<br />

word<strong>en</strong> aangepast <strong>en</strong> is onderhevig aan verander<strong>in</strong>g<strong>en</strong> op basis van de reacties<br />

<strong>en</strong>/of vereist<strong>en</strong> van de stakeholders. E<strong>en</strong> comb<strong>in</strong>atie van verschill<strong>en</strong>de soort<strong>en</strong><br />

overlegtechniek<strong>en</strong> zal word<strong>en</strong> gehanteerd zoals persoonlijk onderhoud,<br />

discussies met focusgroep<strong>en</strong> (kwalitatieve discussies met subgroep<strong>en</strong> b<strong>in</strong>n<strong>en</strong> de<br />

geme<strong>en</strong>schapp<strong>en</strong>, zoals vrouw<strong>en</strong>, jonger<strong>en</strong> <strong>en</strong> <strong>in</strong>heems<strong>en</strong>), op<strong>en</strong>bare<br />

bije<strong>en</strong>komst<strong>en</strong> <strong>en</strong> sociaal-economische huishoud<strong>en</strong>quêtes.<br />

Het algehele overlegproces zal zodanig word<strong>en</strong> opgezet dat dit voldoet aan de<br />

vereist<strong>en</strong> voor op<strong>en</strong>baar overleg als voorgeschrev<strong>en</strong> <strong>in</strong> de concept<br />

milieuwetgev<strong>in</strong>g van Sur<strong>in</strong>ame <strong>en</strong> de richtlijn<strong>en</strong> van de IFC’s Performance<br />

Standard <strong><strong>in</strong>zake</strong> betrokk<strong>en</strong>heid van stakeholders.<br />

ERM 48 SEPTEMBER 2011


Tabel 5-1. Concept Plan voor Overleg - <strong>Merian</strong> <strong>Project</strong><br />

Plan voor Overleg Streef-<br />

ESHIA-fase<br />

datum<br />

Scre<strong>en</strong><strong>in</strong>gsfase Eerste bije<strong>en</strong>komst<strong>en</strong> met <strong>Surgold</strong> (projectvoorstellers).<br />

Juni 2011<br />

Scop<strong>in</strong>g/persoonlijke bije<strong>en</strong>komst<strong>en</strong> met <strong>het</strong> NIMOS<br />

Bezoek NIMOS aan <strong>het</strong> <strong>Merian</strong> <strong>Project</strong><br />

Scop<strong>in</strong>gsfase Onderhoud met Kapite<strong>in</strong>s, Basjas <strong>en</strong> Hoofdkapite<strong>in</strong>s<br />

Fase van<br />

effect<strong>en</strong>analyse<br />

Fase van<br />

op<strong>en</strong>baarmak<strong>in</strong>g<br />

Distributie concept ToR aan belangrijkste stakeholders zoals <strong>het</strong> NIMOS<br />

Regel<strong>in</strong>g<strong>en</strong> treff<strong>en</strong> zodat de concept -ToR toegankelijk is voor de lokale<br />

leefgeme<strong>en</strong>schapp<strong>en</strong> door deze beschikbaar te stell<strong>en</strong> op e<strong>en</strong> website<br />

<strong>en</strong>/of locaties van waaruit dit concept kan word<strong>en</strong> gedistribueerd.<br />

In k<strong>en</strong>nis stell<strong>en</strong> van geme<strong>en</strong>schapp<strong>en</strong> <strong>en</strong> andere stakeholders van<br />

op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong> die gehoud<strong>en</strong> zull<strong>en</strong> word<strong>en</strong> i.v.m. <strong>het</strong> ToRoverleg.<br />

Method<strong>en</strong> zoals advert<strong>en</strong>ties, posters <strong>en</strong> op<strong>en</strong>bare<br />

bek<strong>en</strong>dmak<strong>in</strong>g<strong>en</strong> zull<strong>en</strong> word<strong>en</strong> gebruikt om de stakeholders op de hoogte<br />

te stell<strong>en</strong>.<br />

De eerste ronde van op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong> zal word<strong>en</strong> gehoud<strong>en</strong> om de<br />

stakeholders <strong>in</strong>formatie te verschaff<strong>en</strong> over <strong>het</strong> project, de ESHIA <strong>en</strong> om<br />

feedback <strong>en</strong> zorgpunt<strong>en</strong> te verkrijg<strong>en</strong> m.b.t. de concept-ToR voor <strong>het</strong><br />

project. Voorgesteld is om de op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong> op e<strong>en</strong> paar locaties<br />

te houd<strong>en</strong>, zoals Paramaribo, Mo<strong>en</strong>go <strong>en</strong> Langatabiki,<br />

Er zal e<strong>en</strong> feedbackmechanisme word<strong>en</strong> opgezet zoals responsformulier<strong>en</strong>,<br />

belangrijke contactpunt<strong>en</strong> zodat de stakeholders hun feedback <strong>en</strong><br />

comm<strong>en</strong>taar kunn<strong>en</strong> lever<strong>en</strong>.<br />

Er zull<strong>en</strong> specialistische studies word<strong>en</strong> verricht zoals op <strong>het</strong> gebied van<br />

biodiversiteit, terrestrische ecologie, socio-economie, hydrogeologie etc.<br />

Tijd<strong>en</strong>s deze gespecialiseerde studies, zal er overleg word<strong>en</strong> gepleegd met<br />

de betreff<strong>en</strong>de stakeholders.<br />

Als onderdeel van <strong>het</strong> veldwerk, zull<strong>en</strong> er huishoud<strong>en</strong>quêtes word<strong>en</strong><br />

verricht <strong>en</strong> overleg word<strong>en</strong> gepleegd <strong>en</strong> wel <strong>in</strong> de navolg<strong>en</strong>de dorp<strong>en</strong>:<br />

• Akaati<br />

• Atemsa<br />

• Bada Tabiki<br />

• Kiki Mofo<br />

• Langatabiki<br />

• Loka Loka<br />

• Nason<br />

• Pakira Tabiki<br />

• Sk<strong>in</strong> Tabiki<br />

• Tabiki Ede<br />

Nadat <strong>het</strong> eerste concept van de ESHIA is opgesteld zal er nog e<strong>en</strong> ronde<br />

van op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong> word<strong>en</strong> gehoud<strong>en</strong> om de eerste resultat<strong>en</strong> te<br />

del<strong>en</strong> <strong>en</strong> feedback van de stakeholders te krijg<strong>en</strong> m.b.t. de ESHIA.<br />

Distributie concept ESHIA voor becomm<strong>en</strong>tariër<strong>in</strong>g door <strong>het</strong> publiek (via<br />

<strong>het</strong> NIMOS)<br />

Tracht<strong>en</strong> e<strong>in</strong>dcomm<strong>en</strong>taar te verkrijg<strong>en</strong> van de stakeholders (deadl<strong>in</strong>e<br />

voor becomm<strong>en</strong>tariër<strong>in</strong>g door <strong>het</strong> publiek).<br />

Juni-Jul1<br />

2011<br />

Juli-<br />

Augustus<br />

2011<br />

Augustus<br />

2011<br />

Augustus<br />

2011<br />

September –<br />

Januari<br />

2011<br />

Maart<br />

/April 2012<br />

April-Juni<br />

2012<br />

Juni 2012<br />

N.B.: de schu<strong>in</strong>sgedrukte del<strong>en</strong> gev<strong>en</strong> de bije<strong>en</strong>komst<strong>en</strong> <strong>en</strong>/of <strong>het</strong> overleg aan dat reeds heeft plaatsgehad.<br />

ERM 49 SEPTEMBER 2011


De evaluatie, publicatie <strong>en</strong> op<strong>en</strong>baarmak<strong>in</strong>g van de ESIA zull<strong>en</strong> <strong>het</strong> navolg<strong>en</strong>de<br />

omvatt<strong>en</strong>:<br />

• distributie van <strong>het</strong> ESIA-rapport aan <strong>het</strong> NIMOS, de overheid <strong>en</strong> andere<br />

belanghebb<strong>en</strong>d<strong>en</strong>;<br />

• op<strong>en</strong>bare bije<strong>en</strong>komst<strong>en</strong> om de geanalyseerde effect<strong>en</strong>, de analyse <strong>en</strong> de<br />

mitiger<strong>in</strong>gs- <strong>en</strong> managem<strong>en</strong>tmaatregel<strong>en</strong> te pres<strong>en</strong>ter<strong>en</strong>; <strong>en</strong><br />

• <strong>het</strong> ontvang<strong>en</strong> van becomm<strong>en</strong>tariër<strong>in</strong>g <strong>en</strong> aanbevel<strong>in</strong>g<strong>en</strong> <strong><strong>in</strong>zake</strong> de<br />

effect<strong>en</strong> <strong>en</strong> de mitiger<strong>in</strong>gsmaatregel<strong>en</strong> zijd<strong>en</strong>s <strong>het</strong> publiek.<br />

ERM 50 SEPTEMBER 2011


6.0 VOORLOPIGE LIJST VAN VRAAGSTUKKEN<br />

Op basis van de beschikbare gegev<strong>en</strong>s, zijn de belangrijkste pot<strong>en</strong>tiële effect<strong>en</strong><br />

die wij totnogtoe geïd<strong>en</strong>tificeerd hebb<strong>en</strong> als zak<strong>en</strong> die nader onderzoek <strong>en</strong><br />

analyse zull<strong>en</strong> vereis<strong>en</strong>:<br />

• Het project kan mogelijk de kwaliteit van <strong>het</strong> oppervlakte- <strong>en</strong> grondwater<br />

aantast<strong>en</strong>, vooral door:<br />

o Lekkage van afvalslik <strong>en</strong> afvalgeste<strong>en</strong>te<br />

o Verkeerd managem<strong>en</strong>t van erosie <strong>en</strong> sedim<strong>en</strong>t<strong>en</strong><br />

o Verkeerd managem<strong>en</strong>t van <strong>het</strong> mijnwater<br />

• Mogelijkheid van verlag<strong>in</strong>g van <strong>het</strong> grondwaterpeil door<br />

mijnontwater<strong>in</strong>g <strong>en</strong> loz<strong>in</strong>g van mijnwater<br />

• Mogelijkheid van verhoogd risico voor <strong>het</strong> milieu met betrekk<strong>in</strong>g tot<br />

afvalbeheer <strong>en</strong> <strong>het</strong> gebruik van cyanide, <strong>en</strong> de behoefte om e<strong>en</strong> solide<br />

plan voor milieumanagem<strong>en</strong>t op te stell<strong>en</strong><br />

• Mogelijkheid dat <strong>het</strong> project de biodiversiteit aantast aangezi<strong>en</strong> Sur<strong>in</strong>ame<br />

erk<strong>en</strong>d wordt als e<strong>en</strong> gebied dat rijk is aan biodiversiteit (IFC<br />

Performance Standard 6)<br />

• Mogelijkheid van niet-rout<strong>in</strong>ematige of ongecontroleerde loz<strong>in</strong>g<strong>en</strong> uit de<br />

tail<strong>in</strong>gs storage facility (<strong>het</strong> reservoir voor de opslag van afvalslik),<br />

<strong>het</strong>ge<strong>en</strong> zou kunn<strong>en</strong> leid<strong>en</strong> tot:<br />

o Vervuil<strong>in</strong>g van de bodem, <strong>het</strong> grond- <strong>en</strong> <strong>het</strong> oppervlaktewater;<br />

o Verstor<strong>in</strong>g van flora <strong>en</strong> fauna;<br />

o Effect<strong>en</strong> op de gezondheid van de m<strong>en</strong>s; <strong>en</strong><br />

o Effect<strong>en</strong> op uitoef<strong>en</strong><strong>in</strong>g van de traditionele verzamel<strong>in</strong>g van<br />

Bosbijproduct<strong>en</strong> (Non-Timber Forest Products – NTFP’s) of<br />

jachtactiviteit<strong>en</strong>.<br />

• Mogelijkheid dat <strong>het</strong> project de visstand <strong>en</strong> de watervoorrad<strong>en</strong> aantast<br />

door de waterkwaliteit <strong>en</strong> –kwantiteit aan te tast<strong>en</strong>, <strong>het</strong>ge<strong>en</strong> zal leid<strong>en</strong> tot:<br />

o Pot<strong>en</strong>tiële effect<strong>en</strong> op de visserij stroomafwaarts<br />

o Pot<strong>en</strong>tiële effect<strong>en</strong> op de visserij als middel van bestaan<br />

• Mogelijkheid dat <strong>het</strong> project de luchtkwaliteit zal aantast<strong>en</strong> vanwege:<br />

o Uitstoot van de uitlaatgass<strong>en</strong> van zware stookolieg<strong>en</strong>erator<strong>en</strong> (30<br />

MW Power Plant)<br />

o Opwaai<strong>en</strong>de stof door verstor<strong>in</strong>g van de oppervlakte op de<br />

mijnlocatie langs de transportweg<strong>en</strong>.<br />

ERM 51 SEPTEMBER 2011


• De noodzaak voor plann<strong>in</strong>g <strong><strong>in</strong>zake</strong> mijnsluit<strong>in</strong>g <strong>en</strong> rehabilitatie<br />

• Pot<strong>en</strong>tiële effect<strong>en</strong> van de transportcorridor vooral met betrekk<strong>in</strong>g tot:<br />

o Zorgpunt<strong>en</strong> <strong><strong>in</strong>zake</strong> gezondheid <strong>en</strong> veiligheid van de<br />

geme<strong>en</strong>schapp<strong>en</strong><br />

o Bestaande gevoelige receptor<strong>en</strong><br />

o Capaciteit van <strong>het</strong> bestaande netwerk om additioneel verkeer aan<br />

te kunn<strong>en</strong><br />

o Cumulatieve effect<strong>en</strong> van andere project<strong>en</strong><br />

De hierbov<strong>en</strong> opgesomde vraagstukk<strong>en</strong> werd<strong>en</strong> geïd<strong>en</strong>tificeerd op basis van de<br />

volg<strong>en</strong>de studies <strong>en</strong>/of feedback van stakeholders:<br />

• Haalbaarheidsstudies van <strong>Surgold</strong>, waaronder rapport<strong>en</strong> <strong><strong>in</strong>zake</strong><br />

monsternem<strong>in</strong>g van oppervlakte- <strong>en</strong> grondwater;<br />

• Eerste coörd<strong>in</strong>atiebije<strong>en</strong>komst<strong>en</strong> voor de ESIA gehoud<strong>en</strong> op 14 juni<br />

2011. Hierbij was aanwezig personeel van <strong>Surgold</strong>, Newmont, Golder,<br />

G-M<strong>in</strong><strong>in</strong>g, <strong>en</strong> ERM;<br />

• Kick-off bije<strong>en</strong>komst op <strong>het</strong> <strong>Merian</strong>kantoor bij <strong>het</strong> basiskamp op 27 april<br />

2011. Hierbij war<strong>en</strong> aanwezig <strong>Project</strong>-teamled<strong>en</strong> van <strong>Surgold</strong> (Percy<br />

Montoya, Claudio Ballon, W<strong>en</strong>dell Asadang, Mike Meyer), ERM, <strong>en</strong> e<strong>en</strong><br />

lokale sub- consultant;<br />

• Bezoek aan de Mijnlocatie op 28 juni 2011 (visuele observatie van de<br />

locatie, rivier<strong>en</strong>/krek<strong>en</strong>, activiteit<strong>en</strong> van de porkknockers, etc.);<br />

• Middels overleg met overheids<strong>in</strong>stanties (NIMOS) op 30 juni 2011; <strong>en</strong><br />

• Middels e<strong>en</strong> confer<strong>en</strong>ce call met Golder op 20 juli 2011 om de locaties<br />

voor monsternem<strong>in</strong>g van de oppervlakte- <strong>en</strong> grondwaterputt<strong>en</strong> te<br />

besprek<strong>en</strong>. Hierbij was betrokk<strong>en</strong> technisch personeel van <strong>Surgold</strong>,<br />

Golder, <strong>en</strong> ERM.<br />

• Comm<strong>en</strong>taar ontvang<strong>en</strong> tijd<strong>en</strong>s de Op<strong>en</strong>bare Bije<strong>en</strong>komst<strong>en</strong> die <strong>in</strong><br />

augustus 2011 gehoud<strong>en</strong> werd<strong>en</strong> <strong>in</strong> Paramaribo, Mo<strong>en</strong>go, <strong>en</strong> Langi<br />

Tibiki<br />

ERM 52 SEPTEMBER 2011


7.0 AFBAKENING VAN DE ESIA-WERKZAAMHEDEN<br />

Er is voor <strong>het</strong> <strong>Project</strong> e<strong>en</strong> gebied voor milieuonderzoek alsook e<strong>en</strong> gebied voor<br />

sociaal onderzoek vastgesteld om de afbak<strong>en</strong><strong>in</strong>g van de gebied<strong>en</strong> waar <strong>het</strong><br />

onderzoek zal word<strong>en</strong> verricht t.b.v. de ESIA, te def<strong>in</strong>iër<strong>en</strong> (Afbeeld<strong>in</strong>g<strong>en</strong> 7-1<br />

<strong>en</strong> 7-2). De navolg<strong>en</strong>de hoofdstukk<strong>en</strong> gev<strong>en</strong> de bijzonderhed<strong>en</strong> weer van de<br />

voorgestelde veld- <strong>en</strong> desktopstudies die verricht zull<strong>en</strong> word<strong>en</strong> om de<br />

basel<strong>in</strong>econdities <strong>en</strong> de pot<strong>en</strong>tiële effect<strong>en</strong> van <strong>het</strong> project te id<strong>en</strong>tificer<strong>en</strong>.<br />

De afbak<strong>en</strong><strong>in</strong>g van <strong>het</strong> gebied voor milieuonderzoek was gebaseerd op vorige<br />

<strong>in</strong>zicht<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>het</strong> project, <strong>het</strong> voordur<strong>en</strong>de monitor<strong>in</strong>gwerk van Newmont<br />

<strong><strong>in</strong>zake</strong> <strong>het</strong> milieu, de voorgestelde ‘footpr<strong>in</strong>t’ ofwel bedekk<strong>in</strong>gsgebied van <strong>het</strong><br />

project (toegangsweg<strong>en</strong>, gebied voor afvalslik, mijnfaciliteit<strong>en</strong>, etc.) alsook<br />

overleg met de stakeholders. De vaststell<strong>in</strong>g van <strong>het</strong>/de gebied/gebied<strong>en</strong> of<br />

geme<strong>en</strong>schapp<strong>en</strong> voor sociaal onderzoek is ev<strong>en</strong>e<strong>en</strong>s gebaseerd op eerdere<br />

k<strong>en</strong>nis van <strong>het</strong> project, <strong>in</strong>br<strong>en</strong>g van <strong>het</strong> programma van Newmont voor<br />

betrokk<strong>en</strong>heid van de geme<strong>en</strong>schapp<strong>en</strong> <strong>en</strong> e<strong>en</strong> <strong>in</strong>zicht <strong>in</strong> de ‘footpr<strong>in</strong>t’ van <strong>het</strong><br />

project, alsook de pot<strong>en</strong>tiële effect<strong>en</strong> op de leefgeme<strong>en</strong>schapp<strong>en</strong>.<br />

ERM 53 SEPTEMBER 2011


Afbeeld<strong>in</strong>g 7-1. Gebied voor milieuonderzoek<br />

Bron: ERM<br />

ERM 54 SEPTEMBER 2011


Afbeeld<strong>in</strong>g 7-2. Gebied voor sociaal onderzoek<br />

Bron: ERM<br />

ERM 55 SEPTEMBER 2011


7.1 VOORGESTELDE STUDIES<br />

Deze paragraaf beschrijft de voorgestelde milieu-, sociale <strong>en</strong><br />

gezondheidgerelateerde studies die verricht zull<strong>en</strong> word<strong>en</strong> als onderdeel van <strong>het</strong><br />

ESIA-proces t.b.v. <strong>het</strong> <strong>Merian</strong> <strong>Project</strong>.<br />

Het voornaamste doel van deze studies is de huidige (basel<strong>in</strong>e) condities op de<br />

mijnlocatie te beschrijv<strong>en</strong> alsook de corridor van de transportweg waaraan de<br />

voorkeur wordt gegev<strong>en</strong>, waaronder <strong>in</strong>begrep<strong>en</strong> historische <strong>en</strong> voortgaande<br />

activiteit<strong>en</strong> (bijv. exploratie <strong>en</strong> kle<strong>in</strong>schalige mijnbouw). De resultat<strong>en</strong> van de<br />

studies zull<strong>en</strong> di<strong>en</strong><strong>en</strong> als basis om de pot<strong>en</strong>tiële milieu-, socio-economische <strong>en</strong><br />

gezondheidgerelateerde effect<strong>en</strong> van <strong>het</strong> <strong>Merian</strong> <strong>Project</strong> te id<strong>en</strong>tificer<strong>en</strong>. De<br />

socio-economische studies zull<strong>en</strong> word<strong>en</strong> geïntegreerd met de Strategie voor<br />

Betrokk<strong>en</strong>heid van Stakeholders <strong>en</strong> de activiteit<strong>en</strong> bedoeld om e<strong>en</strong> consist<strong>en</strong>te<br />

<strong>in</strong>teractie met de stakeholders te handhav<strong>en</strong>.<br />

7.1.1 Specialistisch milieuonderzoek<br />

Er zull<strong>en</strong> neg<strong>en</strong> specialistische milieustudies (Environm<strong>en</strong>tal Specialist Studies -<br />

ESS) word<strong>en</strong> verricht op de geselecteerde corridor van de transportweg <strong>en</strong> <strong>in</strong> de<br />

omgev<strong>in</strong>g van <strong>het</strong> voorgestelde gebied voor de mijnactiviteit<strong>en</strong> <strong>en</strong> de<br />

verwerk<strong>in</strong>gsplant:<br />

1. Grondwateronderzoek<br />

2. Onderzoek <strong><strong>in</strong>zake</strong> de strom<strong>in</strong>g <strong>en</strong> de kwaliteit van <strong>het</strong> oppervlaktewater<br />

3. Onderzoek <strong><strong>in</strong>zake</strong> de luchtkwaliteit <strong>en</strong> <strong>het</strong> klimaat<br />

4. Onderzoek <strong><strong>in</strong>zake</strong> geluidh<strong>in</strong>der<br />

5. Flora-onderzoek<br />

6. Bodemonderzoek<br />

7. Onderzoek <strong><strong>in</strong>zake</strong> luchtfauna<br />

8. Onderzoek <strong><strong>in</strong>zake</strong> terrestrische fauna<br />

9. Basel<strong>in</strong>e-onderzoek <strong><strong>in</strong>zake</strong> de visstand <strong>en</strong> de aquatische habitats (ofwel<br />

natuurlijke leefomgev<strong>in</strong>g <strong>in</strong> <strong>het</strong> water)<br />

In e<strong>en</strong> apart docum<strong>en</strong>t zijn er meer bijzonderhed<strong>en</strong> beschikbaar m.b.t. de<br />

technische beschrijv<strong>in</strong>g<strong>en</strong> van deze specifieke studies.<br />

ERM 56 SEPTEMBER 2011


7.1.1.1 Specialistisch milieu-onderzoek 1: Grondwateronderzoek<br />

Vanaf 2009 is er voortdur<strong>en</strong>d onderzoek <strong>en</strong> analyse van de hydrogeologie, of<br />

grondwater, karakteristiek<strong>en</strong> van de locatie verricht. De grondwatercondities<br />

kunn<strong>en</strong> van <strong>in</strong>vloed zijn op <strong>het</strong> projectontwerp <strong>en</strong> kunn<strong>en</strong> ev<strong>en</strong>e<strong>en</strong>s word<strong>en</strong><br />

beïnvloed door <strong>het</strong> project. Voortdur<strong>en</strong>d onderzoek zal zich richt<strong>en</strong> op de<br />

pot<strong>en</strong>tiële effect<strong>en</strong> van de mijn<strong>en</strong> op <strong>het</strong> grondwaterpeil <strong>in</strong> <strong>het</strong> gebied <strong>en</strong> de<br />

daaruit voortvloei<strong>en</strong>de effect<strong>en</strong> op de stroomricht<strong>in</strong>g <strong>en</strong> de kwaliteit van <strong>het</strong><br />

grondwater afkomstig van lekkage van afvalgeste<strong>en</strong>te of afvalslik. Het<br />

grondwateronderzoek zal voortdur<strong>en</strong>de monitor<strong>in</strong>g van bestaande bronn<strong>en</strong><br />

<strong>in</strong>houd<strong>en</strong> <strong><strong>in</strong>zake</strong> <strong>het</strong> waterpeil <strong>en</strong> de chemische sam<strong>en</strong>stell<strong>in</strong>g van <strong>het</strong> water, <strong>en</strong><br />

additionele bronn<strong>en</strong> die zich bev<strong>in</strong>d<strong>en</strong> <strong>in</strong> <strong>het</strong> stroomgebied van de Marowijne <strong>en</strong><br />

de Commewijne om de basel<strong>in</strong>econdities <strong>in</strong> <strong>het</strong> gebied van de ‘tail<strong>in</strong>gs storage<br />

facility’ vast te stell<strong>en</strong> alsook de pot<strong>en</strong>tiële <strong>in</strong>teractie van grondwateroppervlaktewater<br />

<strong>in</strong> <strong>het</strong> stroomgebied van de Commewijne <strong>en</strong> de Marowijne.<br />

Er zull<strong>en</strong> regelmatig tijd<strong>en</strong>s de verschill<strong>en</strong>de seizo<strong>en</strong><strong>en</strong> grondwatergegev<strong>en</strong>s<br />

word<strong>en</strong> verzameld <strong>en</strong> word<strong>en</strong> geanalyseerd door e<strong>en</strong> laboratorium voor e<strong>en</strong><br />

brede reeks van parameters waaronder <strong>in</strong>begrep<strong>en</strong>, de voornaamste ion<strong>en</strong>,<br />

metal<strong>en</strong>, fysieke parameters <strong>en</strong> cyanide. Veldparameters zoals de temperatuur<br />

<strong>en</strong> <strong>het</strong> pH-gehalte zull<strong>en</strong> ook word<strong>en</strong> gemet<strong>en</strong>. Er zal modeller<strong>in</strong>g van <strong>het</strong><br />

grondwater plaatsv<strong>in</strong>d<strong>en</strong> om de stroomricht<strong>in</strong>g<strong>en</strong> b<strong>in</strong>n<strong>en</strong> de geologische<br />

formaties te begrijp<strong>en</strong> <strong>en</strong> de pot<strong>en</strong>tiële effect<strong>en</strong> als gevolg van de<br />

<strong>Project</strong>werkzaamhed<strong>en</strong> te analyser<strong>en</strong>.<br />

7.1.1.2 Specialistisch milieu-onderzoek 2: onderzoek <strong><strong>in</strong>zake</strong> de stroomricht<strong>in</strong>g <strong>en</strong> de kwaliteit<br />

van <strong>het</strong> oppervlaktewater<br />

Vanaf 2003 is er voortdur<strong>en</strong>d onderzoek <strong>en</strong> analyse van <strong>het</strong> oppervlaktewater <strong>en</strong><br />

de waterhuishoud<strong>in</strong>g op de locatie verricht. De oppervlaktewatercondities<br />

kunn<strong>en</strong> van <strong>in</strong>vloed zijn op <strong>het</strong> projectontwerp <strong>en</strong> kunn<strong>en</strong> ev<strong>en</strong>e<strong>en</strong>s word<strong>en</strong><br />

beïnvloed door <strong>het</strong> project. Voortdur<strong>en</strong>d onderzoek zal zich richt<strong>en</strong> op de<br />

mogelijke effect<strong>en</strong> van de mijn<strong>en</strong>, <strong>het</strong> dump<strong>en</strong> van afvalgeste<strong>en</strong>te <strong>en</strong> de<br />

tail<strong>in</strong>gsbas<strong>in</strong> (ofwel <strong>het</strong> afvalslikbekk<strong>en</strong>) <strong><strong>in</strong>zake</strong> de stroomricht<strong>in</strong>g <strong>en</strong> de kwaliteit<br />

van <strong>het</strong> oppervlaktewater. Het grondwateronderzoek zal mede omvatt<strong>en</strong> <strong>het</strong><br />

opzett<strong>en</strong> <strong>en</strong> monitor<strong>en</strong> van meters voor de stroomricht<strong>in</strong>g van <strong>het</strong> water <strong>en</strong><br />

voordur<strong>en</strong>de monitor<strong>in</strong>g van de waterkwaliteit <strong>en</strong> additionele monitor<strong>in</strong>g van<br />

de stroomricht<strong>in</strong>g langs verschill<strong>en</strong>de krek<strong>en</strong> (bijv. de <strong>Merian</strong>kreek, de<br />

Tomulukreek, de Las Dom<strong>in</strong>icanaskreek) b<strong>in</strong>n<strong>en</strong> <strong>het</strong> projectgebied <strong>in</strong> de<br />

stroomgebied<strong>en</strong> van zowel de Commewijne als de Marowijne. Het onderzoek<br />

zal ook <strong>in</strong>houd<strong>en</strong> <strong>het</strong> bepal<strong>en</strong> van de condities <strong>in</strong> <strong>het</strong> gebied van de natuurlijke<br />

hoeveelheid aan zwev<strong>en</strong>de stoff<strong>en</strong> <strong>in</strong> de lucht (natural total susp<strong>en</strong>ded solids - TSS).<br />

Het voorgestelde monitor<strong>in</strong>gnetwerk omvat verschill<strong>en</strong>de hydrometrische<br />

stations (cont<strong>in</strong>ue monitor<strong>in</strong>g van de stroomricht<strong>in</strong>g) <strong>en</strong> additionele stations die<br />

ERM 57 SEPTEMBER 2011


mom<strong>en</strong>teel niet zijn opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> netwerk voor monitor<strong>in</strong>g van de kwaliteit<br />

van <strong>het</strong> oppervlaktewater. De gegev<strong>en</strong>s die verzameld word<strong>en</strong>, zull<strong>en</strong> word<strong>en</strong><br />

gebruikt om <strong>het</strong> bestaande waterhuishoud<strong>in</strong>g <strong>in</strong> de krek<strong>en</strong> nabij <strong>het</strong><br />

projectgebied te typer<strong>en</strong>, voornamelijk basis-stroomricht<strong>in</strong>g<strong>en</strong> <strong>en</strong> de<br />

hoogwaterstand, alsook om de effect<strong>en</strong> van de huidige <strong>en</strong> historische<br />

kle<strong>in</strong>schalige mijnbouwactiviteit<strong>en</strong> op de krek<strong>en</strong> vast te legg<strong>en</strong>. De gegev<strong>en</strong>s<br />

zull<strong>en</strong> <strong>het</strong> ijk<strong>en</strong> van de schatt<strong>in</strong>g<strong>en</strong> van afvloei<strong>in</strong>gscoëfficiënt<strong>en</strong> <strong>en</strong> schatt<strong>in</strong>g<strong>en</strong><br />

van piek<strong>en</strong> <strong>en</strong> lage stroomsnelhed<strong>en</strong> mogelijk mak<strong>en</strong>. De gegev<strong>en</strong>s m.b.t. de<br />

stroomsnelheid zull<strong>en</strong> word<strong>en</strong> gebruikt om de belast<strong>in</strong>g van <strong>het</strong> water met<br />

verontre<strong>in</strong>ig<strong>en</strong>de stoff<strong>en</strong> te berek<strong>en</strong><strong>en</strong>, sam<strong>en</strong> met de gegev<strong>en</strong>s <strong><strong>in</strong>zake</strong> de<br />

waterkwaliteit. De gegev<strong>en</strong>s m.b.t. de stroomsnelheid zull<strong>en</strong> ook e<strong>en</strong> bijdrage<br />

lever<strong>en</strong> aan de ontwikkel<strong>in</strong>g van de algehele balans van <strong>het</strong> mijnwater.<br />

De locaties voor <strong>het</strong> trekk<strong>en</strong> van monsters op de twee hoofdkrek<strong>en</strong><br />

stroomafwaarts van <strong>het</strong> project om de kwaliteit van <strong>het</strong> water te bepal<strong>en</strong>, zijn<br />

opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> programma voor <strong>het</strong> trekk<strong>en</strong> van monsters om de pot<strong>en</strong>tiële<br />

effect<strong>en</strong> op <strong>het</strong> ontvang<strong>en</strong>de milieu te analyser<strong>en</strong>. Er zull<strong>en</strong> analyses word<strong>en</strong><br />

verricht van de regionale stroomsnelhed<strong>en</strong> om te bevestig<strong>en</strong> dat de pot<strong>en</strong>tiële<br />

effect<strong>en</strong> op de Commewijne <strong>en</strong> de Marowijne onder normale<br />

werkomstandighed<strong>en</strong> niet aantoonbaar zull<strong>en</strong> zijn vanwege <strong>het</strong> feit dat e<strong>en</strong> heel<br />

kle<strong>in</strong> perc<strong>en</strong>tage van de stroomgebied<strong>en</strong> van deze hoofdrivier<strong>en</strong> mogelijk door<br />

<strong>het</strong> <strong>Project</strong> zull<strong>en</strong> word<strong>en</strong> beïnvloed. Ook zal word<strong>en</strong> aangetoond dat de<br />

bov<strong>en</strong>stroomse ligg<strong>in</strong>g van <strong>het</strong> <strong>Project</strong> nauwelijks <strong>in</strong>vloed zal hebb<strong>en</strong> op de<br />

waterhuishoud<strong>in</strong>g <strong>in</strong> <strong>het</strong> omr<strong>in</strong>g<strong>en</strong>de stroomgebied van de zijrivier<strong>en</strong>. De<br />

locaties voor <strong>het</strong> trekk<strong>en</strong> van monsters <strong>in</strong> de Commewijne- <strong>en</strong> de<br />

Marowijnerivier, zull<strong>en</strong> word<strong>en</strong> toegevoegd aan <strong>het</strong> programma voor <strong>het</strong><br />

trekk<strong>en</strong> van monsters, <strong>in</strong>di<strong>en</strong> de analyse wijst op mogelijke effect<strong>en</strong> op deze<br />

rivier<strong>en</strong> als gevolg van <strong>het</strong> <strong>Project</strong>. Analyse van de stroomsnelheid van de<br />

Commewijnerivier zal ook word<strong>en</strong> gebruikt om overe<strong>en</strong>komstig de Cyanide<br />

Code <strong>het</strong> ramp<strong>en</strong>plan te onderbouw<strong>en</strong>.<br />

Het programma voor monitor<strong>in</strong>g van <strong>het</strong> oppervlaktewater zal seizo<strong>en</strong>gebond<strong>en</strong><br />

word<strong>en</strong> uitgevoerd om <strong>het</strong> verschil <strong>in</strong> de kwaliteit van <strong>het</strong> water <strong>in</strong> de natte <strong>en</strong><br />

droge seizo<strong>en</strong><strong>en</strong> te met<strong>en</strong> <strong>en</strong> zal e<strong>en</strong> laboratoriumanalyse <strong>in</strong>houd<strong>en</strong> voor e<strong>en</strong><br />

brede reeks van parameters waaronder voed<strong>in</strong>gsstoff<strong>en</strong>, belangrijke ion<strong>en</strong> <strong>en</strong><br />

vaste <strong>en</strong> opgeloste metal<strong>en</strong> <strong>en</strong> zal ook parameters omvatt<strong>en</strong> die red<strong>en</strong> tot<br />

bezorgdheid gev<strong>en</strong>, zoals <strong>het</strong> cyanidegehalte. Ook zull<strong>en</strong> veldmet<strong>in</strong>g<strong>en</strong>, zoals<br />

temperatuur <strong>en</strong> opgeloste zuurstof, verwerkt word<strong>en</strong>.<br />

7.1.1.3 Specialistisch Milieu-onderzoek 3: Luchtkwaliteit <strong>en</strong> Klimaat<br />

Er is e<strong>en</strong> onderzoek nodig <strong><strong>in</strong>zake</strong> de kwaliteit van de lucht <strong>in</strong> de omgev<strong>in</strong>g <strong>en</strong><br />

<strong>het</strong> klimaat om basel<strong>in</strong>econc<strong>en</strong>traties van de luchtkwaliteit alsook de<br />

klimaatcondities op de Mijnlocatie <strong>en</strong> de corridors van de transportweg<strong>en</strong> te<br />

ERM 58 SEPTEMBER 2011


epal<strong>en</strong>. ERM zal de conc<strong>en</strong>traties met<strong>en</strong> van vaste deeltjes van de lucht <strong>in</strong> de<br />

omgev<strong>in</strong>g met e<strong>en</strong> diameter van m<strong>in</strong>der dan 10 micron<strong>en</strong> (PM10) <strong>en</strong> <strong>het</strong> totaal<br />

aan zwev<strong>en</strong>de deeltjes (TSP) alsook <strong>het</strong> gehalte aan stikstofdioxide (NO2) <strong>en</strong><br />

zwaveldioxide (SO2). Er zull<strong>en</strong> op drie locaties monitor<strong>in</strong>gstations word<strong>en</strong><br />

opgezet, t.w.:<br />

• nabij de Maraba-mijn, op ongeveer 500 m afstand van de voorgestelde<br />

Transportweg;<br />

• op de voorgestelde locatie van de Plant; <strong>en</strong><br />

• langs de weg naar Mo<strong>en</strong>go.<br />

ERM zal tijd<strong>en</strong>s de grote droge tijd gegev<strong>en</strong>s verzamel<strong>en</strong>, <strong>het</strong>ge<strong>en</strong> e<strong>en</strong> redelijke<br />

schatt<strong>in</strong>g di<strong>en</strong>t te verschaff<strong>en</strong> van de condities zoals die zich voordo<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

ongunstigste geval.<br />

<strong>Surgold</strong> heeft (<strong>in</strong> 2006) bij de huidige kamplocatie e<strong>en</strong> meteorologisch station<br />

opgezet voor <strong>het</strong> met<strong>en</strong> van de neerslag, de temperatuur, de barometerdruk,<br />

vochtigheid <strong>en</strong> w<strong>in</strong>dsnelheid <strong>en</strong> –richt<strong>in</strong>g. Om de basel<strong>in</strong>e-klimaatcondities vast<br />

te stell<strong>en</strong>, zal ERM de meteorologische gegev<strong>en</strong>s van <strong>het</strong> station die de afgelop<strong>en</strong><br />

vijf jaar ieder uur zijn verzameld, analyser<strong>en</strong>. Er zal e<strong>en</strong> rapport word<strong>en</strong><br />

opgesteld over de kwaliteit van de omgev<strong>in</strong>gslucht, dat aan de opdrachtgever<br />

zal word<strong>en</strong> verstrekt <strong>en</strong> wel b<strong>in</strong>n<strong>en</strong> 30 dag<strong>en</strong> na <strong>het</strong> e<strong>in</strong>de van de<br />

monitor<strong>in</strong>gperiode. Dit rapport zal <strong>het</strong> navolg<strong>en</strong>de bevatt<strong>en</strong>:<br />

1. E<strong>en</strong> opsomm<strong>in</strong>g van alle geldige uurlijkse meteorologische<br />

gegev<strong>en</strong>s;<br />

2. E<strong>en</strong> sam<strong>en</strong>vatt<strong>in</strong>g van de PM10 <strong>en</strong> TSP 24-uur conc<strong>en</strong>traties <strong>en</strong><br />

NO2 <strong>en</strong> SO2-conc<strong>en</strong>traties ter vergelijk<strong>in</strong>g met toepasselijke<br />

standaard<strong>en</strong>, waaronder de Standaard<strong>en</strong> van de World Bank<br />

<strong><strong>in</strong>zake</strong> de Luchtkwaliteit (World Bank Air Quality Standards -<br />

WBAQS);<br />

3. E<strong>en</strong> discussie over de gemet<strong>en</strong> ev<strong>en</strong>tuele overschrijd<strong>in</strong>g<strong>en</strong> van de<br />

NAAQS of de WBAQS;<br />

4. E<strong>en</strong> vaststell<strong>in</strong>g van <strong>het</strong> perc<strong>en</strong>tage verkreg<strong>en</strong> gegev<strong>en</strong>s; <strong>en</strong><br />

5. daarmee verband houd<strong>en</strong>de QA/QC-resultat<strong>en</strong>.<br />

Er zal e<strong>en</strong> protocol word<strong>en</strong> ontwikkeld voor <strong>het</strong> controler<strong>en</strong> van de lucht <strong>in</strong> de<br />

omgev<strong>in</strong>g van <strong>het</strong> project.<br />

7.1.1.4 Specialistisch Milieu-onderzoek 4: Onderzoek naar geluidh<strong>in</strong>der<br />

Er is e<strong>en</strong> studie nodig om de basel<strong>in</strong>e- ofwel de grondwaard<strong>en</strong> van de<br />

geluidsniveaus b<strong>in</strong>n<strong>en</strong> de Mijnlocatie <strong>en</strong> de omligg<strong>en</strong>de gebied<strong>en</strong> vast te stell<strong>en</strong>.<br />

ERM 59 SEPTEMBER 2011


Het ERM zal op twee locaties e<strong>en</strong> monitor<strong>in</strong>g van <strong>het</strong> omgev<strong>in</strong>gsgeluid<br />

verricht<strong>en</strong> (<strong>en</strong> wel nabij de Marabamijn, op ongeveer 500 m afstand van de<br />

voorgestelde Transportweg; <strong>en</strong> nabij de beveilig<strong>in</strong>gspoort (Poort 1), op ongeveer<br />

4 km t<strong>en</strong> zuidoost<strong>en</strong> van de Plantlocatie) om <strong>het</strong> bestaande geluidsmilieu vast te<br />

legg<strong>en</strong>. Per uur zull<strong>en</strong> de gemiddelde equival<strong>en</strong>te geluidsniveaus (LAeq) word<strong>en</strong><br />

gemet<strong>en</strong> <strong>in</strong> A-gewog<strong>en</strong> decibels (dBA). De apparatuur voor geluidsmonitor<strong>in</strong>g<br />

zal voor <strong>en</strong> na elke met<strong>in</strong>g word<strong>en</strong> geijkt. De apparatuur zal op ongeveer 1,5 m<br />

van de grond uit de buurt van gebouw<strong>en</strong> <strong>en</strong>/of constructies word<strong>en</strong> geplaatst<br />

om weerkaats<strong>in</strong>g (echo’s) te voorkom<strong>en</strong>. Klimaatcondities <strong>en</strong><br />

omgev<strong>in</strong>gsgeluid<strong>en</strong> die tijd<strong>en</strong>s de meetperiode word<strong>en</strong> waarg<strong>en</strong>om<strong>en</strong>, zull<strong>en</strong><br />

word<strong>en</strong> vastgelegd. De gemet<strong>en</strong> omgev<strong>in</strong>gsgeluidniveaus zull<strong>en</strong> word<strong>en</strong><br />

vergelek<strong>en</strong> met de geluidsstandaard<strong>en</strong> van de IFC voor bewoonde <strong>en</strong><br />

<strong>in</strong>dustriële gebied<strong>en</strong>.<br />

7.1.1.5 Specialistisch Milieu-onderzoek 5: Onderzoek naar Flora<br />

Het onderzoek <strong><strong>in</strong>zake</strong> de vegetatie <strong>en</strong> de flora zal e<strong>en</strong> nauwkeurige<br />

vegetatietypologie <strong>en</strong> kaart van de vegetatie op de Mijnlocatie producer<strong>en</strong>. De<br />

b<strong>en</strong>ader<strong>in</strong>g m.b.t. de vegetatie- <strong>en</strong> flora-analyse is gebaseerd op <strong>het</strong><br />

<strong>in</strong>v<strong>en</strong>tariser<strong>en</strong> van strok<strong>en</strong> (<strong>in</strong> feite lange, smalle stukk<strong>en</strong> land) op <strong>het</strong> veld van<br />

locaties die repres<strong>en</strong>tatief zijn voor de omgev<strong>in</strong>g, <strong>en</strong> <strong>het</strong> opportunistisch<br />

verzamel<strong>en</strong> van plant<strong>en</strong> op de mijnlocatie.<br />

Het vooraf classificer<strong>en</strong> van de vegetatie zal zijn gebaseerd op de<br />

vegetatietypologieën van Teuniss<strong>en</strong> (1978, 1980) <strong>en</strong> Bord<strong>en</strong>ave (nietgepubliceerd),<br />

alsook op vegetatiebeschrijv<strong>in</strong>g<strong>en</strong> <strong>in</strong> welk van toepass<strong>in</strong>g zijnd CI<br />

RAP rapport dan ook uit de regio. Teuniss<strong>en</strong> (1978, 1980) di<strong>en</strong>t als naslagwerk<br />

voor de laagland<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame (laagland<strong>en</strong> t<strong>en</strong> noord<strong>en</strong> van <strong>het</strong> Guyanaschild<br />

s.s.), terwijl de docum<strong>en</strong>tatie van Bord<strong>en</strong>ave (niet-gepubliceerd) di<strong>en</strong>t als<br />

naslagwerk voor <strong>het</strong> Guyanaschild (voornamelijk vanaf e<strong>en</strong> hoogte van 50-100<br />

m).<br />

De analyse van de vegetatie / flora op <strong>het</strong> veld zal <strong>het</strong> volg<strong>en</strong>de <strong>in</strong>houd<strong>en</strong>:<br />

• <strong>het</strong> verzamel<strong>en</strong> van monsters van de ‘natuurlijke’ vegetatie langs e<strong>en</strong><br />

strook van 200 m per locatie, van tevor<strong>en</strong> geselecteerd op basis van de<br />

landschapanalyse (uit de buurt van bestaande weg<strong>en</strong> of bospad<strong>en</strong>);<br />

• <strong>het</strong> verzamel<strong>en</strong> van monsters van habitats die e<strong>en</strong> verander<strong>in</strong>g hebb<strong>en</strong><br />

ondergaan langs e<strong>en</strong> of meer strok<strong>en</strong> van 50 m, specifiek van secundaire<br />

vegetatie langs bestaande weg<strong>en</strong> <strong>en</strong> bospad<strong>en</strong>; <strong>in</strong> pr<strong>in</strong>cipe zal e<strong>en</strong> stuk<br />

grond dat e<strong>en</strong> verander<strong>in</strong>g heeft ondergaan altijd vergelek<strong>en</strong> word<strong>en</strong><br />

met de nabijgeleg<strong>en</strong> strook vegetatie die <strong>in</strong> haar natuurlijke staat is<br />

geblev<strong>en</strong>, om op die manier gerichte analyses van <strong>het</strong> effect van<br />

verander<strong>in</strong>g op <strong>het</strong> plant<strong>en</strong>lev<strong>en</strong> mogelijk te mak<strong>en</strong>;<br />

ERM 60 SEPTEMBER 2011


• gerichtheid op boomachtig<strong>en</strong> (bom<strong>en</strong> <strong>en</strong> grotere struik<strong>en</strong> <strong>en</strong> lian<strong>en</strong>, met<br />

e<strong>en</strong> stamdiameter > 5 cm) <strong>en</strong> plant<strong>en</strong>groep<strong>en</strong> met species ‘die red<strong>en</strong> tot<br />

bezorgdheid gev<strong>en</strong>’, m.a.w. species die op de ‘red list’ zijn geplaatst door<br />

de IUCN of zijn opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> de CITES-App<strong>en</strong>dix I of II;<br />

• gebruikmak<strong>in</strong>g van de deskundigheid van ervar<strong>en</strong> veldbotanist<strong>en</strong> /<br />

boomverk<strong>en</strong>ner t.b.v. de id<strong>en</strong>tificatie van houtachtige plant<strong>en</strong>, van e<strong>en</strong><br />

specialist van <strong>het</strong> nationaal herbarium van Sur<strong>in</strong>ame (BBS) voor <strong>het</strong><br />

herk<strong>en</strong>n<strong>en</strong> van andere species <strong>en</strong>, <strong>in</strong>di<strong>en</strong> nodig, voor <strong>het</strong> verzamel<strong>en</strong> van<br />

lev<strong>en</strong>svatbare soort<strong>en</strong> als bewijs; <strong>en</strong><br />

• (digitale) fotografische docum<strong>en</strong>tatie van de vegetatie die wordt<br />

waarg<strong>en</strong>om<strong>en</strong> <strong>en</strong> de plant<strong>en</strong> waarvan er del<strong>en</strong> als bewijsmateriaal<br />

word<strong>en</strong> verzameld.<br />

Het verzamelde plant-bewijsmateriaal zal voor zover dat mogelijk is, word<strong>en</strong><br />

geprepareerd <strong>en</strong> geïd<strong>en</strong>tificeerd <strong>in</strong> Sur<strong>in</strong>ame door BBS. Achteraf zull<strong>en</strong> wij de<br />

verricht<strong>in</strong>g<strong>en</strong> van <strong>het</strong> BBS evaluer<strong>en</strong> <strong>in</strong> term<strong>en</strong> van de id<strong>en</strong>tificatie van <strong>het</strong><br />

verzamelde plantmateriaal. Indi<strong>en</strong> zulks vereist is, kan <strong>het</strong> verzamelde<br />

plantmateriaal teg<strong>en</strong> extra kost<strong>en</strong> word<strong>en</strong> opgestuurd naar bijv. <strong>het</strong> Herbarium<br />

van Cay<strong>en</strong>ne (<strong>in</strong> Frans-Guyana) voor id<strong>en</strong>tificatie of <strong>het</strong> bevestig<strong>en</strong> van de<br />

(eerdere) id<strong>en</strong>tificatie.<br />

Om <strong>het</strong> veldwerk te ondersteun<strong>en</strong> <strong>en</strong> e<strong>en</strong> volledigere lijst van de flora van <strong>het</strong><br />

gebied op te kunn<strong>en</strong> stell<strong>en</strong>, zull<strong>en</strong> de gegev<strong>en</strong>s over ‘oude’ soort<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

Herbarium van Sur<strong>in</strong>ame (BBS) word<strong>en</strong> verzameld. Oude soort<strong>en</strong> zijn die<br />

soort<strong>en</strong> die verzameld <strong>en</strong> geïd<strong>en</strong>tificeerd zijn voordat wij van start g<strong>in</strong>g<strong>en</strong> met<br />

ons veldwerk; er wordt naar deze soort<strong>en</strong> verwez<strong>en</strong> <strong>in</strong> <strong>het</strong> BBS-kaart<strong>en</strong>systeem.<br />

Het verwerk<strong>en</strong> van de gegev<strong>en</strong>s die verzameld zijn bij <strong>het</strong> onderzoek <strong>in</strong> de<br />

strok<strong>en</strong> op <strong>het</strong> veld zal <strong>het</strong> volg<strong>en</strong>de <strong>in</strong>houd<strong>en</strong>:<br />

• Het mak<strong>en</strong> van structuurgrafiek<strong>en</strong> – Op basis van gegev<strong>en</strong>s <strong><strong>in</strong>zake</strong> de<br />

id<strong>en</strong>titeit <strong>en</strong> grootte van de species, zal er e<strong>en</strong> grafiek word<strong>en</strong> gemaakt<br />

die op de Y-as de diameters van <strong>in</strong>dividuele bom<strong>en</strong> <strong>en</strong> lian<strong>en</strong> aangeeft <strong>en</strong><br />

de hoogte op de X-as; deze grafiek<strong>en</strong> visualiser<strong>en</strong> de id<strong>en</strong>titeit <strong>en</strong><br />

spreid<strong>in</strong>g van jonge <strong>en</strong> volwass<strong>en</strong> bom<strong>en</strong>, de hoogte van de kru<strong>in</strong> of<br />

kroonsluit<strong>in</strong>g <strong>en</strong> de aanwezigheid <strong>en</strong> id<strong>en</strong>titeit van erg grote <strong>en</strong><br />

opkom<strong>en</strong>de bom<strong>en</strong>;<br />

• Het berek<strong>en</strong><strong>en</strong> van de FIV, ofwel de Family Importance Values (de<br />

belangrijkheid van aanverwante soort<strong>en</strong>) – De <strong>in</strong>dex<strong>en</strong> van Family<br />

Importance Value (FIV; zie Mori c.s. 1987), zull<strong>en</strong> word<strong>en</strong> berek<strong>en</strong>d op<br />

basis van de gegev<strong>en</strong>s van de strok<strong>en</strong><strong>in</strong>v<strong>en</strong>tarisatie; FIV-<strong>in</strong>dex<strong>en</strong> word<strong>en</strong><br />

ERM 61 SEPTEMBER 2011


gebruikt om de sam<strong>en</strong>stell<strong>in</strong>g van <strong>het</strong> bos te vergelijk<strong>en</strong>; de FIV-<strong>in</strong>dex is<br />

e<strong>en</strong> weergave <strong>en</strong> de som van: i) de relatieve dom<strong>in</strong>antie (gekoppeld aan<br />

de boomgrootte) ii) de relatieve overvloed (gekoppeld aan <strong>het</strong> aantal<br />

bom<strong>en</strong>), <strong>en</strong> iii) de relatieve diversiteit (gekoppeld aan <strong>het</strong> aantal per<br />

soort); de belangrijkheids<strong>in</strong>dex<strong>en</strong> word<strong>en</strong> voor elke botanische familie<br />

vastgesteld; de FIV-<strong>in</strong>dex<strong>en</strong> weerspiegel<strong>en</strong> zowel kwalitatieve als<br />

kwantitatieve aspect<strong>en</strong> van de verschill<strong>en</strong>de boomfamilies;<br />

• <strong>het</strong> <strong>in</strong>v<strong>en</strong>tariser<strong>en</strong> van de species – Er wordt e<strong>en</strong> lijst gemaakt van de<br />

species die zijn aangetroff<strong>en</strong> <strong>in</strong> de strok<strong>en</strong> op basis van de Familie<br />

waartoe zij behor<strong>en</strong> <strong>en</strong> hun Latijnse speciesnaam; <strong>en</strong><br />

• <strong>het</strong> opstell<strong>en</strong> van e<strong>en</strong> vegetatietypologie – De diversiteit van de vegetatie<br />

wordt gepres<strong>en</strong>teerd door <strong>het</strong> onderscheid<strong>en</strong>, ord<strong>en</strong><strong>en</strong> <strong>en</strong> <strong>in</strong> <strong>het</strong> kort<br />

beschrijv<strong>en</strong> van de verschill<strong>en</strong>de vegetatiesoort<strong>en</strong>; dit zal gebaseerd zijn<br />

op de <strong>in</strong>terpretatie van de verwerkte gegev<strong>en</strong>s die <strong>in</strong> de strok<strong>en</strong> zijn<br />

verzameld.<br />

De concept-vegetatietypologie zal word<strong>en</strong> afgerond door deze zoveel als<br />

mogelijk <strong>in</strong> overe<strong>en</strong>stemm<strong>in</strong>g te br<strong>en</strong>g<strong>en</strong> met bestaande typologieën voor<br />

Sur<strong>in</strong>ame <strong>en</strong> Frans-Guyana. De plant<strong>en</strong>lijst die voortvloeit uit de<br />

strok<strong>en</strong><strong>in</strong>v<strong>en</strong>tarisatie zal word<strong>en</strong> aangevuld met de plant<strong>en</strong> die door ons gericht<br />

werd<strong>en</strong> verzameld (bijv. buit<strong>en</strong> de strok<strong>en</strong>). De IUCN- <strong>en</strong> CITES-status van de<br />

plant<strong>en</strong> die <strong>in</strong> de lijst zijn vermeld, zal word<strong>en</strong> gecontroleerd <strong>en</strong> er zull<strong>en</strong><br />

aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> word<strong>en</strong> geplaatst <strong>in</strong>di<strong>en</strong> er sprake is van species die ‘red<strong>en</strong> tot<br />

bezorgdheid gev<strong>en</strong>’ (bijv. bedreigde species).<br />

7.1.1.6 Specialistisch Milieu-onderzoek 6: Bodemonderzoek<br />

Het naar de aard k<strong>en</strong>merk<strong>en</strong> van bodemcondities is van belang m.b.t. de<br />

voorspell<strong>in</strong>g <strong>en</strong> mitiger<strong>in</strong>g van watersedim<strong>en</strong>tatie <strong>en</strong> erosiebestrijd<strong>in</strong>g tijd<strong>en</strong>s de<br />

constructie <strong>en</strong> exploitatie <strong>en</strong> om gegev<strong>en</strong>s te verschaff<strong>en</strong> ter ondersteun<strong>in</strong>g van<br />

de mijnsluit<strong>in</strong>g <strong>en</strong> rehabilitatie. Er zull<strong>en</strong> ongeveer 20 bodemmonsters word<strong>en</strong><br />

verzameld van repres<strong>en</strong>tatieve locaties <strong>in</strong> <strong>het</strong> hele voorbestemde mijngebied. Er<br />

zull<strong>en</strong> compostmonsters word<strong>en</strong> verzameld tot e<strong>en</strong> diepte van 20 cm met<br />

gebruikmak<strong>in</strong>g van e<strong>en</strong> handmatig bedi<strong>en</strong>d apparaat voor <strong>het</strong> trekk<strong>en</strong> van<br />

kernmonsters.<br />

7.1.1.7 Specialistisch Milieu-onderzoek 7: Onderzoek <strong><strong>in</strong>zake</strong> lev<strong>en</strong> <strong>in</strong> de lucht<br />

Onderzoek naar Vogels <strong>en</strong> Vleermuiz<strong>en</strong><br />

Het doel van <strong>het</strong> onderzoek naar vogels <strong>en</strong> vleermuiz<strong>en</strong> is e<strong>en</strong> vollediger<br />

overzicht te ontwikkel<strong>en</strong> van de vogel- <strong>en</strong> vleermuiz<strong>en</strong>diversiteit op de locatie,<br />

<strong>en</strong> te analyser<strong>en</strong> of er daar bedreigde soort<strong>en</strong> voorkom<strong>en</strong>, <strong>en</strong> <strong>in</strong>di<strong>en</strong> zulks <strong>het</strong><br />

ERM 62 SEPTEMBER 2011


geval is, waar deze voorkom<strong>en</strong>. The ornithologische ofwel de deskundigheid op<br />

<strong>het</strong> gebied van vogels van de specialist betrokk<strong>en</strong> <strong>in</strong> deze studie, <strong>in</strong> comb<strong>in</strong>atie<br />

met bestaande kaart<strong>en</strong> over de spreid<strong>in</strong>g van vogels <strong>en</strong> vleermuiz<strong>en</strong> (bijv.<br />

Digitale Spreid<strong>in</strong>gskaart<strong>en</strong> <strong><strong>in</strong>zake</strong> Zoogdier<strong>en</strong> / Vogels op <strong>het</strong> Westelijk<br />

Halfrond) maakt e<strong>en</strong> a priori analyse mogelijk van de species die wij <strong>in</strong> <strong>het</strong><br />

onderzoeksgebied kunn<strong>en</strong> verwacht<strong>en</strong>.<br />

Er zull<strong>en</strong> tijd<strong>en</strong>s de veldbezoek<strong>en</strong> naar de Mijnlocatie, veldmet<strong>in</strong>g<strong>en</strong> van vogels<br />

<strong>en</strong> vleermuiz<strong>en</strong> op vooraf vastgestelde locaties <strong>in</strong> <strong>het</strong> onderzoeksgebied word<strong>en</strong><br />

verricht. De locaties zull<strong>en</strong> overe<strong>en</strong> moet<strong>en</strong> kom<strong>en</strong> met die locaties waar er<br />

habitats <strong>en</strong> vegetatie zull<strong>en</strong> word<strong>en</strong> geanalyseerd, hoewel er misschi<strong>en</strong><br />

additionele locaties voor vogel- <strong>en</strong> vleermuiz<strong>en</strong>observatie nodig zull<strong>en</strong> zijn. De<br />

observaties zull<strong>en</strong> word<strong>en</strong> uitgevoerd langs strok<strong>en</strong> (ofwel veldlijn<strong>en</strong>) van 1-2<br />

km l<strong>en</strong>gte.<br />

De veldmet<strong>in</strong>g<strong>en</strong> van vogels <strong>en</strong> vleermuiz<strong>en</strong> zull<strong>en</strong> <strong>het</strong> navolg<strong>en</strong>de omvatt<strong>en</strong>:<br />

• auditieve (zang) <strong>en</strong> visuele vastlegg<strong>in</strong>g van vogels <strong>en</strong> vleermuiz<strong>en</strong>; <strong>en</strong><br />

• opnames langs de weg <strong>en</strong> e<strong>en</strong> paar honderd meter van de weg af, langs<br />

pad<strong>en</strong> aan de kant van de weg;<br />

• doelgericht (<strong>in</strong> e<strong>en</strong> net) vang<strong>en</strong> <strong>en</strong> verzamel<strong>en</strong> <strong>in</strong>geval er twijfel bestaat<br />

over de id<strong>en</strong>titeit van de species die zijn geobserveerd; <strong>en</strong><br />

• (digitale) fotografische docum<strong>en</strong>tatie van vogels/vleermuiz<strong>en</strong> die<br />

gevang<strong>en</strong> of verzameld zijn, <strong>en</strong> <strong>in</strong>di<strong>en</strong> mogelijk, van <strong>en</strong>kele<br />

vogels/vleermuiz<strong>en</strong> die geobserveerd zijn.<br />

Het protocol voor <strong>het</strong> ornithologisch veldwerk zal word<strong>en</strong> ontwikkeld op basis<br />

van soortgelijke protocols die geïmplem<strong>en</strong>teerd zijn tijd<strong>en</strong>s e<strong>en</strong> soortgelijke<br />

studie te Bakhuis (<strong>in</strong> West-Sur<strong>in</strong>ame). Er zull<strong>en</strong> t<strong>en</strong>m<strong>in</strong>ste twee<br />

verk<strong>en</strong>n<strong>in</strong>gstocht<strong>en</strong> naar vogels <strong>en</strong> vleermuiz<strong>en</strong> word<strong>en</strong> ondernom<strong>en</strong> (e<strong>en</strong><br />

tijd<strong>en</strong>s de reg<strong>en</strong>tijd <strong>en</strong> e<strong>en</strong> tijd<strong>en</strong>s de droge tijd), elk ongeveer e<strong>en</strong> week lang.<br />

Deze zull<strong>en</strong> <strong>het</strong> verk<strong>en</strong>n<strong>en</strong> van meerdere locaties <strong>en</strong> strok<strong>en</strong> <strong>in</strong>houd<strong>en</strong>. Er zal<br />

<strong>en</strong>ige additionele <strong>in</strong>formatie over <strong>het</strong> voorkom<strong>en</strong> van vogels <strong>en</strong> vleermuiz<strong>en</strong> <strong>in</strong><br />

<strong>het</strong> gebied word<strong>en</strong> verkreg<strong>en</strong> uit <strong>in</strong>terviews met lokale bewoners (zie de<br />

paragraaf over grote zoogdier<strong>en</strong>, hieronder).<br />

De lijst van vogels <strong>en</strong> vleermuiz<strong>en</strong> die voortvloeit uit onze <strong>in</strong>v<strong>en</strong>tarisatie zal<br />

word<strong>en</strong> aangevuld met de nam<strong>en</strong> van vogels <strong>en</strong> vleermuiz<strong>en</strong> die eerder zijn<br />

waarg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> voorg<strong>en</strong>om<strong>en</strong> Mijngebied. De IUCN / CITES-status van de<br />

species die op de lijst voorkom<strong>en</strong>, zal word<strong>en</strong> gecontroleerd <strong>en</strong> er zull<strong>en</strong><br />

aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> word<strong>en</strong> gemaakt <strong>in</strong>di<strong>en</strong> er species zijn die red<strong>en</strong> tot bezorgdheid<br />

gev<strong>en</strong> (zoals bedreigde soort<strong>en</strong>) <strong>en</strong>/of waarvan vermoed wordt dat deze nog<br />

niet beschrev<strong>en</strong> zijn of tot RRE behor<strong>en</strong>.<br />

ERM 63 SEPTEMBER 2011


7.1.1.8 Specialistisch Milieu-onderzoek 8: Onderzoek <strong><strong>in</strong>zake</strong> terrestrische (ofwel op <strong>het</strong> land<br />

voorkom<strong>en</strong>de) Fauna<br />

Amfibieën <strong>en</strong> reptiel<strong>en</strong><br />

Het doel van <strong>het</strong> onderzoek <strong><strong>in</strong>zake</strong> amfibieën <strong>en</strong> reptiel<strong>en</strong> is voornamelijk<br />

bedoeld om te kom<strong>en</strong> tot e<strong>en</strong> vollediger overzicht van de diversiteit op de<br />

Mijnlocatie <strong>en</strong> om te analyser<strong>en</strong> of er bedreigde <strong>en</strong> pot<strong>en</strong>tieel nieuwe (niet<br />

beschrev<strong>en</strong>) of daar alle<strong>en</strong> op e<strong>en</strong> bepaalde plaats voorkom<strong>en</strong>de species<br />

aanwezig zijn, (RRE – species), <strong>en</strong> <strong>in</strong>di<strong>en</strong> zulks <strong>het</strong> geval is, waar deze<br />

voorkom<strong>en</strong>.<br />

Het trekk<strong>en</strong> van monsters <strong>in</strong> <strong>het</strong> veld op vooraf vastgestelde locaties <strong>in</strong> <strong>het</strong><br />

onderzoeksgebied zal tijd<strong>en</strong>s de reg<strong>en</strong>tijd <strong>en</strong> de droge tijd geschied<strong>en</strong>.<br />

Het trekk<strong>en</strong> van monsters <strong>in</strong> <strong>het</strong> veld van amfibieën <strong>en</strong> reptiel<strong>en</strong> zal <strong>het</strong><br />

volg<strong>en</strong>de omvatt<strong>en</strong>:<br />

• auditieve (zang) <strong>en</strong> visuele vastlegg<strong>in</strong>g van species zowel gedur<strong>en</strong>de de<br />

nacht als overdag;<br />

• Monsternem<strong>in</strong>g van species die nadere id<strong>en</strong>tificatie vereis<strong>en</strong> <strong>in</strong> <strong>het</strong> lab;<br />

• Op elke locatie, vastlegg<strong>in</strong>g/opname / monsternem<strong>in</strong>g langs e<strong>en</strong> pad<br />

van ongeveer 1-1.5 km lang; <strong>en</strong><br />

• (digitale) fotografische docum<strong>en</strong>tatie van amfibie- <strong>en</strong> reptielspecies die<br />

zijn geobserveerd (<strong>in</strong>di<strong>en</strong> zulks mogelijk is) <strong>en</strong> zeker van die species die<br />

verzameld zijn.<br />

Het protocol voor <strong>het</strong> herpetologisch veldwerk zal zijn gebaseerd op onderzoek<br />

dat eerder succesvol is afgerond op verschill<strong>en</strong>de locaties <strong>in</strong> Sur<strong>in</strong>ame door de<br />

specialist die bij dit onderzoek betrokk<strong>en</strong> is.<br />

Er zal wat additionele <strong>in</strong>formatie over <strong>het</strong> voorkom<strong>en</strong> van amfibieën <strong>en</strong> reptiel<strong>en</strong><br />

word<strong>en</strong> verkreg<strong>en</strong> middels <strong>in</strong>terviews met lokale bewoners (zie onderstaande<br />

paragraaf over grote zoogdier<strong>en</strong>).<br />

De lijst van amfibieën <strong>en</strong> reptiel<strong>en</strong> die voortvloeit uit onze <strong>in</strong>v<strong>en</strong>tarisatie zal<br />

word<strong>en</strong> aangevuld met de nam<strong>en</strong> van amfibieën <strong>en</strong> reptiel<strong>en</strong> die eerder zijn<br />

waarg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong> betreff<strong>en</strong>de Mijngebied. De IUCN/ CITES-status van de<br />

species die op de lijst voorkom<strong>en</strong>, zal word<strong>en</strong> gecontroleerd <strong>en</strong> er zull<strong>en</strong><br />

aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> word<strong>en</strong> gemaakt <strong>in</strong>di<strong>en</strong> er species zijn die red<strong>en</strong> tot bezorgdheid<br />

gev<strong>en</strong> (zoals bedreigde soort<strong>en</strong>) <strong>en</strong>/of waarvan vermoed wordt dat deze nog<br />

niet beschrev<strong>en</strong> zijn of tot RRE behor<strong>en</strong>.<br />

ERM 64 SEPTEMBER 2011


Grote Zoogdier<strong>en</strong> <strong>en</strong> Buideldier<strong>en</strong><br />

Het doel van <strong>het</strong> onderzoek naar de grote zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> zal<br />

voornamelijk zijn om te kom<strong>en</strong> tot e<strong>en</strong> vollediger overzicht van de diversiteit<br />

aan grote zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> op de Mijnlocatie <strong>en</strong> om te analyser<strong>en</strong> of er<br />

bedreigde species daar voorkom<strong>en</strong>, and <strong>in</strong>di<strong>en</strong> zulks <strong>het</strong> geval is, waar deze<br />

voorkom<strong>en</strong>. Grote zoogdier<strong>en</strong> kunn<strong>en</strong> word<strong>en</strong> gedef<strong>in</strong>ieerd als zoogdier<strong>en</strong> die<br />

meer dan 1 kg (gemiddeld) weg<strong>en</strong>.<br />

Om de aanwezigheid van grote zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> <strong>in</strong> <strong>het</strong> <strong>Project</strong>gebied<br />

te kunn<strong>en</strong> voorspell<strong>en</strong>, zal gebruik word<strong>en</strong> gemaakt van bestaande kaart<strong>en</strong><br />

<strong><strong>in</strong>zake</strong> hun spreid<strong>in</strong>g (bij. Kaart<strong>en</strong> <strong><strong>in</strong>zake</strong> de Spreid<strong>in</strong>g van Zoogdier<strong>en</strong> <strong>en</strong><br />

Buideldier<strong>en</strong> van <strong>het</strong> Westelijk Halfrond). Reeds bestaande <strong>in</strong>formatie over de<br />

zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> die daadwerkelijk op de mijnlocatie zijn<br />

geobserveerd, is beschikbaar als resultaat van studies middels motion s<strong>en</strong>sor<br />

camera’s die vanaf 2009 op <strong>het</strong> project word<strong>en</strong> verricht. Het vang<strong>en</strong> van<br />

zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> is ge<strong>en</strong> optie, noch <strong>het</strong> uitgebreid opnames mak<strong>en</strong><br />

van grotere zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> langs de pad<strong>en</strong>, hoewel zij e<strong>en</strong> protocol<br />

zull<strong>en</strong> ontwikkel<strong>en</strong> <strong>en</strong> implem<strong>en</strong>ter<strong>en</strong> voor <strong>het</strong> opportunistisch// opnem<strong>en</strong> van<br />

zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> door al onze veldteamled<strong>en</strong>.<br />

Allesomvatt<strong>en</strong>de <strong>in</strong>formatie over <strong>het</strong> voorkom<strong>en</strong> van zoogdier<strong>en</strong> <strong>en</strong><br />

buideldier<strong>en</strong> zal word<strong>en</strong> verkreg<strong>en</strong> middels <strong>het</strong> <strong>in</strong>terview<strong>en</strong> van de lokale<br />

bewoners die won<strong>en</strong> <strong>en</strong> werk<strong>en</strong> <strong>en</strong>/of jag<strong>en</strong> <strong>in</strong> <strong>het</strong> betreff<strong>en</strong>de gebied. Wij zijn<br />

van plan Marrons te <strong>in</strong>terview<strong>en</strong> die <strong>in</strong> dorp<strong>en</strong> <strong>en</strong> kamp<strong>en</strong> won<strong>en</strong> <strong>in</strong> de<br />

laagland<strong>en</strong> <strong>en</strong> ev<strong>en</strong>tueel ook Brazilian<strong>en</strong> die betrokk<strong>en</strong> zijn bij de mijnactiviteit<strong>en</strong><br />

<strong>in</strong> de laagland<strong>en</strong>. Deze <strong>in</strong>terviews zull<strong>en</strong> gericht zijn op jachtspecies <strong>en</strong> species<br />

verzameld voor de handel van <strong>in</strong> <strong>het</strong> wild lev<strong>en</strong>de dier<strong>en</strong> die normaliter <strong>het</strong> best<br />

bek<strong>en</strong>d staan onder de lokale bevolk<strong>in</strong>g alsook de meest waardevolle zijn <strong>en</strong><br />

vaak ook de meest bedreigde species. Tijd<strong>en</strong>s de <strong>in</strong>terviews, zal er feedback<br />

word<strong>en</strong> gevraagd op e<strong>en</strong> lijst van ongeveer 90 dier<strong>en</strong>soort<strong>en</strong> die ev<strong>en</strong>tueel<br />

voorkom<strong>en</strong> <strong>in</strong> <strong>het</strong> grotere gebied, voornamelijk grote zoogdier<strong>en</strong> <strong>en</strong><br />

buideldier<strong>en</strong>. Elke specie op de lijst zal aan de <strong>in</strong>formant word<strong>en</strong> g<strong>en</strong>oemd bij<br />

de lokale naam, <strong>in</strong>di<strong>en</strong> vereist beschrev<strong>en</strong> <strong>in</strong> <strong>het</strong> Nederlands of <strong>in</strong> <strong>het</strong><br />

Sur<strong>in</strong>aamse <strong>en</strong> afgebeeld door kleur<strong>en</strong>tek<strong>en</strong><strong>in</strong>g<strong>en</strong> te wijz<strong>en</strong> <strong>in</strong>di<strong>en</strong> er nog <strong>en</strong>ige<br />

twijfel bestaat.<br />

Wij zull<strong>en</strong> e<strong>en</strong> lijst sam<strong>en</strong>stell<strong>en</strong> van all grote zoogdier<strong>en</strong> <strong>en</strong> buideldier<strong>en</strong> die<br />

voorhe<strong>en</strong> zijn vastgelegd <strong>in</strong> <strong>het</strong> <strong>Project</strong>gebied, die door ons team zijn vastgelegd<br />

<strong>en</strong> die door de lokale bewoners zijn bevestigd. De IUCN- CITES-status van de<br />

species die op de lijst voorkom<strong>en</strong> zal word<strong>en</strong> gecontroleerd <strong>en</strong> er zull<strong>en</strong><br />

aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> word<strong>en</strong> gemaakt <strong>in</strong>di<strong>en</strong> er species die red<strong>en</strong> tot bezorgdheid<br />

gev<strong>en</strong> (bijv. bedreigde soort<strong>en</strong>).<br />

ERM 65 SEPTEMBER 2011


Insect<strong>en</strong><br />

Het doel van de <strong>in</strong>sect<strong>en</strong>studie zal voornamelijk zijn om te kom<strong>en</strong> tot e<strong>en</strong><br />

vollediger overzicht van de diversiteit aan <strong>in</strong>sect<strong>en</strong> op de Mijnlocatie, <strong>en</strong> om te<br />

analyser<strong>en</strong> of er bedreigde <strong>en</strong> pot<strong>en</strong>tieel nieuwe (onbeschrev<strong>en</strong>) of RRE-species<br />

daar voorkom<strong>en</strong> <strong>en</strong> <strong>in</strong>di<strong>en</strong> zulks <strong>het</strong> geval is, waar deze voorkom<strong>en</strong>. De meeste<br />

<strong>in</strong>sect<strong>en</strong> zijn gemakkelijk te herk<strong>en</strong>n<strong>en</strong>, zoals de Hym<strong>en</strong>iptera (bij<strong>en</strong>, wesp<strong>en</strong> <strong>en</strong><br />

mier<strong>en</strong>) of de Coleoptera (kevers). Maar behalve de Lepidoptera (vl<strong>in</strong>ders <strong>en</strong><br />

mott<strong>en</strong>) kunn<strong>en</strong> <strong>in</strong>sect<strong>en</strong> normaliter alle<strong>en</strong> geïd<strong>en</strong>tificeerd word<strong>en</strong> op g<strong>en</strong>us of<br />

species middels <strong>het</strong> gebruik van id<strong>en</strong>tificatiesleutels <strong>en</strong> monografieën.<br />

Het trekk<strong>en</strong> van monsters <strong>in</strong> <strong>het</strong> veld op vooraf vastgestelde locaties <strong>in</strong> <strong>het</strong><br />

onderzoeksgebied zal word<strong>en</strong> verricht zowel tijd<strong>en</strong>s de reg<strong>en</strong>tijd als tijd<strong>en</strong>s de<br />

droge tijd.<br />

Het protocol voor <strong>het</strong> <strong>en</strong>tomologisch veldwerk zal zijn gebaseerd op onderzoek<br />

dat eerder succesvol is afgerond op verschill<strong>en</strong>de locaties <strong>in</strong> Sur<strong>in</strong>ame door de<br />

specialist die bij dit onderzoek betrokk<strong>en</strong> is.<br />

Er zal wat additionele <strong>in</strong>formatie over <strong>het</strong> voorkom<strong>en</strong> van <strong>in</strong>sect<strong>en</strong> word<strong>en</strong><br />

verkreg<strong>en</strong> middels <strong>in</strong>terviews met lokale bewoners (zie bov<strong>en</strong>staande paragraaf<br />

over grote zoogdier<strong>en</strong>).<br />

De lijst van <strong>in</strong>sect<strong>en</strong> die voortvloeit uit onze <strong>in</strong>v<strong>en</strong>tarisatie zal word<strong>en</strong><br />

aangevuld met de nam<strong>en</strong> van <strong>in</strong>sect<strong>en</strong> die eerder zijn waarg<strong>en</strong>om<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

<strong>Project</strong>gebied. De IUCN / CITES-status van de species die op de lijst<br />

voorkom<strong>en</strong>, zal word<strong>en</strong> gecontroleerd <strong>en</strong> er zull<strong>en</strong> aantek<strong>en</strong><strong>in</strong>g<strong>en</strong> word<strong>en</strong><br />

gemaakt <strong>in</strong>di<strong>en</strong> er species zijn die red<strong>en</strong> tot bezorgdheid gev<strong>en</strong> (zoals bedreigde<br />

soort<strong>en</strong>) <strong>en</strong>/of waarvan vermoed wordt dat deze nog niet beschrev<strong>en</strong> zijn of tot<br />

RRE behor<strong>en</strong>.<br />

7.1.1.9 Specialistisch Milieu-onderzoek 9: Basel<strong>in</strong>e-onderzoek <strong><strong>in</strong>zake</strong> Viss<strong>en</strong> <strong>en</strong> aquatische<br />

habitats<br />

Dit onderzoek zal de viss<strong>en</strong> <strong>en</strong> aquatische geme<strong>en</strong>schapp<strong>en</strong> <strong>in</strong> waterstrom<strong>en</strong><br />

(krek<strong>en</strong>, riviertjes) die mogelijk door de mijnactiviteit<strong>en</strong> aangetast kunn<strong>en</strong><br />

word<strong>en</strong> <strong>in</strong> <strong>en</strong> nabij de Mijnlocatie, naar hun aard k<strong>en</strong>merk<strong>en</strong>. Het veldonderzoek<br />

t.b.v. de ESIA zal niet uit elke strom<strong>in</strong>g <strong>en</strong>/of kreek op de Mijnlocatie monsters<br />

trekk<strong>en</strong>, maar zal verschill<strong>en</strong>de strom<strong>in</strong>g<strong>en</strong> van elk belangrijk stroomgebied <strong>in</strong><br />

de omgev<strong>in</strong>g omvatt<strong>en</strong> <strong>en</strong> de volledige reeks van aquatische habitatcondities<br />

(snelheid, waterkwaliteit, voed<strong>in</strong>gsbodemcondities, begroeid vs. niet-begroeid,<br />

etc.) <strong>in</strong> die strom<strong>in</strong>g<strong>en</strong> vastlegg<strong>en</strong>. We zull<strong>en</strong> e<strong>en</strong> onderzoek tijd<strong>en</strong>s de reg<strong>en</strong>tijd<br />

<strong>en</strong> e<strong>en</strong> tijd<strong>en</strong>s de droge tijd verricht<strong>en</strong>, met gebruikmak<strong>in</strong>g van nett<strong>en</strong> <strong>en</strong>/of<br />

elektroshocktechniek<strong>en</strong>.<br />

ERM 66 SEPTEMBER 2011


De viss<strong>en</strong> zull<strong>en</strong> word<strong>en</strong> geïd<strong>en</strong>tificeerd <strong>en</strong> alle zeldzame of <strong>en</strong>demische viss<strong>en</strong>,<br />

alsook viss<strong>en</strong> die word<strong>en</strong> gebruikt als middel van bestaan, zull<strong>en</strong> word<strong>en</strong><br />

vastgelegd. We zull<strong>en</strong> analyses van visweefsel verricht<strong>en</strong> om de basel<strong>in</strong>emetaalconc<strong>en</strong>traties<br />

vast te legg<strong>en</strong>, vooral voor belangrijke metal<strong>en</strong> die naar<br />

verwacht<strong>in</strong>g <strong>in</strong> <strong>het</strong> sijpel<strong>en</strong> van de stortplaats<strong>en</strong> voor afvalgeste<strong>en</strong>te <strong>en</strong> de<br />

tail<strong>in</strong>gsbas<strong>in</strong> zull<strong>en</strong> voorkom<strong>en</strong>. Deze gegev<strong>en</strong>s zull<strong>en</strong> word<strong>en</strong> gecomb<strong>in</strong>eerd<br />

met onderzoek dat <strong>in</strong> <strong>het</strong> verled<strong>en</strong> verricht is op de locatie, waaronder analyse<br />

van visweefsel op metal<strong>en</strong>.<br />

7.1.2 Socio-economische <strong>en</strong> Gezondheidgerelateerd Specialistisch Onderzoek<br />

De sociale basel<strong>in</strong>e studies omvatt<strong>en</strong> drie met elkaar <strong>in</strong> verband staande<br />

aspect<strong>en</strong>:<br />

• socio-economische aspect<strong>en</strong><br />

• aspect<strong>en</strong> <strong><strong>in</strong>zake</strong> volksgezondheid<br />

• aspect<strong>en</strong> <strong><strong>in</strong>zake</strong> lev<strong>en</strong>d cultureel erfgoed, zowel tastbare als ontastbare<br />

7.1.2.1 Socio-Economisch specialistisch onderzoek 1: Sociaal Basel<strong>in</strong>e-onderzoek<br />

E<strong>en</strong> team van specialist<strong>en</strong> sam<strong>en</strong> met lokale subconsultants zull<strong>en</strong> basel<strong>in</strong>eonderzoek<br />

verricht<strong>en</strong>. Op basis van eerdere k<strong>en</strong>nis <strong>en</strong> eerder werk met <strong>Surgold</strong>,<br />

zal ons voornaamste onderzoeksgebied voor deze compon<strong>en</strong>t de ti<strong>en</strong><br />

Pamakaanse dorp<strong>en</strong> omvatt<strong>en</strong>, namelijk:<br />

• Akaati<br />

• Atemsa<br />

• Bada Tabiki<br />

• Kiki Mofo<br />

• Langatabiki<br />

• Loka Loka<br />

• Nason<br />

• Pakira Tabiki<br />

• Sk<strong>in</strong> Tabiki<br />

• Tabiki Ede<br />

Behalve bov<strong>en</strong>g<strong>en</strong>oemde dorp<strong>en</strong>, zoud<strong>en</strong> er ook geme<strong>en</strong>schapp<strong>en</strong> kunn<strong>en</strong> zijn<br />

die mogelijk getroff<strong>en</strong> zull<strong>en</strong> word<strong>en</strong> door de transportcorridor, voornamelijk<br />

vanwege <strong>het</strong> verkeer van trucks <strong>en</strong> voertuig<strong>en</strong> vanuit de hav<strong>en</strong> naar de<br />

betreff<strong>en</strong>de locatie. Op basis van de resultat<strong>en</strong> van e<strong>en</strong> verkeersanalyse zoud<strong>en</strong><br />

bepaalde geme<strong>en</strong>schapp<strong>en</strong> kunn<strong>en</strong> word<strong>en</strong> opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> de basel<strong>in</strong>estudies,<br />

zoals de leefgeme<strong>en</strong>schapp<strong>en</strong> van Pilgrim Kondre, Mora Kondre, Abadu<br />

Kondre etc.<br />

ERM 67 SEPTEMBER 2011


Voorts, afhankelijk van de resultat<strong>en</strong> van e<strong>en</strong> scop<strong>in</strong>gsanalyse van de<br />

Tempatiekreek <strong>en</strong> de Commewijnerivier, alsook wat hydrologische modeller<strong>in</strong>g,<br />

zal word<strong>en</strong> geanalyseerd of <strong>en</strong>kele dorp<strong>en</strong> <strong>in</strong> dit gebied moet<strong>en</strong> word<strong>en</strong><br />

opg<strong>en</strong>om<strong>en</strong> zoals de Ndjuka-leefgeme<strong>en</strong>schapp<strong>en</strong> van Java, P<strong>en</strong>ica, Mapane,<br />

Mo<strong>en</strong>gotapu, Awara, Potehede, Stronkampu, Grankop <strong>en</strong> Moisimoisi.<br />

Waar nodig, zal <strong>het</strong> projectteam e<strong>en</strong> comb<strong>in</strong>atie van kwalitatieve <strong>in</strong>terviews <strong>en</strong><br />

kwantitatieve <strong>en</strong>quêtes houd<strong>en</strong> onder de lokale leefgeme<strong>en</strong>schapp<strong>en</strong> /<br />

huishoud<strong>en</strong>s, lokale besluitvormers / geme<strong>en</strong>schapsleiders, pot<strong>en</strong>tiële<br />

kansarm<strong>en</strong>, lokale NGO’s, overheidsautoriteit<strong>en</strong>. Dit zal word<strong>en</strong> aangevuld met<br />

focusgroepbije<strong>en</strong>komst<strong>en</strong> om de zorgpunt<strong>en</strong> <strong>en</strong> de verwacht<strong>in</strong>g<strong>en</strong> m.b.t. de<br />

activiteit<strong>en</strong> van <strong>Surgold</strong> <strong>in</strong> <strong>het</strong> gebied vast te stell<strong>en</strong>.<br />

Gegev<strong>en</strong>sverzamel<strong>in</strong>g met gebruikmak<strong>in</strong>g van de volg<strong>en</strong>de reeks techniek<strong>en</strong>:<br />

• Huishoud<strong>en</strong>quêtes<br />

• Interviews <strong>en</strong> groepsdiscussies<br />

• In kaart br<strong>en</strong>g<strong>en</strong> van de <strong>in</strong>frastructuur<br />

• Gezondheidsstudies<br />

Het sociaal team zal ook gebruik mak<strong>en</strong> van participatory rural appraisal (PRA)<br />

techniek<strong>en</strong> zoals <strong>het</strong> <strong>in</strong> kaart br<strong>en</strong>g<strong>en</strong> van hulpbronn<strong>en</strong> <strong>en</strong> focusgroepdiscussies<br />

tijd<strong>en</strong>s de <strong>in</strong>terviews met de geme<strong>en</strong>schap.<br />

Het doel van <strong>het</strong> socio-economisch onderzoek is e<strong>en</strong> nauwkeurig <strong>in</strong>zicht te<br />

verkrijg<strong>en</strong> <strong>in</strong> de karakteristiek<strong>en</strong> van de leefgeme<strong>en</strong>schapp<strong>en</strong> b<strong>in</strong>n<strong>en</strong> de<br />

geografische reikwijdte van de werkzaamhed<strong>en</strong>. De socio-economische basel<strong>in</strong>e<br />

zal de navolg<strong>en</strong>de <strong>in</strong>dicatieve <strong>in</strong>houd hebb<strong>en</strong>:<br />

• Demografisch profiel (leeftijd, g<strong>en</strong>der, gez<strong>in</strong>sstructuur etc);<br />

• Woonomstandighed<strong>en</strong> <strong>en</strong> spreid<strong>in</strong>g van vestig<strong>in</strong>g<strong>en</strong>;<br />

• Beroepsprofiel, waaronder stand van zak<strong>en</strong> m.b.t. werkgeleg<strong>en</strong>heid <strong>en</strong><br />

middel<strong>en</strong> van bestaan (werk – <strong>in</strong>di<strong>en</strong> van toepass<strong>in</strong>g, <strong>in</strong>komst<strong>en</strong>bronn<strong>en</strong>,<br />

strategieën <strong><strong>in</strong>zake</strong> middel<strong>en</strong> van bestaan);<br />

• Inkom<strong>en</strong>profiel;<br />

• Educatie (alle niveaus, ook beroepsonderwijs);<br />

• Religie;<br />

• Ras <strong>en</strong> etniciteit (waaronder <strong>in</strong>begrep<strong>en</strong> <strong>in</strong>heemse volker<strong>en</strong>, tal<strong>en</strong>);<br />

• Grondgebruik <strong>en</strong> eig<strong>en</strong>aarschap;<br />

ERM 68 SEPTEMBER 2011


• Toegang tot overheidsdi<strong>en</strong>st<strong>en</strong> <strong>en</strong> nutsvoorzi<strong>en</strong><strong>in</strong>g<strong>en</strong> (elektriciteit,<br />

vuilophaal, water, medische di<strong>en</strong>st<strong>en</strong>, <strong>in</strong>formatie- <strong>en</strong><br />

communicatietechnologie);<br />

• Energiebronn<strong>en</strong> <strong>en</strong> -gebruik;<br />

• Onderzoek <strong><strong>in</strong>zake</strong> op hulpbronn<strong>en</strong> gebaseerde middel<strong>en</strong> van bestaan,<br />

waarbij geconc<strong>en</strong>treerd wordt op <strong>het</strong> grondgebruik <strong>en</strong> hulpbronn<strong>en</strong> –<br />

vooral middels <strong>het</strong> verbouw<strong>en</strong> van cassave, jacht <strong>en</strong> visvangst -- t.b.v.<br />

lev<strong>en</strong>sonderhoud <strong>en</strong> <strong>het</strong> g<strong>en</strong>erer<strong>en</strong> van <strong>in</strong>komst<strong>en</strong>;<br />

• Onderzoek <strong><strong>in</strong>zake</strong> geme<strong>en</strong>schapsgebruik van grond <strong>in</strong> <strong>en</strong> rond de<br />

mijnlocatie met specifieke focus op jacht <strong>en</strong> traditionele transport <strong>en</strong>/of<br />

toegangscorridors;<br />

• Onderzoek <strong><strong>in</strong>zake</strong> grondgebruik (plann<strong>in</strong>g van controles, toegang tot<br />

grond, grond<strong>en</strong>recht<strong>en</strong>, geschied<strong>en</strong>is van grondgebruikpatron<strong>en</strong> –<br />

wanneer m<strong>en</strong> begon met <strong>het</strong> bebouw<strong>en</strong> van bebouwde gebied<strong>en</strong>,<br />

wanneer bepaalde stukk<strong>en</strong> grond werd<strong>en</strong> bewerkt);<br />

• Onderzoek <strong><strong>in</strong>zake</strong> watergebruik;<br />

• Analyse van kwetsbare person<strong>en</strong>; <strong>en</strong><br />

• Lev<strong>en</strong>d cultureel erfgoed <strong>en</strong> gebruik door de geme<strong>en</strong>schap van heilige<br />

plekk<strong>en</strong> bijv. boss<strong>en</strong>.<br />

7.1.2.2 Socio-Economisch Specialistisch onderzoek 2: Basel<strong>in</strong>e-onderzoek <strong><strong>in</strong>zake</strong> Gezondheid<br />

De uitvoer<strong>in</strong>g van <strong>het</strong> onderzoek <strong><strong>in</strong>zake</strong> gezondheid zal geschied<strong>en</strong> door de<br />

leid<strong>in</strong>g van de afdel<strong>in</strong>g Volksgezondheid van ERM <strong>en</strong>/of epidemiologische<br />

professionals waaronder experts van universiteit<strong>en</strong> of NGO’s. De belangrijkste<br />

vraagstukk<strong>en</strong> voor nader onderzoek zoud<strong>en</strong> misschi<strong>en</strong> malaria-overdracht<br />

kunn<strong>en</strong> omvatt<strong>en</strong>, kwikvergiftig<strong>in</strong>g, de capaciteit van <strong>en</strong> de toegang tot<br />

medische <strong>in</strong>frastructuur, <strong>en</strong> g<strong>en</strong>eeswijz<strong>en</strong> van de Inheems<strong>en</strong>. Afhankelijk van de<br />

<strong>in</strong>formatie die tijd<strong>en</strong>s de Scop<strong>in</strong>gswerkzaamhed<strong>en</strong> werd<strong>en</strong> verzameld <strong>en</strong> <strong>het</strong><br />

vaststell<strong>en</strong> van wat al dan niet relevant is voor de ESIA, zou dit ev<strong>en</strong>tueel <strong>het</strong><br />

volg<strong>en</strong>de kunn<strong>en</strong> <strong>in</strong>houd<strong>en</strong>:<br />

• Vector-gerelateerde ziekt<strong>en</strong><br />

o Incid<strong>en</strong>tie <strong>en</strong> preval<strong>en</strong>tie van malaria, tyfus <strong>en</strong> d<strong>en</strong>gue<br />

• Seksueel overdraagbare <strong>in</strong>fecties<br />

o Preval<strong>en</strong>tie van prostitutie<br />

o Incid<strong>en</strong>tie <strong>en</strong> preval<strong>en</strong>tie van HIV/AIDS <strong>en</strong> andere seksueel<br />

overdraagbare <strong>in</strong>fecties (SOI’s)<br />

• Consumptie <strong>en</strong> voed<strong>in</strong>gsgerelateerde vraagstukk<strong>en</strong><br />

ERM 69 SEPTEMBER 2011


o Verander<strong>in</strong>g<strong>en</strong> <strong>in</strong> gewoont<strong>en</strong> m.b.t. lev<strong>en</strong>sonderhoud<br />

o Ondervoed<strong>in</strong>gcijfers<br />

o Incid<strong>en</strong>tie van alcohol- <strong>en</strong> drugsmisbruik<br />

• Ongelukk<strong>en</strong> <strong>en</strong> letsels<br />

o Verkeers- <strong>en</strong> weggerelateerde <strong>in</strong>cid<strong>en</strong>t<strong>en</strong> / dod<strong>en</strong><br />

o Constructie-ongelukk<strong>en</strong>/dod<strong>en</strong><br />

• Blootstell<strong>in</strong>g aan pot<strong>en</strong>tieel gevaarlijke material<strong>en</strong><br />

o Ademhal<strong>in</strong>gscomplicaties als gevolg van luchtverontre<strong>in</strong>ig<strong>in</strong>g / stof<br />

o Consumptie van water uit vervuilde waterbronn<strong>en</strong> (<strong>in</strong>clusief kwik)<br />

• Culturele g<strong>en</strong>eeswijz<strong>en</strong><br />

o Rol van traditionele g<strong>en</strong>ezers, <strong>in</strong>heemse medicijn<strong>en</strong> of unieke culturele<br />

g<strong>en</strong>eeswijz<strong>en</strong><br />

• Infrastructuur <strong>en</strong> capaciteit van medische di<strong>en</strong>st<strong>en</strong><br />

o fysieke <strong>in</strong>frastructuur<br />

o personeel <strong>en</strong> technische capaciteit<strong>en</strong> van medische faciliteit<strong>en</strong> op<br />

lokaal, district <strong>en</strong> prov<strong>in</strong>ciaal niveau.<br />

• Toegang tot medische di<strong>en</strong>st<strong>en</strong><br />

o Preval<strong>en</strong>tie van vacc<strong>in</strong>aties / immunisaties door lokale bevolk<strong>in</strong>g<br />

o Toegang tot primaire <strong>en</strong> tertiaire di<strong>en</strong>st<strong>en</strong> voor de lokale bevolk<strong>in</strong>g<br />

7.1.2.3 Socio-Economisch Specialistisch onderzoek 3: Onderzoek <strong><strong>in</strong>zake</strong> Cultureel Erfgoed<br />

De hulpbronn<strong>en</strong> die belangrijk zijn voor <strong>het</strong> onderzoek <strong><strong>in</strong>zake</strong> <strong>het</strong> cultureel<br />

erfgoed, zijn o.a. prekoloniale archeologische overblijfsel<strong>en</strong> die mogelijk dater<strong>en</strong><br />

uit <strong>het</strong> e<strong>in</strong>de van de ijstijd (Pleistoce<strong>en</strong>) tot <strong>het</strong> beg<strong>in</strong> van de koloniale periode <strong>in</strong><br />

de 16 e eeuw. Het onderzoek zal tev<strong>en</strong>s de koloniale periode <strong>en</strong> de hed<strong>en</strong>daagse<br />

overblijfsel<strong>en</strong> tot <strong>het</strong> midd<strong>en</strong> van de 20 e eeuw omvatt<strong>en</strong>. Er zal overwog<strong>en</strong><br />

word<strong>en</strong> welke archeologische v<strong>in</strong>dplaats<strong>en</strong> van belang zijn voor de<br />

wet<strong>en</strong>schappelijke geme<strong>en</strong>schap alsook voor de lokale stakeholders. Het<br />

onderzoek zal pot<strong>en</strong>tiële archeologische plekk<strong>en</strong> omvatt<strong>en</strong>, alsook historische<br />

gebouw<strong>en</strong>, aangeduide <strong>en</strong> niet-aangeduide begraafplaats<strong>en</strong> <strong>en</strong> plekk<strong>en</strong> van<br />

speciaal religieus <strong>en</strong> spiritueel belang.<br />

E<strong>en</strong> team van specialist<strong>en</strong> bestaande uit e<strong>en</strong> s<strong>en</strong>ior <strong>en</strong> mid-level deskundige op<br />

<strong>het</strong> gebied van cultureel erfgoed, zal e<strong>en</strong> methodiek toepass<strong>en</strong> die o.a. <strong>in</strong>houdt:<br />

• Deskstudie;<br />

• Overleg met lokale <strong>en</strong> <strong>in</strong>ternationale deskundig<strong>en</strong>;<br />

ERM 70 SEPTEMBER 2011


• Veldverk<strong>en</strong>n<strong>in</strong>g<strong>en</strong>; <strong>en</strong><br />

• de kwetsbaarheid van v<strong>in</strong>dplaats<strong>en</strong> <strong>en</strong> bronn<strong>en</strong> <strong><strong>in</strong>zake</strong> de archeologie<br />

<strong>en</strong> de geschied<strong>en</strong>is van Sur<strong>in</strong>ame, waaronder <strong>in</strong>begrep<strong>en</strong> de<br />

alomvatt<strong>en</strong>de lijst van archeologische v<strong>in</strong>dplaats<strong>en</strong> <strong>in</strong> <strong>het</strong> Nationaal<br />

Museum.<br />

Het team zal verwijz<strong>en</strong> naar beschikbare literatuur <strong>en</strong> zal e<strong>en</strong> concept-kaart<br />

opstell<strong>en</strong> <strong><strong>in</strong>zake</strong> kwetsbare culturele erfgoedplaats<strong>en</strong> rondom <strong>het</strong> projectgebied.<br />

De kaart zal exacte locaties aangev<strong>en</strong> van bek<strong>en</strong>de archeologische v<strong>in</strong>dplaats<strong>en</strong><br />

<strong>en</strong> gebied<strong>en</strong> waar zich waarschijnlijk niet-ontdekte v<strong>in</strong>dplaats<strong>en</strong> voorkom<strong>en</strong>. E<strong>en</strong><br />

concept-versie van de kaart zal als leidraad <strong>en</strong> focus van de veldverk<strong>en</strong>n<strong>in</strong>g<br />

di<strong>en</strong><strong>en</strong>, waarbij gebied<strong>en</strong> word<strong>en</strong> aangewez<strong>en</strong> waaraan speciale aandacht moet<br />

word<strong>en</strong> besteed. Deze kaart zal word<strong>en</strong> verfijnd op basis van <strong>het</strong> veldwerk <strong>en</strong><br />

zal later word<strong>en</strong> gebruikt om pot<strong>en</strong>tiële effect<strong>en</strong> te id<strong>en</strong>tificer<strong>en</strong> <strong>en</strong> als leidraad<br />

<strong>en</strong> focus te di<strong>en</strong><strong>en</strong> voor mitiger<strong>in</strong>gs<strong>in</strong>spann<strong>in</strong>g<strong>en</strong>.<br />

7.1.3 Overig Desktoponderzoek om de ESIA van <strong>in</strong>formatie te voorzi<strong>en</strong><br />

7.1.3.1 Desktoponderzoek 1: Geologie<br />

Er is ge<strong>en</strong> ander geologisch veldonderzoek voorgesteld dan welke reeds is<br />

afgerond voor <strong>het</strong> project, maar de ESIA zal putt<strong>en</strong> uit de<br />

exploratiewerkzaamhed<strong>en</strong>, de geologische karakteriser<strong>in</strong>g <strong>en</strong> de geologische<br />

kaart<strong>en</strong> die reeds door <strong>Surgold</strong> zijn voltooid. Deze <strong>in</strong>formatie zal word<strong>en</strong><br />

sam<strong>en</strong>gevat <strong>in</strong> de ESIA.<br />

7.1.3.2 Desktoponderzoek 2: Geo-chemie<br />

<strong>Surgold</strong> heeft al e<strong>en</strong> allesomvatt<strong>en</strong>de analyse verricht van de geo-chemie van de<br />

mijn, waaronder <strong>het</strong> risico op zuur-geste<strong>en</strong>tedra<strong>in</strong>age (‘acid rock dra<strong>in</strong>age’ -<br />

ARD) <strong>en</strong> de lekkage-elem<strong>en</strong>t<strong>en</strong> van de stortplaats voor afvalgeste<strong>en</strong>te <strong>en</strong> de<br />

tail<strong>in</strong>gsbas<strong>in</strong> die mogelijk de kwaliteit van <strong>het</strong> water zull<strong>en</strong> aantast<strong>en</strong>. Er zijn<br />

ge<strong>en</strong> additionele geo-chemische studies voorgesteld m.b.t. de ESIA, maar de<br />

beschikbare <strong>in</strong>formatie zal word<strong>en</strong> gebruikt als <strong>in</strong>put voor modeller<strong>in</strong>g van de<br />

kwaliteit van <strong>het</strong> water. De geo-chemie van de mijn <strong>en</strong> de voorspelde kwaliteit<br />

van <strong>het</strong> oppervlakte- <strong>en</strong> grondwater tijd<strong>en</strong>s de werkzaamhed<strong>en</strong> <strong>en</strong> de<br />

mijnsluit<strong>in</strong>g, zull<strong>en</strong> <strong>in</strong> de ESIA word<strong>en</strong> besprok<strong>en</strong>.<br />

7.1.3.3 Desktoponderzoek 3: Analyse van grond- <strong>en</strong> luchttrill<strong>in</strong>g<strong>en</strong> die gepaard gaan met <strong>het</strong><br />

do<strong>en</strong> ontploff<strong>en</strong> van explosiev<strong>en</strong> ofwel ‘schiet<strong>en</strong>’ bij de mijn<br />

T<strong>en</strong>e<strong>in</strong>de de effect<strong>en</strong> van de grond- <strong>en</strong> luchttrill<strong>in</strong>g<strong>en</strong> (te hoge luchtdruk bij de<br />

ontploff<strong>in</strong>g<strong>en</strong>) als gevolg van de explosies bij de bestaande goudmijn<strong>en</strong> b<strong>in</strong>n<strong>en</strong><br />

de <strong>Surgold</strong>-concessie te analyser<strong>en</strong>, zal ERM met gebruikmak<strong>in</strong>g van<br />

ERM 71 SEPTEMBER 2011


desktopmodell<strong>en</strong> calculaties mak<strong>en</strong> van de basel<strong>in</strong>e grond- <strong>en</strong> luchttrill<strong>in</strong>g<strong>en</strong>.<br />

De berek<strong>en</strong><strong>in</strong>g<strong>en</strong> zoud<strong>en</strong> zijn gebaseerd op <strong>in</strong>formatie verschaft door <strong>Surgold</strong><br />

met betrekk<strong>in</strong>g tot de explosiev<strong>en</strong> die vereist zijn voor de schietwerkzaamhed<strong>en</strong><br />

(soort explosiev<strong>en</strong>, lad<strong>in</strong>gmassa per gat), diameter van <strong>het</strong> schietgat, <strong>en</strong> de<br />

belast<strong>in</strong>g of de hoogte van <strong>het</strong> stripp<strong>en</strong>. Aangezi<strong>en</strong> <strong>het</strong> voorgestelde <strong>Project</strong> ook<br />

<strong>het</strong> schiet<strong>en</strong> bij de mijn zal <strong>in</strong>houd<strong>en</strong>, zal ERM ook gebruik mak<strong>en</strong> van<br />

desktopmodell<strong>en</strong> om de project-gerelateerde effect<strong>en</strong> van de grond- <strong>en</strong><br />

luchttrill<strong>in</strong>g<strong>en</strong> als gevolg van de schietactiviteit<strong>en</strong> bij de voorgestelde goudmijn,<br />

te berek<strong>en</strong><strong>en</strong> <strong>en</strong> te analyser<strong>en</strong>. De niveaus van de grondtrill<strong>in</strong>g<strong>en</strong> (piekwaarde<br />

van deeltjessnelheid) <strong>en</strong> niveaus van luchttrill<strong>in</strong>g<strong>en</strong> (l<strong>in</strong>eaire decibels) zull<strong>en</strong><br />

word<strong>en</strong> vergelek<strong>en</strong> met van toepass<strong>in</strong>g zijnde <strong>in</strong>ternationale standaard<strong>en</strong>, zoals<br />

de richtlijn<strong>en</strong> van de New Zealand Environm<strong>en</strong>t and Conservation Council<br />

(ANZECC) getiteld Technical Basis for Guidel<strong>in</strong>es to M<strong>in</strong>imize Annoyance due to<br />

Blast<strong>in</strong>g Overpressure and Ground Vibration, gedateerd 1990. De mijn<strong>in</strong>g<strong>en</strong>ieur zal<br />

verantwoordelijk zijn voor <strong>het</strong> garander<strong>en</strong> dat de mijnfaciliteit<strong>en</strong> (bijv. de<br />

tail<strong>in</strong>gsdam, arbeidersdorp) op de juiste wijze ontworp<strong>en</strong> zijn om bestand te zijn<br />

teg<strong>en</strong> projectgerelateerde schokgolv<strong>en</strong><br />

7.1.3.4 Desktoponderzoek 4: Onderzoek <strong><strong>in</strong>zake</strong> natuurlijke gevar<strong>en</strong><br />

De ESIA zal nagaan of er e<strong>en</strong> kans bestaat dat natuurlijke gevar<strong>en</strong> <strong>het</strong><br />

projectgebied aantast<strong>en</strong>. Deze natuurlijke gevar<strong>en</strong> kunn<strong>en</strong> o.a. zijn:<br />

overstrom<strong>in</strong>g<strong>en</strong>, orkan<strong>en</strong>, aardbev<strong>in</strong>g<strong>en</strong> <strong>en</strong> geïnduceerde geo-technische<br />

problem<strong>en</strong>. De mogelijkheid dat zich overstrom<strong>in</strong>g<strong>en</strong> voordo<strong>en</strong>, zal<br />

semikwantitatief word<strong>en</strong> geanalyseerd door de frequ<strong>en</strong>tie van grote storm<strong>en</strong><br />

vast te stell<strong>en</strong> op basis van de beschikbare meteorologische gegev<strong>en</strong>s. Aangezi<strong>en</strong><br />

<strong>het</strong> project zich over e<strong>en</strong> bergrug uitstrekt, gelov<strong>en</strong> we niet dat overstrom<strong>in</strong>g e<strong>en</strong><br />

echt zorgpunt is, maar grote storm<strong>en</strong> kunn<strong>en</strong> <strong>het</strong> algehele watermanagem<strong>en</strong>t van<br />

de mijn aantast<strong>en</strong> <strong>en</strong> daarom zal ERM afstemm<strong>en</strong> met de mijn<strong>in</strong>g<strong>en</strong>ieur om er<br />

zeker van te zijn dat <strong>het</strong> watermanagem<strong>en</strong>t van grote storm<strong>en</strong> opg<strong>en</strong>om<strong>en</strong> wordt<br />

<strong>in</strong> <strong>het</strong> mijnontwerp. Sur<strong>in</strong>ame is e<strong>en</strong> gebied dat we<strong>in</strong>ig gevaar loopt <strong>in</strong> term<strong>en</strong><br />

van orkan<strong>en</strong> <strong>en</strong> aardbev<strong>in</strong>g<strong>en</strong>. Deze vraagstukk<strong>en</strong> zull<strong>en</strong> naarmate zij betrekk<strong>in</strong>g<br />

hebb<strong>en</strong> op <strong>het</strong> project, word<strong>en</strong> geanalyseerd op basis van de<br />

waarschijnlijkheidswaard<strong>en</strong> vastgelegd <strong>in</strong> de literatuur.<br />

Grote neerslag <strong>en</strong> andere gebeurt<strong>en</strong>iss<strong>en</strong> kunn<strong>en</strong> geo-technische problem<strong>en</strong><br />

veroorzak<strong>en</strong>, vooral met betrekk<strong>in</strong>g tot de tail<strong>in</strong>gsdam (ofwel de afvalslikdam)<br />

<strong>en</strong> andere technische bouwwerk<strong>en</strong>. Hoewel de technische ontwerper<br />

verantwoordelijk zal zijn <strong>en</strong> garant zal staan voor e<strong>en</strong> adequaat mijnontwerp, zal<br />

de ESIA nagaan <strong>in</strong> hoeverre er e<strong>en</strong> kans bestaat op geo-technische problem<strong>en</strong><br />

(bijv. van e<strong>en</strong> breuk <strong>in</strong> de tail<strong>in</strong>gsdam, <strong>het</strong> wegschuiv<strong>en</strong> van de hell<strong>in</strong>g). De<br />

ESIA zou ervoor zorg<strong>en</strong> dat er ramp<strong>en</strong>plann<strong>en</strong> word<strong>en</strong> opgesteld m.b.t. e<strong>en</strong><br />

dambreuk die niet erg waarschijnlijk is. De ESIA zal e<strong>en</strong> bijlage omvatt<strong>en</strong><br />

ERM 72 SEPTEMBER 2011


waar<strong>in</strong> e<strong>en</strong> uitleg over de ramp<strong>en</strong>plann<strong>en</strong> m.b.t. de damconstructie is<br />

opg<strong>en</strong>om<strong>en</strong>.<br />

7.1.3.5 Desktoponderzoek 5: Onderzoek <strong><strong>in</strong>zake</strong> visuele effect<strong>en</strong><br />

Het project bev<strong>in</strong>dt zich <strong>in</strong> e<strong>en</strong> afgeleg<strong>en</strong> gebied dat ligt op e<strong>en</strong> afstand van<br />

ongeveer 20 km verwijderd van de dichtstbijzijnde weg of won<strong>in</strong>g. Het is<br />

omgev<strong>en</strong> door hoog bos. Daarom gelov<strong>en</strong> wij dat de kans dat <strong>het</strong> project visuele<br />

effect<strong>en</strong> kan veroorzak<strong>en</strong>, m<strong>in</strong>imaal is. Er zal e<strong>en</strong> desktopanalyse van de kans<br />

op visuele effect<strong>en</strong> word<strong>en</strong> verricht, waaronder de id<strong>en</strong>tificatie van pot<strong>en</strong>tiële<br />

gevoelige uitzichtpunt<strong>en</strong> (bijv. de mogelijkheid dat stortplaats<strong>en</strong> voor<br />

afvalgeste<strong>en</strong>te zichtbaar zijn vanuit welke locatie buit<strong>en</strong> de projectlocatie dan<br />

ook) <strong>en</strong> om deze visuele effect<strong>en</strong> <strong>in</strong> <strong>het</strong> algeme<strong>en</strong> naar hun aard te k<strong>en</strong>merk<strong>en</strong>.<br />

Deze visuele analyse zal ook <strong>het</strong> aangezicht van de mijnlocatie bij de sluit<strong>in</strong>g van<br />

de mijn aanpakk<strong>en</strong>.<br />

7.1.3.6 Desktoponderzoek 6: ‘Carbon Footpr<strong>in</strong>t Study’ (ofwel <strong>het</strong> onderzoek naar de<br />

koolstofvoorraad)<br />

Het verricht<strong>en</strong> van e<strong>en</strong> onderzoek naar <strong>het</strong> koolstofbedekk<strong>in</strong>gsgebied van <strong>het</strong><br />

bestaande onderzoeksgebied zal geschied<strong>en</strong> met gebruikmak<strong>in</strong>g van de IPCC<br />

Guidel<strong>in</strong>es for National Gre<strong>en</strong>house Gas Inv<strong>en</strong>tories (IPCC-Richtlijn<strong>en</strong> <strong><strong>in</strong>zake</strong><br />

Nationale Inv<strong>en</strong>tarisaties van Broeikasgass<strong>en</strong>) van 2006. Het onderzoek zal de<br />

waarde evaluer<strong>en</strong> van onverstoord <strong>in</strong>heems bos door verslag uit te br<strong>en</strong>g<strong>en</strong> van<br />

de bestaande koolstofvoorraad (gebond<strong>en</strong> koolstof) <strong>in</strong> elke vegetatiesoort<br />

(biomassa zowel bov<strong>en</strong> de grond als onder de grond) b<strong>in</strong>n<strong>en</strong> <strong>het</strong><br />

onderzoeksgebied <strong>en</strong> <strong>het</strong> koolstof dat <strong>in</strong> de dampkr<strong>in</strong>g terecht komt <strong>in</strong> de vorm<br />

van koolstofdioxide dat zou voortvloei<strong>en</strong> uit de ontboss<strong>in</strong>gsactiviteit<strong>en</strong> op de<br />

mijnlocatie, vaststell<strong>en</strong>. Het onderzoek zal ook verslag uitbr<strong>en</strong>g<strong>en</strong> over de<br />

hoeveelheid koolstof die <strong>in</strong> de atmosfeer terecht komt <strong>en</strong> veroorzaakt wordt door<br />

m<strong>en</strong>selijk handel<strong>en</strong> tijd<strong>en</strong>s de projectconstructie <strong>en</strong> –exploitatiewerkzaamhed<strong>en</strong><br />

(bijv. <strong>het</strong> verbrand<strong>en</strong> van fossiele brandstoff<strong>en</strong> van mijnequipem<strong>en</strong>t, voertuig<strong>en</strong><br />

<strong>en</strong> de krachtc<strong>en</strong>trale).<br />

7.2 METHODIEK INZAKE DE EFFECTENANALYSE<br />

Informatie <strong><strong>in</strong>zake</strong> mogelijke effect<strong>en</strong>, waaronder pot<strong>en</strong>tiële cumulatieve effect<strong>en</strong><br />

voorvloei<strong>en</strong>de uit de activiteit<strong>en</strong> vereist om <strong>het</strong> <strong>Merian</strong> <strong>Project</strong> op te zett<strong>en</strong> <strong>en</strong> te<br />

exploiter<strong>en</strong>, zal word<strong>en</strong> verkreg<strong>en</strong> middels overleg met verschill<strong>en</strong>de bronn<strong>en</strong>,<br />

waaronder overleg met <strong>Surgold</strong> <strong>en</strong> lokale bronn<strong>en</strong>, discussies met <strong>het</strong> NIMOS<br />

<strong>en</strong> andere Sur<strong>in</strong>aamse <strong>in</strong>stanties, alsook EIA’s voor soortgelijke project<strong>en</strong> over<br />

de hele wereld <strong>en</strong> literatuur <strong>en</strong> eig<strong>en</strong> onderzoek.<br />

ERM 73 SEPTEMBER 2011


Om de pot<strong>en</strong>tiële effect<strong>en</strong> die gepaard gaan met of voortvloei<strong>en</strong> uit de<br />

projectactiviteit<strong>en</strong> vast te stell<strong>en</strong>, zal <strong>het</strong> projectteam gebruik mak<strong>en</strong> van<br />

professioneel oordeel, veldwerk <strong>en</strong> desktopanalyse om de pot<strong>en</strong>tiële effect<strong>en</strong> <strong>en</strong><br />

hun <strong>in</strong>teracties te id<strong>en</strong>tificer<strong>en</strong>. Behalve <strong>het</strong> evaluer<strong>en</strong> van gebied<strong>en</strong> van<br />

specifieke hulpbronn<strong>en</strong> zoals vegetatie <strong>en</strong> waterkwaliteit, zal <strong>het</strong> projectteam<br />

onvermijdelijke consequ<strong>en</strong>ties evaluer<strong>en</strong>, zoals effect<strong>en</strong> op de waterkwaliteit, de<br />

vegetatie <strong>en</strong> de biodiversiteit. De significantie van pot<strong>en</strong>tiële effect<strong>en</strong> die zoud<strong>en</strong><br />

kunn<strong>en</strong> voortvloei<strong>en</strong> uit <strong>het</strong> voorgestelde <strong>Project</strong> zal word<strong>en</strong> vastgesteld om <strong>het</strong><br />

NIMOS te help<strong>en</strong> bij <strong>het</strong> opstell<strong>en</strong> van aanbevel<strong>in</strong>g<strong>en</strong> ter evaluatie van <strong>het</strong><br />

voorgestelde <strong>Project</strong>.<br />

De methodiek die zal word<strong>en</strong> toegepast om de pot<strong>en</strong>tiële effect<strong>en</strong> van <strong>het</strong><br />

voorgestelde <strong>Project</strong> te id<strong>en</strong>tificer<strong>en</strong> <strong>en</strong> te analyser<strong>en</strong>, is <strong>in</strong> de navolg<strong>en</strong>de<br />

paragraf<strong>en</strong> beschrev<strong>en</strong>.<br />

7.2.1 Stapp<strong>en</strong> van effect<strong>en</strong>analyse<br />

De Effect<strong>en</strong>analyse wordt als volgt verricht:<br />

1. Vaststell<strong>en</strong> van de basel<strong>in</strong>e – de bestaande condities voordat <strong>het</strong> <strong>Project</strong><br />

wordt uitgevoerd <strong>en</strong> alle effect<strong>en</strong> die <strong>het</strong> tot gevolg heeft;<br />

2. Id<strong>en</strong>tificer<strong>en</strong> van bronn<strong>en</strong> van de effect<strong>en</strong> <strong>en</strong> de effect<strong>en</strong> zelf die word<strong>en</strong><br />

voorgebracht door welk onderdeel dan ook van <strong>het</strong> <strong>Project</strong>;<br />

3. Classificer<strong>en</strong> van de effect<strong>en</strong> voordat <strong>en</strong>ige mitiger<strong>in</strong>g (voor negatieve<br />

effect<strong>en</strong>) of versterk<strong>in</strong>g (voor positieve effect<strong>en</strong>) wordt toegepast;<br />

4. Voorstell<strong>en</strong> van mitiger<strong>in</strong>gs- <strong>en</strong> versterk<strong>in</strong>gsmaatregel<strong>en</strong> om <strong>het</strong> betreff<strong>en</strong>de<br />

effect aan te pakk<strong>en</strong>; <strong>en</strong><br />

5. Classificer<strong>en</strong> van effect<strong>en</strong> na de mitiger<strong>in</strong>g om e<strong>en</strong> classificatie van de<br />

overgeblev<strong>en</strong> effect<strong>en</strong> te mak<strong>en</strong>.<br />

7.2.2 Waarom e<strong>en</strong> Systeem voor Effect<strong>en</strong>classificatie?<br />

Het is gebruikelijk <strong>in</strong> ESIA-process<strong>en</strong> om pot<strong>en</strong>tiële effect<strong>en</strong> te ‘classificer<strong>en</strong>’:<br />

• Om als basis te di<strong>en</strong><strong>en</strong> voor <strong>het</strong> naar prioriteit rangschikk<strong>en</strong> van de effect<strong>en</strong><br />

die moet<strong>en</strong> word<strong>en</strong> aangepakt;<br />

• Om e<strong>en</strong> methode te verschaff<strong>en</strong> om de effectiviteit van de voorgestelde<br />

mitiger<strong>in</strong>gsmaatregel<strong>en</strong> te analyser<strong>en</strong>; <strong>en</strong><br />

• Om e<strong>en</strong> schaalverdel<strong>in</strong>g te kunn<strong>en</strong> mak<strong>en</strong> die de mate van impact aangeeft,<br />

zowel voordat als nadat e<strong>en</strong> voorgestelde mitiger<strong>in</strong>gsmaatregel is toegepast.<br />

Er zal voor de ESIA e<strong>en</strong> consist<strong>en</strong>t systeem voor <strong>het</strong> classificer<strong>en</strong> van effect<strong>en</strong><br />

word<strong>en</strong> gebruikt om zodo<strong>en</strong>de de analyse <strong>en</strong> <strong>het</strong> classificatieproces accuraat toe<br />

ERM 74 SEPTEMBER 2011


te pass<strong>en</strong>. In dez<strong>en</strong> moet m<strong>en</strong> echter <strong>in</strong> gedacht<strong>en</strong> houd<strong>en</strong> dat elk resultaat met<br />

betrekk<strong>in</strong>g tot <strong>het</strong> verm<strong>in</strong>der<strong>en</strong> van grote negatieve effect<strong>en</strong> of <strong>het</strong> versterk<strong>en</strong><br />

van positieve effect<strong>en</strong> afhangt van de selectie, de toepasbaarheid, de<br />

implem<strong>en</strong>tatie <strong>en</strong> de effectiviteit van mitiger<strong>in</strong>gsmaatregel<strong>en</strong> voor <strong>het</strong><br />

voorgestelde <strong>Project</strong>.<br />

7.2.3 Criteria voor <strong>het</strong> classificer<strong>en</strong> van de effect<strong>en</strong><br />

Het classificer<strong>en</strong> van de effect<strong>en</strong> is <strong>het</strong> product van twee elem<strong>en</strong>t<strong>en</strong>: (1) de ernst<br />

van <strong>het</strong> pot<strong>en</strong>tieel effect <strong>en</strong> (2) de aannemelijkheid dat zo e<strong>en</strong> effect zich zal<br />

voordo<strong>en</strong>.<br />

7.2.3.1 Criteria m.b.t. de ernst (ernstcriteria) van de negatieve effect<strong>en</strong> <strong>en</strong> m.b.t. de verbeter<strong>in</strong>g<br />

die teweeg wordt gebracht door de positieve effect<strong>en</strong> (verbeter<strong>in</strong>gscriteria)<br />

De ernst van negatieve effect<strong>en</strong> of de verbeter<strong>in</strong>g als gevolg van de positieve<br />

effect<strong>en</strong> zal word<strong>en</strong> geclassificeerd met gebruikmak<strong>in</strong>g van de criteria die <strong>in</strong> de<br />

tabell<strong>en</strong> 7-1, 7-2, 7-3, <strong>en</strong> 7-4 zijn aangegev<strong>en</strong>. Let wel dat de kleur<strong>en</strong> word<strong>en</strong><br />

gebruikt om de lezer te help<strong>en</strong> bij <strong>het</strong> evaluer<strong>en</strong> van de effect<strong>en</strong> <strong>en</strong> hun relatieve<br />

omvang. Als zodanig di<strong>en</strong><strong>en</strong> deze niet als def<strong>in</strong>itief beschouwd te word<strong>en</strong>.<br />

Tabel 7-1. Criteria <strong><strong>in</strong>zake</strong> de ernst van negatieve Milieu-effect<strong>en</strong><br />

Laag<br />

Matig<br />

Hoog<br />

Duur<br />

Korte termijn (tot<br />

max e<strong>en</strong> jaar )<br />

Lage frequ<strong>en</strong>tie<br />

Middellange termijn<br />

(e<strong>en</strong> tot zev<strong>en</strong> jaar)<br />

Middellange of<br />

afwissel<strong>en</strong>de<br />

frequ<strong>en</strong>tie<br />

Lange termijn<br />

(langer dan zev<strong>en</strong><br />

jaar)/<br />

Onomkeerbaar<br />

Constante frequ<strong>en</strong>tie<br />

Is van <strong>in</strong>vloed op milieucondities, species, <strong>en</strong> habitats gedur<strong>en</strong>de e<strong>en</strong><br />

korte periode, is beperkt tot e<strong>en</strong> bepaalde plaats <strong>en</strong> is omkeerbaar.<br />

Is van <strong>in</strong>vloed op milieucondities, species <strong>en</strong> habitats op de korte tot<br />

middellange termijn. De <strong>in</strong>tegriteit van ecosystem<strong>en</strong> zal niet negatief<br />

beïnvloed word<strong>en</strong> op de lange termijn, maar <strong>het</strong> effect zal waarschijnlijk<br />

significant zijn op de korte of middellange termijn met betrekk<strong>in</strong>g tot<br />

<strong>en</strong>kele species of receptor<strong>en</strong>. Het gebied/de regio kan zich ev<strong>en</strong>tueel<br />

weer herstell<strong>en</strong> middels natuurlijke aangroei <strong>en</strong> herstel.<br />

Is van <strong>in</strong>vloed op milieucondities, species <strong>en</strong> habitats op de lange<br />

termijn, kan <strong>het</strong> lokale <strong>en</strong> regionale ecosysteem <strong>en</strong> de natuurlijke<br />

hulpbronn<strong>en</strong> wez<strong>en</strong>lijk wijzig<strong>en</strong> <strong>en</strong> kan de duurzaamheid aantast<strong>en</strong>.<br />

Herstel naar de vroegere staat zal niet plaatsv<strong>in</strong>d<strong>en</strong> zonder <strong>in</strong>terv<strong>en</strong>tie<br />

Is van <strong>in</strong>vloed op milieucondities of –elem<strong>en</strong>t<strong>en</strong> op de lange termijn,<br />

heeft lokale <strong>en</strong> regionale effect<strong>en</strong> <strong>en</strong>/of is onomkeerbaar.<br />

ERM 75 SEPTEMBER 2011


Tabel 7-2. Criteria <strong><strong>in</strong>zake</strong> de ernst van Negatieve <strong>Sociale</strong> of Gezondheidgerelateerde<br />

Effect<strong>en</strong><br />

Laag<br />

Duur Omvang<br />

Korte termijn<br />

(tot max e<strong>en</strong><br />

jaar)<br />

Lage<br />

frequ<strong>en</strong>tie<br />

Matig Middellange<br />

termijn (e<strong>en</strong><br />

tot zev<strong>en</strong> jaar)<br />

Hoog<br />

Middellange<br />

of<br />

afwissel<strong>en</strong>de<br />

frequ<strong>en</strong>tie<br />

Lange-termijn<br />

(langer dan<br />

zev<strong>en</strong> jaar)<br />

Onomkeerbaar<br />

Constante<br />

frequ<strong>en</strong>tie<br />

Individu/<br />

Huishoud<strong>en</strong><br />

Kle<strong>in</strong> aantal<br />

huishoud<strong>en</strong>s<br />

Groot deel<br />

van of de<br />

volledige<br />

geme<strong>en</strong>schap<br />

Mogelijkheid om<br />

aan te pass<strong>en</strong><br />

De desbetreff<strong>en</strong>d<strong>en</strong><br />

zull<strong>en</strong> zich relatief<br />

gemakkelijk aan de<br />

verander<strong>in</strong>g<strong>en</strong><br />

kunn<strong>en</strong> aanpass<strong>en</strong><br />

<strong>en</strong> hun middel<strong>en</strong><br />

van bestaan, hun<br />

cultuur,<br />

lev<strong>en</strong>skwaliteit <strong>en</strong><br />

gezondheid die zij<br />

hadd<strong>en</strong> vóór de<br />

effect<strong>en</strong>,<br />

behoud<strong>en</strong>.<br />

De desbetreff<strong>en</strong>d<strong>en</strong><br />

zull<strong>en</strong> zich met<br />

<strong>en</strong>ige moeite aan<br />

de verander<strong>in</strong>g<strong>en</strong><br />

kunn<strong>en</strong> aanpass<strong>en</strong><br />

<strong>en</strong> hun middel<strong>en</strong><br />

van bestaan, hun<br />

cultuur,<br />

lev<strong>en</strong>skwaliteit <strong>en</strong><br />

gezondheid die zij<br />

hadd<strong>en</strong> vóór de<br />

effect<strong>en</strong>, behoud<strong>en</strong><br />

maar zulks alle<strong>en</strong><br />

met e<strong>en</strong> bepaalde<br />

mate van<br />

ondersteun<strong>in</strong>g<br />

De getroff<strong>en</strong><strong>en</strong><br />

zull<strong>en</strong> niet <strong>in</strong> staat<br />

zijn zich aan de<br />

verander<strong>in</strong>g<strong>en</strong> aan<br />

te pass<strong>en</strong> <strong>en</strong> zull<strong>en</strong><br />

doorgaan hun<br />

middel van<br />

bestaan van vóór<br />

de effect<strong>en</strong>, te<br />

behoud<strong>en</strong><br />

Sociaal-culturele<br />

gevolg<strong>en</strong><br />

Wat ongemak<br />

maar zonder<br />

consequ<strong>en</strong>ties op<br />

de lange termijn<br />

voor hun<br />

middel<strong>en</strong> van<br />

bestaan, cultuur,<br />

lev<strong>en</strong>skwaliteit,<br />

hulpbronn<strong>en</strong>,<br />

<strong>in</strong>frastructuur <strong>en</strong><br />

di<strong>en</strong>st<strong>en</strong>.<br />

Primaire <strong>en</strong><br />

secundaire<br />

effect<strong>en</strong> op<br />

middel<strong>en</strong> van<br />

bestaan, cultuur,<br />

lev<strong>en</strong>skwaliteit,<br />

hulpbronn<strong>en</strong>,<br />

<strong>in</strong>frastructuur <strong>en</strong><br />

di<strong>en</strong>st<strong>en</strong><br />

Wijdverspreide<br />

<strong>en</strong> diverse<br />

primaire <strong>en</strong><br />

secundaire<br />

effect<strong>en</strong> die<br />

mogelijkerwijs<br />

onomkeerbaar of<br />

niet te vergoed<strong>en</strong><br />

zijn.<br />

Invloed op de<br />

gezondheid<br />

Gebeurt<strong>en</strong>is die<br />

kan leid<strong>en</strong> tot<br />

irritatie, wat<br />

letsel of ziekte<br />

waarvoor ge<strong>en</strong><br />

hospitalisatie<br />

vereist is<br />

Gebeurt<strong>en</strong>is die<br />

leidt tot m<strong>in</strong>der<br />

zwaar letsel of<br />

ziekte waarvoor<br />

ev<strong>en</strong>tueel<br />

hospitalisatie<br />

vereist is.<br />

Catastrofale<br />

gebeurt<strong>en</strong>is die<br />

leidt tot verlies<br />

van <strong>het</strong> lev<strong>en</strong>,<br />

ernstig letsel of<br />

chronische ziekte<br />

waarvoor<br />

hospitalisatie<br />

vereist is.<br />

ERM 76 SEPTEMBER 2011


Tabel 7-3. Verbeter<strong>in</strong>gscriteria (Positieve Milieueffect<strong>en</strong>)<br />

Hoge mate van<br />

verbeter<strong>in</strong>g<br />

Matig niveau<br />

van verbeter<strong>in</strong>g<br />

Laag niveau van<br />

verbeter<strong>in</strong>g<br />

Duur<br />

Voordel<strong>en</strong><br />

zull<strong>en</strong> stand<br />

houd<strong>en</strong><br />

gedur<strong>en</strong>de de<br />

lange termijn.<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

op de korte<br />

termijn meetbaar<br />

zijn <strong>en</strong> mogelijk<br />

langer.<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

op de korte<br />

termijn zijn.<br />

Omvang Mate van<br />

verander<strong>in</strong>g<br />

Voordel<strong>en</strong><br />

zull<strong>en</strong> zich<br />

strekk<strong>en</strong> buit<strong>en</strong><br />

<strong>het</strong> lokale milieu<br />

(d.w.z. koppel<strong>in</strong>g<br />

met<br />

gefragm<strong>en</strong>teerde<br />

habitat, bijv.<br />

regionale<br />

corridor )<br />

Voordel<strong>en</strong> voor<br />

vele species,<br />

habitats <strong>en</strong><br />

natuurlijke<br />

hulpbronn<strong>en</strong> <strong>in</strong><br />

<strong>het</strong> milieu <strong>in</strong> de<br />

omgev<strong>in</strong>g <strong>en</strong><br />

daarbuit<strong>en</strong><br />

Voordel<strong>en</strong> voor<br />

<strong>en</strong>kele species <strong>en</strong><br />

de daaraan<br />

verbond<strong>en</strong><br />

habitat <strong>en</strong><br />

hulpbronn<strong>en</strong><br />

alle<strong>en</strong> <strong>in</strong> de<br />

directe omgev<strong>in</strong>g<br />

Directe<br />

voordel<strong>en</strong> voor<br />

species of<br />

hulpbronn<strong>en</strong><br />

zull<strong>en</strong><br />

significante<br />

mogelijkhed<strong>en</strong><br />

creër<strong>en</strong> voor<br />

duurzaamheid<br />

Matige<br />

voordel<strong>en</strong> voor<br />

species, habitat,<br />

<strong>en</strong> natuurlijke<br />

hulpbronn<strong>en</strong> die<br />

<strong>en</strong>ige<br />

mogelijkhed<strong>en</strong><br />

kunn<strong>en</strong> creër<strong>en</strong><br />

m.b.t.<br />

duurzaamheid<br />

Beperkte<br />

voordel<strong>en</strong> voor<br />

species, habitat,<br />

<strong>en</strong> natuurlijke<br />

hulpbronn<strong>en</strong> die<br />

vrij kle<strong>in</strong>e<br />

mogelijkhed<strong>en</strong><br />

kunn<strong>en</strong> creër<strong>en</strong><br />

t.b.v.<br />

duurzaamheid.<br />

Focus/Kwetsbaarheid<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

betrekk<strong>in</strong>g hebb<strong>en</strong><br />

op species, habitats<br />

<strong>en</strong> natuurlijke<br />

hulpbronn<strong>en</strong> die<br />

achteruit gegaan zijn<br />

of kwetsbaar of<br />

zeldzaam zijn of<br />

beschermd moet<strong>en</strong><br />

word<strong>en</strong>.<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

betrekk<strong>in</strong>g hebb<strong>en</strong><br />

op species, habitats<br />

<strong>en</strong> natuurlijke<br />

hulpbronn<strong>en</strong> met<br />

<strong>en</strong>ige mate van<br />

degradatie,<br />

kwetsbaarheid of<br />

zeldzaamheid.<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

betrekk<strong>in</strong>g hebb<strong>en</strong><br />

op species, habitats<br />

<strong>en</strong> natuurlijke<br />

hulpbronn<strong>en</strong> die niet<br />

kwetsbaar of<br />

zeldzaam zijn.<br />

ERM 77 SEPTEMBER 2011


Tabel 7-4. Verbeter<strong>in</strong>gscriteria (Positieve <strong>Sociale</strong> <strong>en</strong> Gezondheidgerelateerde Effect<strong>en</strong>)<br />

Hoge mate van<br />

verbeter<strong>in</strong>g<br />

Matig niveau<br />

van<br />

verbeter<strong>in</strong>g<br />

Laag niveau<br />

van<br />

verbeter<strong>in</strong>g<br />

Duur Omvang Mate van verander<strong>in</strong>g Focus/ Gevoeligheid<br />

Voordel<strong>en</strong><br />

zull<strong>en</strong><br />

perman<strong>en</strong>t zijn<br />

<strong>en</strong> wel op de<br />

lange termijn,<br />

m.a.w. langer<br />

dan 7 jaar<br />

Voordel<strong>en</strong><br />

zull<strong>en</strong> op de<br />

middellange<br />

termijn gevoeld<br />

word<strong>en</strong> (1 tot 7<br />

jaar) of<br />

gedur<strong>en</strong>de de<br />

langere termijn<br />

afwissel<strong>en</strong>d zijn<br />

Voordel<strong>en</strong><br />

zull<strong>en</strong> korte<br />

termijn zijn (tot<br />

max. e<strong>en</strong> jaar)<br />

7.2.3.2 Aannemelijkheidscriteria<br />

Voordel<strong>en</strong><br />

voor de hele<br />

lokale<br />

leefgeme<strong>en</strong>schap<br />

<strong>en</strong> op de<br />

gehele natie<br />

Voordel<strong>en</strong><br />

voor vele<br />

<strong>in</strong>dividu<strong>en</strong> <strong>en</strong><br />

huishoud<strong>en</strong>s<br />

<strong>in</strong> de lokale<br />

leefgeme<strong>en</strong>schap<br />

<strong>en</strong><br />

daarbuit<strong>en</strong><br />

Voordel<strong>en</strong><br />

voor <strong>en</strong>kele<br />

<strong>in</strong>dividu<strong>en</strong> <strong>en</strong><br />

huishoud<strong>en</strong>s<br />

of <strong>in</strong> <strong>het</strong> lokale<br />

gebied, <strong>en</strong>/of<br />

voor <strong>en</strong>kel<strong>en</strong><br />

daarbuit<strong>en</strong><br />

Directe voordel<strong>en</strong> voor<br />

<strong>in</strong>dividu<strong>en</strong> <strong>en</strong><br />

leefgeme<strong>en</strong>schapp<strong>en</strong><br />

zull<strong>en</strong> significante<br />

mogelijkhed<strong>en</strong> creër<strong>en</strong><br />

die als hefboom kunn<strong>en</strong><br />

functioner<strong>en</strong> voor<br />

secundaire voordel<strong>en</strong><br />

<strong>en</strong> <strong>het</strong><br />

lev<strong>en</strong>sonderhoud voor<br />

h<strong>en</strong>zelf <strong>en</strong> ander<strong>en</strong><br />

direct kunn<strong>en</strong><br />

verbeter<strong>en</strong><br />

Matige voordel<strong>en</strong> voor<br />

<strong>in</strong>dividu<strong>en</strong> <strong>en</strong><br />

leefgeme<strong>en</strong>schapp<strong>en</strong><br />

die <strong>en</strong>kele<br />

mogelijkhed<strong>en</strong> zull<strong>en</strong><br />

creër<strong>en</strong> om zichzelf<br />

vooruit te help<strong>en</strong> <strong>en</strong><br />

hun lev<strong>en</strong>sonderhoud<br />

te verbeter<strong>en</strong><br />

Enkele voordel<strong>en</strong> voor<br />

<strong>in</strong>dividu<strong>en</strong> <strong>en</strong><br />

leefgeme<strong>en</strong>schapp<strong>en</strong>,<br />

die pot<strong>en</strong>tieel de<br />

mogelijkhed<strong>en</strong> om<br />

zichzelf vooruit te<br />

help<strong>en</strong>, verbeter<strong>en</strong><br />

alsook hun<br />

lev<strong>en</strong>sonderhoud<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

betrekk<strong>in</strong>g hebb<strong>en</strong><br />

op kwetsbare<br />

groep<strong>en</strong> <strong>en</strong> deg<strong>en</strong><strong>en</strong><br />

die andersz<strong>in</strong>s<br />

‘verliezers’ zoud<strong>en</strong><br />

zijn geweest als<br />

gevolg van <strong>het</strong><br />

project<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

mogelijk betrekk<strong>in</strong>g<br />

hebb<strong>en</strong> op<br />

kwetsbare groep<strong>en</strong><br />

<strong>en</strong> deg<strong>en</strong><strong>en</strong> die<br />

‘verliezers’ zoud<strong>en</strong><br />

zijn geweest als<br />

gevolg van <strong>het</strong><br />

project<br />

Voordel<strong>en</strong> zull<strong>en</strong><br />

ge<strong>en</strong> betrekk<strong>in</strong>g<br />

hebb<strong>en</strong> op<br />

kwetsbare groep<strong>en</strong><br />

<strong>en</strong> slechts deg<strong>en</strong><strong>en</strong><br />

t<strong>en</strong> goede kom<strong>en</strong><br />

die andersz<strong>in</strong>s<br />

voordeel zoud<strong>en</strong><br />

g<strong>en</strong>iet<strong>en</strong> van <strong>het</strong><br />

project<br />

De aannemelijkheid dat e<strong>en</strong> bepaald <strong>in</strong>cid<strong>en</strong>t zich zal voordo<strong>en</strong> omvat de<br />

volg<strong>en</strong>de categorieën:<br />

• Lage aannemelijkheid – zeldzaam (bijv. e<strong>en</strong> paar of ge<strong>en</strong> <strong>in</strong>cid<strong>en</strong>t<strong>en</strong> <strong>in</strong> de<br />

aan <strong>het</strong> <strong>Project</strong> gerelateerde mijn<strong>in</strong>dustrie);<br />

• Matige aannemelijkheid – Niet vaak voorkom<strong>en</strong>d (bijv. <strong>en</strong>kele vastgelegde<br />

<strong>in</strong>cid<strong>en</strong>t<strong>en</strong> <strong>in</strong> de aan <strong>het</strong> <strong>Project</strong> gerelateerde mijn<strong>in</strong>dustrie); <strong>en</strong><br />

• Hoge aannemelijkheid– Vaak voorkom<strong>en</strong>d (bijv. doet zich vaak voor<br />

b<strong>in</strong>n<strong>en</strong> de mijn<strong>in</strong>dustrie).<br />

ERM 78 SEPTEMBER 2011


7.2.4 Het vaststell<strong>en</strong> van de classificatie<br />

De algehele classificatie van de effect<strong>en</strong> zal word<strong>en</strong> bepaald door gebruikmak<strong>in</strong>g<br />

van de navolg<strong>en</strong>de matrix (Tabel 7-5). Let wel <strong>in</strong> dez<strong>en</strong> dat deze matrices<br />

bedoeld zijn als leiddraad <strong>en</strong> dat zich situaties kunn<strong>en</strong> voordo<strong>en</strong> waarbij e<strong>en</strong><br />

starre toepass<strong>in</strong>g hiervan ongeschikt is <strong>en</strong> waarbij de percepties <strong>en</strong> feedback van<br />

de stakeholders e<strong>en</strong> belangrijke rol te vervull<strong>en</strong> hebb<strong>en</strong>. Voor specifieke effect<strong>en</strong><br />

waar dit <strong>het</strong> geval is, wordt de classificatie duidelijk uitgelegd bij de evaluatie<br />

van <strong>het</strong> betreff<strong>en</strong>de effect.<br />

Tabel 7-5. Classificatiematrix<br />

Aannemelijkheid<br />

Ernst/ Verbeter<strong>in</strong>g Laag Matig Hoog<br />

Hoge mate van<br />

verbeter<strong>in</strong>g<br />

Matige mate van<br />

verbeter<strong>in</strong>g<br />

Matig Ingrijp<strong>en</strong>d Ingrijp<strong>en</strong>d<br />

M<strong>in</strong>der belangrijk Matig Ingrijp<strong>en</strong>d<br />

Lage mate van verbeter<strong>in</strong>g Onbelangrijk M<strong>in</strong>der belangrijk Matig<br />

Niet zo ernstig Onbelangrijk M<strong>in</strong>der belangrijk Matig<br />

Matig ernstig M<strong>in</strong>der belangrijk Matig Ingrijp<strong>en</strong>d<br />

Zeer ernstig Matig Ingrijp<strong>en</strong>d Ingrijp<strong>en</strong>d<br />

7.3 PLAN VOOR MILIEU- EN SOCIAAL MANAGEMENT<br />

Het belangrijkste resultaat van e<strong>en</strong> ESIA is <strong>het</strong> plan voor milieu- <strong>en</strong> sociaal<br />

(ESMP). Het ESMP is e<strong>en</strong> adaptief managem<strong>en</strong>tsysteem dat moet word<strong>en</strong><br />

opgezet om te garander<strong>en</strong> dat de mitiger<strong>in</strong>gsmaatregel<strong>en</strong> die <strong>in</strong> de ESIA zijn<br />

voorgesteld, tijd<strong>en</strong>s de duur van <strong>het</strong> project word<strong>en</strong> uitgevoerd <strong>en</strong> cont<strong>in</strong>ue waar<br />

nodig word<strong>en</strong> verfijnd <strong>en</strong> gewijzigd op basis van daadwerkelijke veldcondities<br />

<strong>en</strong> omstandighed<strong>en</strong> die niet geanticipeerd werd<strong>en</strong> to<strong>en</strong> de ESIA werd opgesteld.<br />

Het ESMP zal e<strong>en</strong> Plan voor Mijnsluit<strong>in</strong>g <strong>en</strong> Rehabilitatie omvatt<strong>en</strong>.<br />

Als managem<strong>en</strong>tsysteem (bijv. ISO 14001), di<strong>en</strong>t <strong>het</strong> ESMP m<strong>in</strong>imaal over de<br />

volg<strong>en</strong>de compon<strong>en</strong>t<strong>en</strong> te beschikk<strong>en</strong>:<br />

• E<strong>en</strong> organisatorische hiërarchie die <strong>het</strong> dagelijkse toezicht op <strong>en</strong> de<br />

uitvoer<strong>in</strong>g van <strong>het</strong> ESMP garandeert, waarbij e<strong>en</strong> s<strong>en</strong>ior<br />

bedrijfsfunctionaris wordt geïd<strong>en</strong>tificeerd die de uite<strong>in</strong>delijke<br />

verantwoordelijkheid heeft voor de uitvoer<strong>in</strong>g van <strong>het</strong> systeem;<br />

ERM 79 SEPTEMBER 2011


• E<strong>en</strong> duidelijke verklar<strong>in</strong>g van de doel<strong>en</strong> <strong>en</strong> <strong>het</strong> schema van uit te voer<strong>en</strong><br />

acties, waaronder de specifieke maatregel<strong>en</strong> ter mitiger<strong>in</strong>g van de effect<strong>en</strong><br />

die <strong>in</strong> de ESIA zijn geïd<strong>en</strong>tificeerd;<br />

• Duidelijke verantwoordelijkhed<strong>en</strong> voor de uitvoer<strong>in</strong>g van elke<br />

mitiger<strong>in</strong>gsmaatregel met e<strong>en</strong> duidelijke hiërarchische structuur i.v.m. <strong>het</strong><br />

toezicht;<br />

• E<strong>en</strong> begrot<strong>in</strong>g voor de implem<strong>en</strong>tatie waaronder e<strong>en</strong> begrot<strong>in</strong>g voor<br />

mogelijke onvoorzi<strong>en</strong>e uitgav<strong>en</strong> <strong>en</strong> e<strong>en</strong> mechanisme voor aanvull<strong>in</strong>g van de<br />

begrot<strong>in</strong>g <strong>in</strong>geval van onverwachte gebeurt<strong>en</strong>iss<strong>en</strong> of omstandighed<strong>en</strong><br />

(bijv. gevall<strong>en</strong> van force majeure);<br />

• E<strong>en</strong> managem<strong>en</strong>tsysteem <strong><strong>in</strong>zake</strong> <strong>het</strong> sluit<strong>en</strong> van contract<strong>en</strong> om te<br />

garander<strong>en</strong> dat alle contractors <strong>en</strong> subcontractors bek<strong>en</strong>d zijn met <strong>en</strong> zich<br />

bewust zijn van <strong>het</strong> ESMP, <strong>en</strong> e<strong>en</strong> mechanisme <strong><strong>in</strong>zake</strong> <strong>het</strong> sluit<strong>en</strong> van<br />

contract<strong>en</strong> om de contractors <strong>en</strong> hun subcontractors te stimuler<strong>en</strong> zich te<br />

houd<strong>en</strong> aan <strong>het</strong> ESMP of om h<strong>en</strong>, <strong>in</strong>di<strong>en</strong> zij zich niet houd<strong>en</strong> aan <strong>het</strong> ESMP,<br />

sancties op te legg<strong>en</strong>; <strong>en</strong><br />

• E<strong>en</strong> voortgaand monitor<strong>in</strong>g- <strong>en</strong> rapportageprogramma, met nauwkeurig<br />

aangegev<strong>en</strong> rapportagetuss<strong>en</strong>poz<strong>en</strong>, tijd<strong>en</strong>s de duur van <strong>het</strong> project<br />

waaronder e<strong>en</strong> overzicht van ‘real time managem<strong>en</strong>t’ <strong>en</strong> controle (bij<br />

voorkeur door derd<strong>en</strong>) om te verifiër<strong>en</strong> dat de effect<strong>en</strong> zich voordo<strong>en</strong> zoals<br />

voorspeld <strong>en</strong> dat de mitiger<strong>in</strong>gsmaatregel<strong>en</strong> effectief zijn. Het ESMP di<strong>en</strong>t<br />

ook e<strong>en</strong> mechanisme te omvatt<strong>en</strong> om cont<strong>in</strong>u aanpass<strong>in</strong>g<strong>en</strong> aan te br<strong>en</strong>g<strong>en</strong><br />

<strong>en</strong> waar nodig corriger<strong>en</strong>de activiteit<strong>en</strong> te ontplooi<strong>en</strong> om te garander<strong>en</strong> dat<br />

de effect<strong>en</strong> waar mogelijk word<strong>en</strong> vermed<strong>en</strong> <strong>en</strong> waar deze niet te vermijd<strong>en</strong><br />

zijn, op effectieve wijze word<strong>en</strong> gemitigeerd.<br />

ERM verwacht dat <strong>Surgold</strong> haar managem<strong>en</strong>tsysteem <strong><strong>in</strong>zake</strong> haar<br />

Environm<strong>en</strong>tal Health Statem<strong>en</strong>t (EHS) waar<strong>in</strong> de meeste van deze zelfde<br />

elem<strong>en</strong>t<strong>en</strong> verankerd zijn, zal toepass<strong>en</strong> op <strong>het</strong> project tijd<strong>en</strong>s de verwachte<br />

lev<strong>en</strong>sduur hiervan. Daarom is <strong>het</strong> logisch om <strong>in</strong> nauwe sam<strong>en</strong>werk<strong>in</strong>g met <strong>het</strong><br />

project-managem<strong>en</strong>tteam van <strong>Surgold</strong> e<strong>en</strong> op <strong>het</strong> project-gebaseerd ESMP op te<br />

stell<strong>en</strong> dat is afgestemd op <strong>het</strong> EHS-managem<strong>en</strong>tsysteem van <strong>het</strong> bedrijf.<br />

ERM 80 SEPTEMBER 2011


8.0 PROJECTSCHEMA<br />

Tabel 8-1 geeft e<strong>en</strong> sam<strong>en</strong>vatt<strong>in</strong>g van <strong>het</strong> schema voor de uitvoer<strong>in</strong>g van de ESIA<br />

i.v.m. <strong>het</strong> <strong>Merian</strong> <strong>Project</strong>. Het ESIA-schema is onderhevig aan verander<strong>in</strong>g<strong>en</strong> op<br />

basis van de behoeft<strong>en</strong> <strong>en</strong> <strong>het</strong> ontwikkel<strong>in</strong>gsschema van <strong>het</strong> project.<br />

Tabel 8-1. Uitvoer<strong>in</strong>gsschema van de ESIA i.v.m. <strong>het</strong> <strong>Merian</strong> <strong>Project</strong><br />

Datum ESIA-proces /Activiteit<br />

Juni – Juli,2011 Eerste bije<strong>en</strong>komst<strong>en</strong> met <strong>in</strong>stanties<br />

Augustus, 2011 Concept-ToR<br />

Augustus, 2011 ToR-overleg <strong>en</strong> op<strong>en</strong>bare bije<strong>en</strong>komst<br />

Augustus 2011-<br />

Februari 2012<br />

Basel<strong>in</strong>e-onderzoek<br />

Februari –Maart, 2012 Studies <strong><strong>in</strong>zake</strong> Effect<strong>en</strong>analyse<br />

Maart 2012 Op<strong>en</strong>bare bije<strong>en</strong>komst <strong><strong>in</strong>zake</strong> concept-ESIA om de<br />

resultat<strong>en</strong> te pres<strong>en</strong>ter<strong>en</strong><br />

April 2012 Distributie concept-ESIA<br />

Juni 2012 E<strong>in</strong>d-ESIA<br />

ERM 81 SEPTEMBER 2011


9.0 NASLAGWERKEN<br />

Buurs<strong>in</strong>k. 2005. Country Environm<strong>en</strong>t Assessm<strong>en</strong>t (CEA) – Sur<strong>in</strong>ame.<br />

Concept-rapport, Februari 2005. Inter American Developm<strong>en</strong>t Bank.<br />

Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame (NIMOS). 2009.<br />

Environm<strong>en</strong>tal Assessm<strong>en</strong>t Guidel<strong>in</strong>es, Volume I: G<strong>en</strong>eric, Second<br />

Edition: Augustus 2009, Office of Environm<strong>en</strong>tal and Social<br />

Assessm<strong>en</strong>t.<br />

Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame (NIMOS).<br />

2005a. Environm<strong>en</strong>tal Assessm<strong>en</strong>t Guidel<strong>in</strong>es, Volume I: G<strong>en</strong>eric,<br />

Office of Environm<strong>en</strong>tal and Social Assessm<strong>en</strong>t.<br />

Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame (NIMOS).<br />

2005b. Environm<strong>en</strong>tal Assessm<strong>en</strong>t Guidel<strong>in</strong>es, Volume IV: Social<br />

Impact Assessm<strong>en</strong>t, Office of Environm<strong>en</strong>tal and Social Assessm<strong>en</strong>t.<br />

SRK Consult<strong>in</strong>g. 2007. Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t of<br />

Transport Aspects of the Proposed Bakhuis Bauxite <strong>Project</strong>,<br />

Rapportnummer 362387/2a.<br />

ERM 82 SEPTEMBER 2011


Annex A<br />

ESIA Team Curriculum Vitas


David W. Blaha, AICP<br />

<strong>Project</strong> Director - Hydropower Specialist<br />

Mr. David Blaha is a Partner with ERM based <strong>in</strong><br />

Wash<strong>in</strong>gton D.C. Mr. Blaha has 29 years of experi<strong>en</strong>ce <strong>in</strong><br />

<strong>en</strong>vironm<strong>en</strong>tal and social impact assessm<strong>en</strong>t, natural and<br />

cultural resource managem<strong>en</strong>t, susta<strong>in</strong>able developm<strong>en</strong>t,<br />

stakeholder consultation, and strategic advice for review<br />

or permitt<strong>in</strong>g of primarily large (>$US 1B) m<strong>in</strong><strong>in</strong>g,<br />

<strong>in</strong>frastructure, and oil & gas projects.<br />

Mr. Blaha is thoroughly familiar with both U.S.<br />

regulatory and procedural requirem<strong>en</strong>ts (e.g., NEPA and<br />

CEQ guidance) and <strong>in</strong>ternational EIA best practice (e.g.,<br />

IFC Performance Standards, EBRD Performance<br />

Requirem<strong>en</strong>ts, and Equator Pr<strong>in</strong>ciples). In addition to<br />

prepar<strong>in</strong>g Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>ts, Managem<strong>en</strong>t Plans, and Action Plans <strong>in</strong><br />

accordance with <strong>in</strong>ternational best practice, Mr. Blaha<br />

has worked with many Equator Banks, bilateral and<br />

multilateral f<strong>in</strong>ancial <strong>in</strong>stitutions, and other l<strong>en</strong>ders to<br />

conduct appropriate <strong>en</strong>vironm<strong>en</strong>tal and social due<br />

dilig<strong>en</strong>ce, gap analysis, and construction/operation<br />

compliance monitor<strong>in</strong>g relative to the IFC Performance<br />

standards, Equator Pr<strong>in</strong>ciples, and other l<strong>en</strong>der<br />

policy/requirem<strong>en</strong>ts.<br />

He has ext<strong>en</strong>sive experi<strong>en</strong>ce address<strong>in</strong>g biodiversity,<br />

<strong>in</strong>dig<strong>en</strong>ous peoples, wetlands, and water resource issues.<br />

Special expertise <strong>in</strong> evaluat<strong>in</strong>g m<strong>in</strong><strong>in</strong>g and metals,<br />

power, land use, military, water resource, and<br />

transportation projects.<br />

For m<strong>in</strong><strong>in</strong>g, Mr. Blaha has significant experi<strong>en</strong>ce <strong>in</strong><br />

evaluat<strong>in</strong>g a wide range of groundwater and surface<br />

water issues associated with m<strong>in</strong><strong>in</strong>g, <strong>in</strong>clud<strong>in</strong>g<br />

evaluat<strong>in</strong>g groundwater drawdown from pit dewater<strong>in</strong>g<br />

(and pot<strong>en</strong>tial <strong>in</strong>direct effects on wetlands), pot<strong>en</strong>tial for<br />

acid rock dra<strong>in</strong>age from waste rock dumps and tail<strong>in</strong>gs<br />

bas<strong>in</strong>s, overburd<strong>en</strong> managem<strong>en</strong>t, hydrometallurgical<br />

residue managem<strong>en</strong>t, and impacts to downstream<br />

fisheries and aquatic habitat.<br />

Professional Affiliations & Registrations<br />

• American Institute of Certified Planners, 1986<br />

• International Association of Impact Assessors<br />

• American Water Resources Association<br />

• National Association of Environm<strong>en</strong>tal Professionals<br />

Fields of Compet<strong>en</strong>ce<br />

• Susta<strong>in</strong>ability plann<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g stakeholder<br />

<strong>en</strong>gagem<strong>en</strong>t and developm<strong>en</strong>t of susta<strong>in</strong>ability<br />

<strong>in</strong>dicators, metrics, and monitor<strong>in</strong>g programs.<br />

• Environm<strong>en</strong>tal and social impact assessm<strong>en</strong>t for a<br />

wide variety of projects <strong>in</strong>clud<strong>in</strong>g m<strong>in</strong><strong>in</strong>g, metal<br />

ref<strong>in</strong><strong>in</strong>g, and smelt<strong>in</strong>g; reservoirs, mar<strong>in</strong>as, power<br />

g<strong>en</strong>eration and transmission, LNG import term<strong>in</strong>als,<br />

gas pipel<strong>in</strong>es, highways, transit, hous<strong>in</strong>g, parks,<br />

military facilities and <strong>in</strong>dustrial developm<strong>en</strong>t projects.<br />

• Public participation <strong>in</strong>clud<strong>in</strong>g the developm<strong>en</strong>t of<br />

<strong>in</strong>novative, collaborative stakeholder <strong>en</strong>gagem<strong>en</strong>t<br />

programs and cons<strong>en</strong>sus-based public participation<br />

processes.<br />

• Regional <strong>en</strong>vironm<strong>en</strong>tal plann<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g river<br />

bas<strong>in</strong> studies, forest managem<strong>en</strong>t plans, wildlife<br />

corridors, and natural resource managem<strong>en</strong>t plans for<br />

parks and preserves.<br />

Education<br />

• Master of Environm<strong>en</strong>tal Managem<strong>en</strong>t, Duke<br />

University, 1981<br />

• Bachelor of Arts, Biology, Gettysburg College, 1978<br />

Key Industry Sectors<br />

• M<strong>in</strong><strong>in</strong>g<br />

• Power<br />

• F<strong>in</strong>ancial<br />

• Governm<strong>en</strong>t<br />

4/20/2011 01-BLAHA, DAVID 2011 LELYDORP.DOC


Key <strong>Project</strong>s<br />

Suralco Alum<strong>in</strong>a Ref<strong>in</strong>ery Expansion ESIA, Sur<strong>in</strong>ame.<br />

Served as <strong>Project</strong> Director for the developm<strong>en</strong>t of an<br />

ESIA evaluat<strong>in</strong>g the <strong>en</strong>vironm<strong>en</strong>tal and social effects of<br />

proposed alum<strong>in</strong>a ref<strong>in</strong>ery modifications required to<br />

accommodate a new bauxite source, as well as expansion<br />

of the bauxite residue disposal areas. Includes<br />

stakeholder <strong>en</strong>gagem<strong>en</strong>t, social basel<strong>in</strong>e surveys, and<br />

developm<strong>en</strong>t of E&S Managem<strong>en</strong>t Plans. <strong>Project</strong><br />

complied with NIMOS guidel<strong>in</strong>es.<br />

Nassau Plateau Bauxite M<strong>in</strong>e ESIA, Sur<strong>in</strong>ame.<br />

Serv<strong>in</strong>g as <strong>Project</strong> Director for basel<strong>in</strong>e studies and<br />

preparation of an ESIA for a bauxite m<strong>in</strong>e to meet both<br />

Sur<strong>in</strong>ame (NIMOS) and <strong>in</strong>ternational standards for<br />

Alcoa. Key issues <strong>in</strong>clude effects on <strong>en</strong>dangered fish,<br />

habitat fragm<strong>en</strong>tation, and water quality. Coord<strong>in</strong>at<strong>in</strong>g<br />

stakeholder <strong>en</strong>gagem<strong>en</strong>t with local Maroon and<br />

Amer<strong>in</strong>dian communities.<br />

Newmont Meridian Gold M<strong>in</strong>e Social Strategy,<br />

Sur<strong>in</strong>ame.<br />

<strong>Project</strong> Director for develop<strong>in</strong>g social strategy for<br />

proposed gold m<strong>in</strong>e <strong>in</strong> eastern Sur<strong>in</strong>ame <strong>in</strong> preparation<br />

for m<strong>in</strong>eral agreem<strong>en</strong>t negotiations with governm<strong>en</strong>t.<br />

Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> Sugarcane/Bioethanol ESIA, Sur<strong>in</strong>ame<br />

<strong>Project</strong> Director for prepar<strong>in</strong>g ESIA to meet <strong>in</strong>ternational<br />

standards and NIMOS guidel<strong>in</strong>es for sugarcane to<br />

bioethanol facility <strong>in</strong> western Sur<strong>in</strong>ame for Staatsolie.<br />

Maniitsoq Alum<strong>in</strong>ium Smelter/Hydropower <strong>Project</strong><br />

ESIA, Gre<strong>en</strong>land. <strong>Project</strong> Director for developm<strong>en</strong>t of<br />

ESHIA for an <strong>in</strong>tegrated hydropower, transmission l<strong>in</strong>e,<br />

alum<strong>in</strong>um smelter, and port complex <strong>in</strong> southwest<br />

Gre<strong>en</strong>land. Coord<strong>in</strong>at<strong>in</strong>g with Gre<strong>en</strong>land Home Rule<br />

Governm<strong>en</strong>t on a Strategic Environm<strong>en</strong>tal Assessm<strong>en</strong>t,<br />

oversee<strong>in</strong>g basel<strong>in</strong>e <strong>en</strong>vironm<strong>en</strong>tal and social studies,<br />

manag<strong>in</strong>g stakeholder <strong>en</strong>gagem<strong>en</strong>t program, and<br />

<strong>in</strong>tegrat<strong>in</strong>g a susta<strong>in</strong>ability <strong>in</strong>itiative <strong>in</strong>to the ESHIA<br />

process.<br />

Oyu Tolgoi Copper M<strong>in</strong>e IESC, Mongolia<br />

<strong>Project</strong> Director serv<strong>in</strong>g as Indep<strong>en</strong>d<strong>en</strong>t Environm<strong>en</strong>tal<br />

and Social Consultant for the l<strong>en</strong>ders (IFC, EBRD, EDC,<br />

Standard Chartered, BNP Paribas) for the world’s largest<br />

undeveloped copper-gold project located <strong>in</strong> the Gobi<br />

Desert. <strong>Project</strong> <strong>in</strong>volves both op<strong>en</strong> pit and underground<br />

m<strong>in</strong><strong>in</strong>g us<strong>in</strong>g block cav<strong>in</strong>g method with an <strong>in</strong>itial<br />

capacity of 110,000 tons per day of ore, which will<br />

<strong>in</strong>crease to at least 158,000 tpd. Copper conc<strong>en</strong>trate to be<br />

exported by truck. Key issues <strong>in</strong>clude Pot<strong>en</strong>tially Acid<br />

G<strong>en</strong>erat<strong>in</strong>g waste rock and tail<strong>in</strong>gs, water use and<br />

availability, impacts to vulnerable herder families and<br />

effects on several globally <strong>en</strong>dangered mega-fauna.<br />

Evaluat<strong>in</strong>g ESIA, ESMP, and ESAP <strong>in</strong> terms of IFC PS,<br />

Equator Pr<strong>in</strong>ciples and EBRD Environm<strong>en</strong>tal<br />

Requirem<strong>en</strong>ts. Responsible for help<strong>in</strong>g l<strong>en</strong>ders manage<br />

f<strong>in</strong>ancial and reputational risks for largest m<strong>in</strong>e<br />

f<strong>in</strong>anc<strong>in</strong>g project <strong>in</strong> history (US$3B project).<br />

NorthMet M<strong>in</strong>e EIS, U.S.<br />

Served as water resource lead, overall EIS technical<br />

coord<strong>in</strong>ator, and strategic advisor for developm<strong>en</strong>t of an<br />

EIS for an op<strong>en</strong> pit 32,000 tpd polymetal sulfide m<strong>in</strong>e <strong>in</strong><br />

M<strong>in</strong>nesota as Third-party Contractor for the US Army<br />

Corps of Eng<strong>in</strong>eers, US Forest Service, and MN<br />

Departm<strong>en</strong>t of Natural Resources, with the active<br />

<strong>in</strong>volvem<strong>en</strong>t of USEPA and US Fish and Wildlife Service.<br />

<strong>Project</strong> <strong>in</strong>volves subaqueous disposal of reactive waste<br />

rock and reuse of a brownfield taconite tail<strong>in</strong>gs bas<strong>in</strong>.<br />

Oversaw developm<strong>en</strong>t of compreh<strong>en</strong>sive EIS <strong>in</strong>clud<strong>in</strong>g<br />

rigorous alternatives and cumulative effects analyses.<br />

Inter-American Developm<strong>en</strong>t Bank (IDB) Support<br />

Services Contract.<br />

<strong>Project</strong> Director for two multi-year task order contracts<br />

with the IDB (one for private sector f<strong>in</strong>anc<strong>in</strong>g and one<br />

for public sector projects) provid<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal and<br />

social impact review and assessm<strong>en</strong>t for a variety of<br />

projects <strong>in</strong>clud<strong>in</strong>g: geothermal power plant <strong>in</strong> Bolivia, an<br />

electric transmission l<strong>in</strong>e <strong>in</strong> Ecuador, and a highway <strong>in</strong><br />

Ecuador.<br />

Nkamouna M<strong>in</strong>e ESDD, Cameroon.<br />

S<strong>en</strong>ior Technical Advisor for an Environm<strong>en</strong>tal and<br />

Social Due Dilig<strong>en</strong>ce/Equator Pr<strong>in</strong>ciples review for a<br />

proposed cobalt-nickel-manganese m<strong>in</strong>e <strong>in</strong> Cameroon on<br />

behalf of the l<strong>en</strong>ders (Standard Chartered among others).<br />

Key issues addressed <strong>in</strong>clude biodiversity and effects on<br />

<strong>in</strong>dig<strong>en</strong>ous peoples (i.e., the Baka, a pygmy tribe).<br />

Global Alum<strong>in</strong>a (GAC) Bauxite M<strong>in</strong>e and Alum<strong>in</strong>a<br />

Ref<strong>in</strong>ery <strong>Project</strong>, Gu<strong>in</strong>ea.<br />

<strong>Project</strong> Director provid<strong>in</strong>g Equator Pr<strong>in</strong>ciple Review and<br />

L<strong>en</strong>der Advice for Global Alum<strong>in</strong>a <strong>Project</strong> (GAC) <strong>in</strong><br />

Gu<strong>in</strong>ea. Conducted an Environm<strong>en</strong>tal and Social Due<br />

Dilig<strong>en</strong>ce and provided <strong>in</strong>vestm<strong>en</strong>t advice to a<br />

consortium of 17 l<strong>en</strong>ders <strong>in</strong>clud<strong>in</strong>g IFC on the feasibility<br />

of l<strong>en</strong>d<strong>in</strong>g and pot<strong>en</strong>tial <strong>en</strong>vironm<strong>en</strong>tal & social risks.<br />

The GAC project <strong>in</strong>cludes the developm<strong>en</strong>t of a m<strong>in</strong>e,<br />

port and alum<strong>in</strong>a ref<strong>in</strong>ery <strong>in</strong> Sangaredi and Kamsar areas<br />

of Gu<strong>in</strong>ea. Assessed the adequacy of the Resettlem<strong>en</strong>t<br />

Action Plan and subsequ<strong>en</strong>t resettlem<strong>en</strong>t activities as<br />

4/20/2011 01-BLAHA, DAVID 2011 LELYDORP.DOC


well as advised on Biodiversity Action Plan to <strong>en</strong>sure<br />

that the chimpanzees <strong>in</strong> the m<strong>in</strong>e area are protected. For<br />

a period of two years ERM specialists reviewed the<br />

project activities, advised the l<strong>en</strong>der consortium and<br />

provided technical assistance.<br />

Land Use Compatibility Study, Canada.<br />

Technical advisor for evaluation of pot<strong>en</strong>tial noise and<br />

vibration effects from an exist<strong>in</strong>g m<strong>in</strong>e on a proposed<br />

hospital and college site on behalf of the Iron Ore<br />

Company of Canada.<br />

Newmont Meridian Gold M<strong>in</strong>e Social Strategy,<br />

Sur<strong>in</strong>ame.<br />

<strong>Project</strong> Director for develop<strong>in</strong>g social strategy for<br />

proposed gold m<strong>in</strong>e <strong>in</strong> eastern Sur<strong>in</strong>ame <strong>in</strong> preparation<br />

for m<strong>in</strong>eral agreem<strong>en</strong>t negotiations with governm<strong>en</strong>t.<br />

Cerrejon Coal M<strong>in</strong>e, Colombia.<br />

Serv<strong>in</strong>g as <strong>Project</strong> Director for an <strong>in</strong>dep<strong>en</strong>d<strong>en</strong>t evaluation<br />

of a proposed expansion of the world’s largest op<strong>en</strong> pit<br />

bitum<strong>in</strong>ous coal m<strong>in</strong>e <strong>in</strong> the world. Address<strong>in</strong>g effects<br />

on <strong>en</strong>vironm<strong>en</strong>t, neighbor<strong>in</strong>g villages, and downstream<br />

<strong>in</strong>dig<strong>en</strong>ous lands.<br />

Suralco Alum<strong>in</strong>a Ref<strong>in</strong>ery Expansion ESIA, Sur<strong>in</strong>ame.<br />

Serv<strong>in</strong>g as <strong>Project</strong> Director for the developm<strong>en</strong>t of an<br />

ESIA evaluat<strong>in</strong>g the <strong>en</strong>vironm<strong>en</strong>tal and social effects of<br />

proposed alum<strong>in</strong>a ref<strong>in</strong>ery modifications required to<br />

accommodate a new bauxite source, as well as expansion<br />

of the bauxite residue disposal areas. Includes<br />

stakeholder <strong>en</strong>gagem<strong>en</strong>t, social basel<strong>in</strong>e surveys, and<br />

developm<strong>en</strong>t of E&S Managem<strong>en</strong>t Plans.<br />

Alcoa-Alcan Alum<strong>in</strong>a Ref<strong>in</strong>ery <strong>Project</strong>, Gu<strong>in</strong>ea.<br />

<strong>Project</strong> Director for several compon<strong>en</strong>ts of a proposed<br />

alum<strong>in</strong>a ref<strong>in</strong>ery near Boke <strong>in</strong> Gu<strong>in</strong>ea. Coord<strong>in</strong>ate the<br />

preparation of a Health Impact Assessm<strong>en</strong>t for the<br />

project and also directed a Worker Camp Sit<strong>in</strong>g<br />

Workshop for the project propon<strong>en</strong>ts.<br />

B<strong>en</strong>i Saf Alum<strong>in</strong>ium Smelter, Algeria.<br />

Technical Advisor for ESHIA for 1.2 Mtpa alum<strong>in</strong>um<br />

smelter <strong>in</strong> Algeria for Dubal. Provided advice regard<strong>in</strong>g<br />

air emissions, sp<strong>en</strong>t pot l<strong>in</strong>er disposal technology, and<br />

issues regard<strong>in</strong>g desal<strong>in</strong>ation plant.<br />

East Iceland Susta<strong>in</strong>ability Initiative.<br />

<strong>Project</strong> Director for project assess<strong>in</strong>g the susta<strong>in</strong>ability of<br />

a controversial hydropower and alum<strong>in</strong>um smelter<br />

project <strong>in</strong> a rural area of Iceland. Assist<strong>in</strong>g Alcoa <strong>in</strong> the<br />

developm<strong>en</strong>t of an overall corporate susta<strong>in</strong>ability<br />

framework, as well as specific <strong>en</strong>vironm<strong>en</strong>tal, social, and<br />

economic <strong>in</strong>dicators and metrics.<br />

Chatham Smelter ESHIA, Tr<strong>in</strong>idad.<br />

<strong>Project</strong> Director for developm<strong>en</strong>t of ESHIA for 341,000<br />

metric tons per annum alum<strong>in</strong>um smelter for Alcoa <strong>in</strong><br />

southwest Tr<strong>in</strong>idad. Coord<strong>in</strong>ated social basel<strong>in</strong>e studies<br />

address<strong>in</strong>g livelihoods and resettlem<strong>en</strong>t concerns,<br />

developed successful stakeholder <strong>en</strong>gagem<strong>en</strong>t strategy<br />

and community meet<strong>in</strong>gs for very controversial project,<br />

and <strong>in</strong>itiated preparation of ESHIA before Alcoa decided<br />

to withdraw the project.<br />

Mass<strong>en</strong>a Alum<strong>in</strong>um Smelter Modification, USA<br />

<strong>Project</strong> Director for conversion of older smelter from<br />

Soderberg to pre-bake technology, <strong>in</strong>clud<strong>in</strong>g<br />

improvem<strong>en</strong>ts <strong>in</strong> air emissions, SPL g<strong>en</strong>eration, and<br />

wastewater discharges.<br />

Jamalco Port Reconstruction Review, Jamaica.<br />

<strong>Project</strong> Director for an <strong>en</strong>vironm<strong>en</strong>tal review of<br />

alternatives for reconstruct<strong>in</strong>g the Jamalco port facilities<br />

that were destroyed <strong>in</strong> Hurricane Dean for Alcoa.<br />

Evaluated effects of trestle and causeway designs on<br />

b<strong>en</strong>thic habitat, sedim<strong>en</strong>t transport, and fish <strong>in</strong> support<br />

of an application to the Jamaica National Environm<strong>en</strong>t &<br />

Plann<strong>in</strong>g Ag<strong>en</strong>cy.<br />

4/20/2011 01-BLAHA, DAVID 2011 LELYDORP.DOC


Sunrita Sarkar<br />

S<strong>en</strong>ior Consultant<br />

Sunrita Sarkar is a Sociologist and is based <strong>in</strong> ERM’s<br />

Wash<strong>in</strong>gton DC office. She is a S<strong>en</strong>ior <strong>Project</strong> Manager at<br />

ERM and her responsibilities <strong>in</strong>clude project plann<strong>in</strong>g,<br />

managem<strong>en</strong>t of teams and execution of projects related to<br />

<strong>en</strong>vironm<strong>en</strong>t social and health impact assessm<strong>en</strong>ts,<br />

resettlem<strong>en</strong>t & rehabilitation, social audits, social risks,<br />

community participation, stakeholder managem<strong>en</strong>t and<br />

natural resources.<br />

She has more than 12 years experi<strong>en</strong>ce of work<strong>in</strong>g on<br />

social impact assessm<strong>en</strong>ts, social audits/due dilig<strong>en</strong>ce,<br />

<strong>in</strong>dig<strong>en</strong>ous people’s issues and resettlem<strong>en</strong>t &<br />

rehabilitation issues of a number of developm<strong>en</strong>t projects<br />

<strong>in</strong> m<strong>in</strong><strong>in</strong>g & oil & gas, forestry, manufactur<strong>in</strong>g sector,<br />

power, dams, roads and highways. She has ext<strong>en</strong>sive<br />

experi<strong>en</strong>ce <strong>in</strong> stakeholder and community managem<strong>en</strong>t.<br />

She has worked ext<strong>en</strong>sively on projects funded by donor<br />

ag<strong>en</strong>cies such as the IFC, World Bank, and the Asian<br />

Developm<strong>en</strong>t Bank.<br />

Sunrita is a certified SA 8000 Lead auditor and has<br />

ext<strong>en</strong>sive experi<strong>en</strong>ce of labor (ILO codes) and human<br />

rights issues. She has conducted several labor rights,<br />

equality and workplace audits of manufactur<strong>in</strong>g plants,<br />

m<strong>in</strong>es and corporations.<br />

She has conducted several Equator Pr<strong>in</strong>ciple reviews<br />

us<strong>in</strong>g Performance Standards for project f<strong>in</strong>ance on behalf<br />

of equator banks and also for IFC. Sunrita co-manages a<br />

contract on behalf of ERM with the G<strong>en</strong>eral<br />

Manufactur<strong>in</strong>g Services (that <strong>in</strong>cludes Agro-bus<strong>in</strong>ess and<br />

Forestry sector) <strong>in</strong> IFC. Her responsibilities <strong>in</strong>clude<br />

advis<strong>in</strong>g the IFC on proposed <strong>in</strong>vestm<strong>en</strong>ts, coord<strong>in</strong>at<strong>in</strong>g<br />

<strong>en</strong>vironm<strong>en</strong>tal and social auditors for the due dilig<strong>en</strong>ce<br />

team and QA/QC of the reports com<strong>in</strong>g out of the<br />

contracts. As a part of the contract, Sunrita has managed<br />

projects <strong>in</strong> Brazil and India and advised IFC on the<br />

proposed l<strong>en</strong>d<strong>in</strong>g.<br />

Sunrita has ext<strong>en</strong>sive hydropower experi<strong>en</strong>ce and has<br />

worked on projects <strong>in</strong> Asia, Africa and LAC. She rec<strong>en</strong>tly<br />

led the workshop on behalf of World Bank and<br />

International Hydropower Association (IHA) on the<br />

formulation of the Hydropower Susta<strong>in</strong>ability<br />

Assessm<strong>en</strong>t Protocol.<br />

Sunrita has delivered several tra<strong>in</strong><strong>in</strong>gs to private sector<br />

cli<strong>en</strong>ts such as Freeport, Alcoa and Guyana Goldfields on<br />

IFC PS and Equator pr<strong>in</strong>ciples. In addition she has<br />

facilitated several policy workshops for l<strong>en</strong>d<strong>in</strong>g<br />

<strong>in</strong>stitutions like the World Bank.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world.<br />

She has authored several policy docum<strong>en</strong>ts and<br />

handbooks for the World Bank group such as Community<br />

Developm<strong>en</strong>t and Local Conflict <strong>in</strong> Extractive projects,<br />

Community Developm<strong>en</strong>t Agreem<strong>en</strong>ts (CDAs) <strong>in</strong> the<br />

Extractive Sector and the IFC Social Investm<strong>en</strong>t Handbook.<br />

She has worked <strong>in</strong> Asia, Caribbean, Mediterranean, Africa<br />

and Lat<strong>in</strong> America.<br />

Fields of Compet<strong>en</strong>ce<br />

• Social Impact Assessm<strong>en</strong>ts and mitigation<br />

• Resettlem<strong>en</strong>t and Rehabilitation<br />

• IFC Performance Standards/ Equator Pr<strong>in</strong>ciples<br />

Review (of ESIA and ESMP <strong>in</strong>clud<strong>in</strong>g RAP Review)<br />

• Social Managem<strong>en</strong>t Plans<br />

• Public Consultation and Disclosure Plans<br />

• Community Relations and Stakeholder Engagem<strong>en</strong>t<br />

• Social / Community Investm<strong>en</strong>t Strategy<br />

• Monitor<strong>in</strong>g and Evaluation<br />

• M&A (Phase I ESA audits & compliance review,<br />

<strong>en</strong>vironm<strong>en</strong>tal risk & due dilig<strong>en</strong>ce)<br />

• Environm<strong>en</strong>tal & social regulatory review<br />

• Social/Labour Audits<br />

• Policy studies<br />

Education<br />

• Masters <strong>in</strong> Sociology from Jawahar Lal Nehru<br />

University, 1997-99<br />

• B.A. (Hons) <strong>in</strong> History From Delhi University, 1994-97<br />

Certification<br />

SA 8000, Lead Auditor<br />

Languages<br />

• English<br />

• H<strong>in</strong>di<br />

• B<strong>en</strong>gali


Key <strong>Project</strong>s<br />

ESIA of Suralco’s proposed m<strong>in</strong><strong>in</strong>g exploration <strong>in</strong> the<br />

Nassau plateaus <strong>in</strong> Sur<strong>in</strong>ame. ERM has be<strong>en</strong><br />

commissioned by Alcoa (Suralco) to conduct a detailed<br />

ESIA and feasibility analysis of the proposed bauxite<br />

m<strong>in</strong><strong>in</strong>g activities <strong>in</strong> the Nassau area. The project <strong>in</strong>volves<br />

m<strong>in</strong><strong>in</strong>g <strong>in</strong> the Nassau concession as well as a transport<br />

road connect<strong>in</strong>g the proposed m<strong>in</strong>e to the ref<strong>in</strong>ery at<br />

Paranam. Sunrita is the lead social specialist who is<br />

head<strong>in</strong>g a team that is conduct<strong>in</strong>g surveys, assessm<strong>en</strong>ts &<br />

stakeholder consultations <strong>in</strong> the Maroon villages <strong>in</strong> the<br />

Nassau area as well as all the habitations that fall <strong>in</strong> the<br />

proposed transport corridor.<br />

ESIA of Suralco’s (Alcoa) DRDA 2 and 3 <strong>in</strong> Sur<strong>in</strong>ame.<br />

Suralco (Alcoa local company) <strong>in</strong> Sur<strong>in</strong>ame is mak<strong>in</strong>g<br />

changes to their residual disposal areas for red mud<br />

disposal. These changes necessitate the build<strong>in</strong>g of two<br />

residual disposal areas adjac<strong>en</strong>t to Alcoa’s ref<strong>in</strong>ery plant.<br />

Suralco commissioned ERM to conduct an ESIA of the<br />

project. Sunrita was the lead social specialist who carried<br />

out the social impact assessm<strong>en</strong>t and stakeholder<br />

consultation for the project. She has facilitated a<br />

household survey, stakeholder consultations and<br />

organized public meet<strong>in</strong>gs with the communities as the<br />

lead social specialist.<br />

<strong>Surgold</strong> Social Strategies and Capacity build<strong>in</strong>g<br />

Assistance for the <strong>Merian</strong> project Sur<strong>in</strong>ame. Sunrita is<br />

the project manager and is advis<strong>in</strong>g <strong>Surgold</strong> (Newmont)<br />

on its community relations strategy and developm<strong>en</strong>t<br />

plan go<strong>in</strong>g forward <strong>in</strong> the <strong>Merian</strong> project. This <strong>in</strong>volves<br />

tra<strong>in</strong><strong>in</strong>g the community relations staff and consultations<br />

with the communities.<br />

Preparation of Resettlem<strong>en</strong>t Action Plan (RAP) for a<br />

Hydropower <strong>Project</strong> <strong>in</strong> Albania. Sunrita led a team and<br />

advised on resettlem<strong>en</strong>t aspects of a hydropower project<br />

<strong>in</strong> Kalivac <strong>in</strong> Albania. Hydro which is a private<br />

construction company is seek<strong>in</strong>g id<strong>en</strong>tification of<br />

resettlem<strong>en</strong>t and livelihood impacts due to the project<br />

and the formulation of RAP to <strong>in</strong>ternational standards.<br />

Sunrita facilitated the process and was the <strong>in</strong>ternational<br />

resettlem<strong>en</strong>t expert lead<strong>in</strong>g the effort.<br />

Social assessm<strong>en</strong>t for Alla<strong>in</strong> Duhangan Hydroelectric<br />

<strong>Project</strong> (ADHP) <strong>in</strong> Himachal Pradesh. RSWML is<br />

seek<strong>in</strong>g partial f<strong>in</strong>anc<strong>in</strong>g from the International F<strong>in</strong>ance<br />

Corporation (IFC) for the project. To fulfill the<br />

requirem<strong>en</strong>ts of IFC’s Environm<strong>en</strong>tal and Social Review<br />

of the project, ERM India had be<strong>en</strong> <strong>in</strong>vited to prepare<br />

detailed <strong>in</strong>formation on <strong>en</strong>vironm<strong>en</strong>tal and social impact<br />

assessm<strong>en</strong>t of the project, along with sev<strong>en</strong> specialized<br />

studies and a reconnaissance survey of the proposed<br />

transmission l<strong>in</strong>e corridor, prior to IFC’s approval on<br />

f<strong>in</strong>anc<strong>in</strong>g the project. Sunrita prepared a detailed RAP for<br />

the project, recomm<strong>en</strong>ded <strong>in</strong>stitutional and monitor<strong>in</strong>g<br />

mechanisms and developed a detailed Public<br />

Consultation and Disclosure Plan for the <strong>en</strong>tire project<br />

period.<br />

Tra<strong>in</strong><strong>in</strong>g and Facilitation workshop on Hydropower<br />

Susta<strong>in</strong>ability Assessm<strong>en</strong>t Forum (HSAF). The World<br />

Bank is the facilitator for this multi-stakeholder<br />

roundtable on susta<strong>in</strong>ability and Hydropower projects of<br />

the Internation Hydropower Association (IHA). Sunrita<br />

facilitated a three day workshop at the World Bank to<br />

assist <strong>in</strong> the draft<strong>in</strong>g of HSAF protocol which can <strong>in</strong>form<br />

susta<strong>in</strong>able <strong>in</strong>vestm<strong>en</strong>ts <strong>in</strong> Hydropower projects<br />

Socio-economic Impact Assessm<strong>en</strong>t of the Rajasthan<br />

Power Sector Restructur<strong>in</strong>g <strong>Project</strong>, World Bank. The<br />

socio-economic impact study <strong>in</strong>volved provid<strong>in</strong>g an<br />

<strong>in</strong>tegrated and participatory framework for gather<strong>in</strong>g<br />

analyz<strong>in</strong>g, prioritiz<strong>in</strong>g and <strong>in</strong>corporat<strong>in</strong>g social<br />

<strong>in</strong>formation <strong>in</strong> develop<strong>in</strong>g and implem<strong>en</strong>t<strong>in</strong>g the<br />

power reform programme <strong>in</strong> the state. The state power<br />

sector reforms process is be<strong>in</strong>g supported by the<br />

World Bank. ERM was also asked to develop a social<br />

strategy that will <strong>in</strong>flu<strong>en</strong>ce the decision mak<strong>in</strong>g <strong>in</strong> the<br />

reform process, help monitor the impacts of the<br />

reforms on poor and vulnerable groups and id<strong>en</strong>tify<br />

steps to mitigate the hardships faced by these groups,<br />

if any. The study <strong>in</strong>volved ext<strong>en</strong>sive field survey of<br />

over 1000 households <strong>in</strong> rural and urban areas <strong>in</strong> the<br />

<strong>en</strong>tire state, an ext<strong>en</strong>sive consultations at the state,<br />

district and village levels. 3 stakeholder workshops<br />

were held as a part of this consultation process.<br />

Social and Environm<strong>en</strong>tal Analysis of the 2nd Rural<br />

Water Supply and Sanitation <strong>Project</strong>, Maharashtra for<br />

Water Supply and Sanitation Departm<strong>en</strong>t, Govt. of<br />

Maharashtra & World Bank. ERM conducted a social<br />

and <strong>en</strong>vironm<strong>en</strong>tal analysis, which a part of the project<br />

preparation study of the World Bank supported water<br />

and sanitation project. The objective of the study is to<br />

assist the GOM <strong>in</strong> design<strong>in</strong>g the project tak<strong>in</strong>g <strong>in</strong>to<br />

account the socio-economic characteristics of the target<br />

population and the <strong>en</strong>vironm<strong>en</strong>tal issues, so that the<br />

project / program delivers susta<strong>in</strong>able water and<br />

sanitation services to rural communities at large and poor<br />

and vulnerable groups (such as wom<strong>en</strong>, scheduled castes<br />

and scheduled tribes), <strong>in</strong> particular. The analysis was<br />

conducted <strong>in</strong> 20 villages spread over 5 districts cover<strong>in</strong>g<br />

differ<strong>en</strong>t geographical locations <strong>in</strong> the state and more<br />

than 600 households. A separate Indig<strong>en</strong>ous Peoples<br />

Developm<strong>en</strong>t Plan (IPDP) was also prepared with<br />

ext<strong>en</strong>sive consultations and participatory PRA and<br />

plann<strong>in</strong>g activities with tribal communities <strong>in</strong> Gram<br />

Panchayats (local village repres<strong>en</strong>tative bodies) <strong>in</strong> sev<strong>en</strong><br />

districts with high tribal conc<strong>en</strong>tration.<br />

2011-03 S.SARKAR


Alan D. Trippel, C.P.G.<br />

Partner<br />

Al Trippel has worked <strong>in</strong> the m<strong>in</strong><strong>in</strong>g <strong>in</strong>dustry and<br />

<strong>en</strong>vironm<strong>en</strong>tal consult<strong>in</strong>g for over 25 years. Industry<br />

experi<strong>en</strong>ce consisted of sulfide metallic m<strong>in</strong>eral<br />

exploration, developm<strong>en</strong>t, m<strong>in</strong>e managem<strong>en</strong>t, and<br />

<strong>en</strong>vironm<strong>en</strong>tal positions, <strong>in</strong>clud<strong>in</strong>g six years as the<br />

<strong>en</strong>vironm<strong>en</strong>tal, governm<strong>en</strong>t and public affairs<br />

coord<strong>in</strong>ator for a large precious and base metal m<strong>in</strong><strong>in</strong>g<br />

complex <strong>in</strong> Nevada, USA. Consult<strong>in</strong>g experi<strong>en</strong>ce<br />

consists of EHS and Susta<strong>in</strong>ability services <strong>in</strong>clud<strong>in</strong>g<br />

metallic and non-metallic m<strong>in</strong>e permitt<strong>in</strong>g, basel<strong>in</strong>e<br />

studies, Environm<strong>en</strong>tal / Social Impact Assessm<strong>en</strong>ts,<br />

compliance audits, <strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t systems,<br />

compliance issue resolution, M&A due dilig<strong>en</strong>ce,<br />

reclamation and closure, legislative developm<strong>en</strong>t, public<br />

(<strong>in</strong>clud<strong>in</strong>g communities, media, NGOs, and Indig<strong>en</strong>ous),<br />

and governm<strong>en</strong>t ag<strong>en</strong>cy affairs. Mr. Trippel also has<br />

experi<strong>en</strong>ce with the International Cyanide Code.<br />

Skills <strong>in</strong>clude develop<strong>in</strong>g pragmatic solutions to complex<br />

<strong>en</strong>vironm<strong>en</strong>tal chall<strong>en</strong>ges, and direct<strong>in</strong>g multidiscipl<strong>in</strong>e<br />

teams of sci<strong>en</strong>tists and <strong>en</strong>g<strong>in</strong>eers, and <strong>in</strong>terfac<strong>in</strong>g with<br />

<strong>in</strong>dustry and external stakeholders. Mr. Trippel has<br />

exceptional communication skills with all levels of<br />

bus<strong>in</strong>ess organizations, ag<strong>en</strong>cies, elected officials, trade<br />

associations, and the public.<br />

Mr. Trippel has supported m<strong>in</strong><strong>in</strong>g as well as chemical,<br />

automotive, electroplat<strong>in</strong>g, pulp and paper, forest<br />

products, petroleum, pharmaceutical, manufactur<strong>in</strong>g, rail<br />

transportation, waste managem<strong>en</strong>t, and property<br />

redevelopm<strong>en</strong>t cli<strong>en</strong>ts <strong>in</strong> North America, Lat<strong>in</strong> America.<br />

South America, Africa, Australia, Ch<strong>in</strong>a, Asia Pacific,<br />

UK, and Europe.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Professional Affiliations and Registrations<br />

• Society of M<strong>in</strong><strong>in</strong>g and Metallurgical Eng<strong>in</strong>eers<br />

Fields of Compet<strong>en</strong>ce<br />

• Metallic and non-metallic m<strong>in</strong><strong>in</strong>g/process permitt<strong>in</strong>g,<br />

compliance, and closure/reclamation<br />

• M<strong>in</strong>e Permitt<strong>in</strong>g and Environm<strong>en</strong>tal / Social Impact<br />

Assessm<strong>en</strong>ts<br />

• Public, Community, Media, NGOs, Indig<strong>en</strong>ous, and<br />

Governm<strong>en</strong>tal Relations<br />

• Legislative and Regulatory developm<strong>en</strong>t<br />

• Facility decommission<strong>in</strong>g, and compreh<strong>en</strong>sive closure<br />

and reclamation plann<strong>in</strong>g<br />

• Short and Long Term F<strong>in</strong>ancial Assurance<br />

• Wastewater, storm water, surface /groundwater<br />

managem<strong>en</strong>t (<strong>in</strong>clud<strong>in</strong>g Acid Rock Dra<strong>in</strong>age)<br />

• Groundwater <strong>in</strong>vestigations and remedial actions<br />

• Wetland and wildlife managem<strong>en</strong>t and mitigation<br />

• Solid and hazardous waste managem<strong>en</strong>t<br />

• Geotechnical stability<br />

• Asbestos abatem<strong>en</strong>t<br />

• Landfill permitt<strong>in</strong>g and closure<br />

• Air quality permitt<strong>in</strong>g and compliance<br />

• Environm<strong>en</strong>tal quality monitor<strong>in</strong>g<br />

• Environm<strong>en</strong>tal risk assessm<strong>en</strong>ts<br />

• Due dilig<strong>en</strong>ce for mergers and acquisitions<br />

• Environm<strong>en</strong>tal managem<strong>en</strong>t systems<br />

• Pollution prev<strong>en</strong>tion and susta<strong>in</strong>able developm<strong>en</strong>t<br />

• Corporate Advisory Services<br />

• Susta<strong>in</strong>able Developm<strong>en</strong>t<br />

Education<br />

• M.S., Geology, Colorado State University, 1985<br />

• B.S., Geology, Michigan State University, 1981


Key <strong>Project</strong>s<br />

M<strong>in</strong>nesota, USA<br />

Mr. Trippel is curr<strong>en</strong>tly the project manager for the third<br />

party multidiscipl<strong>in</strong>e team to prepare a full state-federal<br />

(NEPA) EIS for the proposed NorthMet <strong>Project</strong>, a<br />

polymetallic sulfide m<strong>in</strong>eral m<strong>in</strong>e on behalf of the State<br />

of M<strong>in</strong>nesota. A multi-volume draft EIS was issued <strong>in</strong><br />

2009, and approximately 3,800 comm<strong>en</strong>ts were received.<br />

He coord<strong>in</strong>ated the analysis and response to these<br />

comm<strong>en</strong>ts. Additional responsibilities <strong>in</strong>clude analyz<strong>in</strong>g<br />

natural and cultural resource basel<strong>in</strong>e and impact<br />

predictions, alternatives analysis, cumulative effects<br />

analysis, and advis<strong>in</strong>g cooperat<strong>in</strong>g ag<strong>en</strong>cies on<br />

<strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t of sulfide m<strong>in</strong><strong>in</strong>g<br />

operations, as applied to this high-profile proposed<br />

surface m<strong>in</strong>e and mill. (2006 – pres<strong>en</strong>t)<br />

Nevada USA<br />

Mr. Trippel managed all <strong>en</strong>vironm<strong>en</strong>tal activities at a<br />

large, active gold m<strong>in</strong><strong>in</strong>g (sulfide) facility <strong>in</strong> Nevada,<br />

<strong>in</strong>clud<strong>in</strong>g operational compliance, reclamation and<br />

remediation, and permitt<strong>in</strong>g. His <strong>en</strong>vironm<strong>en</strong>tal<br />

stewardship efforts won praise from state and federal<br />

ag<strong>en</strong>cies, operations staff, corporate officers, and special<br />

<strong>in</strong>terest groups. As a result of his efforts, no violations<br />

occurred dur<strong>in</strong>g his 6 years of responsibility, <strong>in</strong>clud<strong>in</strong>g<br />

NEPA, CWA, SDWA, CAA, RCRA, CERCLA, SARA,<br />

AHERA, and EPCRA.<br />

Permitt<strong>in</strong>g activities <strong>in</strong>cluded successfully lead<strong>in</strong>g state<br />

and federal permitt<strong>in</strong>g (<strong>in</strong>clud<strong>in</strong>g NEPA EIS) related to<br />

the high profile (due to sulfide cont<strong>en</strong>t and pot<strong>en</strong>tial for<br />

acid rock dra<strong>in</strong>age impacts) Pho<strong>en</strong>ix <strong>Project</strong>, a major<br />

expansion of m<strong>in</strong><strong>in</strong>g, mill<strong>in</strong>g, and heap leach<strong>in</strong>g. Tasks<br />

<strong>in</strong>cluded primary coord<strong>in</strong>ation of <strong>in</strong>ternal <strong>en</strong>g<strong>in</strong>eers and<br />

managem<strong>en</strong>t; outsourced sci<strong>en</strong>tists and <strong>en</strong>g<strong>in</strong>eers; local<br />

state and federal ag<strong>en</strong>cies; Native American tribal<br />

repres<strong>en</strong>tatives; special <strong>in</strong>terest groups; and the media.<br />

Mr. Trippel was <strong>in</strong>strum<strong>en</strong>tal <strong>in</strong> successfully def<strong>en</strong>d<strong>in</strong>g<br />

the project on appeal; the project is now under<br />

construction. Also supervised multi-million dollar<br />

closure and reclamation program, which consisted of 170<br />

<strong>in</strong>active or historic m<strong>in</strong><strong>in</strong>g facilities over 50 square miles.<br />

<strong>Project</strong> managem<strong>en</strong>t <strong>in</strong>cluded site evaluation, process<br />

wastewater treatm<strong>en</strong>t and disposal, evaluation and<br />

mitigation of acid rock dra<strong>in</strong>age from waste rock and<br />

copper leach dumps, soil and groundwater remedial<br />

actions, dust suppression for large tail<strong>in</strong>gs disposal area,<br />

hydrocarbon impact mitigation, solid and hazardous<br />

waste treatm<strong>en</strong>t and disposal, landfill closure, asbestos<br />

bear<strong>in</strong>g process pip<strong>in</strong>g disposal, re-contour<strong>in</strong>g and re-<br />

vegetation programs, <strong>en</strong>vironm<strong>en</strong>tal risk assessm<strong>en</strong>ts,<br />

due dilig<strong>en</strong>ce, and pollution prev<strong>en</strong>tion. (1995-2005)<br />

Midwest USA<br />

Conducted compreh<strong>en</strong>sive <strong>en</strong>vironm<strong>en</strong>tal audits of<br />

numerous large, well-established iron ore m<strong>in</strong><strong>in</strong>g and<br />

taconite pellet process<strong>in</strong>g facilities. Audits <strong>en</strong>tailed<br />

ext<strong>en</strong>sive docum<strong>en</strong>t review, <strong>in</strong>terviews, and on-site<br />

<strong>in</strong>spections for compliance with m<strong>in</strong><strong>in</strong>g, dam safety,<br />

wetland/stream protection, and reclamation permits,<br />

and for compliance with PCB, asbestos, solid and<br />

hazardous waste regulations. Audit f<strong>in</strong>d<strong>in</strong>gs and<br />

recomm<strong>en</strong>dations were used by the cli<strong>en</strong>t <strong>in</strong> their goal of<br />

susta<strong>in</strong><strong>in</strong>g and improv<strong>in</strong>g their <strong>en</strong>vironm<strong>en</strong>tal<br />

compliance and stewardship at the operations.<br />

(2002 – pres<strong>en</strong>t)<br />

Michigan, USA<br />

Responsible for provid<strong>in</strong>g EIA, EHS compliance, and<br />

governm<strong>en</strong>t/community relations support to a jo<strong>in</strong>t<br />

v<strong>en</strong>ture of large and small m<strong>in</strong><strong>in</strong>g companies for<br />

exploration /developm<strong>en</strong>t of a high profile new base-<br />

and precious- metal massive sulfide discovery at a<br />

gre<strong>en</strong>field site located <strong>in</strong> Michigan’s Upper P<strong>en</strong><strong>in</strong>sula.<br />

Evaluated pre-drill<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal basel<strong>in</strong>e<br />

conditions, provided EHS guidance dur<strong>in</strong>g exploration<br />

and developm<strong>en</strong>t activities, coord<strong>in</strong>ated ag<strong>en</strong>cy dispute<br />

resolution and field reclamation of surface disturbance.<br />

In addition, ERM facilitated the developm<strong>en</strong>t and<br />

implem<strong>en</strong>tation of a compreh<strong>en</strong>sive communications<br />

program to <strong>in</strong>form state regulators, elected officials,<br />

resid<strong>en</strong>ts, and NGOs about the curr<strong>en</strong>t project and<br />

pot<strong>en</strong>tial impacts and b<strong>en</strong>efits of a future m<strong>in</strong><strong>in</strong>g<br />

operation. Repres<strong>en</strong>ted the jo<strong>in</strong>t v<strong>en</strong>ture <strong>in</strong> public<br />

meet<strong>in</strong>gs, local and legislative <strong>in</strong>itiatives, and led<br />

numerous site visits and field trips to <strong>in</strong>form<br />

stakeholders about m<strong>in</strong>eral exploration, m<strong>in</strong><strong>in</strong>g,<br />

<strong>en</strong>vironm<strong>en</strong>tal protection, and susta<strong>in</strong>ability.<br />

(2002 to pres<strong>en</strong>t)<br />

13.01.11 ADT


Colorado, USA<br />

Responsible for successful developm<strong>en</strong>t and production<br />

of op<strong>en</strong>-pit underground gold-silver m<strong>in</strong>es. Performed<br />

managem<strong>en</strong>t functions for multi-million dollar projects,<br />

which <strong>in</strong>cluded budget<strong>in</strong>g, supervision of employees and<br />

contractors, geostatistical reserve estimates, feasibility<br />

studies, sampl<strong>in</strong>g programs, metallurgical test<strong>in</strong>g,<br />

geotechnical <strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g, op<strong>en</strong>-pit m<strong>in</strong>e plan,<br />

schedul<strong>in</strong>g, landwork, permitt<strong>in</strong>g, and public relations.<br />

(1986-1988)<br />

Nevada, USA<br />

Responsible for lead<strong>in</strong>g a team of social sci<strong>en</strong>tists <strong>in</strong><br />

determ<strong>in</strong><strong>in</strong>g the social and economic impacts to a rural<br />

community of simultaneous sulfide and oxide metallic<br />

m<strong>in</strong>e startups, closures, and a large proposed power<br />

plant all owed by a large m<strong>in</strong><strong>in</strong>g cli<strong>en</strong>t. <strong>Project</strong> scop<strong>in</strong>g<br />

<strong>in</strong>cluded <strong>in</strong>terviews with <strong>in</strong>ternal and external<br />

stakeholders to id<strong>en</strong>tify key issues, some of which were<br />

not id<strong>en</strong>tified <strong>in</strong> traditional <strong>en</strong>vironm<strong>en</strong>tal permitt<strong>in</strong>g.<br />

Results resulted <strong>in</strong> improved stakeholder relations,<br />

impact recognition, and managem<strong>en</strong>t recomm<strong>en</strong>dations<br />

to m<strong>in</strong>imize negative impacts and <strong>en</strong>hance positive<br />

impacts to the community. (2005)<br />

Michigan, USA<br />

Mr. Trippel won praise from the Governor of Michigan,<br />

the Directors of the Departm<strong>en</strong>t of Environm<strong>en</strong>tal<br />

Quality and Departm<strong>en</strong>t of Natural Resources, and<br />

NGOs (Sierra Club, National Wildlife Federation, and<br />

Trout Unlimited) for repres<strong>en</strong>t<strong>in</strong>g <strong>in</strong>dustry on behalf of a<br />

cli<strong>en</strong>t <strong>in</strong> prepar<strong>in</strong>g compreh<strong>en</strong>sive new metallic sulfide<br />

m<strong>in</strong><strong>in</strong>g legislation.<br />

Two rec<strong>en</strong>t discoveries of sulfide m<strong>in</strong>eral deposits <strong>in</strong><br />

Michigan's Upper P<strong>en</strong><strong>in</strong>sula sparked strong opposition<br />

and controversy over the adequacy of exist<strong>in</strong>g laws to<br />

protect the <strong>en</strong>vironm<strong>en</strong>t. Members consisted of state<br />

and local units of governm<strong>en</strong>ts, tribes, <strong>en</strong>vironm<strong>en</strong>tal<br />

groups, academia, and <strong>in</strong>dustry. Mr. Trippel’s strong<br />

expertise <strong>in</strong> m<strong>in</strong><strong>in</strong>g issues and stakeholder <strong>en</strong>gagem<strong>en</strong>t<br />

helped to resolve conflicts and build a workable statutory<br />

framework. The result was a bill which reflected the<br />

cons<strong>en</strong>sus of the stakeholders, and was passed<br />

unanimously by the House and S<strong>en</strong>ate.<br />

ERM cont<strong>in</strong>ues to repres<strong>en</strong>t our cli<strong>en</strong>t <strong>in</strong> multistakeholder<br />

rule and guidance mak<strong>in</strong>g processes to<br />

complim<strong>en</strong>t the new statute. The model for conflict and<br />

issue resolution developed by the work group is now<br />

be<strong>in</strong>g used on other controversial topics <strong>in</strong> Michigan.<br />

(2004 – pres<strong>en</strong>t)<br />

Colorado, USA<br />

Participated <strong>in</strong> an <strong>in</strong>ternal ISO 14001 Environm<strong>en</strong>tal<br />

Managem<strong>en</strong>t System audit for a large scale active base<br />

metal (sulfide) m<strong>in</strong><strong>in</strong>g and process<strong>in</strong>g operation. (2005)<br />

Arizona, USA<br />

Provided technical support to design a passive<br />

remediation system for precious metal heap leach pad<br />

residual dra<strong>in</strong> down at an <strong>in</strong>dustrial cli<strong>en</strong>ts closed<br />

facility. (2003)<br />

West Virg<strong>in</strong>ia, USA<br />

Participated <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal compliance audit of a large<br />

underground coal m<strong>in</strong><strong>in</strong>g complex. Responsibilities<br />

<strong>in</strong>cluded m<strong>in</strong>e permit compliance, reclamation,<br />

stormwater managem<strong>en</strong>t, and protection of surface<br />

waters. (2007)<br />

South Dakota, USA<br />

Successfully “unpermitted” an <strong>in</strong>active, historic, large<br />

surface gold m<strong>in</strong>e by conduct<strong>in</strong>g a detailed review and<br />

demonstration of all m<strong>in</strong>e permit reclamation obligations<br />

were completed and that post-m<strong>in</strong><strong>in</strong>g land use had be<strong>en</strong><br />

achieved. Worked collaboratively with the m<strong>in</strong><strong>in</strong>g<br />

company and state ag<strong>en</strong>cies to prepare a package of<br />

docum<strong>en</strong>ts to support the cancellation of the m<strong>in</strong>e<br />

permit, and developed a Post-Closure Plan to manage<br />

long term collection and treatm<strong>en</strong>t of metal-bear<strong>in</strong>g<br />

leachate from waste rock stockpiles. Testified before the<br />

State Board of M<strong>in</strong><strong>in</strong>g and Environm<strong>en</strong>t on this first-ever<br />

request. Approval was granted and the Board<br />

complim<strong>en</strong>ted ERM and our cli<strong>en</strong>t on the thoroughness<br />

of the <strong>in</strong>formation pres<strong>en</strong>ted.<br />

Chile / Arg<strong>en</strong>t<strong>in</strong>a<br />

S<strong>en</strong>ior consultant on a third party review of<br />

<strong>en</strong>vironm<strong>en</strong>tal and social impact assessm<strong>en</strong>t processes<br />

for a proposed high profile gold m<strong>in</strong>e located on the<br />

cont<strong>in</strong><strong>en</strong>tal divide <strong>in</strong> the Andes Mounta<strong>in</strong>s. The project<br />

consisted of site visit, <strong>in</strong>terviews, and preparation of a<br />

summary report to m<strong>in</strong><strong>in</strong>g company managem<strong>en</strong>t that<br />

assisted <strong>in</strong> respond<strong>in</strong>g to shareholder concerns (2006)<br />

13.01.11 ADT


Emma McK<strong>en</strong>nirey<br />

<strong>Project</strong> Manager, Impact Assessm<strong>en</strong>t<br />

Emma McK<strong>en</strong>nirey is a Consultant with<strong>in</strong> ERM based <strong>in</strong><br />

Toronto, Ontario<br />

Ms. McK<strong>en</strong>nnirey is a Professional Eng<strong>in</strong>eer with eight<br />

years of experi<strong>en</strong>ce <strong>in</strong> water resource managemnet,<br />

m<strong>in</strong><strong>in</strong>g and <strong>in</strong>frastructure projects. She is well versed <strong>in</strong><br />

<strong>en</strong>vironm<strong>en</strong>tal and social impact assessm<strong>en</strong>t, hydrology,<br />

hydrogeology, hydraulics, water quality analysis,<br />

groundwater-surface water <strong>in</strong>teraction and field<br />

<strong>in</strong>vestigations. Ms. McK<strong>en</strong>nirey has worked across<br />

Canada and is familiar with a wide range of national and<br />

<strong>in</strong>terational regulatory <strong>en</strong>vironm<strong>en</strong>ts and has a strong<br />

knowledge of <strong>in</strong>ternational <strong>en</strong>vironm<strong>en</strong>tal and social<br />

impact standards.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Professional Affiliations & Registrations<br />

• Member, Professional Eng<strong>in</strong>eers Ontario<br />

• Member, Canadian Water Resources Association<br />

Fields of Compet<strong>en</strong>ce<br />

• Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t<br />

• Hydrology<br />

• Hydraulics<br />

• Field <strong>in</strong>vestigations<br />

• Devleopm<strong>en</strong>t of <strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g soloutions<br />

• Water quality analysis<br />

Education<br />

• Bachelor’s Degree of Applied Sci<strong>en</strong>ce, Civil<br />

Eng<strong>in</strong>eer<strong>in</strong>g, Water Resources Specialization,<br />

University of Waterloo, Canada, 2004<br />

• Bachelor’s Degree of Public Relations, Mount Sa<strong>in</strong>t<br />

V<strong>in</strong>c<strong>en</strong>t University, Canada, 1999<br />

Languages<br />

• English, native speaker<br />

• Fr<strong>en</strong>ch<br />

Key Industry Sectors<br />

• Metals and M<strong>in</strong><strong>in</strong>g<br />

• Energy<br />

• Infrastructure


Key <strong>Project</strong>s<br />

Cobre de Panama, Panama, Inmet M<strong>in</strong><strong>in</strong>g Corporation,<br />

2011.<br />

Environm<strong>en</strong>tal Advisor<br />

Completed <strong>en</strong>vironm<strong>en</strong>t and social due dilig<strong>en</strong>ce review<br />

of the project’s <strong>en</strong>vironm<strong>en</strong>tal and social impact<br />

assessm<strong>en</strong>t and related managem<strong>en</strong>t plans as they<br />

related to water resources (<strong>in</strong>clud<strong>in</strong>g climate, hydrology,<br />

hydrogeology, water quality and sedim<strong>en</strong>t and erosion<br />

control) and provided advice regard<strong>in</strong>g improvem<strong>en</strong>ts<br />

required to br<strong>in</strong>g the proposed project up to <strong>in</strong>ternational<br />

standards.<br />

Bratsk Pulp Mill Rebuild, Russia, Ilim Group, 2010<br />

Environm<strong>en</strong>tal Advisor<br />

Led the Export Developm<strong>en</strong>t Canada <strong>en</strong>vironm<strong>en</strong>tal and<br />

social due dilig<strong>en</strong>ce review of the <strong>en</strong>vironm<strong>en</strong>tal and<br />

social impacts of the proposed rebuild of one of the<br />

world’s largest pulp and paper mills located <strong>in</strong> Siberia,<br />

Russia <strong>in</strong>clud<strong>in</strong>g b<strong>en</strong>chmark<strong>in</strong>g to IFC Performance<br />

Standards and OECD Common Approaches. Led<br />

coord<strong>in</strong>ation with Export Credit Ag<strong>en</strong>cies <strong>in</strong> F<strong>in</strong>land and<br />

Swed<strong>en</strong>.<br />

Mack<strong>en</strong>zie Valley W<strong>in</strong>ter Road Water Lic<strong>en</strong>s<strong>in</strong>g,<br />

Canada, M<strong>in</strong>istry of Transporation, Governm<strong>en</strong>t of the<br />

Northwest Territories, 2009<br />

Water Resources Specialist<br />

Assessed the feasibility of predict<strong>in</strong>g under-ice<br />

streamflow for over 20 ungauged bas<strong>in</strong>s <strong>in</strong> the NWT via<br />

hydraulic modell<strong>in</strong>g or regional analysis to improve the<br />

NWT Departm<strong>en</strong>t of Transportation’s compliance with<br />

its water lic<strong>en</strong>se to take water to from the water courses<br />

to build the Mack<strong>en</strong>zie Valley W<strong>in</strong>ter Road. Emma is<br />

liaised with the Sahtu Water Board and experts from<br />

Environm<strong>en</strong>t Canada and the University of Alberta to<br />

f<strong>in</strong>d a solution that was cost-effective and delivered<br />

reliable data.<br />

Mary River Iron Ore M<strong>in</strong>e, Canada, Baff<strong>in</strong>land Metals<br />

Inc., 2009<br />

Water Resources Specialist<br />

Provided hydrologic and hydraulic design of over 215<br />

water cross<strong>in</strong>gs by world’s most northern railroad<br />

located on Baff<strong>in</strong> Island as well as prelim<strong>in</strong>ary and<br />

detailed design of culvert cross<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g<br />

<strong>in</strong>stallations <strong>in</strong> permafrost and mounta<strong>in</strong>ous terra<strong>in</strong>.<br />

Emma was the liaison betwe<strong>en</strong> the <strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g and<br />

<strong>en</strong>vironm<strong>en</strong>tal impact assessm<strong>en</strong>t teams for aquatic<br />

resources. .<br />

St. Andrews River Susta<strong>in</strong>able Yield Analysis, Canada,<br />

Town of Stewiacke, 2008<br />

Water Resources Specialist<br />

Completed a susta<strong>in</strong>able yield analysis to predict low<br />

flow <strong>in</strong> an un-gauged bas<strong>in</strong> <strong>in</strong> Nova Scotia to determ<strong>in</strong>e<br />

the impacts of projected water tak<strong>in</strong>g by the Town of<br />

Stewiacke based on projected growth <strong>in</strong>to 2026. Advised<br />

Town Council regard<strong>in</strong>g the risks associated with<br />

aggressive growth and recomm<strong>en</strong>ded actions for the<br />

Town to <strong>en</strong>sure reliable water supply as the municipality<br />

grows.<br />

Tulsequah Chief M<strong>in</strong>e Permitt<strong>in</strong>g, Canada, Redfern<br />

Resources, 2007<br />

Water Rescourses Discipl<strong>in</strong>e Lead<br />

Managed the developm<strong>en</strong>t of the water managem<strong>en</strong>t<br />

plan for an 18-month construction phase of a new basemetal<br />

m<strong>in</strong>e <strong>in</strong> northern British Columbia. Emma liasied<br />

with a large <strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g team, construction contractors,<br />

and prov<strong>in</strong>cial regulat<strong>in</strong>g bodies. She modeled the water<br />

managem<strong>en</strong>t system, develop<strong>in</strong>g operational procedures<br />

as well as ma<strong>in</strong>t<strong>en</strong>ance and monitor<strong>in</strong>g programs.<br />

Tulsequah Chief M<strong>in</strong>eBarg<strong>in</strong>g Option ESIA, Canada,<br />

Redfern Resources, 2007<br />

Water Resources Specialist<br />

Emma compiled historical and field data and conducted a<br />

literature review to provide a characterization of the Tulsequah<br />

and Taku Rivers <strong>in</strong> northern British Columbia to support the<br />

Environm<strong>en</strong>tal and Soical Impact Assessm<strong>en</strong>t of a proposed<br />

project to barge ore from the Tulsequah Chief m<strong>in</strong>e to Juneau,<br />

Alaska.<br />

Back River M<strong>in</strong>e ESIA, Canada, Dundee Resources,<br />

2006<br />

Hydrology Discipl<strong>in</strong>e Lead<br />

Developed and managed a multi-year hydrology surface<br />

water monitor<strong>in</strong>g program <strong>in</strong> the Northwest Territories<br />

to collect basel<strong>in</strong>e hydrology data to support an<br />

upcom<strong>in</strong>g Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>t for a<br />

pot<strong>en</strong>tial m<strong>in</strong>e <strong>in</strong> the Northwest Territories.<br />

High Lake M<strong>in</strong>e ESIA, Canada, Wolfd<strong>en</strong> Resources<br />

Ltd., 2005<br />

Hydrology Discipl<strong>in</strong>e Coord<strong>in</strong>ator<br />

Emma implem<strong>en</strong>ted a three-year field hydrology<br />

program <strong>in</strong> the Western Arctic territory of Nunavut,<br />

completed annual field summaries, compiled<br />

meteorological and hydrological data and developed<br />

basel<strong>in</strong>e hydrology reports for Environm<strong>en</strong>tal Impact<br />

Assessm<strong>en</strong>t. She also contributed to the water balance,<br />

water model, culvert design and water quality models.<br />

22.07.11 EMMA MCKENNIREY


Alastair Gow-Smith<br />

Consultant, IAP<br />

Alastair Gow-Smith is a Consultant with<strong>in</strong> ERM based<br />

<strong>in</strong> London.<br />

Alastair has an educational background <strong>in</strong> Social<br />

Anthropology (BA) and Impact Assessm<strong>en</strong>t and<br />

Managem<strong>en</strong>t (MA), from the University of Manchester.<br />

Alastair has be<strong>en</strong> <strong>in</strong>volved <strong>in</strong> a variety of projects<br />

<strong>in</strong>clud<strong>in</strong>g SIAs, Social Managem<strong>en</strong>t Plann<strong>in</strong>g,<br />

Resettlem<strong>en</strong>t Plann<strong>in</strong>g and Artisanal M<strong>in</strong><strong>in</strong>g<br />

Managem<strong>en</strong>t.<br />

Alastair has substantial project experi<strong>en</strong>ce with<strong>in</strong> the<br />

m<strong>in</strong><strong>in</strong>g, natural resource and <strong>in</strong>frastructure sectors. This<br />

social managem<strong>en</strong>t experi<strong>en</strong>ce has <strong>in</strong>cluded rec<strong>en</strong>t <strong>in</strong>country<br />

experi<strong>en</strong>ce collect<strong>in</strong>g socio-economic data <strong>in</strong><br />

Burk<strong>in</strong>a Faso, Turkey, Sur<strong>in</strong>ame and Ecuador as well as<br />

a strategic review of Community Developm<strong>en</strong>t<br />

Agreem<strong>en</strong>ts for the World Bank, <strong>in</strong>clud<strong>in</strong>g fieldwork <strong>in</strong><br />

Ghana. Alastair has also be<strong>en</strong> <strong>in</strong>volved <strong>in</strong> several<br />

projects throughout sub-Saharan Africa and with<strong>in</strong><br />

C<strong>en</strong>tral Asia that have <strong>in</strong>volved impact assessm<strong>en</strong>t and<br />

social managem<strong>en</strong>t plann<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g substantial<br />

basel<strong>in</strong>e data collection as well as coord<strong>in</strong>ation and<br />

project managem<strong>en</strong>t of subconsultants.<br />

Alastair has substantial experi<strong>en</strong>ce of stakeholder<br />

<strong>en</strong>gagem<strong>en</strong>t <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>terviews, focus group<br />

discussions and participatory rural appraisal / learn<strong>in</strong>g<br />

and action throughout a range of projects.<br />

Professional Affiliations & Registrations<br />

Member of the Society for Applied Anthropology<br />

Fields of Compet<strong>en</strong>ce<br />

Social Impact Assessm<strong>en</strong>t, Social Managem<strong>en</strong>t<br />

Plann<strong>in</strong>g, Resettlem<strong>en</strong>t Plann<strong>in</strong>g and Artisanal<br />

M<strong>in</strong><strong>in</strong>g Managem<strong>en</strong>t.<br />

Education<br />

Masters <strong>in</strong> Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>t and<br />

Managem<strong>en</strong>t, University of Manchester, 2008<br />

Bachelor of Social Sci<strong>en</strong>ce (BSocSc) <strong>in</strong> Social<br />

Anthropology, University of Manchester, 2006<br />

Languages<br />

English, native speaker<br />

Basic Spanish<br />

Basic Fr<strong>en</strong>ch<br />

Key Industry Sectors<br />

Extractives


Key <strong>Project</strong>s<br />

The follow<strong>in</strong>g projects relate to Alastair’s project<br />

experi<strong>en</strong>ce.<br />

Social Strategy, Sur<strong>in</strong>ame, Newmont M<strong>in</strong><strong>in</strong>g, 2010<br />

Data collection and analysis<br />

Alastair gathered socio-economic data <strong>in</strong> pot<strong>en</strong>tially<br />

impacted communities surround<strong>in</strong>g Newmont’s <strong>Merian</strong><br />

exploration site to develop a social strategy for the<br />

<strong>Project</strong>. This <strong>in</strong>cluded data collection from artisanal<br />

m<strong>in</strong>ers and a social risk assessm<strong>en</strong>t analysis; develop<strong>in</strong>g<br />

recomm<strong>en</strong>dations and a strategy go<strong>in</strong>g forward.<br />

Social Impact Assessm<strong>en</strong>t, Ghana, Newmont M<strong>in</strong><strong>in</strong>g,<br />

2010<br />

Desk-based analysis<br />

Alastair contributed to a impact assessm<strong>en</strong>t team<br />

analys<strong>in</strong>g socio-economic data gathered by ERM to<br />

develop an ESIA of Newmont’s Akyem site. This SIA<br />

<strong>in</strong>clud<strong>in</strong>g an analysis of pot<strong>en</strong>tial human rights and<br />

social impacts to affected communities.<br />

Environm<strong>en</strong>tal and Social Due Dilig<strong>en</strong>ce, UniCredit,<br />

Turkey, 2010,<br />

Data collection and analysis<br />

Alastair helped to complete the <strong>en</strong>vironm<strong>en</strong>tal and<br />

social due dilig<strong>en</strong>ce of a planned Nickel M<strong>in</strong>e <strong>in</strong><br />

Turkey. This <strong>in</strong>volved socio-economic data collection <strong>in</strong><br />

pot<strong>en</strong>tially impacted communities and with other<br />

stakeholders surround<strong>in</strong>g the project. The <strong>Project</strong> ESIA<br />

was analysed aga<strong>in</strong>st this ground truth<strong>in</strong>g exercise for<br />

compliance with the Equator Pr<strong>in</strong>ciples.<br />

Community Developm<strong>en</strong>t Agreem<strong>en</strong>ts (CDA) Study<br />

with<strong>in</strong> the M<strong>in</strong><strong>in</strong>g Sector, Global, World Bank, 2010<br />

Case study managem<strong>en</strong>t and data collection.<br />

Alastair helped to compile a report for the World Bank<br />

concern<strong>in</strong>g the curr<strong>en</strong>t sc<strong>en</strong>arios, opportunities and<br />

chall<strong>en</strong>ges fac<strong>in</strong>g CDAs with<strong>in</strong> the m<strong>in</strong><strong>in</strong>g sector. This<br />

<strong>in</strong>cluded field work <strong>in</strong> Ghana and a series of <strong>in</strong>terviews<br />

surround<strong>in</strong>g the successes and failures of CDAs with<strong>in</strong><br />

the m<strong>in</strong><strong>in</strong>g sector. Interviews were conducted with a<br />

range of stakeholder groups and this fieldwork <strong>in</strong> was<br />

used <strong>in</strong> addition to case studies <strong>in</strong> Papua New Gu<strong>in</strong>ea<br />

and Arg<strong>en</strong>t<strong>in</strong>a to develop a review of CDA application<br />

globally <strong>in</strong>clud<strong>in</strong>g an analysis of their successes and<br />

failures.<br />

Fruta Del Norte Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>t, Ecuador, K<strong>in</strong>ross Aurelian, 2009-2010<br />

Socio-economic researcher and <strong>Project</strong> Managem<strong>en</strong>t<br />

Alastair provided a range of project managem<strong>en</strong>t<br />

support to K<strong>in</strong>ross <strong>in</strong> relation to an ESIA. This <strong>in</strong>cluded<br />

manag<strong>in</strong>g subconsultants socio-economic field research<br />

and stakeholder <strong>en</strong>gagem<strong>en</strong>t and data collection <strong>in</strong><br />

relation to ASM. This project <strong>in</strong>volved data analysis for<br />

a Social Basel<strong>in</strong>e Study and Social Impact Assessm<strong>en</strong>t as<br />

well as develop<strong>in</strong>g an ESIA Report.<br />

Belahouro Social Impact Assessm<strong>en</strong>t, Burk<strong>in</strong>a Faso,<br />

Société des M<strong>in</strong>es de Belahouro – WEGA M<strong>in</strong><strong>in</strong>g,<br />

2009.<br />

Socio-economic and ASM researcher and impact<br />

assessor.<br />

Alastair carried out the field-based research and<br />

analysis required to prepare a Social Basel<strong>in</strong>e and<br />

Impact Assessm<strong>en</strong>t of the Belahouro Gold M<strong>in</strong>e <strong>in</strong><br />

Burk<strong>in</strong>a Faso. This <strong>in</strong>volved a prolonged period of<br />

fieldwork gather<strong>in</strong>g quantitative and qualitative data,<br />

manag<strong>in</strong>g a team of <strong>en</strong>umerators and numerous<br />

stakeholder <strong>en</strong>gagem<strong>en</strong>t meet<strong>in</strong>gs. A large factor <strong>in</strong> this<br />

project was the pres<strong>en</strong>ce of ASM <strong>in</strong> the region which<br />

<strong>in</strong>volved develop<strong>in</strong>g a series of specific stakeholder<br />

<strong>en</strong>gagem<strong>en</strong>t activities and impact mitigation techniques<br />

with<strong>in</strong> the SIA report. Hav<strong>in</strong>g gathered the required<br />

data Alastair analysed the results to prepare a Social<br />

Impact Assessm<strong>en</strong>t guided by the IFC Performance<br />

Standards<br />

Tulawaka Social Closure Risk Assessm<strong>en</strong>t, Tanzania,<br />

Barrick Gold, 2009.<br />

Desk-based socio-economic data analysis.<br />

Alastair provided desk based assistance analys<strong>in</strong>g<br />

qualitative and quantitative socio-economic data to<br />

assist develop a Social Closure Risk Assessm<strong>en</strong>t for the<br />

Tulawaka m<strong>in</strong>e. Alastair had a desk based role<br />

assess<strong>in</strong>g the data that was gathered based on a three<br />

week period of onsite fieldwork that <strong>in</strong>cluded<br />

participatory research methods with employees,<br />

villages and other stakeholders.<br />

Integrated Rural Developm<strong>en</strong>t Plan 2009, Tanzania,<br />

Barrick Gold, North Mara,<br />

Desk-based data analysis<br />

Alastair provided desk based assistance design<strong>in</strong>g an<br />

Integrated Rural Developm<strong>en</strong>t Plan (IDAP) for Barrick<br />

Gold’s M<strong>in</strong>e at North Mara to promote regional<br />

developm<strong>en</strong>t and growth and <strong>in</strong>stitutional capacity <strong>in</strong><br />

the North Mara area amongst resettled communities.<br />

The project <strong>in</strong>volved assist<strong>in</strong>g the formation of<br />

community based organisations, design<strong>in</strong>g frameworks<br />

to promote social accountability, <strong>en</strong>gag<strong>in</strong>g with key<br />

stakeholders and design<strong>in</strong>g and evaluat<strong>in</strong>g community<br />

and social <strong>in</strong>frastructure to promote rural developm<strong>en</strong>t.<br />

For this project Alastair had a research role<br />

Analysis of the CAR M<strong>in</strong><strong>in</strong>g Sector, C<strong>en</strong>tral African<br />

Republic, World Bank, 2009<br />

16.05.11 NAME


Artisanal M<strong>in</strong><strong>in</strong>g Managem<strong>en</strong>t Researcher<br />

As part of a World Bank funded project Alastair<br />

provide desk-based assistance <strong>in</strong> develop<strong>in</strong>g an analysis<br />

of the C<strong>en</strong>tral African Republic m<strong>in</strong><strong>in</strong>g sector <strong>in</strong> order<br />

to id<strong>en</strong>tify relevant actions for reforms and proposed<br />

<strong>en</strong>hancem<strong>en</strong>ts, with the aim to promote and organize<br />

<strong>in</strong>dustrial as well as artisanal m<strong>in</strong><strong>in</strong>g operations as<br />

<strong>in</strong>strum<strong>en</strong>ts of poverty reduction and economic<br />

developm<strong>en</strong>t. The project <strong>in</strong>cluded a review of the<br />

M<strong>in</strong><strong>in</strong>g Code and associated regulations, as well as of<br />

legal docum<strong>en</strong>ts as relevant to both artisanal and<br />

<strong>in</strong>dustrial sectors (<strong>en</strong>vironm<strong>en</strong>t, land, labour, health,<br />

health and safety, fiscal provisions, etc.), a review of<br />

M<strong>in</strong><strong>in</strong>g Agreem<strong>en</strong>ts betwe<strong>en</strong> the C<strong>en</strong>tral African<br />

Republic State and various m<strong>in</strong><strong>in</strong>g companies and the<br />

review of the <strong>in</strong>stitutional capacity of the adm<strong>in</strong>istration<br />

of m<strong>in</strong>e<br />

Susta<strong>in</strong>able Managem<strong>en</strong>t of M<strong>in</strong>eral Resources,<br />

Nigeria, World Bank, 2008-9<br />

Artisanal M<strong>in</strong><strong>in</strong>g and Socio-Economic Researcher<br />

Alastair was <strong>in</strong>volved <strong>in</strong> a World Bank funded Review<br />

(<strong>in</strong>clud<strong>in</strong>g <strong>in</strong>stitutional audit and legal framework<br />

review) and analysis of rural livelihoods <strong>in</strong> Artisanal<br />

M<strong>in</strong><strong>in</strong>g locales provid<strong>in</strong>g desk-based support. This<br />

<strong>in</strong>volved creat<strong>in</strong>g detailed recomm<strong>en</strong>dations and action<br />

plans for stakeholder <strong>en</strong>gagem<strong>en</strong>t and sectoral reform.<br />

This project was undertak<strong>en</strong> as part of the curr<strong>en</strong>t<br />

Susta<strong>in</strong>able Managem<strong>en</strong>t of M<strong>in</strong>eral Resources <strong>Project</strong><br />

(SMMRP).<br />

Lubelska Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>t, Ukra<strong>in</strong>e, CCI Lubelska -Lubel M<strong>in</strong>es,<br />

2008<br />

Social Economic Researcher<br />

Alastair provided desk-based support to analyse socioeconomic<br />

data to develop an IFC standard ESIA of an<br />

underground coal m<strong>in</strong>e <strong>in</strong> Ukra<strong>in</strong>e.<br />

Analysis of the CSR feasibility of the M<strong>in</strong>eral Sector,<br />

Gabon, Arcellor Mittal, 2008<br />

Social Economic and ASM Researcher<br />

Alastair provided desk-based analysis of the CSR and<br />

bus<strong>in</strong>ess context of Gabon develop<strong>in</strong>g a report for<br />

Arcellor Mittal advis<strong>in</strong>g on the pot<strong>en</strong>tial feasibility of<br />

<strong>in</strong>vestm<strong>en</strong>t with<strong>in</strong> the manganese sector.<br />

Lunda South Social Basel<strong>in</strong>e Study, Angola, BHP<br />

Billiton, 2008<br />

Desk-based socio-economic data analysis.<br />

Alastair assisted analyse socio-economic data to prepare<br />

a Social Basel<strong>in</strong>e study of a m<strong>in</strong>e <strong>in</strong> Angola. This<br />

<strong>in</strong>cluded <strong>in</strong>terrogat<strong>in</strong>g quantitative and qualitative data<br />

to prepare a Social Basel<strong>in</strong>e Study to b<strong>en</strong>chmark socioeconomic<br />

conditions surround<strong>in</strong>g the m<strong>in</strong>e and to raise<br />

awar<strong>en</strong>ess of key social issues and opportunities for<br />

community developm<strong>en</strong>t for companies, governm<strong>en</strong>t,<br />

NGOs and other stakeholders. The project <strong>in</strong>volved a<br />

Social basel<strong>in</strong>e study of 14 communities. Particular<br />

att<strong>en</strong>tion was paid to <strong>in</strong>ternally displaced persons and<br />

constra<strong>in</strong>ts associated with conflict affected areas.<br />

Ori<strong>en</strong>te Prov<strong>in</strong>ce Social Characterisation Study, DRC,<br />

Confid<strong>en</strong>tial, 2008<br />

Anthropological and socio-economic researcher<br />

Alastair helped to prepare a Social Characterisation<br />

Study for an exploration site <strong>in</strong> North-East DRC. This<br />

<strong>in</strong>volved anthropological and socio-economic research<br />

and the developm<strong>en</strong>t of a Social Characterisation<br />

Report provid<strong>in</strong>g guidance and advice to the company.<br />

The project was designed to assist the company with<br />

<strong>in</strong>itial stages of community <strong>en</strong>gagem<strong>en</strong>t at exploration<br />

stage, and to advise on manag<strong>in</strong>g community<br />

expectations.<br />

16.05.11 NAME


PERSONALIA<br />

RESUMÉ<br />

First name: Salomon S.L.<br />

Last name: Emanuels<br />

Year of birth: 1951<br />

Date: December 18 Th<br />

Sex: Male<br />

Adress: Livorno Beekhuiz<strong>en</strong>weg 16<br />

City: Paramaribo<br />

Country: Sur<strong>in</strong>ame, South America<br />

Telephone: (597) 520456/520484(werk); (597) 485610 (thuis)/08553324(mobiel)<br />

E-mail: salomonemanuels@yahoo.com; salomon@sr.net<br />

Education<br />

Major: Cultural and Social Anthropology, Catholic University of Nijmeg<strong>en</strong>, the Netherlands<br />

Graduated: Cultural and Social Anthropologist Msc, 1988<br />

Specialities: Legal Anthropology and Social Geography of Develop<strong>in</strong>g Countries.<br />

Thematic keywords: Anthropology; Community Developm<strong>en</strong>t, Participation and Social<br />

Assessm<strong>en</strong>t; Indig<strong>en</strong>ous and Tribal People Rights, Political and Religious Anthropology.<br />

Courses: Post-Academic Courses “F<strong>in</strong>ancial Managem<strong>en</strong>t and Quality Policy” ; “Market<strong>in</strong>g,<br />

Sponsor<strong>in</strong>g and Fundrais<strong>in</strong>g”, C<strong>en</strong>tre for Policy and Managem<strong>en</strong>t, University of Utrecht, the<br />

Netherlands, 1995; “Charity Fundrais<strong>in</strong>g Managem<strong>en</strong>t”, Institute of Charity Fundrais<strong>in</strong>g<br />

Managers Trust, London 1995; “Participation <strong>in</strong> Local Developm<strong>en</strong>t”, Agromisa Foundation,<br />

the Netherlands, 2001.<br />

Employm<strong>en</strong>t<br />

Type of work:<br />

- Director: 2002-2010, Equalance Foundation, Sur<strong>in</strong>ame.<br />

- Consultant Nationaal Instituut voor Milieu <strong>en</strong> Ontwikkel<strong>in</strong>g (NIMOS): Review of the<br />

Draft Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>t Reports of the Staatsolie Ref<strong>in</strong>ery Expansion<br />

<strong>Project</strong>, December 2009 – January 2010.<br />

- Program Manager, 2008-2009: Program Education for Work. A Program to help Youth <strong>in</strong><br />

the Interior to get work by organiz<strong>in</strong>g vocational tra<strong>in</strong><strong>in</strong>g. Support<strong>in</strong>g by ZZg and ICCO,<br />

the Netherlands.<br />

- Local UNDP Consultant for the Economic Commission for Lat<strong>in</strong> America and the<br />

Caribbean (ECLAC): Sur<strong>in</strong>ame: the impact of the May 2006 floods on susta<strong>in</strong>able<br />

livelihoods, March 2007.<br />

- Consultant/Researcher ZZG/ICCO the Netherlands: Haalbaarheid van vakopleid<strong>in</strong>g<strong>en</strong> <strong>in</strong><br />

<strong>het</strong> b<strong>in</strong>n<strong>en</strong>land van Sur<strong>in</strong>ame, May-July 2007.<br />

- Consultant: Technical Support Consultation Process of Developm<strong>en</strong>t Plann<strong>in</strong>g for the<br />

Interior. M<strong>in</strong>istry of Regional Developm<strong>en</strong>t, October-December 2006<br />

- <strong>Project</strong> Advisor/Tra<strong>in</strong>er: Program for Str<strong>en</strong>gth<strong>en</strong><strong>in</strong>g of Traditional Authorities <strong>in</strong> the<br />

Interior. PAS/Equalance, 2003-2006. Research and Developm<strong>en</strong>t of Tra<strong>in</strong><strong>in</strong>g Program.<br />

- Consultant/Researcher NIMOS: Social and Environm<strong>en</strong>tal Assessm<strong>en</strong>t; Unicef; Situation<br />

Analysis of Childr<strong>en</strong> <strong>in</strong> Brokopondo; UNDP/Small Grants Programme: Tra<strong>in</strong><strong>in</strong>g <strong>Project</strong><br />

Managem<strong>en</strong>t for Target Communities, 2003-2005


- Lecturer: Anton de Kom University; Research Methods and Techniques, Culture and<br />

Developm<strong>en</strong>t, Cultural Anthropology, 2003-2010.<br />

- <strong>Project</strong> Advisor: Traditional Leadership, Land Rights and Empowerm<strong>en</strong>t: 2002-2003,<br />

Moiwana Human Rights Organization, Sur<strong>in</strong>ame.<br />

- Programme Officer Community Developm<strong>en</strong>t: 1998-2001, Bureau Forum NGO’s,<br />

Sur<strong>in</strong>ame<br />

- Street Corner Worker: 1993-1998, Amsterdam, the Netherlands.<br />

- Tra<strong>in</strong>er: Inter Cultural Communication for Governm<strong>en</strong>t Officers and M<strong>in</strong>ority Groups,<br />

1988-1993, several municipalities <strong>in</strong> the Netherlands.<br />

- Consultant: Developm<strong>en</strong>t of Vocational Tra<strong>in</strong><strong>in</strong>g Program for Refugees <strong>in</strong> the<br />

Amersfoort-Utrecht region. South-East Utrecht Prov<strong>in</strong>ce, 1990-1991, the Netherlands.<br />

- Program Officer Education and Work: 1988-1993, Regional Office for Education,<br />

Amersfoort, the Netherlands.<br />

- Community Worker: 1981-1988, Dev<strong>en</strong>ter, the Netherlands.<br />

Knowledge of languages<br />

English Dutch Sranan Saamaka/Ndjuka<br />

and other Maroon<br />

languages<br />

Speak<strong>in</strong>g Moderate Excell<strong>en</strong>t Excell<strong>en</strong>t Excell<strong>en</strong>t<br />

Writ<strong>in</strong>g Moderate Excell<strong>en</strong>t Excell<strong>en</strong>t Excell<strong>en</strong>t<br />

Papers/Lectures<br />

- The threat to Old Tradition <strong>in</strong> the Maroon village of Santigron; Paramaribo, 2002<br />

- Description of the function of Traditional Authorities among the Maroons <strong>in</strong> Sur<strong>in</strong>ame;<br />

Paramaribo, 2005 (unpublished project report).<br />

- Reflection on our National developm<strong>en</strong>t: First Time, Today and Tomorrow; Paramaribo,<br />

2005.<br />

- Childr<strong>en</strong> of Brokopondo: A Situation analysis; M<strong>in</strong>istry of Regional Developm<strong>en</strong>t and<br />

UNICEF; Paramaribo, 2003.<br />

- Land Rights, Economical developm<strong>en</strong>t and Ethnic Id<strong>en</strong>tity among the Maroons <strong>in</strong><br />

Sur<strong>in</strong>ame; Paramaribo, 2003.<br />

- We have problem, so we sell our forest. Report on a prelim<strong>in</strong>ary research about juridical<br />

status and utilisation of forest <strong>in</strong> the H<strong>in</strong>terland of Sur<strong>in</strong>ame; Paramaribo, 2002.<br />

- Politicization of Ethnic Id<strong>en</strong>tity; Paramaribo, 2002<br />

- Land Policy of the Governm<strong>en</strong>t: Land Rights Issue and the occupation of land <strong>in</strong><br />

Sur<strong>in</strong>ame; Paramaribo, 2002.<br />

- Susta<strong>in</strong>able Developm<strong>en</strong>t: People First; SWI, Paramaribo, 2000<br />

- Land Right Issue <strong>in</strong> the H<strong>in</strong>terland: In what way it solved? Paramaribo, 2000.<br />

- Involved, but not participat<strong>in</strong>g: Research on participation of Sur<strong>in</strong>am people <strong>in</strong> immigrant<br />

policy <strong>in</strong> the municipality of Dev<strong>en</strong>ter. Doctoral thesis. Catholic University Nijmeg<strong>en</strong>,<br />

1988.


Matthew Kuniholm<br />

<strong>Project</strong> Sci<strong>en</strong>tist<br />

Matt Kuniholm is a member of ERM’s Wash<strong>in</strong>gton D.C.<br />

Social Consult<strong>in</strong>g Team. He has experi<strong>en</strong>ce work<strong>in</strong>g<br />

with public, private, and non-profit organizations <strong>in</strong><br />

<strong>en</strong>vironm<strong>en</strong>tal, social and <strong>in</strong>ternational developm<strong>en</strong>t<br />

sectors. Most rec<strong>en</strong>tly, he completed a two year contract<br />

manag<strong>in</strong>g community-based <strong>en</strong>vironm<strong>en</strong>tal<br />

conservation and economic developm<strong>en</strong>t <strong>in</strong> Guatemala.<br />

Mr. Kuniholm’s work experi<strong>en</strong>ce has focused on the<br />

relation betwe<strong>en</strong> <strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t and socioeconomic<br />

issues, particularly related to <strong>in</strong>ternational<br />

developm<strong>en</strong>t, social impact assessm<strong>en</strong>ts, community<br />

relations, and stakeholder <strong>en</strong>gagem<strong>en</strong>t. His work<br />

comb<strong>in</strong>es practical field skills such as stakeholder<br />

<strong>en</strong>gagem<strong>en</strong>t activities, community relations,<br />

participatory rural appraisal techniques, and social gap<br />

analyses with analytic research skills, report writ<strong>in</strong>g and<br />

project managem<strong>en</strong>t.<br />

Past projects have <strong>in</strong>cluded social impact assessm<strong>en</strong>ts;<br />

stakeholder <strong>en</strong>gagem<strong>en</strong>t programs; desktop social due<br />

dilig<strong>en</strong>ce reviews; resettlem<strong>en</strong>t plann<strong>in</strong>g; municipal<br />

economic developm<strong>en</strong>t; <strong>en</strong>vironm<strong>en</strong>tal monitor<strong>in</strong>g of<br />

<strong>en</strong>dangered species; forest mapp<strong>in</strong>g, managem<strong>en</strong>t and<br />

<strong>in</strong>c<strong>en</strong>tive plann<strong>in</strong>g; artisanal m<strong>in</strong><strong>in</strong>g <strong>en</strong>gagem<strong>en</strong>t<br />

plann<strong>in</strong>g; community <strong>in</strong>vestm<strong>en</strong>t; develop<strong>in</strong>g and<br />

manag<strong>in</strong>g community based ecotourism projects, tree<br />

nurseries and reforestation; agricultural cooperatives;<br />

and projects <strong>in</strong>volv<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal services.<br />

Matt has lived and worked <strong>in</strong> the USA, Canada, C<strong>en</strong>tral<br />

America and Africa, and has experi<strong>en</strong>ce on projects<br />

funded by <strong>in</strong>ternational l<strong>en</strong>d<strong>in</strong>g ag<strong>en</strong>cies, the UNDP-<br />

GEF; G<strong>en</strong>eva Global, a sub-contractor for USAID; the<br />

Austrian Developm<strong>en</strong>t Ag<strong>en</strong>cy; and national and<br />

<strong>in</strong>ternational NGO’s.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

Social Impact Assessm<strong>en</strong>t<br />

Stakeholder <strong>en</strong>gagem<strong>en</strong>t<br />

Community based and participatory developm<strong>en</strong>t<br />

(PRA techniques, and participatory project design)<br />

Community relations and grievance mechanisms<br />

Artis<strong>in</strong>al and Small Scale M<strong>in</strong><strong>in</strong>g<br />

Conservation and monitor<strong>in</strong>g of biodiversity and<br />

natural resources<br />

Conceptualization and developm<strong>en</strong>t of <strong>in</strong>novative<br />

communication/report<strong>in</strong>g materials<br />

Work and liv<strong>in</strong>g experi<strong>en</strong>ce <strong>in</strong> North America, C<strong>en</strong>tral<br />

America, South America and Africa<br />

Education<br />

Houghton College, Houghton, New York<br />

Double Major: B.A. Biology, B.A. International<br />

Relations<br />

Magna Cum Laude, Deans List every semester<br />

Languages<br />

English (Native)<br />

Spanish


Relevant ERM <strong>Project</strong> Experi<strong>en</strong>ce<br />

ESIA, Sur<strong>in</strong>ame, ongo<strong>in</strong>g<br />

ERM has be<strong>en</strong> commissioned by Alcoa (Suralco) to<br />

conduct a detailed ESIA and feasibility analysis of<br />

the proposed bauxite m<strong>in</strong><strong>in</strong>g activities. Matthew is a<br />

member of the social impact assessm<strong>en</strong>t team<br />

responsible for conduct<strong>in</strong>g household surveys,<br />

participatory rural appraisals (PRA) and stakeholder<br />

consultations.<br />

Social Impact Assesm<strong>en</strong>t of Gold M<strong>in</strong>e, Newmont,<br />

Ghana, 2010<br />

Carried out field work, analysis and writ<strong>in</strong>g of social<br />

impact basel<strong>in</strong>e and assessm<strong>en</strong>t of communities<br />

<strong>in</strong>directly affected by a proposed gold m<strong>in</strong>e <strong>in</strong> the<br />

eastern region of Ghana. Field research techniques<br />

<strong>in</strong>cluded PRA methods such as focus groups<br />

discussions, community profil<strong>in</strong>g and seasonal<br />

cal<strong>en</strong>dars, as well as secondary research. The project<br />

also <strong>in</strong>volved a household c<strong>en</strong>sus of directly affected<br />

households, a human rights impact assessm<strong>en</strong>t and<br />

mitigation plann<strong>in</strong>g for issues <strong>in</strong>clud<strong>in</strong>g small scale<br />

m<strong>in</strong><strong>in</strong>g.<br />

Community Developm<strong>en</strong>t Framework Case Study<br />

Report, World Bank, 2010<br />

Assisted the plann<strong>in</strong>g, research and draft<strong>in</strong>g of a<br />

case study report on the global use of CDAs <strong>in</strong> both<br />

regulated and voluntary contexts. Specific case<br />

studies <strong>in</strong>cluded projects <strong>in</strong> Arg<strong>en</strong>t<strong>in</strong>a, Ghana and<br />

PNG. Tasks <strong>in</strong>cluded secondary research and<br />

telephone <strong>in</strong>terviews with key stakeholders<br />

worldwide.<br />

Complem<strong>en</strong>tary ESIA for El Salto Hydropower<br />

<strong>Project</strong>, Nicaragua, 2010<br />

Supported the developm<strong>en</strong>t of a complem<strong>en</strong>tary<br />

ESIA accord<strong>in</strong>g to IFC standards for a proposed<br />

Hydropower <strong>Project</strong> <strong>in</strong> Nicaragua and wrote the<br />

social basel<strong>in</strong>e, social impact and social managem<strong>en</strong>t<br />

plans. Key social issues <strong>in</strong>cluded resettlem<strong>en</strong>t,<br />

<strong>in</strong>dig<strong>en</strong>ous peoples, stakeholder <strong>en</strong>gagem<strong>en</strong>t and<br />

national parks and protected areas.<br />

ESDD Review support for Atotonilco wastewater<br />

treatm<strong>en</strong>t plant, Mexico City, 2010<br />

Performed a gap analysis of project EIA/Concession<br />

docum<strong>en</strong>tation and IFC Performance Standards,<br />

EHS Guidel<strong>in</strong>es, Equator Pr<strong>in</strong>ciples and secondary<br />

research on social basel<strong>in</strong>e and impacts.<br />

Regional Stakeholder Engagem<strong>en</strong>t Strategy<br />

Plann<strong>in</strong>g, K<strong>in</strong>ross Gold, Chile, 2010 Supported the<br />

research, plann<strong>in</strong>g and developm<strong>en</strong>t of a<br />

compreh<strong>en</strong>sive Stakeholder Engagem<strong>en</strong>t Strategy<br />

for three gold m<strong>in</strong>es, <strong>in</strong>clud<strong>in</strong>g project specific<br />

Action Plans, grievance mechanism, docum<strong>en</strong>tation<br />

system, community <strong>in</strong>vestm<strong>en</strong>t and <strong>in</strong>ternal staff<br />

tra<strong>in</strong><strong>in</strong>g.<br />

Stakeholder Engagem<strong>en</strong>t Strategy and Support,<br />

Cerro Casale (CMC), Chile, 2009-2010<br />

Supported the design and implem<strong>en</strong>tation of<br />

corporate social responsibility programs and<br />

strategies for world-class gold m<strong>in</strong><strong>in</strong>g project,<br />

<strong>in</strong>clud<strong>in</strong>g stakeholder <strong>en</strong>gagem<strong>en</strong>t activities, public<br />

consultations and ‘op<strong>en</strong> house’ ev<strong>en</strong>ts, grievance<br />

mechanism developm<strong>en</strong>t and tra<strong>in</strong><strong>in</strong>g and<br />

community <strong>in</strong>vestm<strong>en</strong>t strategy design.<br />

Social Risk Managem<strong>en</strong>t Tools, Teck, 2009-2010<br />

Drafted a Stakeholder Id<strong>en</strong>tification and Mapp<strong>in</strong>g<br />

Tool, High-Level Social Risk Id<strong>en</strong>tification Tool and<br />

a Guidance Note on Resettlm<strong>en</strong>t Action Plann<strong>in</strong>g to<br />

accompany full suite of other social risk<br />

managem<strong>en</strong>t tools to be rolled out across all Teck<br />

m<strong>in</strong><strong>in</strong>g projects.<br />

Support for ESIA of proposed gold m<strong>in</strong><strong>in</strong>g site,<br />

Guyana, 2009<br />

Supported the developm<strong>en</strong>t of social basel<strong>in</strong>e and<br />

impact chapters of a full ESIA for a proposed gold<br />

m<strong>in</strong>e, and wrote the Artisanal and Small Scale<br />

M<strong>in</strong><strong>in</strong>g (ASM) Managem<strong>en</strong>t Plan.<br />

Best-Practice Guidel<strong>in</strong>es for Involuntary<br />

Resettlm<strong>en</strong>t, Mongolian, 2009<br />

Researched and drafted cli<strong>en</strong>t-specific guidel<strong>in</strong>es for<br />

carry<strong>in</strong>g out resettlem<strong>en</strong>t plann<strong>in</strong>g and<br />

implem<strong>en</strong>tation for planned coal m<strong>in</strong><strong>in</strong>g projects <strong>in</strong><br />

Mongolia.<br />

ESDD Review support for highway construction<br />

project, Peru, 2009<br />

Performed gap analysis of project EIA/Concession<br />

docum<strong>en</strong>tation and IFC Performance Standards,<br />

EHS Guidel<strong>in</strong>es and Equator Pr<strong>in</strong>ciples.<br />

Research and preparation support for the<br />

developm<strong>en</strong>t of “Decommission<strong>in</strong>g and Closure of<br />

Oil Fields and M<strong>in</strong>es: A Toolkit to Assist<br />

Governm<strong>en</strong>t Ag<strong>en</strong>cies,” 2009<br />

2010 MATTHEW KUNIHOLM


Aided <strong>in</strong> the compilation of comm<strong>en</strong>ts, stakeholder<br />

<strong>in</strong>put, research and edit<strong>in</strong>g of the World Bank<br />

sponsored toolkit.<br />

Review of Land Rights Study for the Roundtable<br />

on Susta<strong>in</strong>able Biofuels, 2009<br />

Aided <strong>in</strong> the review and preparation for a special<br />

study on land rights and land use rights <strong>in</strong><br />

susta<strong>in</strong>able biofuel production.<br />

Past Experi<strong>en</strong>ce<br />

United States Peace Corps, Guatemala<br />

Environm<strong>en</strong>tal Conservation and Income G<strong>en</strong>eration<br />

Volunteer (Jan 2007 – Apr 2009)<br />

Obta<strong>in</strong>ed over $200,000 <strong>in</strong> fund<strong>in</strong>g for social and<br />

<strong>en</strong>vironm<strong>en</strong>tal developm<strong>en</strong>t projects through the<br />

Austrian Developm<strong>en</strong>t Ag<strong>en</strong>cy and the UNDP-GEF<br />

and fulfilled project goals through successful<br />

plann<strong>in</strong>g, tra<strong>in</strong><strong>in</strong>g and adm<strong>in</strong>istration<br />

Conducted community characterizations, stakeholder<br />

analyses and needs assessm<strong>en</strong>ts us<strong>in</strong>g participatory,<br />

community based methods<br />

Enabled municipal forestry office to conduct forest<br />

diagnostics, create maps, and process applications for<br />

<strong>in</strong>clusion <strong>in</strong> a national forest managem<strong>en</strong>t <strong>in</strong>c<strong>en</strong>tive<br />

program, lead<strong>in</strong>g to the protection of over 25 private<br />

and public forest properties <strong>in</strong> two years<br />

Initiated an agricultural cooperative employ<strong>in</strong>g over<br />

45 farmers sell<strong>in</strong>g non-traditional export crops<br />

Designed and carried out a three phase year-long<br />

community-based conservation project to protect an<br />

<strong>en</strong>dangered bird species, <strong>in</strong>corporat<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal<br />

education, reforestation, and monitor<strong>in</strong>g.<br />

Formed multi-sector municipal ecotourism<br />

developm<strong>en</strong>t committee and took <strong>in</strong>itiative <strong>in</strong> tra<strong>in</strong><strong>in</strong>g<br />

and empower<strong>in</strong>g local organizations<br />

Developed a professional spok<strong>en</strong> and writt<strong>en</strong> ability<br />

level <strong>in</strong> Spanish<br />

Adapted fully to the rural-Mayan community as a<br />

prerequisite to work effectively <strong>in</strong> the local community<br />

context<br />

2010 MATTHEW KUNIHOLM


S<strong>in</strong>ang Lee<br />

Consultant, Health/Social Specialist<br />

Ms. S<strong>in</strong>ang Lee is a Health/Social Specialist <strong>in</strong> our<br />

Impact Assessm<strong>en</strong>t Practice (IAP) with an<br />

<strong>in</strong>terdiscipl<strong>in</strong>ary background <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal sci<strong>en</strong>ces,<br />

public health and <strong>in</strong>ternational developm<strong>en</strong>t. S<strong>in</strong>ang's<br />

expertise lies <strong>in</strong> assess<strong>in</strong>g risks and impacts of<br />

developm<strong>en</strong>t projects from an <strong>in</strong>tegrated <strong>en</strong>vironm<strong>en</strong>tal,<br />

social and health l<strong>en</strong>s. She has over eight years of<br />

experi<strong>en</strong>ce <strong>in</strong> <strong>en</strong>gag<strong>in</strong>g various stakeholders <strong>in</strong> manag<strong>in</strong>g<br />

<strong>en</strong>vironm<strong>en</strong>tal health risks and natural resources at the<br />

local, national and <strong>in</strong>ternational levels.<br />

Her diverse projects <strong>in</strong>clude <strong>in</strong>tegrat<strong>in</strong>g health impact<br />

assessm<strong>en</strong>t (HIA) <strong>in</strong>to US NEPA Review/EIS and ESHIA<br />

processes, build<strong>in</strong>g proper chemicals managem<strong>en</strong>t<br />

capacity throughout C<strong>en</strong>tral America, promot<strong>in</strong>g health<br />

and safety <strong>in</strong>terv<strong>en</strong>tions among agricultural workers <strong>in</strong><br />

Cambodia, and lead<strong>in</strong>g tribal <strong>en</strong>gagem<strong>en</strong>t efforts <strong>in</strong><br />

watershed managem<strong>en</strong>t.<br />

S<strong>in</strong>ang has specific skills <strong>in</strong> conduct<strong>in</strong>g HIAs/SIAs;<br />

apply<strong>in</strong>g participatory rural appraisal techniques <strong>in</strong><br />

develop<strong>in</strong>g country context; design<strong>in</strong>g social/health<br />

assessm<strong>en</strong>t surveys; evaluat<strong>in</strong>g quantitative/qualitative<br />

data; and creat<strong>in</strong>g community <strong>en</strong>gagem<strong>en</strong>t tra<strong>in</strong><strong>in</strong>gs.<br />

Prior to jo<strong>in</strong><strong>in</strong>g ERM, S<strong>in</strong>ang worked for State of<br />

Wash<strong>in</strong>gton, Pacific Northwest Agricultural Safety and<br />

Health C<strong>en</strong>ter, US EPA's Office of International Affairs<br />

and US Ag<strong>en</strong>cy for International Developm<strong>en</strong>t (USAID).<br />

She has pres<strong>en</strong>ted her work at the International Sci<strong>en</strong>tific<br />

Confer<strong>en</strong>ce on Occupational and Environm<strong>en</strong>tal Health<br />

<strong>in</strong> Hanoi, Vietnam; and at US EPA’s Watershed<br />

Managem<strong>en</strong>t Confer<strong>en</strong>ce.<br />

S<strong>in</strong>ang holds a Master of Public Health degree <strong>in</strong><br />

Environm<strong>en</strong>tal and Occupational Health Sci<strong>en</strong>ces from<br />

University of Wash<strong>in</strong>gton and a Bachelors degree <strong>in</strong><br />

Environm<strong>en</strong>tal Sci<strong>en</strong>ces from UC Berkeley.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

• Health/Social Impact Assessm<strong>en</strong>ts<br />

• Integrated ESHIAs<br />

• Stakeholder Engagem<strong>en</strong>t and Public Consultation<br />

• Environm<strong>en</strong>tal Site Assessm<strong>en</strong>ts<br />

• Environm<strong>en</strong>tal Regulatory Compliance<br />

Education<br />

• MPH, Environm<strong>en</strong>tal and Occupational Health<br />

Sci<strong>en</strong>ces, University of Wash<strong>in</strong>gton, U.S. 2006<br />

• BA, Environm<strong>en</strong>tal Sci<strong>en</strong>ces, UC Berkeley, U.S. 2001<br />

Languages<br />

• English, native speaker<br />

• Khmer, native speaker<br />

• Spanish, <strong>in</strong>termediate<br />

Key Industry Sectors<br />

• Local and Tribal Governm<strong>en</strong>ts<br />

• Agriculture<br />

• Oil, Gas & M<strong>in</strong><strong>in</strong>g<br />

• Manufactur<strong>in</strong>g<br />

• Non-Governm<strong>en</strong>tal Organizations<br />

Honors & Awards<br />

• UW Graduate School Top Scholar, 2004-2005<br />

• Puget Sound Partners for Global Health Grant<br />

Recipi<strong>en</strong>t, 2005<br />

Publications<br />

• Fluoresc<strong>en</strong>t Tracer Manual: An Educational Tool for<br />

Pesticide Safety Educators<br />

http://depts.wash<strong>in</strong>gton.edu/pnash/FT.php<br />

• Bear-Evans Watershed Temperature and Dissolved<br />

Oxyg<strong>en</strong> Total Maximum Daily Load: Water Quality<br />

Improvem<strong>en</strong>t Report<br />

www.ecy.wa.gov/biblio/0810058.html


Key <strong>Project</strong>s<br />

Integrated ESHIA for Offshore Oil Developm<strong>en</strong>t<br />

<strong>Project</strong>, Confid<strong>en</strong>tial, Timor-Leste, 2011-pres<strong>en</strong>t.<br />

Curr<strong>en</strong>tly serv<strong>in</strong>g as technical lead for the health basel<strong>in</strong>e<br />

assessm<strong>en</strong>t and impacts analysis for the offshore oil<br />

developm<strong>en</strong>t project. Critically review<strong>in</strong>g draft<br />

assessm<strong>en</strong>ts to <strong>en</strong>sure public health is appropriately<br />

addressed.<br />

Integrated ESHIA for Offshore M<strong>in</strong>erals Petroluem<br />

<strong>Project</strong>, Confid<strong>en</strong>tial, Gre<strong>en</strong>land, 2011-pres<strong>en</strong>t.<br />

Prepared a health basel<strong>in</strong>e study, with a focus on the<br />

healthcare system and health profile <strong>in</strong> Gre<strong>en</strong>land,<br />

<strong>in</strong>clud<strong>in</strong>g capacity and services at the municipality and<br />

national levels and the implications of a rec<strong>en</strong>t healthcare<br />

reform. The study <strong>in</strong>volves a review of secondary data<br />

and field data collection (<strong>in</strong>clud<strong>in</strong>g <strong>in</strong>terviews and<br />

consultation); and an assessm<strong>en</strong>t of health impacts.<br />

Social Basel<strong>in</strong>e Study for the Deepwater Horizon Gulf<br />

of Mexico, Confid<strong>en</strong>tial, USA, 2010-pres<strong>en</strong>t.<br />

Prepared a social basel<strong>in</strong>e study to understand the<br />

community health issues associated with oil and gas<br />

activities <strong>in</strong> the Gulf of Mexico. The study is prepared as<br />

part of anticipated permitt<strong>in</strong>g requirem<strong>en</strong>ts as well as to<br />

meet <strong>in</strong>ternal corporate susta<strong>in</strong>able developm<strong>en</strong>t<br />

priorities.<br />

Best Practices <strong>in</strong> Community Health and Safety, Inter-<br />

American Developm<strong>en</strong>t Bank (IDB), 2010-pres<strong>en</strong>t.<br />

Consultant<br />

Supported the developm<strong>en</strong>t of case studies <strong>in</strong> manag<strong>in</strong>g<br />

community health and safety risks and impacts <strong>in</strong> IDBfunded<br />

projects <strong>in</strong> transport, <strong>en</strong>ergy, extractive, agribus<strong>in</strong>ess<br />

and manufactur<strong>in</strong>g sectors.<br />

Corporate Social Responsibility Tra<strong>in</strong><strong>in</strong>g Program,<br />

Canada, Barrick Gold Corp, 2010-pres<strong>en</strong>t. Consultant<br />

Curr<strong>en</strong>tly design<strong>in</strong>g e-learn<strong>in</strong>g modules and facilitated<br />

workshops to operationalise Barrick’s Community<br />

Relations Managem<strong>en</strong>t System throughout its global<br />

operations. Tra<strong>in</strong><strong>in</strong>g topics <strong>in</strong>clude CSR and community<br />

<strong>en</strong>gagem<strong>en</strong>t.<br />

HIA Integration <strong>in</strong>to Po<strong>in</strong>t Thomson EIS, Alaska,<br />

Confid<strong>en</strong>tial, 2010 - pres<strong>en</strong>t. Consultant<br />

Responsible for <strong>in</strong>tegrat<strong>in</strong>g a state-developed HIA <strong>in</strong>to<br />

the proposed project’s EIS as part of the NEPA Review<br />

process. HIA evaluated health impacts from the<br />

proposed oil and natural gas cond<strong>en</strong>sate extraction<br />

operation.<br />

HIA as part of the ESIA for Suralco Nassau Bauxite<br />

M<strong>in</strong>e <strong>Project</strong>, Alcoa/Suralco, Sur<strong>in</strong>ame 2010 – pres<strong>en</strong>t.<br />

Consultant<br />

Completed a high-level health risk assessm<strong>en</strong>t as part of<br />

the m<strong>in</strong>e and haul road project’s ESIA process. The<br />

scre<strong>en</strong><strong>in</strong>g <strong>in</strong>volves an assessm<strong>en</strong>t of the pot<strong>en</strong>tial<br />

community health impacts and risks associated with the<br />

project, exist<strong>in</strong>g health vulnerabilities among local<br />

communities; an other pot<strong>en</strong>tial factors, which alone or<br />

comb<strong>in</strong>ed, may warrant a full HIA.Reviewed secondary<br />

data sources to develop country and regional level health<br />

profiles.<br />

Stakeholder Engagem<strong>en</strong>t Tools, Canada, Teck M<strong>in</strong><strong>in</strong>g<br />

Company, 2010. Consultant<br />

Developed community <strong>en</strong>gagem<strong>en</strong>t protocols and<br />

guidance docum<strong>en</strong>ts, <strong>in</strong>clud<strong>in</strong>g the guidances on How to<br />

Build a Community Team, Community Health and<br />

Engagem<strong>en</strong>t Plann<strong>in</strong>g.<br />

Watershed Managem<strong>en</strong>t Plan, WA State Departm<strong>en</strong>t of<br />

Ecology, 2006-2009. <strong>Project</strong> Manager<br />

Managed the stakeholder <strong>in</strong>volvem<strong>en</strong>t process to <strong>en</strong>gage<br />

citiz<strong>en</strong>s, tribes and local governm<strong>en</strong>ts <strong>in</strong> prepar<strong>in</strong>g<br />

sci<strong>en</strong>ce-based watershed managem<strong>en</strong>t plans (or TMDLs).<br />

Led and facilitated stakeholder advisory groups and<br />

public meet<strong>in</strong>gs. Effectively communicated technical<br />

concepts <strong>in</strong> reports and pres<strong>en</strong>tations for the public.<br />

Served as community liaison to 7 community advisory<br />

councils.<br />

Pesticide Safety Interv<strong>en</strong>tion Tools for Agricultural<br />

Workers, Pacific NW Agricultural Safety and Health<br />

C<strong>en</strong>ter, USA and Cambodia, 2005-2006. Researcher<br />

Evaluated the effectiv<strong>en</strong>ess of an <strong>in</strong>novative pesticide<br />

safety <strong>in</strong>terv<strong>en</strong>tion tool. Designed and tested 17 field<br />

tra<strong>in</strong><strong>in</strong>gs us<strong>in</strong>g PRA techniques with over 200 farmers <strong>in</strong><br />

Cambodia. Collected and analyzed qualitative data from<br />

critical article reviews, key <strong>in</strong>formant <strong>in</strong>terviews and<br />

focus group observations. Authored a NIOSH-funded<br />

guidance manual for Pesticide Safety Educators.<br />

Chemicals Information Exchange Network, C<strong>en</strong>tral<br />

America, US Environm<strong>en</strong>tal Protection Ag<strong>en</strong>cy,<br />

Wash<strong>in</strong>gton, DC, 2002-2003. <strong>Project</strong> Manager<br />

Collaborated with UN Environm<strong>en</strong>tal Programme and a<br />

Costa Rican NGO to plan 8 technical assistance<br />

workshops to build proper chemicals managem<strong>en</strong>t<br />

4/19/2011 LEE-SINANG 2011_IAP1


capacity throughout C<strong>en</strong>tral America. Promoted the use<br />

of the <strong>in</strong>ternet to access proper chemicals <strong>in</strong>formation.<br />

Presid<strong>en</strong>tial Water for the Poor Initiative, US Ag<strong>en</strong>cy<br />

for International Developm<strong>en</strong>t, Wash<strong>in</strong>gton, DC, 2003-<br />

2004. Database Manager<br />

Tracked the <strong>in</strong>dicators of success and progress of the<br />

largest Presid<strong>en</strong>tial Initiative, Water for the Poor.<br />

Coord<strong>in</strong>ated with 75 field offices worldwide to collect,<br />

under a strict deadl<strong>in</strong>e, fund<strong>in</strong>g data and case studies for<br />

the annual report to Congress and the White House.<br />

Montrose /Palos Verdes Shelf Sedim<strong>en</strong>t Cleanup, US<br />

Environm<strong>en</strong>tal Protection Ag<strong>en</strong>cy, California, 2003.<br />

Community Liaison<br />

Conducted a multi-ethnic angler survey to gather fish<br />

consumption habits of immigrants fish<strong>in</strong>g at a DDT- and<br />

PCB- contam<strong>in</strong>ated sedim<strong>en</strong>t Superfund site off the coast<br />

of Southern California. Results guided the developm<strong>en</strong>t<br />

of a nationally-recognized community-based health<br />

education and outreach program.<br />

San Jose Community Gard<strong>en</strong>s, UC Berkeley<br />

Departm<strong>en</strong>t of Environm<strong>en</strong>tal Sci<strong>en</strong>ces, CA, 2000-2001.<br />

Researcher<br />

Evaluated the social and health b<strong>en</strong>efits of community<br />

gard<strong>en</strong>s as perceived among immigants and Americanborn<br />

gard<strong>en</strong>ers. Designed the self-adm<strong>in</strong>istered<br />

questionnaire with translations to Spanish, Vietnamese,<br />

and Bosnian. Study promoted the value of gre<strong>en</strong> spaces<br />

to help immigrants resettle <strong>in</strong> US towns.<br />

Antimicrobial Properties of Medic<strong>in</strong>al Plants, Tropical<br />

Biology Institute, Costa Rica, 2000. Researcher<br />

Interviewed rural community members <strong>in</strong> Spanish on the<br />

traditional uses of medic<strong>in</strong>al plants. Tested the antimicrobial<br />

properties of tea extracts from two medic<strong>in</strong>al<br />

plants.<br />

4/19/2011 LEE-SINANG 2011_IAP1


Eml<strong>en</strong> Myers, PhD<br />

S<strong>en</strong>ior Consultant<br />

Dr. Myers has 30 years of professional experi<strong>en</strong>ce, <strong>in</strong>clud<strong>in</strong>g 18<br />

years of experi<strong>en</strong>ce as a consultant. He curr<strong>en</strong>tly serves as<br />

S<strong>en</strong>ior Consultant on social and cultural heritage issues <strong>in</strong> the<br />

Wash<strong>in</strong>gton, DC office of ERM, where he focuses on<br />

<strong>in</strong>ternational projects <strong>in</strong> archaeology, and on project impact<br />

assessm<strong>en</strong>t. Myers has played a pr<strong>in</strong>cipal role <strong>in</strong> over 100<br />

consultancies for mult<strong>in</strong>ational commercial cli<strong>en</strong>ts, multilateral<br />

l<strong>en</strong>d<strong>in</strong>g <strong>in</strong>stitutions, and for U.S. Federal, state and local<br />

ag<strong>en</strong>cies.<br />

In 1988-2001, Myers was S<strong>en</strong>ior Consultant <strong>in</strong> the Bolivian office<br />

of a former employer, work<strong>in</strong>g on the <strong>en</strong>vironm<strong>en</strong>tal<br />

compliance team and direct<strong>in</strong>g the archaeology program for<br />

two mult<strong>in</strong>ational pipel<strong>in</strong>e projects <strong>in</strong> Bolivia and Brazil. He has<br />

geographically wide-rang<strong>in</strong>g research and compliance<br />

experi<strong>en</strong>ce, hav<strong>in</strong>g managed projects and conducted<br />

<strong>in</strong>vestigations throughout the United States and <strong>in</strong> Albania,<br />

Georgia, Greece, Gre<strong>en</strong>land, Morocco, Romania, Spa<strong>in</strong>, Bolivia,<br />

Ecuador, Mexico, Panama, and Peru.<br />

Myers’ consult<strong>in</strong>g experi<strong>en</strong>ce <strong>in</strong>cludes project-driv<strong>en</strong><br />

<strong>en</strong>vironm<strong>en</strong>tal plann<strong>in</strong>g studies (e.g. EA, ESHIA and SEA) <strong>in</strong><br />

North, C<strong>en</strong>tral and South America, and Eastern Europe,<br />

<strong>in</strong>clud<strong>in</strong>g studies for large-scale projects sponsored by the<br />

World Bank, International F<strong>in</strong>ance Corporation (IFC),<br />

InterAmerican Developm<strong>en</strong>t Bank (IADB) and U.S. Overseas<br />

Private Investm<strong>en</strong>t Corporation (OPIC). He is highly<br />

experi<strong>en</strong>ced <strong>in</strong> governm<strong>en</strong>t and ag<strong>en</strong>cy coord<strong>in</strong>ation for<br />

heritage and cultural resources projects of all types. He has<br />

published several major policy analyses and research works <strong>in</strong><br />

the area of cultural resource managem<strong>en</strong>t, authored technical<br />

articles <strong>in</strong> refereed scholarly journals, and assisted the World<br />

Bank/IFC and U.S. National Park Service <strong>in</strong> develop<strong>in</strong>g policy<br />

guidance for heritage managem<strong>en</strong>t issues.<br />

Prior to becom<strong>in</strong>g a consultant, Myers was a Post-doctoral<br />

Fellow and th<strong>en</strong> Visit<strong>in</strong>g Sci<strong>en</strong>tist at the Smithsonian Institution,<br />

from 1984 to 1991, and a heritage policy analyst at the U.S.<br />

National Park Service’s Archaeological Assistance Division <strong>in</strong><br />

Wash<strong>in</strong>gton, DC, 1991 to 1992. He has prior research, study,<br />

and employm<strong>en</strong>t experi<strong>en</strong>ce <strong>in</strong> North Africa and the Middle<br />

East from 1977 until 1984 wh<strong>en</strong> he received his doctorate for an<br />

ethnographic and archaeological project conducted over five<br />

field seasons <strong>in</strong> Morocco.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world.<br />

Fields of Compet<strong>en</strong>ce<br />

• Archaeology and Cultural Heritage Managem<strong>en</strong>t<br />

• Public Pres<strong>en</strong>tation of Archaeology and Cultural Heritage<br />

• Social and Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>t<br />

Cred<strong>en</strong>tials<br />

• Ph.D., Anthropology, B<strong>in</strong>ghamton University, 1984<br />

• M.A., Anthropology, B<strong>in</strong>ghamton University, 1978<br />

• B.A., Anthropology, University of Michigan, Ann Arbor<br />

1975<br />

• Meets U.S. Secretary of the Interior’s (36-CFR-61) Professional<br />

Standards for Historic and Prehistoric Archaeology.<br />

Languages<br />

• English—native<br />

• Spanish— good (speak and read)<br />

• Fr<strong>en</strong>ch—work<strong>in</strong>g knowledge (read)<br />

• German—work<strong>in</strong>g knowledge (read)<br />

Key <strong>Project</strong>s<br />

Gre<strong>en</strong>land Smelter and Port <strong>Project</strong> - Alcoa Alum<strong>in</strong>ium –<br />

Gre<strong>en</strong>land. Serves as cultural heritage specialist for this<br />

project’s ESHIA team. Coord<strong>in</strong>at<strong>in</strong>g the Gre<strong>en</strong>land National<br />

Museum archaeological field studies and prepar<strong>in</strong>g cultural<br />

heritage basel<strong>in</strong>e docum<strong>en</strong>tation for ESHIA. The project<br />

<strong>in</strong>cludes a smelter, port, hydroelectric power g<strong>en</strong>eration plant,<br />

and electrical transmission l<strong>in</strong>e which will be sited and built <strong>in</strong><br />

eastern Gre<strong>en</strong>land. May 2008 – May 2010.<br />

Cerro Rico M<strong>in</strong>e <strong>Project</strong> Heritage Evaluation - Potosí Bolivia.<br />

S<strong>in</strong>ce pre-colonial times the Cerro Rico M<strong>in</strong>e was recognize as<br />

one of the richest sources of Silver <strong>in</strong> the World. Colonial<br />

exploitation of the m<strong>in</strong>e was a major source of wealth for the<br />

Spanish Empire <strong>in</strong> the sev<strong>en</strong>te<strong>en</strong>th and eighte<strong>en</strong>th c<strong>en</strong>turies.<br />

The Potosí M<strong>in</strong>e is now a World Heritage Site and a major<br />

tourist attraction. For a confid<strong>en</strong>tial cli<strong>en</strong>t, Myers prepared an<br />

archaeological feasibility study for a proposed new m<strong>in</strong><strong>in</strong>g<br />

project at Cerro Rico, review<strong>in</strong>g archaeological<br />

studies prepared for the cli<strong>en</strong>t and evaluat<strong>in</strong>g<br />

the planned activities <strong>in</strong> relation to<br />

<strong>in</strong>ternational cultural heritage managem<strong>en</strong>t<br />

standards. 2000


UNOCAL - “Sol de Mañana” Geothermal Energy and Silver<br />

M<strong>in</strong>e <strong>Project</strong>- San Cristóbal, Bolivia. Supported archaeological<br />

study <strong>in</strong> support basel<strong>in</strong>e <strong>en</strong>vironm<strong>en</strong>tal assessm<strong>en</strong>t for a<br />

geothermal project to support silver m<strong>in</strong>e developm<strong>en</strong>t east of<br />

Laguna Colorada, with<strong>in</strong> “Eduardo Avaroa” National Reserve<br />

(Sud Lípez, Potosí) at south-eastern Bolivia. Three pot<strong>en</strong>tial<br />

geothermal production areas (Sol de Mañana, Apac<strong>het</strong>a-Agüita<br />

Brava and Juaylla Hara) were <strong>in</strong>vestigated to determ<strong>in</strong>e exist<strong>in</strong>g<br />

conditions (geology, biology, archaeology, meteorology, and<br />

water and air quality control.) <strong>Project</strong> also <strong>in</strong>cluded feasibility<br />

study performed together with TDE (Bolivian Electricity<br />

Transport Utility) for a transmission l<strong>in</strong>e (167 km l<strong>en</strong>gth) from<br />

Sol de Mañana geothermal production area to San Cristobal<br />

town. The study focused on <strong>en</strong>vironm<strong>en</strong>tal feasibility of the<br />

project alternatives.1998.<br />

Trans Adriatic Pipel<strong>in</strong>e (TAP) – Cultural Heritage Coord<strong>in</strong>ator<br />

– Albania, Greece, Italy. ERM is prepar<strong>in</strong>g a number of preconstruction<br />

<strong>en</strong>vironm<strong>en</strong>tal plann<strong>in</strong>g studies for TAP <strong>in</strong>clud<strong>in</strong>g<br />

ESIAs <strong>in</strong> each of the three countries for this high priority project<br />

that will br<strong>in</strong>g natural gas from the Caspian to the European<br />

Union. As a part of the ERM TAP team Myers is coord<strong>in</strong>at<strong>in</strong>g<br />

archaeology and other cultural heritage issues manag<strong>in</strong>g<br />

national archaeological subcontractors <strong>in</strong> each of the three<br />

countries to assure that national IBRD cultural heritage<br />

standards are met. Began <strong>in</strong> 2009.<br />

World Bank/International F<strong>in</strong>ance Corporation - Cultural<br />

Heritage Consultant - Wash<strong>in</strong>gton, DC. Prepared<br />

implem<strong>en</strong>tation guidance for Environm<strong>en</strong>tal and Social<br />

Performance Standards focus<strong>in</strong>g, provid<strong>in</strong>g key technical<br />

expertise for archaeological and cultural heritage compon<strong>en</strong>t<br />

(PS-8) of this <strong>in</strong>ternational standard for the <strong>en</strong>vironm<strong>en</strong>tal and<br />

social susta<strong>in</strong>ability of commercial projects. 2006.<br />

Panama Canal Expansion <strong>Project</strong> - Panama Canal Authority<br />

(ACP <strong>in</strong> Spanish) – Panama City, Panama. Serves as lead<br />

consultant responsible for archaeological and social issues on a<br />

team of <strong>in</strong>ternational consultants charged with prepar<strong>in</strong>g<br />

semestral reports to the ACP and to its <strong>in</strong>ternational l<strong>en</strong>ders<br />

group, regard<strong>in</strong>g alignm<strong>en</strong>t of the Expansion <strong>Project</strong> with the<br />

Equator Pr<strong>in</strong>ciples, an <strong>in</strong>ternational b<strong>en</strong>chmark for social and<br />

<strong>en</strong>vironm<strong>en</strong>tal susta<strong>in</strong>ability. Reports assess the degree to<br />

which ACP, through the efforts of its project contractors, is<br />

comply<strong>in</strong>g with the projects managem<strong>en</strong>t plans, which<br />

repres<strong>en</strong>t impact avoidance and mitigation commitm<strong>en</strong>ts of the<br />

project ESHIA. <strong>Project</strong> duration is from September 2008 – June<br />

of 2014.<br />

Baba Multi - Purpose Hydro <strong>Project</strong> – Norberto Odebrecht -<br />

Bu<strong>en</strong>a Fé, Ecuador. Indep<strong>en</strong>d<strong>en</strong>t field auditor and advisor to<br />

local project consultants, Diagonal Urbano and Efficacitas<br />

focus<strong>in</strong>g on resettlem<strong>en</strong>t plan, public consultation, and cultural<br />

resources issues covered by project EIA. Assisted with IADB<br />

coord<strong>in</strong>ation of the above technical studies. 2006.<br />

PERU LNG <strong>Project</strong> – Hunt Oil Company – Lima, Peru. Serves<br />

as Contract Manager and Technical Director for Construction<br />

Phase Archaeological Master Services Agreem<strong>en</strong>t (MSA).<br />

Under the contract, ERM Peru provides a range of field<br />

archaeological services and s<strong>en</strong>ior staff<strong>in</strong>g to Cli<strong>en</strong>t. Field<br />

services <strong>in</strong>clude archaeological monitor<strong>in</strong>g and rescue<br />

excavation of “chance f<strong>in</strong>ds.” Contract began July of 2008 and<br />

will conclude <strong>in</strong> June of 2010.<br />

PERU LNG <strong>Project</strong> – Hunt Oil Company – Lima, Peru. Served<br />

as Cli<strong>en</strong>t Technical Repres<strong>en</strong>tative <strong>in</strong> Archaeology and Cultural<br />

Resources. Responsible for oversee<strong>in</strong>g contractor work <strong>in</strong><br />

compliance with Peruvian national standards for archaeological<br />

compliance for this approximately 600 km-long pipel<strong>in</strong>e project<br />

which stretches from Amazonia to coastal Peru. The project will<br />

export liquid natural gas (LNG) from Peru to markets <strong>in</strong> the<br />

Pacific Rim . He was also responsible for coord<strong>in</strong>at<strong>in</strong>g with<br />

contractors and project staff to meet Cultural Heritage<br />

Protection Standards of the project’s <strong>in</strong>ternational l<strong>en</strong>ders,<br />

<strong>in</strong>clud<strong>in</strong>g InterAmerican Developm<strong>en</strong>t Bank (IADB) and World<br />

Bank/International F<strong>in</strong>ance Corporation (IFC). Assignm<strong>en</strong>t<br />

was from February 2007 to June 2008.<br />

Archaeological Monograph for Bolivia - Brazil Natural Gas<br />

Pipel<strong>in</strong>e – GasTransBoliviano – Santa Cruz, Bolivia.<br />

Researched and wrote a book-l<strong>en</strong>gth monograph published<br />

simultaneously <strong>in</strong> English and Spanish <strong>en</strong>titled East of the Andes,<br />

South of the Amazon. The book <strong>in</strong>cludes detailed description and<br />

illustrations of field <strong>in</strong>vestigations and of artifacts recovered<br />

from numerous archaeological sites uncovered by Myers’<br />

consultant archaeological team, along with the results of special<br />

analyses <strong>in</strong>clud<strong>in</strong>g C-14 dat<strong>in</strong>g of charcoal samples and of<br />

extracted human bone collag<strong>en</strong>, and trace-elem<strong>en</strong>t analyses of<br />

pottery. The volume was widely praised by museum and<br />

university specialists as exemplary effort <strong>in</strong> modern project<br />

driv<strong>en</strong> archaeology, and for its discovery of previously<br />

unid<strong>en</strong>tified prehipanic cultures of the dry lowlands of eastern<br />

Bolivia. 2000.<br />

La Chorrera Potable Water <strong>Project</strong> Feasibility Study -<br />

InterAmericn Developm<strong>en</strong>t Bank – Panama City, Panama.<br />

Accompanied IDB due dilig<strong>en</strong>ce team (f<strong>in</strong>ance, technical and<br />

<strong>en</strong>vironm<strong>en</strong>tal) on a trip to Panama to evaluate f<strong>in</strong>anc<strong>in</strong>g<br />

pot<strong>en</strong>tial for a proposed Panama Canal Authority potable water<br />

project. He prepared the social and <strong>en</strong>vironm<strong>en</strong>tal feasibility<br />

report for IDB based on data review and trip f<strong>in</strong>d<strong>in</strong>gs. 2007.<br />

Cli<strong>en</strong>t Confid<strong>en</strong>tial - Natural Gas Pipel<strong>in</strong>e - Brazil and<br />

Uruguay. Conducted archaeological desk review for cli<strong>en</strong>t<br />

feasibility study of proposed Uruguay to Brazil natural gas<br />

pipel<strong>in</strong>e, Porto Allegre, Brazil. 1998.<br />

2011-03 EMyers


Maggie Cawley<br />

Maggie Cawley is a consultant with ERM based <strong>in</strong><br />

Annapolis, Maryland. She has over sev<strong>en</strong> years<br />

experi<strong>en</strong>ce <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal and social impact<br />

assessm<strong>en</strong>ts, federal, state and local governm<strong>en</strong>t<br />

plann<strong>in</strong>g, and real estate developm<strong>en</strong>t. Ms. Cawley has<br />

prepared socioeconomic impact assessm<strong>en</strong>ts,<br />

compreh<strong>en</strong>sive plans, water resources plans, municipal<br />

growth plans, hous<strong>in</strong>g reports, and demographic<br />

analyses. Additional experi<strong>en</strong>ce <strong>in</strong>cludes hous<strong>in</strong>g<br />

assessm<strong>en</strong>ts, research and writ<strong>in</strong>g on gre<strong>en</strong> build<strong>in</strong>g<br />

policy, susta<strong>in</strong>able communities, and <strong>en</strong>vironm<strong>en</strong>tal<br />

justice issues, as well as the facilitation of public meet<strong>in</strong>gs<br />

as part of community plann<strong>in</strong>g projects.<br />

Through her studies at Johns Hopk<strong>in</strong>s University, Ms.<br />

Cawley is explor<strong>in</strong>g the use of Geographic Information<br />

Systems (GIS) to better understand health and social<br />

tr<strong>en</strong>ds and impacts. In her most rec<strong>en</strong>t work, she used<br />

GIS to test assumptions about the spread of Lyme disease<br />

<strong>in</strong> southeastern P<strong>en</strong>nsylvania. Future coursework will<br />

explore the use of GIS <strong>in</strong> epidemiology, and remote<br />

s<strong>en</strong>s<strong>in</strong>g. Through her knowledge of GIS, Ms. Cawley has<br />

provided support to projects related to landfill<br />

remediation studies, cultural resources, impact<br />

assessm<strong>en</strong>ts, gre<strong>en</strong> <strong>in</strong>frastructure plans, growth studies,<br />

reuse assessm<strong>en</strong>ts, and compreh<strong>en</strong>sive land use plans.<br />

Ms. Cawley’s background <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal and social<br />

plann<strong>in</strong>g, impact assessm<strong>en</strong>t and stakeholder <strong>en</strong>gagem<strong>en</strong>t<br />

has <strong>en</strong>abled her to provide dep<strong>en</strong>dable and responsive<br />

support on a diverse range of public- and private-sector<br />

projects.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

• Environm<strong>en</strong>tal, Social & Health Impact Assessm<strong>en</strong>t<br />

(ESHIA)<br />

• Community Relations & Stakeholder Engagem<strong>en</strong>t<br />

• Geographic Information Systems<br />

• Compreh<strong>en</strong>sive Land Use Plann<strong>in</strong>g<br />

• Demographic and Socioeconomic Analyses<br />

• Water and Wastewater Capacity Assessm<strong>en</strong>ts<br />

• Hazardous waste operations & emerg<strong>en</strong>cy response<br />

(HAZWOPER)<br />

Education<br />

• Certificate <strong>in</strong> Geographic Information Systems, Johns<br />

Hopk<strong>in</strong>s University, Ongo<strong>in</strong>g.<br />

• Masters of Urban and Regional Plann<strong>in</strong>g, Virg<strong>in</strong>ia<br />

Commonwealth University, 2008.<br />

• Certificate <strong>in</strong> Urban Revitalization, Virg<strong>in</strong>ia<br />

Commonwealth University, 2006.<br />

• Bachelor of Arts, International Studies: World<br />

Politics and Diplomacy, University of Richmond,<br />

2003.<br />

• University of Que<strong>en</strong>sland, Brisbane, Australia, Study<br />

Abroad, 2001.<br />

Key Industry Sectors<br />

• Power<br />

• Oil and Gas<br />

• Governm<strong>en</strong>t<br />

• M<strong>in</strong><strong>in</strong>g<br />

Languages<br />

• English (Native)<br />

• German (Intermediate)<br />

• Spanish (Basic)


Selected Key <strong>Project</strong>s<br />

Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t, Suralco<br />

Nassau Plateau Bauxite M<strong>in</strong>e, Sur<strong>in</strong>ame. 2009-pres<strong>en</strong>t.<br />

Planner, Data Analyst, GIS Specialist. Provid<strong>in</strong>g support<br />

on multiple aspects of the project, <strong>in</strong>clud<strong>in</strong>g transport<br />

corridor selection, hydrologic data analysis, and GIS<br />

managem<strong>en</strong>t. Support for the id<strong>en</strong>tification of the preferred<br />

transportation corridor betwe<strong>en</strong> the proposed m<strong>in</strong>e and an<br />

exist<strong>in</strong>g alum<strong>in</strong>um ref<strong>in</strong>ery <strong>in</strong>cluded a GIS-based<br />

evaluation of the <strong>en</strong>vironm<strong>en</strong>tal and social constra<strong>in</strong>ts<br />

with<strong>in</strong> each of the corridor alternatives. Led the<br />

organization of field data and supported data analysis for<br />

hydrologic <strong>in</strong>vestigations, <strong>in</strong>clud<strong>in</strong>g the <strong>in</strong>terpretation of<br />

historic and rec<strong>en</strong>t precipitation data and piezometer<br />

read<strong>in</strong>gs. Completed barometric corrections and QA/QC<br />

assessm<strong>en</strong>t of data and collected additional hydrologic data<br />

for statistical developm<strong>en</strong>t of synt<strong>het</strong>ic hydrographs and<br />

recurr<strong>en</strong>ce <strong>in</strong>terval precipitation and stream flows. Lead<br />

GIS Specialist, creat<strong>in</strong>g maps and provid<strong>in</strong>g analysis for all<br />

aspects of the project. This effort also <strong>en</strong>tails the<br />

developm<strong>en</strong>t of orig<strong>in</strong>al data, <strong>in</strong>clud<strong>in</strong>g a stream system<br />

layer that was created based on a local topographical<br />

survey to support the del<strong>in</strong>eation of the m<strong>in</strong><strong>in</strong>g limits.<br />

Hous<strong>in</strong>g Survey and Ra<strong>in</strong>water Harvest<strong>in</strong>g System<br />

Installation, Aguayuda, Barra del Colorado, Costa Rica,<br />

2011. Consultant. Assist<strong>in</strong>g <strong>in</strong> a pilot project to provide<br />

safe dr<strong>in</strong>k<strong>in</strong>g water to a remote Costa Rican community<br />

through the construction of ra<strong>in</strong>water harvest<strong>in</strong>g systems.<br />

Upcom<strong>in</strong>g tasks will <strong>in</strong>clude a survey of 80 households,<br />

which will be the basis for evaluat<strong>in</strong>g the feasibility of<br />

<strong>in</strong>stall<strong>in</strong>g <strong>in</strong>dividual potable water systems for each home<br />

<strong>in</strong> the community.<br />

Deepwater Socio-economic Basel<strong>in</strong>e Study, Gulf of<br />

Mexico, 2010 to pres<strong>en</strong>t. Planner. Assisted Shell<br />

Corporation <strong>in</strong> the developm<strong>en</strong>t of a socio-economic<br />

basel<strong>in</strong>e for the Gulf of Mexico region <strong>in</strong> the United States.<br />

Ms. Cawley evaluated exist<strong>in</strong>g social cohesion, economic<br />

conditions, cultural resources, local history, and<br />

developm<strong>en</strong>t priorities. The basel<strong>in</strong>e effort will feed<br />

<strong>in</strong>formation <strong>in</strong>to Shell’s long term social <strong>in</strong>vestm<strong>en</strong>t<br />

decision-mak<strong>in</strong>g.<br />

Environm<strong>en</strong>tal Justice Assessm<strong>en</strong>t, Biomass Power Plant<br />

Site, Sampson County, North Carol<strong>in</strong>a, 2009. Planner. On<br />

behalf of a private biomass power plant company,<br />

conducted socioeconomic, demographic, and<br />

<strong>en</strong>vironm<strong>en</strong>tal justice assessm<strong>en</strong>ts for a pot<strong>en</strong>tial biomass<br />

plant site <strong>in</strong> Sampson County, NC. Designed a GIS-based<br />

demographic analysis of the area surround<strong>in</strong>g the pot<strong>en</strong>tial<br />

power plant site and developed a demographic comparison<br />

with other areas <strong>in</strong> this region conta<strong>in</strong><strong>in</strong>g poultry plants<br />

and other agricultural operations. Results were used to<br />

make recomm<strong>en</strong>dations on communicat<strong>in</strong>g and pot<strong>en</strong>tially<br />

mitigat<strong>in</strong>g social and health impacts on the surround<strong>in</strong>g<br />

community.<br />

MC252 Incid<strong>en</strong>t Response, Gulf Coast, USA, 2010. Liquid<br />

Waste Specialist. Handled logistics and liquid waste<br />

track<strong>in</strong>g from offshore transport to on-shore<br />

decontam<strong>in</strong>ation and disposal. Used GIS to provide site<br />

mapp<strong>in</strong>g support and illustrate stormwater runoff patterns.<br />

68th Street Landfill Site Remediation, Baltimore,<br />

Maryland, 2008-pres<strong>en</strong>t. Community Relations Liaison.<br />

Led community relations activities <strong>in</strong> conjunction with EPA<br />

to maximize public awar<strong>en</strong>ess and <strong>in</strong>volvem<strong>en</strong>t and<br />

m<strong>in</strong>imize health and social impacts on the community.<br />

Conducted personal one-on-one <strong>in</strong>terviews with area<br />

resid<strong>en</strong>ts to solicit public op<strong>in</strong>ions, facilitated workshops<br />

and developed mail<strong>in</strong>gs.<br />

Regional Landfill Sit<strong>in</strong>g Study, Confid<strong>en</strong>tial Cli<strong>en</strong>t,<br />

Maryland, 2010. Planner. Used GIS-based scre<strong>en</strong><strong>in</strong>g<br />

criteria to id<strong>en</strong>tify and compare land suitable for a multicounty<br />

landfill <strong>in</strong> the eastern United States. The project<br />

<strong>in</strong>volved the design and application of criteria related to<br />

the social, <strong>en</strong>vironm<strong>en</strong>tal, and <strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g aspects of the<br />

landfill, and <strong>in</strong>cluded prelim<strong>in</strong>ary design and layout of the<br />

landfill and ancillary facilities.<br />

Nanjemoy Hous<strong>in</strong>g Assessm<strong>en</strong>t, Charles County,<br />

Maryland, 2010. Lead Planner. Led a hous<strong>in</strong>g survey to<br />

assess the liv<strong>in</strong>g conditions of the resid<strong>en</strong>ts of rural<br />

Nanjemoy, Maryland. Created a mail survey and held<br />

multiple public meet<strong>in</strong>gs to id<strong>en</strong>tify exist<strong>in</strong>g hous<strong>in</strong>g needs<br />

and barriers to improved liv<strong>in</strong>g conditions.<br />

Water Resources Elem<strong>en</strong>ts (WRE), Maryland Statewide,<br />

2008-2010. <strong>Project</strong> planner for the developm<strong>en</strong>t of WREs for<br />

the Compreh<strong>en</strong>sive Plans of six counties and four<br />

municipalities <strong>in</strong> Maryland. Each WRE evaluates the<br />

impacts of proposed future land sc<strong>en</strong>arios use on dr<strong>in</strong>k<strong>in</strong>g<br />

water and wastewater treatm<strong>en</strong>t capacity, as well as its<br />

contribution to nutri<strong>en</strong>t load<strong>in</strong>g from po<strong>in</strong>t sources and<br />

stormwater runoff.<br />

Compreh<strong>en</strong>sive Plans. Maryland Statewide, 2008-2011.<br />

<strong>Project</strong> planner and GIS specialist assist<strong>in</strong>g <strong>in</strong> the<br />

preparation of multiple compreh<strong>en</strong>sive plans for local<br />

governm<strong>en</strong>ts <strong>in</strong> Maryland. Compreh<strong>en</strong>sive Plans are the<br />

basis for laws and decisions related to land use and<br />

<strong>in</strong>vestm<strong>en</strong>t <strong>in</strong> public <strong>in</strong>frastructure and services.<br />

2011 CAWLEY


B<strong>en</strong> Sussman, AICP<br />

Mr. Sussman has more than t<strong>en</strong> years’ experi<strong>en</strong>ce <strong>in</strong> local and<br />

regional compreh<strong>en</strong>sive plann<strong>in</strong>g, transportation plann<strong>in</strong>g, and<br />

urban design He has prepared compreh<strong>en</strong>sive plans and<br />

community plans for small and large cities and un<strong>in</strong>corporated<br />

communities throughout Maryland, with particular emphasis<br />

on the l<strong>in</strong>kages betwe<strong>en</strong> land use, growth, and water resources.<br />

He has also developed and evaluated regional land use<br />

sc<strong>en</strong>arios; waterfront plans; and municipal economic analyses.<br />

Mr. Sussman places emphasis on public pres<strong>en</strong>tations and<br />

public <strong>en</strong>gagem<strong>en</strong>t as a critical part of community plann<strong>in</strong>g<br />

projects.<br />

As a transportation planner, Mr. Sussman has evaluated<br />

vehicular and rail transportation options for <strong>in</strong>dustrial,<br />

commercial, and resid<strong>en</strong>tial land uses. He has prepared EIS<br />

docum<strong>en</strong>tation <strong>in</strong> support of FTA New Starts authorizations<br />

(focus<strong>in</strong>g on land use/transit relationships), and also has<br />

considerable airport plann<strong>in</strong>g experi<strong>en</strong>ce, with a particular<br />

focus on “landside” facilities and operations (curbs, park<strong>in</strong>g<br />

facilities, and consolidated r<strong>en</strong>tal car facilities).<br />

Mr. Sussman has prepared EIS and EA evaluations of the land<br />

use, transportation, visual/aest<strong>het</strong>ic, socioeconomic, and<br />

<strong>en</strong>vironm<strong>en</strong>tal justice impacts of military airspace, natural gas<br />

drill<strong>in</strong>g sites and pipel<strong>in</strong>es, hydroelectric projects, and other<br />

proposed facilities.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world.<br />

Professional Affiliations & Registration<br />

American Institute of Certified Planners<br />

American Plann<strong>in</strong>g Association<br />

Fields of Compet<strong>en</strong>ce<br />

Compreh<strong>en</strong>sive Plann<strong>in</strong>g<br />

Land Use Plann<strong>in</strong>g<br />

Transportation Plann<strong>in</strong>g<br />

Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>ts<br />

Brownfields<br />

Policy and Research<br />

Urban Design<br />

Education<br />

MCRP, Georgia Tech, 2002.<br />

B.S., Sci<strong>en</strong>ce, Technology, and Society, Stanford University,<br />

1998.


Key <strong>Project</strong>s<br />

Compreh<strong>en</strong>sive Plann<strong>in</strong>g<br />

Compreh<strong>en</strong>sive Plan, Cecil County, MD – Task manager for<br />

developm<strong>en</strong>t of the Water Resources Elem<strong>en</strong>t which l<strong>in</strong>ks<br />

growth and land use decisions to the availability of water and<br />

sewer <strong>in</strong>frastructure, and to impacts on non-po<strong>in</strong>t source<br />

pollution and stormwater managem<strong>en</strong>t. Involves coord<strong>in</strong>ation<br />

with the County’s municipalities, its Citiz<strong>en</strong>s Oversight<br />

Committee, and state officials.<br />

Subregion 5 and 6 Master Plans, Maryland-National Capital<br />

Park and Plann<strong>in</strong>g Commission, Pr<strong>in</strong>ce George’s County, MD<br />

– Task manager responsible for transportation plann<strong>in</strong>g and<br />

managem<strong>en</strong>t of GIS resources for two separate Master Plans for<br />

adjac<strong>en</strong>t areas <strong>in</strong> Pr<strong>in</strong>ce George’s County, MD. Together,<br />

Subregions 5 and 6 <strong>en</strong>compass nearly one-third of the County,<br />

<strong>in</strong>clud<strong>in</strong>g large portions of the “develop<strong>in</strong>g” and “rural” tiers.<br />

Gre<strong>en</strong> Community Manual, MD – <strong>Project</strong> manager for the<br />

developm<strong>en</strong>t of a susta<strong>in</strong>ability guidebook for Maryland’s<br />

downtowns. The Manual, jo<strong>in</strong>tly sponsored by the Maryland<br />

Departm<strong>en</strong>t of Natural Resources and Departm<strong>en</strong>t of Hous<strong>in</strong>g<br />

and Community Developm<strong>en</strong>t, gives practical guidance on<br />

ways that Maryland’s downtown bus<strong>in</strong>ess districts can be more<br />

<strong>en</strong>vironm<strong>en</strong>tally, economically, and socially susta<strong>in</strong>able.<br />

Susta<strong>in</strong>ability Plan, West Des Mo<strong>in</strong>es, IA – Part of an<br />

<strong>in</strong>terdiscipl<strong>in</strong>ary ERM team assist<strong>in</strong>g the City of West Des<br />

Mo<strong>in</strong>es <strong>in</strong> def<strong>in</strong><strong>in</strong>g its susta<strong>in</strong>ability goals, and <strong>in</strong> implem<strong>en</strong>t<strong>in</strong>g<br />

those goals through policies, programs, and updates to its<br />

Compreh<strong>en</strong>sive Plan.<br />

Compreh<strong>en</strong>sive Developm<strong>en</strong>t Plan, Garrett County, MD –<br />

S<strong>en</strong>ior planner for an update of the Compreh<strong>en</strong>sive<br />

Developm<strong>en</strong>t Plan for Maryland’s westernmost county.<br />

Developed a master plan for the Deep Creek Lake region, the<br />

County’s economic <strong>en</strong>g<strong>in</strong>e, where growth and developm<strong>en</strong>t<br />

pressures are the strongest. Developed the Water Resources<br />

Elem<strong>en</strong>t, the first county-level elem<strong>en</strong>t adopted <strong>in</strong> Maryland.<br />

Compreh<strong>en</strong>sive Plan, Town of Boonsboro, MD. <strong>Project</strong><br />

Manager for an update of the Town’s Compreh<strong>en</strong>sive Plan.<br />

Boonsboro's most important plann<strong>in</strong>g chall<strong>en</strong>ge is growth,<br />

specifically the annexation of nearly 1,000 acres of land--which<br />

more than doubled the Town's size. ERM is help<strong>in</strong>g the Town<br />

to def<strong>in</strong>e the amount and phas<strong>in</strong>g of new developm<strong>en</strong>t on this<br />

annexed land, and will prepare a Water Resources Elem<strong>en</strong>t to<br />

def<strong>in</strong>e how the Town would be served by dr<strong>in</strong>k<strong>in</strong>g water and<br />

sewer systems.<br />

Water Resources Elem<strong>en</strong>ts, Dorchester and Talbot Counties,<br />

MD – <strong>Project</strong> manager for the preparation of Water Resources<br />

Elem<strong>en</strong>ts for two adjac<strong>en</strong>t counties on Maryland’s Eastern<br />

Shore. The elem<strong>en</strong>ts will evaluate water demand, wastewater<br />

demand, and nutri<strong>en</strong>t (nitrog<strong>en</strong> and phosphorus) load<strong>in</strong>g from<br />

exist<strong>in</strong>g and projected future developm<strong>en</strong>t.<br />

Compreh<strong>en</strong>sive Plan, City of Hagerstown, MD – S<strong>en</strong>ior<br />

planner and analyst for this update to the city’s Compreh<strong>en</strong>sive<br />

Plan. Responsible for develop<strong>in</strong>g plan goals, objectives, and<br />

policies <strong>in</strong> conjunction with Plann<strong>in</strong>g Commission. The plan<br />

<strong>in</strong>cluded ext<strong>en</strong>sive guidance on water and sewer capacity<br />

issues. Created all maps and graphics and oversaw all editorial<br />

and layout aspects of the plan docum<strong>en</strong>t.<br />

Municipal Growth Elem<strong>en</strong>t, Town of Bel Air, MD – <strong>Project</strong><br />

manager for the preparation of a Municipal Growth Elem<strong>en</strong>ts<br />

for the County Seat of Harford County, north of Baltimore. The<br />

elem<strong>en</strong>t must del<strong>in</strong>eate the Town’s future annexation, and must<br />

demonstrate that the Town has adequate <strong>in</strong>frastructure and<br />

public facilities to accommodate projected population growth.<br />

LaVale Region Plan, Allegany County, MD – Planner for a<br />

regional compreh<strong>en</strong>sive plan for an area of Allegany County<br />

c<strong>en</strong>tered around the National Road (US 40 Alt). The plan<br />

established future policies for growth, land use, transportation,<br />

water resources, and community facilities.<br />

Worton and Butlertown Village Master Plan, K<strong>en</strong>t County,<br />

MD – <strong>Project</strong> planner for a “m<strong>in</strong>iature compreh<strong>en</strong>sive plan” for<br />

two adjac<strong>en</strong>t rural villages <strong>in</strong> c<strong>en</strong>tral K<strong>en</strong>t County. Worton and<br />

Butlertown are fac<strong>in</strong>g growth pressures, and the Village Master<br />

Plan conveyed the community’s vision for future land use,<br />

zon<strong>in</strong>g, public facilities, op<strong>en</strong> space, and urban design.<br />

Compreh<strong>en</strong>sive Plan, City of Frederick, MD – <strong>Project</strong> planner<br />

and analyst for this update to the city’s Compreh<strong>en</strong>sive Plan.<br />

Analyzed exist<strong>in</strong>g employm<strong>en</strong>t and helped develop an<br />

Economic Profile for the city. Also compared employm<strong>en</strong>t<br />

tr<strong>en</strong>ds for the city to the county, region, and nation. Oversaw all<br />

editorial, graphic, and layout aspects of the plan docum<strong>en</strong>t.<br />

2009 2 BSussman


Key <strong>Project</strong>s (cont.)<br />

Wye Mills Area Community Plan, Wye Mills, MD – <strong>Project</strong><br />

planner for a study to establish a new economic developm<strong>en</strong>t<br />

c<strong>en</strong>ter (and Priority Fund<strong>in</strong>g Area) <strong>in</strong> the vic<strong>in</strong>ity of Chesapeake<br />

College <strong>in</strong> Que<strong>en</strong> Anne’s County. The project <strong>in</strong>volved<br />

balanc<strong>in</strong>g economic developm<strong>en</strong>t, community plann<strong>in</strong>g,<br />

<strong>en</strong>vironm<strong>en</strong>tal, and <strong>in</strong>frastructure (water and sewer) demands.<br />

Landscape and Sett<strong>in</strong>g Protection Plan, St. Mary’s College of<br />

Maryland, St. Mary’s City, MD – <strong>Project</strong> Planner for a study to<br />

help the College and Historic St. Mary’s City evaluate the<br />

threats posed to their sc<strong>en</strong>ic and historic landscape from the<br />

pot<strong>en</strong>tial developm<strong>en</strong>t of nearby land. The study <strong>in</strong>cluded an<br />

analysis of threat levels, as well as a series of recomm<strong>en</strong>ded<br />

strategies for protection, such as fee-simple land purchases,<br />

sc<strong>en</strong>ic easem<strong>en</strong>ts, and Transfer of Developm<strong>en</strong>t Rights.<br />

Bucks County Waterfront Revitalization Plan, Lower Bucks<br />

County, PA – <strong>Project</strong> planner for a multi-discipl<strong>in</strong>ary effort to<br />

help guide the future growth, developm<strong>en</strong>t, and redevelopm<strong>en</strong>t<br />

of six P<strong>en</strong>nsylvania municipalities along the Delaware River.<br />

Developed g<strong>en</strong>eral pr<strong>in</strong>ciples for the project area, as well as<br />

urban design concepts for targeted revitalization areas. Oversaw<br />

all editorial, graphic, and layout aspects of the plan docum<strong>en</strong>t.<br />

Transportation Plann<strong>in</strong>g<br />

Northern Worcester Transportation Study, Worcester County,<br />

MD –Subconsultant to the RBA Group for a project to evaluate<br />

the transportation system (<strong>in</strong>clud<strong>in</strong>g automobile, transit,<br />

bicycle, and pedestrian) and transportation policies <strong>in</strong> the area<br />

to the west of Ocean City, MD. Performed a developm<strong>en</strong>t<br />

capacity analysis that helped def<strong>in</strong>e trip g<strong>en</strong>eration rates, as<br />

<strong>in</strong>puts <strong>in</strong>to a custom-built traffic model of the study area.<br />

Prepared land use policy recomm<strong>en</strong>dations that would help to<br />

achieve the desired future transportation conditions id<strong>en</strong>tified<br />

<strong>in</strong> the study.<br />

Rail Sit<strong>in</strong>g Study, Confid<strong>en</strong>tial Cli<strong>en</strong>t – As part of two<br />

separate but related studies, evaluated alternatives to <strong>in</strong>crease<br />

fuel delivery capacity for a Midwest utility provider. Each study<br />

focused on a dist<strong>in</strong>ct portion of the utility’s service area. The<br />

project <strong>in</strong>volved developm<strong>en</strong>t of criteria and GIS/CAD<br />

mapp<strong>in</strong>g to id<strong>en</strong>tify and rank new and upgraded candidate rail<br />

alignm<strong>en</strong>ts from multiple po<strong>in</strong>ts of orig<strong>in</strong> to multiple power<br />

plant dest<strong>in</strong>ations. The analysis also considered water-borne<br />

fuel deliveries separately and <strong>in</strong> conjunction with rail options.<br />

City of Buffalo Ma<strong>in</strong> Street Multi-Modal Access and<br />

Revitalization <strong>Project</strong> Environm<strong>en</strong>tal Assessm<strong>en</strong>t. Buffalo, NY<br />

– Researched and wrote the Environm<strong>en</strong>tal Justice (EJ) section.<br />

This docum<strong>en</strong>t helped the City and its partners (the Niagara<br />

Frontier Transportation Authority, Erie County, the New York<br />

State Departm<strong>en</strong>t of Transportation, and Buffalo Place) evaluate<br />

options for restor<strong>in</strong>g vehicular traffic to Ma<strong>in</strong> Street—curr<strong>en</strong>tly<br />

reserved for pedestrians and a light rail transit system—<strong>in</strong> order<br />

to revitalize the downtown.<br />

C<strong>en</strong>tral Maryland Mobility Study - <strong>Project</strong> Planner for this<br />

Maryland Departm<strong>en</strong>t of Transportation (MDOT)-sponsored<br />

land use and transportation study that analyzed developable<br />

land, calculated developm<strong>en</strong>t capacity, and created future<br />

developm<strong>en</strong>t sc<strong>en</strong>arios for a 600-square mile area that <strong>in</strong>cluded<br />

portions of five counties, c<strong>en</strong>tered on I-95 betwe<strong>en</strong> the Baltimore<br />

and Wash<strong>in</strong>gton beltways. Responsible for data collection,<br />

analysis, and id<strong>en</strong>tification of land use and economic<br />

developm<strong>en</strong>t tr<strong>en</strong>ds with<strong>in</strong> this important regional employm<strong>en</strong>t<br />

and population c<strong>en</strong>ter.<br />

Northern Sub Area Study (NSAS), Atlanta, GA - <strong>Project</strong><br />

Planner for a sc<strong>en</strong>ario-build<strong>in</strong>g study for the Georgia Regional<br />

Transportation Authority (GRTA). The project g<strong>en</strong>erated<br />

alternative forecasts for the year 2025 for a number of land use<br />

and transportation sc<strong>en</strong>arios. Responsible for the allocation of<br />

forecasts to sub-county areas based on various policy,<br />

regulatory and <strong>en</strong>vironm<strong>en</strong>tal conditions.<br />

Miami-Dade Transit, Miami, FL – Planner for a 10-mile<br />

ext<strong>en</strong>sion of Miami’s Metrorail system that would connect the<br />

Miami Intermodal C<strong>en</strong>ter (at Miami International Airport) with<br />

Florida International University. Analyzed demographic data<br />

and conducted field surveys to verify exist<strong>in</strong>g land uses, locate<br />

exist<strong>in</strong>g and pot<strong>en</strong>tial future employm<strong>en</strong>t and activity c<strong>en</strong>ters,<br />

and id<strong>en</strong>tify any properties that could be adversely impacted by<br />

the proposed transit route.<br />

MetroSouth Alternatives Analyis and Draft EIS, St. Louis, MO<br />

– Planner for a 10-mile ext<strong>en</strong>sion of St. Louis’ Metrol<strong>in</strong>k light<br />

rail system <strong>in</strong>to southern St. Louis County. Responsible for land<br />

use and demographic analysis. Id<strong>en</strong>tified candidate alignm<strong>en</strong>ts,<br />

station locations, and opportunities for developm<strong>en</strong>t and<br />

redevelopm<strong>en</strong>t, with a focus on station-area developm<strong>en</strong>t.<br />

2009 3 BSussman


Key <strong>Project</strong>s (cont.)<br />

Port Bi<strong>en</strong>ville Master Plan, Hancock County, MS – Planner for<br />

an updated master plan for the port and its <strong>in</strong>dustrial park.<br />

Conducted <strong>in</strong>terviews with exist<strong>in</strong>g t<strong>en</strong>ants to evaluate exist<strong>in</strong>g<br />

road and rail transportation facilities and projected future<br />

transportation needs.<br />

Airport Landside Transportation Evaluations – Transportation<br />

planner responsible for evaluat<strong>in</strong>g and mak<strong>in</strong>g<br />

recomm<strong>en</strong>dations related to curb traffic, roadway system<br />

function, park<strong>in</strong>g capacity and function, and other aspects of<br />

landside operations at major U.S. airports, <strong>in</strong>clud<strong>in</strong>g D<strong>en</strong>ver<br />

International Airport, George Bush Intercont<strong>in</strong><strong>en</strong>tal (Houston)<br />

Airport, and M<strong>in</strong>neapolis-St. Paul International Airport.<br />

Airport Consolidated R<strong>en</strong>tal Car Facilities – Transportation<br />

planner for several projects to def<strong>in</strong>e the sit<strong>in</strong>g, layout, and<br />

operational aspects of consolidated r<strong>en</strong>tal car facilities at major<br />

U.S. airports. Conducted on-site surveys of r<strong>en</strong>tal car ag<strong>en</strong>cies<br />

and meet<strong>in</strong>gs with airport officials and r<strong>en</strong>tal car ag<strong>en</strong>cy<br />

repres<strong>en</strong>tatives. G<strong>en</strong>erated facility layouts. Specific projects<br />

<strong>in</strong>cluded the CONRAC (under construction) at Hartsfield-<br />

Jackson Atlanta International Airport, the r<strong>en</strong>tal car facility at<br />

the Miami (FL) Intermodal C<strong>en</strong>ter (under construction), and a<br />

pot<strong>en</strong>tial facility at Wash<strong>in</strong>gton Dulles International Airport.<br />

Conceptual Layout, Daily Park<strong>in</strong>g Garages, Charlotte-Douglas<br />

International Airport, Charlotte, NC – Developed <strong>in</strong>itial<br />

conceptual layout of the airport’s new daily garages, <strong>in</strong>clud<strong>in</strong>g<br />

vehicular circulation to, from, and with<strong>in</strong> the garages.<br />

<strong>Project</strong> Mapp<strong>in</strong>g, North and Northeast Corridors, Charlotte<br />

Area Transportation System (CATS), Charlotte, NC –<br />

Developed land use maps and station-area maps, and<br />

conducted land use analysis <strong>in</strong> support of transit plann<strong>in</strong>g for<br />

CATS’ North and Northeast corridors.<br />

American University Op<strong>en</strong> Space Master Plan, Wash<strong>in</strong>gton,<br />

DC - <strong>Project</strong> Planner for the transportation portion of the Master<br />

Plan. Analyzed vehicular traffic volume, park<strong>in</strong>g demand, and<br />

<strong>in</strong>tersection operations, as well as pedestrian safety and facility<br />

demand.<br />

Impact Assessm<strong>en</strong>ts<br />

Sc<strong>en</strong>ery Managem<strong>en</strong>t (Visual) Assessm<strong>en</strong>t, White P<strong>in</strong>es W<strong>in</strong>d<br />

Power <strong>Project</strong>, Manistee National Forest, Michigan. –<br />

Evaluated visual simulations of a proposed w<strong>in</strong>d farm near<br />

Manistee, Michigan. Used evaluation criteria based on the US<br />

Forest Service’s Sc<strong>en</strong>ery Managem<strong>en</strong>t System (SMS).<br />

Environm<strong>en</strong>tal, Social, and Health Impact Assessm<strong>en</strong>t<br />

(ESHIA), Confid<strong>en</strong>tial Cli<strong>en</strong>t – Researched and wrote an<br />

evaluation of the impacts of a large-scale natural gas<br />

developm<strong>en</strong>t project <strong>in</strong> the western United States. Responsible<br />

for evaluations of impacts on land use, transportation, public<br />

<strong>in</strong>frastructure (<strong>in</strong>clud<strong>in</strong>g water and sewer service), and local<br />

services.<br />

Northeast Gateway Energy Bridge, Massachusetts Bay, Third-<br />

Party Environm<strong>en</strong>tal Impact Statem<strong>en</strong>t - Work<strong>in</strong>g under<br />

direction of the U.S. Coast Guard, researched and wrote EIS<br />

sections perta<strong>in</strong><strong>in</strong>g to Land Use, Ocean Use, Transportation,<br />

Recreation, and Visual Resources. The proposed action would<br />

<strong>in</strong>clude construction of a deepwater port and pipel<strong>in</strong>e lateral <strong>in</strong><br />

Massachusetts Bay, to be used for the offload of Liquefied<br />

Natural Gas.<br />

Draft Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t, New<br />

Provid<strong>en</strong>ce Island, Bahamas – Lead transportation planner for<br />

an Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t (ESIA) for a<br />

planned resort on New Provid<strong>en</strong>ce Island, The Bahamas. The<br />

project would <strong>in</strong>clude a new mar<strong>in</strong>a, hous<strong>in</strong>g, hotels, and an<br />

<strong>in</strong>ternal road network. Verified exist<strong>in</strong>g road conditions and<br />

planned road network improvem<strong>en</strong>ts. Performed level of<br />

service (LOS) calculations for <strong>in</strong>tersections, and managed traffic<br />

counts and model<strong>in</strong>g tasks to describe LOS for exist<strong>in</strong>g and<br />

future conditions. Conducted high-level consultations with<br />

plann<strong>in</strong>g and public works ag<strong>en</strong>cies to <strong>en</strong>sure governm<strong>en</strong>tal<br />

support for the ESIA.<br />

Offshore LNG Port and Pipel<strong>in</strong>e Feasibility Assessm<strong>en</strong>t,<br />

Confid<strong>en</strong>tial Cli<strong>en</strong>t – Researched and wrote a feasibility<br />

analysis for construction of a deepwater port and pipel<strong>in</strong>e near<br />

a major US City, to be used for the offload of Liquefied Natural<br />

Gas. Responsible for sections related to Land Use, Ocean Use,<br />

Transportation, Recreation, and Visual Resources.<br />

Prelim<strong>in</strong>ary Application Docum<strong>en</strong>t for Hydropower<br />

Lic<strong>en</strong>s<strong>in</strong>g, Mass<strong>en</strong>a, New York – Conducted <strong>in</strong>itial site<br />

reconnaissance, collected data, and wrote socio-economics and<br />

cultural resources sections <strong>in</strong> support of a new hydroelectric<br />

dam <strong>in</strong> upstate New York. The docum<strong>en</strong>t id<strong>en</strong>tified exist<strong>in</strong>g<br />

2009 4 BSussman


Key <strong>Project</strong>s (cont.)<br />

conditions and issues that require additional research and<br />

<strong>in</strong>formation.<br />

Condor Airspace Environm<strong>en</strong>tal Assessm<strong>en</strong>t, Ma<strong>in</strong>e and New<br />

Hampshire – Researched and wrote the land use, socioeconomic<br />

resources, and cultural resources sections of this EA for the Air<br />

National Guard (ANG), which evaluated the pot<strong>en</strong>tial impacts<br />

of comb<strong>in</strong><strong>in</strong>g two adjo<strong>in</strong><strong>in</strong>g ANG airspaces, and lower<strong>in</strong>g the<br />

operational floor of that airspace.<br />

Manassas National Battlefield Park Draft G<strong>en</strong>eral<br />

Managem<strong>en</strong>t Plan and Environm<strong>en</strong>tal Impact Statem<strong>en</strong>t,<br />

Manassas, VA – <strong>Project</strong> planner and docum<strong>en</strong>t editor. Revised<br />

the Draft GMP/EIS to reflect National Park Service and other<br />

federal and state ag<strong>en</strong>cy comm<strong>en</strong>ts. Responsible for preparation<br />

of all graphics and overall editorial control of this primary<br />

plann<strong>in</strong>g docum<strong>en</strong>t for Manassas National Battlefield Park.<br />

Brownfields Plann<strong>in</strong>g<br />

Remedial Investigation and Feasibility Study, 68th Street<br />

Landfill Site, Rosedale, MD – <strong>Project</strong> planner for the<br />

<strong>in</strong>vestigation and evaluation of cleanup options for a 270-acre<br />

study area, follow<strong>in</strong>g USEPA’s Superfund Alternative Site (SAS)<br />

process. Helped prepare the Land Re-Use section of the<br />

Sitewide Program Managem<strong>en</strong>t Plan (SWPMP), and prepared<br />

project maps. Created the project logo.<br />

Republic Services, Socioeconomic and Demographic<br />

Assessm<strong>en</strong>t of Pot<strong>en</strong>tial Landfill Sites, Person County, NC-<br />

Collected and analyzed c<strong>en</strong>sus data to determ<strong>in</strong>e the pot<strong>en</strong>tial<br />

pres<strong>en</strong>ce of Environm<strong>en</strong>tal Justice (EJ) populations near two<br />

pot<strong>en</strong>tial solid waste landfill sites <strong>in</strong> North Carol<strong>in</strong>a.<br />

Policy and Research<br />

World Bank City Performance Indicators Study – Conducted<br />

research and prepared pres<strong>en</strong>tation materials and graphics. The<br />

study created a model to help cities throughout the world<br />

evaluate and improve their ability to meet the needs of their<br />

citiz<strong>en</strong>s. The model will be ground-tested <strong>in</strong> six cities:<br />

Vancouver and Toronto, Canada; Bogotá and Cali, Colombia;<br />

and Sao Paolo and Belo Horizonte, Brazil.<br />

Enlibra Workbook – Collaborator and writer for two Workbook<br />

chapters. Enlibra and its associated Pr<strong>in</strong>ciples were created by<br />

the Western Governor’s Association <strong>in</strong> the late 1990s <strong>in</strong> an effort<br />

to re-<strong>en</strong>vision <strong>en</strong>vironm<strong>en</strong>tal regulation, protection, and<br />

managem<strong>en</strong>t <strong>in</strong> the United States. The Workbook is designed to<br />

give specific guidance on how to <strong>in</strong>corporate the Enlibra<br />

Pr<strong>in</strong>ciples <strong>in</strong>to everyday <strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t decisions<br />

and practices.<br />

SMARTRAQ <strong>Project</strong>, Atlanta, GA - Planner and Researcher for<br />

the Strategies for Metropolitan Atlanta’s Regional<br />

Transportation and Air Quality (SMARTRAQ) research<br />

program, hosted at Georgia Tech. The project sought l<strong>in</strong>ks<br />

betwe<strong>en</strong> land use patterns, transportation behaviors, public<br />

health, and air quality, with the ultimate goal of reduc<strong>in</strong>g<br />

Atlanta’s level of automobile dep<strong>en</strong>d<strong>en</strong>ce while promot<strong>in</strong>g the<br />

economic, <strong>en</strong>vironm<strong>en</strong>tal, and personal health of the region and<br />

its resid<strong>en</strong>ts.<br />

K<strong>in</strong>g County Smart Growth Initiative (SGI), Seattle, WA -<br />

<strong>Project</strong> Planner for a study that l<strong>in</strong>ked land use patterns,<br />

transportation and travel behavior, physical activity, and public<br />

health. Developed a GIS database to l<strong>in</strong>k exist<strong>in</strong>g land uses<br />

with observed transportation and physical activity choices.<br />

Created and analyzed numerical measures of land use <strong>in</strong>t<strong>en</strong>sity,<br />

<strong>in</strong>clud<strong>in</strong>g resid<strong>en</strong>tial d<strong>en</strong>sity, <strong>in</strong>tersection d<strong>en</strong>sity, and land use<br />

mix. Three Seattle-area communities were chos<strong>en</strong> as test cases<br />

to exam<strong>in</strong>e the small-scale effects of land use policy changes.<br />

2009 5 BSussman


Dorothy Trippel<br />

Staff Sci<strong>en</strong>tist<br />

Dorothy Trippel is a Staff Sci<strong>en</strong>tist with<strong>in</strong> ERM<br />

based <strong>in</strong> Scottsdale, Arizona. Ms. Trippel jo<strong>in</strong>ed<br />

ERM <strong>in</strong> 2011, br<strong>in</strong>g<strong>in</strong>g 5 years of academic and<br />

operations/corporate <strong>in</strong>dustry experi<strong>en</strong>ce <strong>in</strong><br />

m<strong>in</strong><strong>in</strong>g, chemicals, external relations, community<br />

developm<strong>en</strong>t, socio-economic developm<strong>en</strong>t,<br />

corporate community <strong>in</strong>vestm<strong>en</strong>t, group discussion<br />

facilitation and susta<strong>in</strong>ability.<br />

Ms. Trippel received her B.A. <strong>in</strong> Anthropology,<br />

Sociology, and Religious Studies from Kalamazoo<br />

College (K) <strong>in</strong> 2009. While at K, she focused on<br />

community developm<strong>en</strong>t, globalization, corporate<br />

social responsibility (CSR), susta<strong>in</strong>able developm<strong>en</strong>t<br />

and market<strong>in</strong>g <strong>in</strong> the m<strong>in</strong><strong>in</strong>g <strong>in</strong>dustry, and Native<br />

American culture and religions. In fall of 2011, Ms.<br />

Trippel will beg<strong>in</strong> an M.A. program <strong>in</strong><br />

Susta<strong>in</strong>ability at Arizona State University where she<br />

will focus on apply<strong>in</strong>g a dynamic systems<br />

framework to solv<strong>in</strong>g susta<strong>in</strong>ability problems.<br />

Ms. Trippel has found <strong>in</strong>tegrated solutions to social,<br />

<strong>en</strong>vironm<strong>en</strong>tal, and economic chall<strong>en</strong>ges at<br />

Kalamazoo College, Newmont M<strong>in</strong><strong>in</strong>g Corporation<br />

(Nevada Operations) and The Dow Chemical<br />

Company (Global Corporate EH&S and<br />

Susta<strong>in</strong>ability Group). She has supported projects<br />

<strong>in</strong>volv<strong>in</strong>g stakeholder mapp<strong>in</strong>g and analysis,<br />

community <strong>en</strong>gagem<strong>en</strong>t and <strong>in</strong>vest<strong>in</strong>g, water<br />

scarcity and biodiversity footpr<strong>in</strong>t mapp<strong>in</strong>g,<br />

susta<strong>in</strong>ability strategy and market<strong>in</strong>g, and GRI<br />

susta<strong>in</strong>ability report<strong>in</strong>g.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

• Susta<strong>in</strong>ability strategy -operations and corporate<br />

• Corporate Social Responsibility (CSR)<br />

• Socio-economic developm<strong>en</strong>t<br />

• Stakeholder <strong>en</strong>gagem<strong>en</strong>t<br />

• Qualitative research methods<br />

Key Skills<br />

• Stakeholder <strong>in</strong>terview<strong>in</strong>g/mapp<strong>in</strong>g<br />

• WBCSD Water Tool mapp<strong>in</strong>g<br />

• IBAT for Bus<strong>in</strong>ess biodiversity foot pr<strong>in</strong>t<strong>in</strong>g<br />

• Group discussion facilitation<br />

Education and Tra<strong>in</strong><strong>in</strong>g<br />

• M.A. Susta<strong>in</strong>ability, Arizona State University,<br />

United States, anticipated 2013<br />

• B.A. Anthropology, Sociology and Religious<br />

Studies, Kalamazoo College, United States, 2009<br />

• Certificate of Basic Fr<strong>en</strong>ch Profici<strong>en</strong>cy, Marc<br />

Bloch University, Strasbourg France, 2008<br />

• 40-Hour MSHA surface, 2010<br />

Languages<br />

• English, native speaker<br />

• Fr<strong>en</strong>ch, basic writt<strong>en</strong> and spok<strong>en</strong> profici<strong>en</strong>cy<br />

Key Industry Sectors<br />

• M<strong>in</strong><strong>in</strong>g<br />

• Chemical


Key Experi<strong>en</strong>ce<br />

Social Impact Assessm<strong>en</strong>t Follow-up, Newmont<br />

M<strong>in</strong><strong>in</strong>g Corporation - Nevada Operations, 2008-10.<br />

Developed process to follow up on socio-economic<br />

and <strong>en</strong>vironm<strong>en</strong>tal impacts of large-scale surface<br />

copper-gold m<strong>in</strong><strong>in</strong>g construction through closure<br />

and reclamation, and a coal-fired power plant<br />

construction id<strong>en</strong>tified by ERM <strong>in</strong> a 2005 SIA.<br />

Interviewed stakeholders repres<strong>en</strong>t<strong>in</strong>g local<br />

governm<strong>en</strong>t, bus<strong>in</strong>ess, community, ranch<strong>in</strong>g,<br />

Western Shoshone, contractors and employees.<br />

Synthesized stakeholder feedback <strong>in</strong>to effective<br />

managem<strong>en</strong>t recomm<strong>en</strong>dations to further improve<br />

community relations.<br />

Newmont Legacy Fund, Newmont M<strong>in</strong><strong>in</strong>g<br />

Corporation – Nevada Operations, 2010.<br />

Supported <strong>in</strong>ter-departm<strong>en</strong>tal team at Newmont <strong>in</strong><br />

research and design of a Legacy Fund to establish<br />

vehicle for susta<strong>in</strong>able community <strong>in</strong>vestm<strong>en</strong>t.<br />

Teamed with External Relations Repres<strong>en</strong>tatives to<br />

brand and roll out Legacy Fund to <strong>in</strong>ternal and<br />

external stakeholders. Coord<strong>in</strong>ated with University<br />

of Nevada, R<strong>en</strong>o to create a non-profit managem<strong>en</strong>t<br />

tra<strong>in</strong><strong>in</strong>g sem<strong>in</strong>ar for key Newmont employees.<br />

Global Water Stress and Scarcity Mapp<strong>in</strong>g, The<br />

Dow Chemical Company – Corporate<br />

EH&S/Susta<strong>in</strong>ability Group 2010.<br />

Mapped curr<strong>en</strong>t and projected water stress and<br />

scarcity <strong>in</strong> proximity to global operation sites us<strong>in</strong>g<br />

The World Bus<strong>in</strong>ess Council for Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t (WBCSD) Water Tool <strong>in</strong> order to<br />

provide data for the Susta<strong>in</strong>able Chemistry Index –<br />

a Life Cycle Assessm<strong>en</strong>t tool measur<strong>in</strong>g progress<br />

towards Dow’s 2015 Susta<strong>in</strong>ability Goals.<br />

Global Biodiversity Indicator Mapp<strong>in</strong>g, The Dow<br />

Chemical Company – Corporate<br />

EH&S/Susta<strong>in</strong>ability Group, 2010.<br />

Tested Integrated Biodiversity Assessm<strong>en</strong>t Tool (IBAT)<br />

for Bus<strong>in</strong>ess to map key biodiversity <strong>in</strong>dicators <strong>in</strong><br />

proximity to global operations <strong>in</strong> order to id<strong>en</strong>tify<br />

biodiversity footpr<strong>in</strong>t and support the developm<strong>en</strong>t<br />

and implem<strong>en</strong>tation of Dow’s global biodiversity<br />

strategy.<br />

Global Report<strong>in</strong>g Initiative (GRI) Report, The<br />

Dow Chemical Company – Corporate<br />

EH&S/Susta<strong>in</strong>ability Group, 2010.<br />

Reviewed Dow GRI reports and <strong>in</strong>dustry market<strong>in</strong>g<br />

tr<strong>en</strong>ds to provide recomm<strong>en</strong>dations to improve<br />

navagability and <strong>in</strong>crease readership of 2009 report<br />

Authored <strong>in</strong>tegrated table of cont<strong>en</strong>ts, co-authored<br />

Biodiversity Aspect.<br />

Community Investm<strong>en</strong>t Susta<strong>in</strong>ability<br />

Assessm<strong>en</strong>t, Newmont M<strong>in</strong><strong>in</strong>g Corporation –<br />

Nevada Operations, 2009.<br />

Analyzed four Newmont community <strong>in</strong>vestm<strong>en</strong>t<br />

committees <strong>in</strong> Northern Nevada and the long-term<br />

socio-economic impacts of their <strong>in</strong>vestm<strong>en</strong>ts.<br />

Id<strong>en</strong>tified str<strong>en</strong>gths and weaknesses <strong>in</strong> application<br />

format, review process, and program market<strong>in</strong>g and<br />

led group discussions on opportunities for<br />

improvem<strong>en</strong>t.<br />

Corporate Social Responsibility (CSR) and<br />

M<strong>in</strong><strong>in</strong>g S<strong>en</strong>ior Thesis, Kalamazoo College, 2009.<br />

Developed and conducted library research project<br />

analyz<strong>in</strong>g CSR’s history, def<strong>in</strong>ition, managem<strong>en</strong>t<br />

theory, bus<strong>in</strong>ess case, ethics and role <strong>in</strong> susta<strong>in</strong>able<br />

developm<strong>en</strong>t efforts <strong>in</strong> the m<strong>in</strong><strong>in</strong>g <strong>in</strong>dustry.<br />

Outl<strong>in</strong>ed future research to expand literature on<br />

CSR, docum<strong>en</strong>t community perspectives on m<strong>in</strong><strong>in</strong>g<br />

impacts and promote collaboration betwe<strong>en</strong><br />

<strong>in</strong>dustry, academia and community.<br />

Asset Based Community Developm<strong>en</strong>t <strong>Project</strong>,<br />

Kalamazoo Eastside Neighborhood Association,<br />

2007.<br />

Teamed with resid<strong>en</strong>ts, faculty and peers to design<br />

developm<strong>en</strong>t project. Conducted door-to-door<br />

capacity <strong>in</strong>v<strong>en</strong>tories of resid<strong>en</strong>ts’ skills and<br />

resources. Compiled oral histories of the<br />

neighborhood. Coded and analyzed qualitative data<br />

us<strong>in</strong>g ATLAS.ti to id<strong>en</strong>tify developm<strong>en</strong>t<br />

opportunities. Organized and facilitated community<br />

forum to share f<strong>in</strong>d<strong>in</strong>gs and <strong>en</strong>gage resid<strong>en</strong>ts.<br />

16.05.11 DOROTHY TRIPPEL


Jason Willey<br />

Aquatic Ecologist<br />

Mr. Willey has approximately elev<strong>en</strong> years experi<strong>en</strong>ce <strong>in</strong><br />

ecology and natural resource managem<strong>en</strong>t with specific<br />

expertise <strong>in</strong> aquatic ecology and assess<strong>in</strong>g the<br />

<strong>en</strong>vironm<strong>en</strong>tal impacts of hydropower developm<strong>en</strong>ts.<br />

He has t<strong>en</strong> years experi<strong>en</strong>ce <strong>in</strong> Environm<strong>en</strong>tal Impact<br />

Assessm<strong>en</strong>t, has managed several impact assessm<strong>en</strong>t<br />

projects over his t<strong>en</strong>ure at ERM, and has made<br />

significant technical contributions to many others. Mr.<br />

Willey is a skilled field biologist, and has performed<br />

aquatic biological impact assessm<strong>en</strong>ts <strong>in</strong> North America,<br />

Asia, South America, Europe, and Africa. He is well<br />

versed <strong>in</strong> family-level macro<strong>in</strong>vertebrate diversity<br />

<strong>in</strong>dices, the US EPA’s Rapid Bioassessm<strong>en</strong>t Protocols,<br />

and various fisheries assessm<strong>en</strong>t techniques.<br />

Fields of Compet<strong>en</strong>ce<br />

• Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t, to<br />

NEPA (USA) and <strong>in</strong>ternational standards<br />

• Aquatic and estuar<strong>in</strong>e ecology, <strong>in</strong>clud<strong>in</strong>g quantitative<br />

and qualitative fish community survey methods (US<br />

EPA rapid bioassessm<strong>en</strong>t protocol), Ess<strong>en</strong>tial Fish<br />

Habitat evaluation, aquatic macro<strong>in</strong>vertebrate ecology,<br />

water quality sampl<strong>in</strong>g, and <strong>in</strong>-stream macrohabitat<br />

assessm<strong>en</strong>t<br />

• Terrestrial ecology, <strong>in</strong>clud<strong>in</strong>g application of Habitat<br />

Suitability Indices (HSIs), Forest Stand Del<strong>in</strong>eations,<br />

Riparian Habitat Evaluation, and wetland<br />

reconnaissance and del<strong>in</strong>eation<br />

• Aerial photograph, landscape feature, and habitat<br />

<strong>in</strong>terpretation<br />

• Wetland del<strong>in</strong>eation and functional assessm<strong>en</strong>t<br />

Education<br />

• B.S., Biology, University of Richmond, Richmond,<br />

VA, May 1997<br />

• M.S. Environm<strong>en</strong>tal Sci<strong>en</strong>ce and Policy, Johns<br />

Hopk<strong>in</strong>s University, May 2007<br />

Language<br />

English<br />

Key <strong>Project</strong>s<br />

Suralco (Alcoa Sur<strong>in</strong>ame). Lead aquatic ecologist on a<br />

feasibility assessm<strong>en</strong>t for a bauxite m<strong>in</strong>e at a gre<strong>en</strong>field<br />

site <strong>in</strong> c<strong>en</strong>tral Sur<strong>in</strong>ame. Historical <strong>in</strong>vestigations<br />

docum<strong>en</strong>ted several species of armored catfish at the<br />

site, <strong>in</strong>clud<strong>in</strong>g at least one species that was pot<strong>en</strong>tially<br />

<strong>en</strong>demic to the local watershed immediately surround<strong>in</strong>g<br />

the proposed developm<strong>en</strong>t site. We have discovered<br />

new populations of one highly <strong>en</strong>demic species, at least<br />

one species new to sci<strong>en</strong>ce, and another species that<br />

previously be<strong>en</strong> suspected to be ext<strong>in</strong>ct. Partner<strong>in</strong>g with<br />

Auburn University researchers to substantiate our<br />

discoveries with molecular phylog<strong>en</strong>etic analyses.<br />

Curr<strong>en</strong>tly prepar<strong>in</strong>g the impact assessm<strong>en</strong>t, mitigation<br />

plan, and monitor<strong>in</strong>g plan focus<strong>in</strong>g on preserv<strong>in</strong>g the<br />

rare fish on the plateau.<br />

Staatsolie (ongo<strong>in</strong>g). Aquatic biological technical lead<br />

on the ESIA for Staatsolie’s proposed Sugarcane-to-<br />

Ethanol Plant <strong>in</strong> Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>. <strong>Project</strong> is <strong>in</strong> its <strong>in</strong>itial<br />

stages, but tasks will <strong>in</strong>clude review and compilation of<br />

exist<strong>in</strong>g aquatic biological data <strong>in</strong> the affected area,<br />

lead<strong>in</strong>g/supervis<strong>in</strong>g field studies as necessary, and<br />

prepar<strong>in</strong>g the relevant ESIA sections. One of the key<br />

issues to be addressed <strong>in</strong> the ESIA will be water use<br />

(giv<strong>en</strong> the high demand for water <strong>in</strong> the production of<br />

sugarcane), water quality, and associated impacts on<br />

aquatic biota.<br />

Suralco. Assisted with the terrestrial biological portion<br />

of the ESHIA related to a proposed expansion of Alcoa’s<br />

alum<strong>in</strong>ium ref<strong>in</strong>ery <strong>in</strong> northeastern Sur<strong>in</strong>ame. Assisted<br />

other ERM staff with the plann<strong>in</strong>g for a rapid<br />

assessm<strong>en</strong>t biodiversity survey of the undeveloped area<br />

surround<strong>in</strong>g the ref<strong>in</strong>ery. The results of the RAP survey<br />

were used to evaluate the impact of the proposed<br />

ref<strong>in</strong>ery expansion on local ecology and to recomm<strong>en</strong>d<br />

ways to m<strong>in</strong>imize adverse effects s<strong>en</strong>sitive habitats and<br />

species.<br />

Alcoa (ongo<strong>in</strong>g). Prepar<strong>in</strong>g an EIA for an alum<strong>in</strong>um<br />

smelt<strong>in</strong>g project <strong>in</strong> southwest Gre<strong>en</strong>land to <strong>in</strong>clude a two<br />

hydroelectric developm<strong>en</strong>ts and electric transmission<br />

l<strong>in</strong>es. Issues of concern related to construction of the<br />

hydropower developm<strong>en</strong>ts <strong>in</strong>clude pot<strong>en</strong>tial ecological<br />

impacts of freshwater discharges to near shore mar<strong>in</strong>e<br />

habitats as well as impacts on anadromous and resid<strong>en</strong>t<br />

Arctic char. Issues of concern related to the transmission<br />

l<strong>in</strong>es <strong>in</strong>clude pot<strong>en</strong>tial restriction of access to <strong>in</strong>shore<br />

fish<strong>in</strong>g areas and <strong>in</strong>terfer<strong>en</strong>ce with bird flight patterns.<br />

Rohas Euco. Prepared the fisheries and aquatics<br />

resources impact assessm<strong>en</strong>t as part of the ESHIA for<br />

the proposed 60 MW Nam Sane 3 Hydroelectric <strong>Project</strong><br />

<strong>in</strong> Ban Phouviang, Xi<strong>en</strong>g Khouang Prov<strong>in</strong>ce, Lao PDR.<br />

Conducted field assessm<strong>en</strong>ts of aquatic habitat, fisheries<br />

and aquaculture practices, and g<strong>en</strong>eral aquatic ecology.


Overcame pot<strong>en</strong>tial safety hazards from unexploded<br />

ord<strong>in</strong>ance that prev<strong>en</strong>ted <strong>in</strong>-water surveys by<br />

<strong>in</strong>terview<strong>in</strong>g local and <strong>in</strong>dig<strong>en</strong>ous people concern<strong>in</strong>g fish<br />

distributions, migrations, and habitat use, as well as<br />

extrapolat<strong>in</strong>g from exist<strong>in</strong>g fisheries data from elsewhere<br />

<strong>in</strong> the Mekong River Bas<strong>in</strong>.<br />

International Jo<strong>in</strong>t Commission (US and Canada).<br />

Managed a project to evaluate the pot<strong>en</strong>tial effects of<br />

peak<strong>in</strong>g pond<strong>in</strong>g by hydropower <strong>in</strong>terests on the ecology<br />

of the St. Mary’s River. Consulted with the federal,<br />

state, and prov<strong>in</strong>cial ag<strong>en</strong>cy personnel with regulatory<br />

responsibility on the river to evaluate the ag<strong>en</strong>cy’s<br />

concerns relative to peak<strong>in</strong>g and pond<strong>in</strong>g. Prepared an<br />

assessm<strong>en</strong>t for the IJC of peak<strong>in</strong>g and pond<strong>in</strong>g’s effects<br />

on biological resources of concern, <strong>in</strong>clud<strong>in</strong>g migratory<br />

fish, the threat<strong>en</strong>ed lake sturgeon (Acip<strong>en</strong>ser<br />

brevirostrum), and nuisance species, <strong>in</strong>clud<strong>in</strong>g the<br />

catadromous sea lamprey (Petromyzon mar<strong>in</strong>us).<br />

Bui Hydroelectric <strong>Project</strong>. Performed the aquatic<br />

resources and fisheries impact assessm<strong>en</strong>t for the Bui<br />

Hydroelectric <strong>Project</strong> on the Black Volta River <strong>in</strong><br />

western Ghana. Key aquatic issues <strong>in</strong>cluded conversion<br />

of river<strong>in</strong>e habitat to lacustr<strong>in</strong>e habitat, loss of riparian<br />

productivity, and migration barriers.<br />

Hydro SRL. Authored the aquatic resources and<br />

fisheries section of the EIA for the planned 100 MW<br />

Kalivac Hydro Power Plant on the Vjose River <strong>in</strong><br />

Southern Albania. Determ<strong>in</strong>ed that the project had the<br />

pot<strong>en</strong>tial to fragm<strong>en</strong>t populations of resid<strong>en</strong>t and<br />

migratory fish species, <strong>in</strong>clud<strong>in</strong>g the several IUCN-listed<br />

m<strong>in</strong>nows, two salmonids, and two species of sturgeon.<br />

Concluded that the project had the pot<strong>en</strong>tial to <strong>en</strong>hance<br />

fisheries upstream of the dam due to <strong>in</strong>creased<br />

productivity <strong>in</strong> the impounded reach. Recomm<strong>en</strong>ded<br />

monitor<strong>in</strong>g for <strong>in</strong>dications of barotrauma and/or<br />

congregations of migratory fish downstream of the dam.<br />

Mass<strong>en</strong>a Electric Departm<strong>en</strong>t. Prepared aquatic<br />

resources section of the Prelim<strong>in</strong>ary Application<br />

Docum<strong>en</strong>t submitted to FERC for a small (


Sarah S. Piper<br />

Ms. Sarah Piper has 9 years of diverse experi<strong>en</strong>ce <strong>in</strong><br />

biological assessm<strong>en</strong>t work, <strong>en</strong>vironm<strong>en</strong>tal assessm<strong>en</strong>t of<br />

chemically impacted sites and <strong>en</strong>vironm<strong>en</strong>tal<br />

compliance. She has conducted several ecological risk<br />

assessm<strong>en</strong>ts, wetland del<strong>in</strong>eations, biological<br />

assessm<strong>en</strong>ts and threat<strong>en</strong>ed and <strong>en</strong>dangered species<br />

surveys. Ms. Piper is the west coast lead for avian<br />

<strong>in</strong>spections and surveys for a telecommunications cli<strong>en</strong>t.<br />

Additionally, she has conducted <strong>in</strong>vestigations of soil,<br />

ground, and surface water contam<strong>in</strong>ation for projects<br />

associated with m<strong>in</strong>es, manufactur<strong>in</strong>g facilities, military<br />

bases, construction sites, and other <strong>in</strong>dustrial facilities.<br />

Ms. Piper has worked on <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>vestigations at<br />

several closed m<strong>in</strong>e sites. She has conducted stormwater<br />

monitor<strong>in</strong>g, groundwater sampl<strong>in</strong>g, and ecological<br />

sampl<strong>in</strong>g at Sulphur bank Mercury M<strong>in</strong>e. Additionally,<br />

she has conducted characterizations for several former<br />

hydraulic gold m<strong>in</strong>es and mercury m<strong>in</strong>es <strong>in</strong> the Sierra<br />

foothills and coast range.<br />

Ms. Piper has performed <strong>en</strong>vironm<strong>en</strong>tal compliance for<br />

<strong>in</strong>dustries <strong>in</strong> several states, <strong>in</strong>clud<strong>in</strong>g California, Nevada,<br />

Oregon, Wash<strong>in</strong>gton, and Alaska. She conducted over<br />

150 Phase I <strong>en</strong>vironm<strong>en</strong>tal site assessm<strong>en</strong>ts (ESA) for a<br />

variety of cli<strong>en</strong>ts, <strong>in</strong>clud<strong>in</strong>g a national homebuilder, Bay<br />

Area redevelopm<strong>en</strong>t ag<strong>en</strong>cy, and state ag<strong>en</strong>cies. She has<br />

acted as an on-site hazardous waste and materials<br />

coord<strong>in</strong>ator, and is familiar with regulations for<br />

hazardous wastes as well as has g<strong>en</strong>eral knowledge of<br />

other compliance regulations.<br />

Ms. Piper has worked <strong>in</strong> remote locations and used a<br />

variety of methods to access sites and collect samples.<br />

She has mounta<strong>in</strong>-biked and backpacked <strong>in</strong>to m<strong>in</strong><strong>in</strong>g<br />

sites, kayaked <strong>in</strong>to lakes and wetlands, and driv<strong>en</strong> allterra<strong>in</strong><br />

vehicles <strong>in</strong>to sites. For sample collection, she has<br />

rappelled <strong>in</strong>to m<strong>in</strong>e shafts for soil and water, collected<br />

water measurem<strong>en</strong>ts, biota, and sedim<strong>en</strong>ts from a kayak,<br />

and operated an electro-shock<strong>in</strong>g boat for fish collection.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

Wetland del<strong>in</strong>eations<br />

Biological assessm<strong>en</strong>ts<br />

Ecological Risk Assessm<strong>en</strong>t<br />

Threat<strong>en</strong>ed and Endangered species surveys<br />

M<strong>in</strong>e assessm<strong>en</strong>t and closure<br />

Regulatory compliance<br />

Compliance, <strong>in</strong>clud<strong>in</strong>g facility audits and ESAs<br />

Storm water monitor<strong>in</strong>g programs<br />

Soil and ground water <strong>in</strong>vestigation<br />

Monitor<strong>in</strong>g well <strong>in</strong>stallation<br />

Ground water monitor<strong>in</strong>g programs<br />

Soil and ground water sampl<strong>in</strong>g techniques<br />

Education<br />

B.A., Biological Sci<strong>en</strong>ces, Pace University, New York,<br />

2000<br />

40-hour OSHA HAZWOPER, 2001<br />

8-hour OSHA HAZWOPER Refresher, curr<strong>en</strong>t<br />

16 hour Wilderness First Aid, CPR, curr<strong>en</strong>t<br />

Swift water Rescue Technician, curr<strong>en</strong>t<br />

Key Industry Sectors<br />

Aerospace<br />

Chemical<br />

Governm<strong>en</strong>t<br />

Manufactur<strong>in</strong>g<br />

M<strong>in</strong><strong>in</strong>g & Extractive<br />

Transportation<br />

Waste Managem<strong>en</strong>t Services


Key <strong>Project</strong>s<br />

M<strong>in</strong>e Characterization and Wetland Del<strong>in</strong>eation,<br />

Sulphur Creek M<strong>in</strong><strong>in</strong>g District, Homestake M<strong>in</strong><strong>in</strong>g,<br />

2009-pres<strong>en</strong>t. Technical Team Lead<br />

Assisted with design of conceptual site model and a data<br />

gap analysis for the C<strong>en</strong>tral M<strong>in</strong>e Group (5 m<strong>in</strong>es) and<br />

Wide Awake M<strong>in</strong>e. Designed a work plan to conduct the<br />

characterization of the m<strong>in</strong>es for a clean-up and removal<br />

action. Conducted sampl<strong>in</strong>g and mapp<strong>in</strong>g of m<strong>in</strong>e<br />

waste. Additionally, conducted several wetland<br />

del<strong>in</strong>eations and Waters of the US determ<strong>in</strong>ations for the<br />

m<strong>in</strong>e sites. Created habitat restoration/revegetation plan<br />

for the m<strong>in</strong>e sites <strong>in</strong> anticipation of remediation. Wrote a<br />

biological assessm<strong>en</strong>t for the m<strong>in</strong>e sites and surround<strong>in</strong>g<br />

area. Curr<strong>en</strong>tly analyz<strong>in</strong>g the data for m<strong>in</strong>e waste<br />

removal plann<strong>in</strong>g.<br />

Wetland Del<strong>in</strong>eations, California, Utah, and Nevada,<br />

2000-2011. Del<strong>in</strong>eator/Assessor<br />

Performed wetland del<strong>in</strong>eations <strong>in</strong> various habitat types<br />

<strong>in</strong>clud<strong>in</strong>g forest, dessert, foothill chaparral, and urban<br />

<strong>en</strong>vironm<strong>en</strong>ts. Submitted reports to the US Army Corp of<br />

Eng<strong>in</strong>eers for approval.<br />

Biological Assessm<strong>en</strong>ts, California, Wash<strong>in</strong>gton, Utah,<br />

and Nevada, 2000-2011. Biologist.<br />

Completed g<strong>en</strong>eral biological surveys for nationwide<br />

homebuilder and several private cli<strong>en</strong>ts to assess<br />

biological resources at various sites. Conducted<br />

threat<strong>en</strong>ed and <strong>en</strong>dangered (T&E) species surveys for<br />

various private cli<strong>en</strong>ts for several species of flora and<br />

fauna; this <strong>in</strong>cluded surveys for habitat as well as specific<br />

species surveys.<br />

Ecological Investigation, Sur<strong>in</strong>ame, South America,<br />

2010. Biologist.<br />

Conducted surveys of several creeks at the Nassau<br />

Plateau. Collected water quality measurem<strong>en</strong>ts,<br />

docum<strong>en</strong>ted habitat conditions, and captured fish and<br />

<strong>in</strong>vertebrates for DNA analysis.<br />

Avian Surveys, California, 2010-pres<strong>en</strong>t. Biologist.<br />

Ms. Piper has be<strong>en</strong> designated as the west coast lead for<br />

avian <strong>in</strong>spections and surveys for a national<br />

telecommunications cli<strong>en</strong>t. Ms. Piper is “on call” for<br />

travell<strong>in</strong>g to cell phone towers where pot<strong>en</strong>tially active<br />

nests have be<strong>en</strong> observed. She <strong>in</strong>spects the nest and<br />

surveys the area to determ<strong>in</strong>e the type of bird, w<strong>het</strong>her<br />

the nest is occupied, and determ<strong>in</strong>es an action plan for<br />

timeframe for work to be conducted near the nest.<br />

Emerg<strong>en</strong>cy Response, MC252 Oil Spill, Gulf of Mexico,<br />

BP, 2010. Technical Team Lead.<br />

Assisted with <strong>en</strong>vironm<strong>en</strong>tal decontam<strong>in</strong>ation team <strong>in</strong><br />

the plann<strong>in</strong>g group dur<strong>in</strong>g oil clean-up activities. Acted<br />

as deputy of the <strong>en</strong>vironm<strong>en</strong>tal decontam<strong>in</strong>ation team<br />

for a portion of the response effort. Co-authored the<br />

liquid and solid waste managem<strong>en</strong>t plans, and on- and<br />

near-shore decontam<strong>in</strong>ation plans. Conducted<br />

regulatory compliance audits for all BP sites <strong>in</strong><br />

Mississippi. Assisted with coord<strong>in</strong>ation of shipp<strong>in</strong>g,<br />

receiv<strong>in</strong>g, and storage of oily waste at Waste Mangem<strong>en</strong>t<br />

facilities. Conducted <strong>in</strong>spections of on-shore<br />

decontam<strong>in</strong>ation facilities <strong>in</strong> Florida and Alabama.<br />

Ecological Risk Assessm<strong>en</strong>t, Hold<strong>en</strong> M<strong>in</strong>e, Private<br />

Cli<strong>en</strong>t, 2008-2009. Technical Team Lead<br />

Assisted with design of work plan to conduct an<br />

ecological assessm<strong>en</strong>t at 20 differ<strong>en</strong>t areas of <strong>in</strong>terest<br />

<strong>in</strong>clud<strong>in</strong>g tail<strong>in</strong>gs piles, w<strong>in</strong>dblown tail<strong>in</strong>gs, and waste<br />

rock piles. Collaborated with US Forest Service<br />

repres<strong>en</strong>tatives on work plan and sample location<br />

selection. Acted as on-site coord<strong>in</strong>ator for field crew of 9<br />

people dur<strong>in</strong>g implem<strong>en</strong>tation of the work plan; this<br />

<strong>in</strong>cluded collection of surface and deep soils, plants, and<br />

soil <strong>in</strong>vertebrates. Analyzed the data and wrote the Risk<br />

Assessm<strong>en</strong>t report.<br />

Ecological Risk Assessm<strong>en</strong>t, George Air Force Base,<br />

California, US Military, 2010. Risk Assessor<br />

Conducted the site reconnaissance and biological<br />

assessm<strong>en</strong>t of the site to determ<strong>in</strong>e receptors and<br />

exposure pathways. Assisted with the risk assessm<strong>en</strong>t<br />

and provided f<strong>in</strong>al technical review of the report.<br />

Burrow<strong>in</strong>g Owl Monitor<strong>in</strong>g, H<strong>en</strong>derson, NV, Private<br />

Cli<strong>en</strong>t, 2008. Technical Team Lead<br />

Assisted with design of burrow<strong>in</strong>g owl survey at a<br />

contam<strong>in</strong>ated landfill. Conducted survey and id<strong>en</strong>tified<br />

active and pot<strong>en</strong>tial burrow sites. Conducted a second<br />

confirmation survey, cleared and collapsed empty<br />

burrows to <strong>en</strong>courage the owls to vacate from the site.<br />

Site Investigation, Alpha Digg<strong>in</strong>s, Omega Digg<strong>in</strong>s, and<br />

Relief Hill M<strong>in</strong>es, US Forest Service, 2005-2007.<br />

Technical Team Lead<br />

Conducted exploratory <strong>in</strong>vestigations at all three m<strong>in</strong>es<br />

to determ<strong>in</strong>e m<strong>in</strong>e features <strong>in</strong>clud<strong>in</strong>g <strong>in</strong>let and outlet<br />

portals, collapsed shafts, settl<strong>in</strong>g ponds and high walls.<br />

Sampled soils, surface water, and ra<strong>in</strong> water to determ<strong>in</strong>e<br />

pot<strong>en</strong>tial mercury contam<strong>in</strong>ation.<br />

MARCH 2011 SARAH PIPER


CURRICULUM VITAE<br />

Personalia<br />

Family name de Wolf<br />

First name Rutger<br />

Resid<strong>en</strong>ce Paramaribo, Sur<strong>in</strong>ame<br />

Date of birth 30-04-1980<br />

Place of birth Dracht<strong>en</strong>, The Netherlands<br />

G<strong>en</strong>der Male<br />

Nationality Dutch<br />

Civil status Married<br />

Education<br />

1999 – 2006 MSc Forest and Nature Conservation<br />

Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> University, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>, The Netherlands<br />

Ma<strong>in</strong> subjects: community & social forestry, susta<strong>in</strong>able forestry and certification<br />

May – Dec 2003 Master Thesis 1: Natural areas for livelihood improvem<strong>en</strong>t of local communities <strong>in</strong><br />

Romania (Piatra Craiului National Park), socio-economic research, supervised by Ir.<br />

M.A. Hoogstra MTD<br />

KNNV (Royal Dutch Society for Nature Conservation), Netherlands and ICAS-<br />

Bucharest (Forest Research and Managem<strong>en</strong>t Institute), Romania<br />

Oct 2004 – Jun 2005 Master Thesis 2: Internal transaction costs of <strong>in</strong>dig<strong>en</strong>ous community forest <strong>en</strong>terprises <strong>in</strong><br />

TCO Tacana, Bolivia, socio-economic research, supervised by Ir. C.E.B. B<strong>en</strong>neker and<br />

Dr. Ir. K.F. Wiersum<br />

Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> University and Research, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>, The Netherlands and Bolivia<br />

Aug – Dec 2005 Internship: Junior consultant concern<strong>in</strong>g susta<strong>in</strong>able forest managem<strong>en</strong>t and<br />

certification, legality of timber and occupational safety and health, supervised by S.<br />

van Dijk MSc.<br />

Sticht<strong>in</strong>g Erk<strong>en</strong>d Gro<strong>en</strong>, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>, The Netherlands<br />

May – Dec 2003 Socio-economic research, title research: Natural areas for livelihood improvem<strong>en</strong>t of<br />

local communities <strong>in</strong> Romania (Piatra Craiului National Park);<br />

1998 – 1999 EH-basic year<br />

Evangelical High School, Amersfoort, The Netherlands<br />

Ma<strong>in</strong> subjects: Philosophy, g<strong>en</strong>eral writ<strong>in</strong>g / didactical / communication skills<br />

1992 – 1998 VWO, secondary school<br />

Reformed Compreh<strong>en</strong>sive School Guido de Brès, Amersfoort, The Netherlands<br />

Short Courses<br />

Feb 2008 Forest Inv<strong>en</strong>tory and Data Process<strong>in</strong>g<br />

C<strong>en</strong>tre for Developm<strong>en</strong>t of Enterprises (EU), Paramaribo, Sur<strong>in</strong>ame<br />

Oct 2010 Editorial tra<strong>in</strong><strong>in</strong>g for journals<br />

Schrijversvakschool, Paramaribo, Sur<strong>in</strong>ame<br />

Jan 2011 Model<strong>in</strong>g Environm<strong>en</strong>tal Dynamics (e.g. deforestation) with D<strong>in</strong>amica Ego<br />

Federal University of M<strong>in</strong>as Gerais (Brazil), Paramaribo, Sur<strong>in</strong>ame<br />

Mar 2011 Long-range Energy Alternatives Plann<strong>in</strong>g System (LEAP) – modell<strong>in</strong>g tool<br />

Stockholm Environm<strong>en</strong>t Institute (USA), Paramaribo, Sur<strong>in</strong>ame


Employm<strong>en</strong>t Record<br />

Mar 2011 – pres<strong>en</strong>t Environm<strong>en</strong>tal Services & Support N.V., Paramaribo, Sur<strong>in</strong>ame - fulltime<br />

For consultancy, technical assistance, tra<strong>in</strong><strong>in</strong>g, research and project managem<strong>en</strong>t<br />

regard<strong>in</strong>g susta<strong>in</strong>able managem<strong>en</strong>t and utilization of forest and nature (<strong>in</strong> Sur<strong>in</strong>ame).<br />

Associate consultant<br />

July 2007 – Mar 2011 Environm<strong>en</strong>tal Services & Support N.V., Paramaribo, Sur<strong>in</strong>ame - fulltime<br />

For consultancy, technical assistance, tra<strong>in</strong><strong>in</strong>g, research and project managem<strong>en</strong>t<br />

regard<strong>in</strong>g susta<strong>in</strong>able managem<strong>en</strong>t and utilization of forest and nature (<strong>in</strong> Sur<strong>in</strong>ame).<br />

Consultant and office manager<br />

Feb 2006 – June 2007 Sticht<strong>in</strong>g Erk<strong>en</strong>d Gro<strong>en</strong>, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>, The Netherlands - fulltime<br />

For consultancy, technical assistance, education, research, project managem<strong>en</strong>t and<br />

control on improved quality of work, occupational safety and health and<br />

<strong>en</strong>vironm<strong>en</strong>tal issues <strong>in</strong> agriculture, forestry, nature conservation and <strong>en</strong>vironm<strong>en</strong>t<br />

related sectors <strong>in</strong> The Netherlands and <strong>in</strong> Sur<strong>in</strong>ame.<br />

Junior consultant<br />

Aug 2000 – Mar 2002 OHRA Zorgverzekeraar (Health Insurer), Arnhem, The Netherlands - part-time<br />

Adm<strong>in</strong>istrative employee<br />

Short Missions<br />

Sep - Oct 2006 Platform Houtsector Sur<strong>in</strong>ame, Paramaribo, Sur<strong>in</strong>ame<br />

Elaborat<strong>in</strong>g docum<strong>en</strong>ts, conduct<strong>in</strong>g <strong>in</strong>terviews with stakeholders and tra<strong>in</strong><strong>in</strong>g the<br />

sector concern<strong>in</strong>g legality of timber.<br />

Professional Experi<strong>en</strong>ce<br />

July 2007 – pres<strong>en</strong>t Sur<strong>in</strong>ame (Environm<strong>en</strong>tal Services & Support<br />

- G<strong>en</strong>eral managem<strong>en</strong>t, workflow managem<strong>en</strong>t, budget<strong>in</strong>g and control<br />

- <strong>Project</strong> plann<strong>in</strong>g, report writ<strong>in</strong>g and proposals for fund<strong>in</strong>g<br />

- <strong>Project</strong> implem<strong>en</strong>tation and managem<strong>en</strong>t<br />

- Writ<strong>in</strong>g of advisory docum<strong>en</strong>ts, both for governm<strong>en</strong>tal and profit organisations,<br />

on <strong>en</strong>vironm<strong>en</strong>tal policy and susta<strong>in</strong>able managem<strong>en</strong>t<br />

Actively <strong>in</strong>volved <strong>in</strong> e.g. the follow<strong>in</strong>g assignm<strong>en</strong>ts:<br />

- Nassau Ecological Basel<strong>in</strong>e Studies, fieldwork, report<strong>in</strong>g, project logistics,<br />

managem<strong>en</strong>t and co-editor on flora & habitat analyses; for ERM (USA), 2010<br />

- Feasibility Study for Oil Palm Plantations <strong>in</strong> Eastern Sur<strong>in</strong>ame, report<strong>in</strong>g (coeditor);<br />

for the Royal Tropical Institute (KIT, NL), 2010<br />

- Mitigation Assessm<strong>en</strong>t for Second National Communication to the UNFCCC,<br />

stakeholders consultation and report<strong>in</strong>g on forests and forestry (ma<strong>in</strong> editor),<br />

2010-ongo<strong>in</strong>g<br />

- Forest Exploitation and Bus<strong>in</strong>ess plans, plann<strong>in</strong>g and mapp<strong>in</strong>g of forest<br />

exploitation activities (ma<strong>in</strong> editor); for two concessionaires, 2009-2010<br />

- Quarterly Specialist Journal on Forest & Nature, editor and manager; for the<br />

C<strong>en</strong>tre for Agricultural Research <strong>in</strong> Sur<strong>in</strong>ame (CELOS), 2009-ongo<strong>in</strong>g<br />

- Preparation of the Third National Report for UN Conv<strong>en</strong>tion on Biological<br />

Diversity, stakeholders consultations and report<strong>in</strong>g (co-editor); for the M<strong>in</strong>istry<br />

of Labour, Technological Developm<strong>en</strong>t and Environm<strong>en</strong>t (ATM), 2009<br />

- National Capacity Self Assessm<strong>en</strong>t (NCSA): Thematic Assessm<strong>en</strong>t Climate<br />

Change (co-editor), Cross-cutt<strong>in</strong>g Analysis (ma<strong>in</strong> editor), Capacity Developm<strong>en</strong>t<br />

Action Plan (ma<strong>in</strong> editor), NCSA Report (ma<strong>in</strong> editor), for the M<strong>in</strong>istry of<br />

Labour, Technological Developm<strong>en</strong>t and Environm<strong>en</strong>t (ATM), 2008-2009


- National Biodiversity Action Plan (NBAP), stakeholders consultation and<br />

report<strong>in</strong>g (project managem<strong>en</strong>t and co-editor); for National Institute for<br />

Environm<strong>en</strong>t and Developm<strong>en</strong>t <strong>in</strong> Sur<strong>in</strong>ame (NIMOS), 2007-2008<br />

- Edit<strong>in</strong>g and lay-out of publications (reports, flyers, posters, etc); for various<br />

organisations, 2009-ongo<strong>in</strong>g<br />

Feb 2006 – June 2007 The Netherlands (Sticht<strong>in</strong>g Erk<strong>en</strong>d Gro<strong>en</strong>)<br />

- <strong>Project</strong> plann<strong>in</strong>g, report writ<strong>in</strong>g and proposals for fund<strong>in</strong>g<br />

- <strong>Project</strong> implem<strong>en</strong>tation and managem<strong>en</strong>t<br />

- Writ<strong>in</strong>g and publication of manuals on occupational safety and health<br />

Actively <strong>in</strong>volved <strong>in</strong> e.g. the follow<strong>in</strong>g assignm<strong>en</strong>ts:<br />

- Legality of Timber <strong>in</strong> Sur<strong>in</strong>ame, managem<strong>en</strong>t, assessm<strong>en</strong>t, tra<strong>in</strong><strong>in</strong>g and report<strong>in</strong>g<br />

(project managem<strong>en</strong>t and implem<strong>en</strong>tation); for Platform Houtsector Sur<strong>in</strong>ame<br />

(PHS), 2006-2007<br />

- Veilig <strong>en</strong> Gezond Werk<strong>en</strong> (Occupational Safety and Health), report<strong>in</strong>g and<br />

prepar<strong>in</strong>g pres<strong>en</strong>tations (co-editor); for CNV, 2006-2007<br />

Aug 2000 – Mar 2002 The Netherlands (OHRA Zorgverzekeraar, Health Insurer)<br />

- Adm<strong>in</strong>istration of policy claims<br />

- Customer service<br />

Other activities<br />

Dec 2003 - Sep 2004 OMF and IFES, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> and Utrecht, The Netherlands, and Thailand<br />

Organiz<strong>in</strong>g and co-lead<strong>in</strong>g a four weeks ori<strong>en</strong>tation trip for stud<strong>en</strong>ts to Thailand.<br />

Apr 2000 - Apr 2004 Stud<strong>en</strong>ts’ group, Wag<strong>en</strong><strong>in</strong>g<strong>en</strong>, The Netherlands<br />

Participation <strong>in</strong> several commissions (<strong>in</strong>troductory period, redaction of periodical)<br />

and lead<strong>in</strong>g sub-groups.<br />

Publications<br />

2010 Various articles (<strong>in</strong>terviews, reports, thematic discussions) on susta<strong>in</strong>able managem<strong>en</strong>t <strong>in</strong> Sur<strong>in</strong>ame,<br />

published <strong>in</strong> Vakblad BOS & NATUUR<br />

C<strong>en</strong>tre for Agricultural Research <strong>in</strong> Sur<strong>in</strong>ame (CELOS): 6 articles (<strong>in</strong> Dutch)<br />

2007 S. van Dijk, R. de Wolf, R.L.H. Poels (<strong>in</strong> prep.). CELOS Managem<strong>en</strong>t System <strong>in</strong> relation to Susta<strong>in</strong>able<br />

Forest Managem<strong>en</strong>t. In: The CELOS Managem<strong>en</strong>t System: CMS Pr<strong>in</strong>ciples, Implem<strong>en</strong>tation, Results and<br />

Experi<strong>en</strong>ces so far. G.M.J. Mohr<strong>en</strong>, and R. van Kant<strong>en</strong> (eds.)<br />

2006 A manual for employees and executives regard<strong>in</strong>g occupational safety and health. (several parts)<br />

Sticht<strong>in</strong>g Erk<strong>en</strong>d Gro<strong>en</strong> / Vezor Publisher / CNV Veilig <strong>en</strong> Gezond Werk<strong>en</strong>: 64 pages (<strong>in</strong> Dutch)<br />

2006 A series of 12 <strong>in</strong>fo sheets on Occupational Safety and Health <strong>in</strong> Forestry<br />

Bosschap, trad<strong>in</strong>g organization for forestry and timber production <strong>in</strong> The Netherlands: each 2 pages<br />

(<strong>in</strong> Dutch)<br />

Skills<br />

Languages Dutch: excell<strong>en</strong>t <strong>in</strong> speak<strong>in</strong>g, read<strong>in</strong>g and writ<strong>in</strong>g<br />

English: good <strong>in</strong> speak<strong>in</strong>g, read<strong>in</strong>g and writ<strong>in</strong>g<br />

Spanish*: fair <strong>in</strong> speak<strong>in</strong>g, read<strong>in</strong>g and writ<strong>in</strong>g<br />

Fr<strong>en</strong>ch*: poor <strong>in</strong> speak<strong>in</strong>g and writ<strong>in</strong>g, fair <strong>in</strong> read<strong>in</strong>g<br />

* after refresher course


Computer skills Good knowledge of and experi<strong>en</strong>ce with W<strong>in</strong>dows NT and XP, Microsoft Word,<br />

Microsoft Excel, Microsoft PowerPo<strong>in</strong>t, Outlook, Internet Explorer, Adobe Acrobat,<br />

Photoshop and InDesign.<br />

Some experi<strong>en</strong>ce with Microsoft Access, ArcGis, D<strong>in</strong>amica Ego and Leap.<br />

In possession of typ<strong>in</strong>g diploma, ga<strong>in</strong>ed <strong>in</strong> 1999.<br />

Other<br />

In possession of driv<strong>in</strong>g lic<strong>en</strong>se BE (Sur<strong>in</strong>amese).


CURRICULUM VITAE JAN H.A. MOL<br />

Family name Mol<br />

First name Johannes (Jan) Hubertus Adrianus<br />

Date of birth 24 November 1958<br />

Place of birth Oss (the Netherlands)<br />

Sex Male<br />

Nationality Dutch (the Netherlands)<br />

Civil status Married<br />

Work address Anton de Kom University of Sur<strong>in</strong>ame / CELOS, POB 9212, Leysweg, Paramaribo, Sur<strong>in</strong>ame<br />

Home address Verl<strong>en</strong>gde Gem<strong>en</strong>elandsweg 127, Paramaribo, Sur<strong>in</strong>ame; tel. 597-465449<br />

E-mail fisheco@celos.sr.org , janevikim@hotmail.com<br />

EDUCATION<br />

1984: M.Sc. Biology. University of Utrecht, the Netherlands. Thesis - Interspecific competition betwe<strong>en</strong> the<br />

European eel (Anguilla anguilla ) and the bream (Abramis brama) <strong>in</strong> the shallow, eutrophic Lake<br />

Tjeukemeer, the Netherlands.<br />

1995: Ph.D. Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> University, the Netherlands. Dissertation - Interspecific competition, predation, and the<br />

coexist<strong>en</strong>ce of three closely related Neotropical armoured catfishes (Siluriformes-Callichthyidae).<br />

COMMAND OF LANGUAGES<br />

Mother tongue : Dutch<br />

Excell<strong>en</strong>t : English<br />

Fair : German, Fr<strong>en</strong>ch<br />

POSITIONS HELD<br />

1986-1988 : Teacher <strong>in</strong> biology at secondary schools <strong>in</strong> Sur<strong>in</strong>ame.<br />

1987-1995 : Research associate at the Anton de Kom University of Sur<strong>in</strong>ame. Research on ecology<br />

and culture of neotropical armoured catfish.<br />

1996-pres<strong>en</strong>t : S<strong>en</strong>ior Lecturer, University of Sur<strong>in</strong>ame.<br />

1987-pres<strong>en</strong>t : Ichthyologist <strong>in</strong> several ra<strong>in</strong>forest expeditions of the National Zoological Collection of<br />

the University of Sur<strong>in</strong>ame and RAP-expeditions of Conservation International to the<br />

Kanuku Mounta<strong>in</strong>s, Guyana, and C<strong>en</strong>tral Sur<strong>in</strong>ame Nature Reserve, Sur<strong>in</strong>ame.<br />

1991-2000 : Secretary of the Institute of Agricultural Research (WAO) of the University of<br />

Sur<strong>in</strong>ame.<br />

1990-1992, 1996-2000 : Repres<strong>en</strong>tative of the departm<strong>en</strong>ts of Biology and Chemistry <strong>in</strong> the Board of the Faculty<br />

of Technological Sci<strong>en</strong>ces, University of Sur<strong>in</strong>ame.<br />

2001-pres<strong>en</strong>t : Editor-<strong>in</strong>-chief of Interactie, journal of the University of Sur<strong>in</strong>ame<br />

PUBLICATIONS<br />

1. Mol, J.H. (1993). Aquatic <strong>in</strong>vertebrates of the Coastal Pla<strong>in</strong>. In The Freshwater Ecosystems of Sur<strong>in</strong>ame (Ouboter,<br />

P.E., ed.), pp. 113-131. Dordrecht: Kluwer Academic Publishers.<br />

2. Mol, J.H. (1993). Structure and function of float<strong>in</strong>g bubble nests of three armoured catfishes (Callichthyidae) <strong>in</strong><br />

relation to the aquatic <strong>en</strong>vironm<strong>en</strong>t. In The Freshwater Ecosystems of Sur<strong>in</strong>ame (Ouboter, P.E., ed.), pp.<br />

167-197. Dordrecht: Kluwer Academic Publishers.<br />

3. Mol, J.H. (1994). Effects of sal<strong>in</strong>ity on distribution, growth and survival of three neotropical armoured catfishes<br />

(Siluriformes - Callichthyidae). Journal of Fish Biology 45, 763-776.<br />

4. Mol, J.H. (1995). Ontog<strong>en</strong>etic diet shifts and diet overlap among three closely related neotropical armoured<br />

catfishes. Journal of Fish Biology 47, 788-807.<br />

5. Mol, J.H. (1995). Interspecific competition, predation, and the coexist<strong>en</strong>ce of three closely related neotropical<br />

armoured catfishes (Siluriformes-Callichthyidae). Ph.D. thesis Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> University, The Netherlands.<br />

6. Mol, J.H. (1996). Reproductive seasonality and nest-site differ<strong>en</strong>tiation <strong>in</strong> three closely related armoured catfishes<br />

(Siluriformes: Callichthyidae). Environm<strong>en</strong>tal Biology of Fishes 45, 363-381.<br />

7. Mol, J.H. (1996). Impact of predation on early stages of the armoured catfish Hoplosternum thoracatum<br />

(Siluriformes-Callichthyidae) and implications for the syntopic occurr<strong>en</strong>ce with other related catfishes <strong>in</strong> a<br />

Curriculum Vitae 1<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


neotropical multi-predator swamp. Oecologia 107, 395-410.<br />

8. Mol, J.H. (1998). On reproduction <strong>in</strong> runn<strong>in</strong>g water by means of a float<strong>in</strong>g bubble nest: the reproductive ecology<br />

of Kater<strong>in</strong>a kwikwi (Megalechis personata) <strong>in</strong> a small ra<strong>in</strong>forest creek. Interactie (University of Sur<strong>in</strong>ame)<br />

4, 17-28.<br />

9. Mol, J.H. (2001). De teelt van de soké kwikwi (Hoplosternum littorale). Interactie 5, 43-54. (State of the art of the<br />

culture of the armoured catfish Hoplosternum littorale) (<strong>in</strong> Dutch with English summary)<br />

10. Mol, J.H. (<strong>in</strong> prep). Man-eat<strong>in</strong>g by piranha Serrasalmus rhombeus (L., 1766) <strong>in</strong> Sur<strong>in</strong>ame, South America.<br />

Submitted to Studies Neotropical Fauna and Environm<strong>en</strong>t<br />

11. Mol, J.H. & F.L. Van der Lugt (1995). Distribution and feed<strong>in</strong>g ecology of the African Tilapia Oreochromis<br />

mossambicus (Teleostei, Perciformes, Cichlidae) <strong>in</strong> Sur<strong>in</strong>ame (South America) with comm<strong>en</strong>ts on the<br />

Tilapia - Kwikwi (Hoplosternum littorale) (Teleostei, Siluriformes, Callichthyidae) <strong>in</strong>teraction. Acta<br />

Amazonica 25, 101-116.<br />

12. Mol, J.H. & F.L. Van der Lugt (2004). Economische ontwikkel<strong>in</strong>g <strong>en</strong> ecologische degradatie <strong>in</strong> Sur<strong>in</strong>ame. In<br />

Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong> Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland (A.P.J<br />

Mol, J.H. Mol & B. Van Vliet, eds), pp. 1-20. Van Arkel, Utrecht. (<strong>in</strong> Dutch)<br />

13. Mol, J.H. & D. Ponton (2003). Growth of juv<strong>en</strong>ile armoured catfish Megalechis thoracata <strong>in</strong> neotropical swamps<br />

and a ra<strong>in</strong>-forest creek as revealed by daily micro-<strong>in</strong>crem<strong>en</strong>ts <strong>in</strong> otoliths. Journal of Tropical Ecology 19,<br />

301-313.<br />

14. Mol, J.H. & P.E. Ouboter (2004). Downstream effects of erosion from small-scale gold m<strong>in</strong><strong>in</strong>g on the <strong>in</strong>stream<br />

habitat and fish community of a small Neotropical ra<strong>in</strong>forest stream. Conservation Biology 18, 201-214.<br />

15. Mol, J.H., W. Atsma, G. Flik, H. Bouwmeester & J.W.M. Osse (1999). Effect of low ambi<strong>en</strong>t m<strong>in</strong>eral<br />

conc<strong>en</strong>trations on the accumulation of calcium, magnesium and phosphorus by early life stages of the airbreath<strong>in</strong>g<br />

armoured catfish Megalechis personata (Siluriformes: Callichthyidae). Journal of Experim<strong>en</strong>tal<br />

Biology 202, 2121-2129.<br />

16. Mol, J.H., D. Resida, J.S. Ramlal & C.R. Becker (2000). Effects of El Niño-related drought on freshwater and<br />

brackish-water fishes <strong>in</strong> Sur<strong>in</strong>ame, South America. Environm<strong>en</strong>tal Biology of Fishes 59, 429-440.<br />

17. Mol, J.H., J.S. Ramlal, C. Lietar & M. Verloo (2001). Mercury contam<strong>in</strong>ation <strong>in</strong> freshwater, estuar<strong>in</strong>e, and<br />

mar<strong>in</strong>e fishes <strong>in</strong> relation to small-scale gold m<strong>in</strong><strong>in</strong>g <strong>in</strong> Sur<strong>in</strong>ame. Environm<strong>en</strong>tal Research 86, 183-197.<br />

18. Mol, J.H. (<strong>in</strong> press). Susta<strong>in</strong>able exploitation of neotropical fish resources: aquaculture trials with three<br />

callichthyid catfishes, Hoplosternum littorale, Hoplosternum thoracatum and Callichthys callichthys. In<br />

Proceed<strong>in</strong>gs of the 2nd Jo<strong>in</strong>t Confer<strong>en</strong>ce of the Universities of Guyana and Sur<strong>in</strong>ame on Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t <strong>in</strong> the Guyanas, Georgetown 1991.<br />

19. Hostache, G. & J.H. Mol (1998). Reproductive biology of the neotropical armoured catfish Hoplosternum<br />

littorale (Siluriformes - Callichthyidae): a synthesis stress<strong>in</strong>g the role of the float<strong>in</strong>g bubble nest. Aquatic<br />

Liv<strong>in</strong>g Resources 11, 173-185.<br />

20. Mol, A.P.J., J.H. Mol & B. Van Vliet (eds) (2004). Sur<strong>in</strong>ame Schoon G<strong>en</strong>oeg? Hulpbronn<strong>en</strong>gebruik <strong>en</strong><br />

Milieubescherm<strong>in</strong>g <strong>in</strong> e<strong>en</strong> Kle<strong>in</strong> Amazoneland. Van Arkel, Utrecht, 218 pp. (<strong>in</strong> Dutch)<br />

21. Ouboter, P.E. & J.H. Mol (1993). The fish fauna of Sur<strong>in</strong>ame. In The Freshwater Ecosystems of Sur<strong>in</strong>ame<br />

(Ouboter, P.E., ed.). pp. 133-154. Dordrecht: Kluwer Academic Publishers.<br />

22. Ouboter, P.E. & J.H. Mol (1994). Ex-situ susta<strong>in</strong>able use of fish and wildlife <strong>in</strong> Sur<strong>in</strong>ame. Interactie 2, 5-18.<br />

23. Ouboter, P.E., P.C. Dixit, M.C.M. Werkhov<strong>en</strong>, J.H. Mol & M. Khodabaks (<strong>in</strong> press). Some aspects of<br />

<strong>en</strong>vironm<strong>en</strong>tal research <strong>in</strong> Sur<strong>in</strong>ame with special emphasis on biodiversity. In Environm<strong>en</strong>tally Sound<br />

Socio-economic Developm<strong>en</strong>t <strong>in</strong> the Humid Tropics. Paris: UNESCO.<br />

24. Ponton, D., J.H. Mol & J. Panfili (2001). Use of otolith micro<strong>in</strong>crem<strong>en</strong>ts for estimat<strong>in</strong>g the age and growth of<br />

young armoured catfish Hoplosternum littorale. Journal of Fish Biology 58, 1274-1285.<br />

25. Reis, R.E., P.Y. Le Bail & J.H. Mol, <strong>in</strong> prep. New arrangem<strong>en</strong>ts <strong>in</strong> the synonymy <strong>in</strong> Megalechis Reis, 1997<br />

(Siluriformes, Callichthyidae). Submitted to Copeia.<br />

PROFESSIONAL CONSULTING<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study on the fish and aquatic <strong>in</strong>vertebrate fauna of coastal pla<strong>in</strong><br />

swamps at Onverwagt, Sur<strong>in</strong>ame. On behalf of Biliton Bauxite M<strong>in</strong><strong>in</strong>g Company, Sur<strong>in</strong>ame.<br />

1994-1995: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e studies on the fish and aquatic <strong>in</strong>vertebrate fauna of (1) creeks and<br />

rivers dra<strong>in</strong><strong>in</strong>g the Gold<strong>en</strong> Star gold concession area at Gros Rosebel, Sur<strong>in</strong>ame, and (2) the Kle<strong>in</strong>e<br />

Saramacca River, Sur<strong>in</strong>ame. On behalf of RESCAN Environm<strong>en</strong>tal Services (Canada) and Gold<strong>en</strong> Star<br />

Resources (Canada).<br />

1998: Environm<strong>en</strong>tal consultant, basel<strong>in</strong>e study of fish and aquatic macro<strong>in</strong>vertebrate fauna of coastal swamps and<br />

mangrove forests at the State oil concession Sara-Maria, Saramacca, Sur<strong>in</strong>ame. On behalf of State oil<br />

Sur<strong>in</strong>ame.<br />

Curriculum Vitae 2<br />

Jan H.A. Mol<br />

September 25, 2007


Paul Wh<strong>in</strong>cup<br />

Water Specialist<br />

Paul Wh<strong>in</strong>cup jo<strong>in</strong>ed ERM as Regional Technical Director<br />

<strong>in</strong> Asia Pacific <strong>in</strong> 2001 from URS Dames & Moore where<br />

he was Vice Presid<strong>en</strong>t and G<strong>en</strong>eral Manager Asia from<br />

1994 to 2001.<br />

He has 40 years of <strong>in</strong>ternational experi<strong>en</strong>ce <strong>in</strong> Australia,,<br />

Asia, UK, Europe, Middle East, the Indian subcont<strong>in</strong><strong>en</strong>t,<br />

Africa and South America with project <strong>in</strong>volvem<strong>en</strong>t <strong>in</strong><br />

over 30 countries.<br />

Professional Affiliations and Registrations<br />

• Fellow and Chartered Professional Environm<strong>en</strong>tal,<br />

Australasian Institute of M<strong>in</strong><strong>in</strong>g and Metallurgy<br />

• Member, International Association of Hydrogeologists<br />

(IAH)<br />

• Former Presid<strong>en</strong>t, IAH, Australian Chapter<br />

• Former Presid<strong>en</strong>t, Australian Drill<strong>in</strong>g Industry<br />

Association<br />

• Former Director, Australian Drill<strong>in</strong>g Industry<br />

Tra<strong>in</strong><strong>in</strong>g Committee<br />

• Formerly on Editorial Board of International Journal<br />

of Applied Hydrogeology and Journal of Land<br />

Contam<strong>in</strong>ation and Reclamation<br />

Fields of Compet<strong>en</strong>ce<br />

• Water supply and water managem<strong>en</strong>t<br />

• Environm<strong>en</strong>tal impact assessm<strong>en</strong>t<br />

Education<br />

University of St. Andrews, Scotland, B.Sc. (Hons) <strong>in</strong><br />

Geology, 1962<br />

Experi<strong>en</strong>ce<br />

• Geological Survey of Western Australia,<br />

Hydrogeologist and Eng<strong>in</strong>eer<strong>in</strong>g Geologist, 1963-1970,<br />

• Geotechnics (Aust) Pty Ltd, Chief Hydrogeologist,<br />

1970-1973<br />

• Groundwater Resource Consultants, Founder and<br />

Manag<strong>in</strong>g Director, 1973-1984. Acquired by Dames &<br />

Moore <strong>in</strong> 1984<br />

• Partner and Vice Presid<strong>en</strong>t Dames & Moore 1988 to<br />

2001<br />

• ERM Technical Director Asia-Pacific<br />

Key <strong>Project</strong>s<br />

• Lead Consultant for developm<strong>en</strong>t of conjunctive use<br />

water strategy for the CIC Mmamabula Energy <strong>Project</strong><br />

<strong>in</strong> Botswana <strong>in</strong>volv<strong>in</strong>g surface water transmission<br />

from the north of Botswana and fossil groundwater<br />

aquifers. Also developm<strong>en</strong>t of water managem<strong>en</strong>t<br />

plan.<br />

• Technical adviser to BHPBilliton on closure of the<br />

Be<strong>en</strong>up m<strong>in</strong>eral sands dredg<strong>in</strong>g project <strong>in</strong> Western<br />

Australia.<br />

• Hydrogeological studies for VALE INCO on Residual<br />

Storage Facilities at lateritic nickel m<strong>in</strong><strong>in</strong>g and<br />

process<strong>in</strong>g operations <strong>in</strong> Sulawesi, Indonesia.<br />

• Hydrogelogical model<strong>in</strong>g and karstification studies<br />

for Eramet (Weda Bay Nickel) at the proposed<br />

limestone m<strong>in</strong><strong>in</strong>g areas <strong>in</strong> Halmahera.<br />

• <strong>Project</strong> Director for model<strong>in</strong>g of op<strong>en</strong> cut coal m<strong>in</strong>e<br />

dewater<strong>in</strong>g for CIC MEP project <strong>in</strong> Botswana<br />

<strong>in</strong>clud<strong>in</strong>g transport of acid m<strong>in</strong>e dra<strong>in</strong> sulphate<br />

dra<strong>in</strong>age plume and developm<strong>en</strong>t of m<strong>in</strong>e closure<br />

plan on the basis of monitored natural att<strong>en</strong>uation.<br />

• Evaluation of the causes of the Kurnia Banjar Pani<br />

mud volcano near Surabaya, Indonesia on behalf of a<br />

Japanese oil exploration company.<br />

• Chairman of Peer Review Committee for the South<br />

West Yarragadee aquifer, Western Australia<br />

Governm<strong>en</strong>t<br />

• Water managem<strong>en</strong>t and groundwater supply<br />

<strong>in</strong>stallation for BP Tangguh LNG project, West Papua,<br />

Indonesia.<br />

• <strong>Project</strong> Director for contam<strong>in</strong>ated site <strong>in</strong>vestigation<br />

and remediation <strong>in</strong> many countries <strong>in</strong>clud<strong>in</strong>g<br />

Australia, Spa<strong>in</strong>, Italy, UK, Ch<strong>in</strong>a, Taiwan, Hong<br />

Kong, Korea, Malaysia, Philipp<strong>in</strong>es, S<strong>in</strong>gapore,<br />

Thailand, Indonesia <strong>in</strong>volv<strong>in</strong>g fertilisers, m<strong>in</strong><strong>in</strong>g<br />

wastes, hydrocarbons, heavy metals, radioactivity,<br />

PCBs, solv<strong>en</strong>ts and others us<strong>in</strong>g a range of <strong>in</strong> situ and<br />

ex situ remediation techniques.<br />

• Review of parameters established by RioT<strong>in</strong>to for<br />

derivation of targets and key performance <strong>in</strong>dicators<br />

for water managem<strong>en</strong>t.<br />

• High Level Water Managem<strong>en</strong>t Assessm<strong>en</strong>t of the<br />

Freeport Grasberg M<strong>in</strong><strong>in</strong>g Complex, Indonesia for PT<br />

Freeport Indonesia, <strong>in</strong>clud<strong>in</strong>g review of preferred<br />

groundwater pathways <strong>in</strong> karstic limestone.<br />

• Water supply evaluation for proposed Mitchell<br />

Plateau bauxite m<strong>in</strong>e, Kimberley region Western


Australia<br />

• Water supply evaluations for Koolan and Cockatoo<br />

Islands, Kimberley region Western Australia<br />

• Water supply evaluation for Groote Eylandt, Northern<br />

territory.<br />

• Eng<strong>in</strong>eeri<strong>in</strong>g geologist dur<strong>in</strong>g construction of Ord<br />

River Dam and Moochalabra Creek Dam, Kimberley<br />

Region, Western Australia.<br />

• Member of BHP Billiton corporate audit team, T<strong>in</strong>taya<br />

copper m<strong>in</strong>e Peru<br />

• Developm<strong>en</strong>t of quantitative and qualitative<br />

groundwater model of the Freeport m<strong>in</strong>e lowlands<br />

tail<strong>in</strong>gs disposal area for <strong>in</strong>put to the Ecological Risk<br />

Assessm<strong>en</strong>t<br />

• Review of s<strong>in</strong>k hole developm<strong>en</strong>t <strong>in</strong> Bukit Merah<br />

village, Malaysia lead<strong>in</strong>g to closure of adjo<strong>in</strong><strong>in</strong>g t<strong>in</strong><br />

m<strong>in</strong><strong>in</strong>g operation<br />

• Expert witness for the Supreme Court Inquiry <strong>in</strong>to<br />

M<strong>in</strong><strong>in</strong>g b<strong>en</strong>eath the Stored Waters of the Southern<br />

Coalfields of NSW.<br />

• Dewater<strong>in</strong>g of coal m<strong>in</strong>es at Collie for Griff<strong>in</strong> Coal,<br />

Western Collieries and <strong>in</strong> New Zealand at Huntly<br />

West and Greymouth.<br />

• Water supply for Kaltim Prima Coal, Cliffs Robe River<br />

(Pannawonica town supply), Mt Newman railway,<br />

Le<strong>in</strong>ster township (published paper).<br />

• Dewater<strong>in</strong>g for Mt Isa M<strong>in</strong>es,Hilton (published<br />

paper), Perseverance nickel (published paper),<br />

GEMCO manganese, R<strong>en</strong>ison Bell.<br />

• Water supply and <strong>en</strong>vironm<strong>en</strong>tal impact assessm<strong>en</strong>t<br />

for m<strong>in</strong>eral sand m<strong>in</strong>es for Western Titanium,<br />

Westralian Sands, Western M<strong>in</strong>eral Sands, Cable<br />

Sands, Cudg<strong>en</strong>, Allied Eneabba, Consolidated Rutile,<br />

Laporte<br />

• Tail<strong>in</strong>gs Dam assessm<strong>en</strong>ts for CSBP & Farmers<br />

Kw<strong>in</strong>ana, Kw<strong>in</strong>ana Nickel Ref<strong>in</strong>ery, Freeport, Agip,<br />

Perseverance, Alcoa, Mount Isa M<strong>in</strong>es, Freeport.<br />

• Contam<strong>in</strong>ation assessm<strong>en</strong>t and remediation of<br />

groundwater at Kw<strong>in</strong>ana Nickel Ref<strong>in</strong>ery and tail<strong>in</strong>gs<br />

ponds for WMC.<br />

• Contam<strong>in</strong>ation assessm<strong>en</strong>t and remediation for<br />

Kw<strong>in</strong>ana Steelworks of Australian Iron and Steel and<br />

adjac<strong>en</strong>t sites (Chemical Industries Kw<strong>in</strong>ana, BP<br />

Ref<strong>in</strong>ery and Alcoa alum<strong>in</strong>a ref<strong>in</strong>ery).<br />

• Water supply and contam<strong>in</strong>ation assessm<strong>en</strong>t of<br />

tail<strong>in</strong>gs ponds for Alcoa Kw<strong>in</strong>ana, Wagerup and<br />

P<strong>in</strong>jarra alum<strong>in</strong>a ref<strong>in</strong>eries, <strong>in</strong>clud<strong>in</strong>g Rhone Poul<strong>en</strong>c<br />

gallium/rare earth proposed facility at P<strong>in</strong>jarra.<br />

• Contam<strong>in</strong>ation assessm<strong>en</strong>t and remediation for<br />

Laporte Titanium, Austral<strong>in</strong>d (published paper).<br />

• Basel<strong>in</strong>e studies for Worsley alum<strong>in</strong>a ref<strong>in</strong>ery at<br />

Worsley and Bodd<strong>in</strong>gton and for proposed Mitchell<br />

Plateau bauxite m<strong>in</strong><strong>in</strong>g project, <strong>in</strong>clud<strong>in</strong>g proposed<br />

ref<strong>in</strong>ery and port near Geraldton, Western Australia.<br />

• Design and <strong>in</strong>stallation of expanded borefield for<br />

Geelong Water Board build<strong>in</strong>g on the <strong>in</strong>itial borefield<br />

<strong>in</strong>stalled <strong>in</strong> 1985. Water managem<strong>en</strong>t and<br />

desertification control for the Kela II gas field <strong>in</strong><br />

Taklamakan Desert, X<strong>in</strong>jiang Prov<strong>in</strong>ce, NorthWest<br />

Ch<strong>in</strong>a<br />

• <strong>Project</strong> Director for Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>t for the 4,000 km long West to East gas<br />

pipel<strong>in</strong>e <strong>in</strong> Ch<strong>in</strong>a <strong>in</strong>clud<strong>in</strong>g developm<strong>en</strong>t of water<br />

managem<strong>en</strong>t plans dur<strong>in</strong>g construction.<br />

• <strong>Project</strong> Manager for clean up of float<strong>in</strong>g product <strong>in</strong><br />

Chalk aquifer adjac<strong>en</strong>t to River Thames.<br />

• Environm<strong>en</strong>tal and groundwater pollution studies <strong>in</strong><br />

Que<strong>en</strong>sland (m<strong>in</strong>eral sand m<strong>in</strong><strong>in</strong>g, m<strong>in</strong>e water<br />

disposal), Western Australia (m<strong>in</strong>e water disposal<br />

leakage from tail<strong>in</strong>gs ponds of acid and alkali<br />

residues, deep well <strong>in</strong>jection of toxic wastes,<br />

evaluation and <strong>in</strong>vestigation of radioactive waste<br />

disposal sites) and Victoria. Regional studies of<br />

groundwater pollution from large <strong>in</strong>dustrial<br />

complexes and developm<strong>en</strong>t of appropriate<br />

managem<strong>en</strong>t and legislative guidel<strong>in</strong>es.<br />

• Pr<strong>in</strong>cipal Consultant. Groundwater pollution control<br />

for many <strong>in</strong>dustrial and process<strong>in</strong>g facilities <strong>in</strong><br />

Australia <strong>in</strong>clud<strong>in</strong>g chemical, fertiliser, pesticide,<br />

hydrocarbon and radioactive wastes, 1974-90.<br />

• <strong>Project</strong> Director and Specialist Groundwater<br />

Consultant: Master Plan Study for Rural Water<br />

Supply, coastal region of Sarawak 1986-90.<br />

• Pr<strong>in</strong>cipal Hydrogeologist: Master Plan Studies for<br />

Cimanuk River Bas<strong>in</strong> (1979), Cisanggarung River<br />

Bas<strong>in</strong> (1982) and South West Mounta<strong>in</strong>s (1981), <strong>in</strong><br />

West and C<strong>en</strong>tral Java.<br />

• <strong>Project</strong> Manager - Gnangara Mound Groundwater<br />

Resource Developm<strong>en</strong>t Plan, Environm<strong>en</strong>tal Review<br />

and Managem<strong>en</strong>t Plan, Western Australia, 1986; Perth<br />

Urban Water Balance Feasibility Study, 1983.<br />

4/20/2011 PAUL WHINCUP


Y<strong>in</strong>ka Afon, P.E.<br />

<strong>Project</strong> Eng<strong>in</strong>eer<br />

Mr. Afon is a professional <strong>en</strong>g<strong>in</strong>eer and <strong>en</strong>vironm<strong>en</strong>tal<br />

consultant with over sev<strong>en</strong> years of experi<strong>en</strong>ce <strong>in</strong> air<br />

quality evaluations, gre<strong>en</strong>house gas (GHG) <strong>in</strong>v<strong>en</strong>tories,<br />

meteorology, acoustics and sound propagation model<strong>in</strong>g,<br />

vibration, water resources, public safety and security,<br />

regulatory compliance, and preparation of National<br />

Environm<strong>en</strong>tal Policy Act (NEPA) docum<strong>en</strong>ts <strong>in</strong>clud<strong>in</strong>g<br />

<strong>en</strong>vironm<strong>en</strong>tal impact statem<strong>en</strong>ts and <strong>en</strong>vironm<strong>en</strong>tal<br />

assessm<strong>en</strong>ts.<br />

He has experi<strong>en</strong>ce prepar<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal assessm<strong>en</strong>ts<br />

and <strong>en</strong>vironm<strong>en</strong>tal impact statem<strong>en</strong>ts for a wide variety of<br />

projects <strong>in</strong>clud<strong>in</strong>g developm<strong>en</strong>t of m<strong>in</strong><strong>in</strong>g and<br />

ref<strong>in</strong><strong>in</strong>g/process<strong>in</strong>g operations, hydroelectric facilities,<br />

w<strong>in</strong>d farms, nuclear power plants, transmission l<strong>in</strong>es,<br />

onshore and offshore liquefied natural gas facilities, gas<br />

storage facilities, gas pipel<strong>in</strong>es, compressor stations, and<br />

transportation projects. He also has <strong>in</strong>ternational<br />

experi<strong>en</strong>ce <strong>in</strong> countries such as Sur<strong>in</strong>ame, Guatemala,<br />

Gre<strong>en</strong>land, Bahamas, and Nigeria.<br />

Professional Affiliations and Registration<br />

• Registered Professional Eng<strong>in</strong>eer, State of Maryland<br />

• Member of Air & Waste Managem<strong>en</strong>t Association<br />

• Member of American Institute of Chemical Eng<strong>in</strong>eers<br />

Education<br />

• M.S.E., Environm<strong>en</strong>tal Process Eng<strong>in</strong>eer<strong>in</strong>g, Johns Hopk<strong>in</strong>s<br />

University, Baltimore, Maryland, 2004<br />

• B.S., Chemical Eng<strong>in</strong>eer<strong>in</strong>g, Ladoke Ak<strong>in</strong>tola University of<br />

Technology, Nigeria, 2001<br />

Publication<br />

• Afon Y and Erv<strong>in</strong> D. An Assessm<strong>en</strong>t of Air Emissions from<br />

Liquefied Natural Gas Ships Us<strong>in</strong>g Differ<strong>en</strong>t Power Systems and<br />

Differ<strong>en</strong>t Fuels . Journal of Air & Waste Managem<strong>en</strong>t<br />

Association No.3, Vol 58, 404 – 411 (2008).<br />

Key Industry Sectors<br />

• M<strong>in</strong><strong>in</strong>g, and ref<strong>in</strong><strong>in</strong>g/process<strong>in</strong>g<br />

• Oil, gas, and pipel<strong>in</strong>e developm<strong>en</strong>t<br />

• W<strong>in</strong>d and nuclear <strong>en</strong>ergy<br />

• Transportation<br />

Key <strong>Project</strong>s<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Suralco Inc. - Nassau Plateau Bauxite M<strong>in</strong>e and Transport<br />

Road ESIA, Sur<strong>in</strong>ame, Ongo<strong>in</strong>g. Curr<strong>en</strong>tly serv<strong>in</strong>g as the<br />

project <strong>en</strong>g<strong>in</strong>eer for the preparation of an ESIA for a bauxite<br />

m<strong>in</strong>e on Nassau Plateau and associated transport road to meet<br />

both Sur<strong>in</strong>ame and <strong>in</strong>ternational standards for Alcoa. Prepared<br />

exist<strong>in</strong>g conditions and impact analysis for air quality, GHGs,<br />

noise, odor, natural hazards, ground vibration airblast<br />

overpressure, and flyrock. The ESIA is be<strong>in</strong>g prepared <strong>in</strong><br />

accordance with the legal and regulatory framework for EIS <strong>in</strong><br />

Sur<strong>in</strong>ame (NIMOS) and the World Bank Group/International<br />

F<strong>in</strong>ance Corporation (IFC) Performance Standards.<br />

Suralco Inc. – Alum<strong>in</strong>a Ref<strong>in</strong>ery Residue Expansion and<br />

Ref<strong>in</strong>ery Modification, Sur<strong>in</strong>ame, 2007 – 2008. As <strong>Project</strong><br />

<strong>en</strong>g<strong>in</strong>eer, provided resource expertise for the preparation of an<br />

ESIA associated with the expansion of Suralco’s alum<strong>in</strong>a<br />

ref<strong>in</strong>ery dry residual disposal areas (DRDAs). The ref<strong>in</strong>ery’s<br />

need to process approximately 23% more bauxite required the<br />

creation of two additional DRDAs. Prepared exist<strong>in</strong>g<br />

conditions and impact analysis for air, GHGs noise, odor,<br />

<strong>in</strong>frastructure, and vibration resources. Developed an<br />

<strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t plan for the project based on<br />

recomm<strong>en</strong>dations and mitigation measures listed <strong>in</strong> the ESIA.<br />

The project was prepared <strong>in</strong> accordance with NIMOS and the<br />

World Bank Group/ IFC Performance Standards.<br />

Staatsolie – Wag<strong>en</strong><strong>in</strong>g<strong>en</strong> Sugarcane-to-ethanol <strong>Project</strong>,<br />

Sur<strong>in</strong>ame, Ongo<strong>in</strong>g. Curr<strong>en</strong>tly serv<strong>in</strong>g as the Deputy <strong>Project</strong><br />

Manager for the preparation of an ESIA for construct<strong>in</strong>g and<br />

operat<strong>in</strong>g a Sugarcane-to-Ethanol Plant <strong>in</strong> the Wag<strong>en</strong><strong>in</strong>g<strong>en</strong><br />

Area of District Nickerie <strong>in</strong> Sur<strong>in</strong>ame. The plant is expected to<br />

produce 80 – 90 million liters of ethanol per year. Tasks <strong>in</strong>clude<br />

project managem<strong>en</strong>t, stakeholder consultations, and<br />

preparation of some ESIA sections such as air quality and<br />

climate, GHGs, noise, odors, natural hazards, and vibration.<br />

The ESIA is be<strong>in</strong>g prepared <strong>in</strong> accordance with NIMOS and the<br />

World Bank Group/ IFC Performance Standards. Key issues to<br />

be addressed <strong>in</strong> the ESIA <strong>in</strong>clude water use (needed for<br />

sugarcane cultivation), water quality, land use managem<strong>en</strong>t<br />

and ownership, air quality, and noise.<br />

PolyMet M<strong>in</strong><strong>in</strong>g Inc. - NorthMet M<strong>in</strong>e & Ore Process<strong>in</strong>g<br />

<strong>Project</strong>, MN, 2007 to pres<strong>en</strong>t. As <strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer, provided<br />

resource expertise and report<strong>in</strong>g for an EIS evaluat<strong>in</strong>g noise,<br />

water resources, air quality, gre<strong>en</strong>house gases, <strong>en</strong>ergy and<br />

climate change effects of operat<strong>in</strong>g a m<strong>in</strong>e and low-grade<br />

sulfide ore and precious metals process<strong>in</strong>g facility <strong>in</strong> northeast<br />

M<strong>in</strong>esota. Some of the major issues associated with the project


were water managem<strong>en</strong>t, tail<strong>in</strong>gs managem<strong>en</strong>t, mercury issues<br />

and effects on wild rice.<br />

Alcoa - Air Quality, Noise, and Meteorological Studies for a<br />

Proposed Alum<strong>in</strong>um Smelter and Hydroelectric Facility <strong>in</strong><br />

Gre<strong>en</strong>land, 2009. As <strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer, provided resource<br />

expertise for the preparation of an <strong>en</strong>vironm<strong>en</strong>tal<br />

basel<strong>in</strong>e study associated with the developm<strong>en</strong>t of an<br />

alum<strong>in</strong>um smelter and hydroelectric facility <strong>in</strong> western<br />

Gre<strong>en</strong>land. Prepared exist<strong>in</strong>g conditions for resources<br />

such as climate, air quality, gre<strong>en</strong>house gases, and noise.<br />

Conducted ambi<strong>en</strong>t noise measurem<strong>en</strong>ts at the smelter site and<br />

at noise s<strong>en</strong>sitive areas <strong>in</strong> the Town of Maniitsoq to establish<br />

basel<strong>in</strong>e noise levels. Monitored meteorological data measured<br />

from a meteorological station at the smelter site. Provided<br />

monthly meteorological data monitor<strong>in</strong>g report to cli<strong>en</strong>t.<br />

AEI Inc. – Jaguar Thermal Electric Power Plant <strong>Project</strong>,<br />

Guatemala, 2008. <strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer for evaluat<strong>in</strong>g noise effects<br />

of operat<strong>in</strong>g a 300 MW thermal electric power plant <strong>in</strong><br />

Guatemala <strong>in</strong> accordance with IFC EHS guidel<strong>in</strong>es. The<br />

evaluation was performed as part of the project’s ESHIA<br />

process. Provided noise impact support services and<br />

coord<strong>in</strong>ated the model<strong>in</strong>g of noise emissions from over 1,200<br />

id<strong>en</strong>tified major noise sources at the Site. Assessed and<br />

evaluated the off-site noise effects associated with coal and<br />

limestone truck deliveries on nearby noise s<strong>en</strong>sitive receptors.<br />

Proctor & Gamble – Agbara Industrial Estate Manufactur<strong>in</strong>g<br />

<strong>Project</strong>, Agbara Town, Nigeria, 2010. As <strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer and<br />

<strong>en</strong>vironm<strong>en</strong>tal specialist, reviewed the draft ESIA associated<br />

with P&G’s proposed developm<strong>en</strong>t of a new 40 ha facility for<br />

manufacture, storage and distribution of consumer goods<br />

with<strong>in</strong> Agbara Town, Ogun State, Nigeria. Participated <strong>in</strong> a<br />

Public Disclosure Meet<strong>in</strong>g at the k<strong>in</strong>g’s palace <strong>in</strong> Agbara Town<br />

to discuss pot<strong>en</strong>tial social and <strong>en</strong>vironm<strong>en</strong>tal issues. Some of<br />

the major issues addressed at the meet<strong>in</strong>g <strong>in</strong>clude the project’s<br />

effect on traffic, solid waste handl<strong>in</strong>g, jobs for the locals, odor<br />

from wastewater and sewage, wastewater treatm<strong>en</strong>t and<br />

discharge sources, noise, and air pollution.<br />

BP Alternative Energy – White P<strong>in</strong>es W<strong>in</strong>d Power <strong>Project</strong>,<br />

Huron-Manistee National Forests, Mason County, MI, 2009.<br />

<strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer for an EIS evaluat<strong>in</strong>g public safety & security<br />

issues associated with the developm<strong>en</strong>t of a proposed w<strong>in</strong>d<br />

farm near Manistee, Michigan. The w<strong>in</strong>d farm is expected to<br />

have 28 w<strong>in</strong>d turb<strong>in</strong>e g<strong>en</strong>erators, each rated at 2.5 MW.<br />

Areva – Technical Support for Lic<strong>en</strong>s<strong>in</strong>g Two New Nuclear<br />

Facilities, U.S. East Coast, 2008. Provided technical and<br />

<strong>en</strong>vironm<strong>en</strong>tal support for the preparation of comb<strong>in</strong>ed<br />

lic<strong>en</strong>se (COL) applications for two new 1600 MW nuclear<br />

reactors <strong>in</strong> Bell B<strong>en</strong>d, PA, and Scriba, NY. Coord<strong>in</strong>ated with<br />

other sub-contractors to address cli<strong>en</strong>t’s comm<strong>en</strong>ts and<br />

<strong>en</strong>sured the applications were submitted to Nuclear<br />

Regulatory Commission with<strong>in</strong> the scheduled time. The COL<br />

applications were prepared <strong>in</strong> accordance with NRC’s NUREG<br />

1555 and Regulatory Guide 4.2.<br />

Floridian Natural Gas Storage Company - Floridian Natural<br />

Gas Storage <strong>Project</strong>, FL, 2007–2008. As <strong>Project</strong> <strong>en</strong>g<strong>in</strong>eer and<br />

3rd Party EIS contractor with FERC, provided resource<br />

expertise and managem<strong>en</strong>t for developm<strong>en</strong>t of a 100 MMscf<br />

per day natural gas storage and liquefaction facility and a 4mile<br />

pipel<strong>in</strong>e <strong>in</strong> Mart<strong>in</strong> County, Florida. Prepared exist<strong>in</strong>g<br />

conditions and impact analysis for air quality and noise and<br />

provided quick responses to public and ag<strong>en</strong>cy comm<strong>en</strong>ts.<br />

F<strong>in</strong>al EIS for construction of storage facility was approved by<br />

the Federal Environm<strong>en</strong>tal Regulatory Commission <strong>in</strong> 2008<br />

with some lic<strong>en</strong>s<strong>in</strong>g conditions.<br />

Excelerate Energy - Northeast Gateway Deepwater Port LNG<br />

Term<strong>in</strong>al and Pipel<strong>in</strong>e, Massachusetts Bay, 2006. As <strong>Project</strong><br />

<strong>en</strong>g<strong>in</strong>eer and 3rd Party EIS contractor with U.S Coast Guard,<br />

provided resource expertise and managem<strong>en</strong>t for developm<strong>en</strong>t<br />

of a 400 MMscfd per day LNG deepwater port with speciallydesigned<br />

regasification vessels and associated pipel<strong>in</strong>es <strong>in</strong><br />

Massachusetts Bay. Prepared an air conformity analysis report<br />

<strong>in</strong> accordance with Massachusetts State Implem<strong>en</strong>tation Plans<br />

(SIPs) and participated <strong>in</strong> consultation with brokers for<br />

purchas<strong>in</strong>g emission reduction credits to offset project<br />

emissions. Wrote air quality and noise sections of EIS and<br />

provided quick responses to comm<strong>en</strong>ts from various ag<strong>en</strong>cies<br />

and the public. The Maritime Adm<strong>in</strong>istration issued a Record<br />

of Decision for the deepwater port <strong>in</strong> 2006. The port is<br />

curr<strong>en</strong>tly <strong>in</strong> operation.<br />

BP - Crown Land<strong>in</strong>g LNG <strong>Project</strong>, NJ, 2004 –2007. <strong>Project</strong><br />

<strong>en</strong>g<strong>in</strong>eer for the preparation of a FERC application for the<br />

developm<strong>en</strong>t of a 1.2 Bscf per day onshore LNG facility and<br />

associated pipel<strong>in</strong>e corridors <strong>in</strong> Logan township, NJ.<br />

Performed a term<strong>in</strong>al system alternatives analysis and<br />

evaluated project impacts on air quality, noise, and water<br />

resources. Prepared a facility-wide air permit application for<br />

the term<strong>in</strong>al and ships at berth.<br />

AES Corporation - Sparrows Po<strong>in</strong>t Onshore LNG and Power<br />

Plant <strong>Project</strong>, Baltimore, MD, 2006 – 2008. Work<strong>in</strong>g with<br />

Maryland DNR and PPRP staff, reviewed and provided<br />

comm<strong>en</strong>ts to noise and air quality sections of applicant’s<br />

resource reports and FERC prepared-EIS for a proposed 1.5<br />

Bscf per day onshore LNG facility and power plant <strong>in</strong><br />

Baltimore, MD. Reviewed and provided comm<strong>en</strong>ts to project’s<br />

draft g<strong>en</strong>eral conformity report and emission calculations.<br />

F<strong>in</strong>al EIS for construction of the storage facility was approved<br />

by the Federal Environm<strong>en</strong>tal Regulatory Commission <strong>in</strong> 2008<br />

with some lic<strong>en</strong>s<strong>in</strong>g conditions.<br />

2011-03 YAFON


J. Gabriel Luna<br />

Mr. Gabriel Luna is an associate geologist based <strong>in</strong><br />

ERM’s Exton, P<strong>en</strong>nsylvania office. He has over 5 years of<br />

experi<strong>en</strong>ce work<strong>in</strong>g with the US Geological Survey<br />

Water Resources Division as a hydrologist. He has<br />

managed stream gag<strong>in</strong>g stations throughout Kansas and<br />

Alaska as part of a nationwide streamflow monitor<strong>in</strong>g<br />

network. His <strong>en</strong>vironm<strong>en</strong>tal field experi<strong>en</strong>ce <strong>in</strong>cludes<br />

water sampl<strong>in</strong>g, measur<strong>in</strong>g field parameters, supervis<strong>in</strong>g<br />

the <strong>in</strong>stallation and abandonm<strong>en</strong>t of monitor<strong>in</strong>g stations,<br />

and calibration and ma<strong>in</strong>t<strong>en</strong>ance of field equipm<strong>en</strong>t.<br />

His project experi<strong>en</strong>ce <strong>in</strong>cludes site <strong>in</strong>vestigations,<br />

subcontractor managem<strong>en</strong>t, organization and oversight<br />

of field sampl<strong>in</strong>g, public and confid<strong>en</strong>tial file review, and<br />

technical report writ<strong>in</strong>g.<br />

Mr. Luna has conducted work and supported projects <strong>in</strong><br />

P<strong>en</strong>nsylvania, Maryland, New Jersey, Delaware,<br />

Connecticut, Massachusetts, West Virg<strong>in</strong>ia, Virg<strong>in</strong>ia,<br />

Kansas, Colorado and Alaska.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Fields of Compet<strong>en</strong>ce<br />

• Site Investigation and Remediation<br />

• Data analysis and technical report preparation<br />

• Soil, surface water, ground water, ambi<strong>en</strong>t air and soil<br />

vapor sampl<strong>in</strong>g<br />

• Geological logg<strong>in</strong>g of soil and bedrock<br />

• Coord<strong>in</strong>ation of field <strong>in</strong>vestigation studies<br />

• Phase II Environm<strong>en</strong>tal Site Assessm<strong>en</strong>t<br />

• Technical Software Packages: W<strong>in</strong>River II, Microsoft<br />

Excel, Adobe Acrobat 8.0, W<strong>in</strong>dows XP<br />

• Collection and <strong>in</strong>terpretation of Acoustic Doppler<br />

Curr<strong>en</strong>t Profiler data<br />

Education<br />

• B.S., Environm<strong>en</strong>tal Geosci<strong>en</strong>ce, University of Notre<br />

Dame, 2001<br />

• Occupational Safety and Health Adm<strong>in</strong>istration<br />

(OSHA) 40-hour Hazardous Waste Site Operations<br />

(HAZWOPER) tra<strong>in</strong><strong>in</strong>g, 2007<br />

• OSHA 8-hour HAZWOPER Refresher tra<strong>in</strong><strong>in</strong>g, 2008<br />

• Site Remediation Basics course through Rutgers<br />

University and the New Jersey Agricultural<br />

Experim<strong>en</strong>t Station Office of Cont<strong>in</strong>u<strong>in</strong>g Professional<br />

Education, 2008<br />

• Wilderness First Aid and Heartsaver AED Certified<br />

(<strong>in</strong>cludes CPR)


Key <strong>Project</strong>s<br />

Nassau Plateau Bauxite M<strong>in</strong>e ESHIA, Sur<strong>in</strong>ame.<br />

Field geologist that participated <strong>in</strong> the <strong>in</strong>stallation of a<br />

network of piezometers, stream and ra<strong>in</strong> gauges, and a<br />

meteorological station to evaluate the hydrological<br />

characteristics of the Nassau Plateau. Provided field<br />

tra<strong>in</strong><strong>in</strong>g and evaluated the collected of the data to assess<br />

the impacts of the m<strong>in</strong>e <strong>Project</strong> on the hydrological<br />

resources of the Plateau. The work on the <strong>Project</strong> also<br />

<strong>in</strong>cluded the writ<strong>in</strong>g of the geology sections of the ESHIA<br />

and preparation of geological cross sections.<br />

Organized and completed several frac-water<br />

characterization sampl<strong>in</strong>g ev<strong>en</strong>ts at natural gas wells<br />

located with<strong>in</strong> the Marcellus Shale formation for a<br />

confid<strong>en</strong>tial cli<strong>en</strong>t. Duties <strong>in</strong>cluded coord<strong>in</strong>ation with<br />

onsite contractors to determ<strong>in</strong>e appropriate sample<br />

<strong>in</strong>tervals, sample collection and logistical correspond<strong>en</strong>ce<br />

with an analytical laboratory for submission and analysis<br />

of time-s<strong>en</strong>sitive characterization parameters.<br />

Lead geologist for an extraction well <strong>in</strong>stallation at a<br />

New Jersey Superfund Site conta<strong>in</strong><strong>in</strong>g LNAPL <strong>in</strong>clud<strong>in</strong>g<br />

PCB’s. Reviewed and compared previous soil logg<strong>in</strong>g<br />

and laser-<strong>in</strong>duced fluoresc<strong>en</strong>ce (LIF) data to observations<br />

conducted dur<strong>in</strong>g drill<strong>in</strong>g to determ<strong>in</strong>e appropriate well<br />

construction.<br />

Field geologist for a Phase II Environm<strong>en</strong>tal Assessm<strong>en</strong>t<br />

for a due dilig<strong>en</strong>ce effort <strong>in</strong>volv<strong>in</strong>g a P<strong>en</strong>nsylvania<br />

landfill land acquisition. The work <strong>in</strong>cluded soil<br />

sampl<strong>in</strong>g, monitor<strong>in</strong>g well <strong>in</strong>stallation and sampl<strong>in</strong>g,<br />

field survey oversight and preparation of a Phase II<br />

Environm<strong>en</strong>tal Site Assessm<strong>en</strong>t report.<br />

Completed soil gas and Summa canister ambi<strong>en</strong>t air and<br />

sub-slab vapor sampl<strong>in</strong>g at a northern New Jersey site to<br />

monitor performance of a biosparg<strong>in</strong>g system. Used a<br />

TVA 1000 meter, a comb<strong>in</strong>ed PID and FID.<br />

<strong>Project</strong> geologist for a site <strong>in</strong>vestigation effort at an<br />

aerosol products manufactur<strong>in</strong>g facility <strong>in</strong> Bucks County,<br />

PA. Completed docum<strong>en</strong>t review, oversight of soil<br />

bor<strong>in</strong>g <strong>in</strong>stallation, soil sampl<strong>in</strong>g, and oversight of<br />

monitor<strong>in</strong>g well <strong>in</strong>stallation, ground water sampl<strong>in</strong>g and<br />

att<strong>en</strong>ded cli<strong>en</strong>t meet<strong>in</strong>gs.<br />

Field geologist for a site <strong>in</strong>vestigation of a former<br />

manufactur<strong>in</strong>g facility <strong>in</strong> eastern West Virg<strong>in</strong>ia.<br />

Supervised the <strong>in</strong>stallation of sub-slab vapor monitor<strong>in</strong>g<br />

po<strong>in</strong>ts and soil bor<strong>in</strong>gs. Sampled sub-slab soil gas and<br />

soil and provided oversight of subcontractor cleanup<br />

activities.<br />

Lead field geologist for a Brownfields Redevelopm<strong>en</strong>t<br />

project <strong>in</strong> New Jersey. Field activities have <strong>in</strong>cluded<br />

us<strong>in</strong>g GPS to locate and mark sampl<strong>in</strong>g locations with<strong>in</strong><br />

a 10+ acre site, <strong>in</strong>stallation and sample collection of 40+<br />

soil vapor po<strong>in</strong>ts with<strong>in</strong> a former landfill, and collection<br />

of 20+ ground water samples follow<strong>in</strong>g New Jersey DEP<br />

low-flow guidel<strong>in</strong>es.<strong>Project</strong> geologist for a real estate<br />

purchase due dilig<strong>en</strong>ce <strong>in</strong>vestigation focus<strong>in</strong>g on USTs <strong>in</strong><br />

Baltimore, MD. Supervised soil bor<strong>in</strong>g <strong>in</strong>stallation and<br />

collected soil samples. Wrote field related portions of<br />

Phase II letter report and created soil bor<strong>in</strong>g logs and<br />

table of sample analysis. Field activities and report were<br />

completed <strong>in</strong> less than one week <strong>in</strong> order to allow real<br />

estate transfer to proceed on schedule.<br />

Provided technical support and supervised subcontractor<br />

replacem<strong>en</strong>t of a packer system <strong>in</strong> a ground water well at<br />

a NPL Superfund site <strong>in</strong> eastern P<strong>en</strong>nsylvania.<br />

Field geologist for a rout<strong>in</strong>e round of ground water<br />

sampl<strong>in</strong>g at a chemical plant <strong>in</strong> Chester County, PA.<br />

Field methods <strong>in</strong>cluded the use of a PID for VOC level<br />

scre<strong>en</strong><strong>in</strong>g, collection of ground water samples by the<br />

low-flow method us<strong>in</strong>g a peristaltic pump and<br />

decontam<strong>in</strong>ation of equipm<strong>en</strong>t betwe<strong>en</strong> sampl<strong>in</strong>g po<strong>in</strong>ts.<br />

Facility required adher<strong>en</strong>ce to specific safety protocol.<br />

Ground water samples were analyzed for metals, VOCs<br />

and SVOCs.<br />

Performed subcontractor oversight and soil sampl<strong>in</strong>g<br />

dur<strong>in</strong>g excavation of dra<strong>in</strong> l<strong>in</strong>es at a Superfund site <strong>in</strong><br />

Virg<strong>in</strong>ia. Duties <strong>in</strong>cluded direction of excavation<br />

activities, <strong>en</strong>forced adher<strong>en</strong>ce to health and safety<br />

protocol and QA/QC observation.<br />

Field geologist for an LNAPL plume del<strong>in</strong>eation project<br />

at a coal burn<strong>in</strong>g power plant <strong>in</strong> Delaware. The project<br />

utilized LIF technology coupled with direct push drill<strong>in</strong>g<br />

to create a near real-time three-dim<strong>en</strong>sional model of the<br />

contam<strong>in</strong>ate plume at the site. Collection of soil samples<br />

and <strong>in</strong>stallation of temporary piezometers was<br />

completed to verify the LIF results.<br />

Installed and ma<strong>in</strong>ta<strong>in</strong>ed monitor<strong>in</strong>g equipm<strong>en</strong>t,<br />

collected data and reported f<strong>in</strong>d<strong>in</strong>gs from surface water<br />

and groundwater <strong>in</strong>vestigations at locations throughout<br />

Kansas and Alaska. Equipm<strong>en</strong>t used <strong>in</strong>cludes Rio<br />

Grande Acoustic Doppler Curr<strong>en</strong>t Profiler (ADCP),<br />

various submersible and non-submersible pressure<br />

transducers, Sutron and Campbell Sci<strong>en</strong>tific dataloggers<br />

and field survey<strong>in</strong>g equipm<strong>en</strong>t.<br />

4/20/2011 14-LUNA 2011.DOC


James G. Nalv<strong>en</strong><br />

Environm<strong>en</strong>tal Compliance, Hydrogeologist<br />

James Nalv<strong>en</strong> is a Consultant with<strong>in</strong> ERM based <strong>in</strong><br />

D<strong>en</strong>ver, Colorado. Mr. Nalv<strong>en</strong> has more than 30 years<br />

experi<strong>en</strong>ce <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal compliance, hydrogeology<br />

and <strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t. Much of this<br />

experi<strong>en</strong>ce has <strong>in</strong>volved natural resource projects and<br />

companies. He has ext<strong>en</strong>sive m<strong>in</strong><strong>in</strong>g experi<strong>en</strong>ce <strong>in</strong> coal,<br />

gold, copper, molybd<strong>en</strong>um, iron, aggregates, lithium,<br />

lead/z<strong>in</strong>c, chromium, uranium, phosphate, and talc<br />

m<strong>in</strong>es and process<strong>in</strong>g facilities. Other <strong>in</strong>dustrial related<br />

activities <strong>in</strong>clude work at fertilizer plants, power plants,<br />

secondary lead smelter, hazardous waste landfill,<br />

pesticide plant, petroleum facilities, dams, and real estate<br />

developm<strong>en</strong>ts.<br />

Mr. Nalv<strong>en</strong> has worked <strong>in</strong> a wide variety of<br />

<strong>en</strong>vironm<strong>en</strong>tal and hydrologic areas. These <strong>in</strong>clude<br />

water supply, water rights, ground water contam<strong>in</strong>ation,<br />

hydrologic monitor<strong>in</strong>g, geophysics, hydrologic portions<br />

of <strong>en</strong>vironm<strong>en</strong>tal assessm<strong>en</strong>t projects and hydrologic<br />

aspects of permitt<strong>in</strong>g. Participated and managed<br />

<strong>en</strong>vironm<strong>en</strong>tal portions of merger and acquisitions<br />

reviews by large m<strong>in</strong><strong>in</strong>g company. For a major m<strong>in</strong><strong>in</strong>g<br />

corporation, Mr. Nalv<strong>en</strong> was the hydrologist for the coal<br />

and copper divisions, the chief <strong>en</strong>vironm<strong>en</strong>tal <strong>en</strong>g<strong>in</strong>eer<br />

for the coal division and corporate manager of<br />

<strong>en</strong>vironm<strong>en</strong>tal compliance. He has also provided<br />

consult<strong>in</strong>g services, primarily provid<strong>in</strong>g hydrologic and<br />

<strong>en</strong>vironm<strong>en</strong>tal compliance services to m<strong>in</strong><strong>in</strong>g companies.<br />

Mr. Nalv<strong>en</strong> sp<strong>en</strong>t more than four years work<strong>in</strong>g for a<br />

very large copper/z<strong>in</strong>c m<strong>in</strong>e <strong>in</strong> Peru where he was <strong>in</strong><br />

charge of <strong>en</strong>vironm<strong>en</strong>tal compliance as well as head<strong>in</strong>g a<br />

one-year water managem<strong>en</strong>t and ground water study.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Professional Affiliations & Registrations<br />

National Ground Water Association<br />

American Water Works Association<br />

Environm<strong>en</strong>tal Audit<strong>in</strong>g Roundtable<br />

Association of Eng<strong>in</strong>eer<strong>in</strong>g Geologists<br />

Society for M<strong>in</strong><strong>in</strong>g, Metallurgy and Exploration<br />

Colorado M<strong>in</strong><strong>in</strong>g Association<br />

Fields of Compet<strong>en</strong>ce<br />

Environm<strong>en</strong>tal compliance managem<strong>en</strong>t and audits<br />

Environm<strong>en</strong>tal program managem<strong>en</strong>t<br />

Water balance studies<br />

Coal m<strong>in</strong>e permit preparation and submittal<br />

Managem<strong>en</strong>t of <strong>en</strong>vironm<strong>en</strong>tal aspects of m<strong>in</strong>e due<br />

dilig<strong>en</strong>ce studies<br />

Post-closure option evaluation<br />

Toxic Release Inv<strong>en</strong>tory evaluations<br />

Design of hydrologic monitor<strong>in</strong>g programs<br />

NPDES permitt<strong>in</strong>g<br />

Developm<strong>en</strong>t and managem<strong>en</strong>t of large hydrologic<br />

databases<br />

M<strong>in</strong>e <strong>in</strong>flow studies<br />

Ground water contam<strong>in</strong>ation studies<br />

Design, supervision and <strong>in</strong>terpretation of pump<strong>in</strong>g<br />

and slug test data


Education<br />

M.S., Applied Geology, R<strong>en</strong>sselaer Polytechnic<br />

Institute, 1972.<br />

B.S., Geology, R<strong>en</strong>sselaer Polytechnic Institute, 1971<br />

Creat<strong>in</strong>g, Conduct<strong>in</strong>g and Evaluat<strong>in</strong>g Environm<strong>en</strong>tal<br />

Compliance Audits short course—Executive<br />

Enterprises<br />

Environm<strong>en</strong>tal Audit<strong>in</strong>g Advanced Workshop—<br />

Governm<strong>en</strong>t Institutes<br />

Design of Water Quality Monitor<strong>in</strong>g Networks short<br />

course—Colorado State University<br />

Toxic Release Inv<strong>en</strong>tory Tra<strong>in</strong><strong>in</strong>g for New Industries<br />

(multiple courses)—USEPA<br />

Radiation Safety Officer Tra<strong>in</strong><strong>in</strong>g—Applied Health<br />

Physics<br />

Languages<br />

English, native speaker<br />

Spanish<br />

Key Industry Sectors<br />

M<strong>in</strong><strong>in</strong>g<br />

Publications<br />

Toxic Release Inv<strong>en</strong>tory Report<strong>in</strong>g and Consequ<strong>en</strong>ces for a<br />

Typical Gold M<strong>in</strong><strong>in</strong>g Facility, SME Annual Meet<strong>in</strong>g,<br />

D<strong>en</strong>ver, Colorado, 1999<br />

Tight<strong>en</strong> My Discharge Limits (TMDL): NPDES R<strong>en</strong>ewals<br />

Under the TMDL Program, National Western M<strong>in</strong><strong>in</strong>g<br />

Confer<strong>en</strong>ce, Colorado Spr<strong>in</strong>gs, Colorado, 2000<br />

(Pres<strong>en</strong>tation)<br />

Key <strong>Project</strong>s<br />

Managed large surface and ground water monitor<strong>in</strong>g<br />

program to ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g compliance at a copper/z<strong>in</strong>c<br />

m<strong>in</strong>e. In three years compliance improved from 85% to<br />

greater than 99%. Also performed g<strong>en</strong>eral hydrologic<br />

services, <strong>in</strong>clud<strong>in</strong>g permitt<strong>in</strong>g, m<strong>in</strong>e closure analyses,<br />

water supply, water managem<strong>en</strong>t and water disposal<br />

options review at a m<strong>in</strong>e, port and camp <strong>in</strong> Peru.<br />

Tra<strong>in</strong>ed staff and technicians <strong>in</strong> water data analysis and<br />

managem<strong>en</strong>t and water sampl<strong>in</strong>g methodologies.<br />

Conducted over 60 <strong>en</strong>vironm<strong>en</strong>tal audits <strong>in</strong> over 20 states<br />

and three foreign countries, primarily of coal and metal<br />

m<strong>in</strong><strong>in</strong>g, and m<strong>in</strong>eral process<strong>in</strong>g facilities.<br />

Developed and managed <strong>en</strong>vironm<strong>en</strong>tal audit<strong>in</strong>g<br />

program for large coal, metal and gold m<strong>in</strong><strong>in</strong>g company.<br />

Performed <strong>en</strong>vironm<strong>en</strong>tal due dilig<strong>en</strong>ce studies of coal<br />

m<strong>in</strong>es <strong>in</strong> New Mexico, Indiana, Colorado and Canada, a<br />

proposed base metal/gold m<strong>in</strong>e <strong>in</strong> Ma<strong>in</strong>e, metal<br />

process<strong>in</strong>g facility <strong>in</strong> New Jersey, iron m<strong>in</strong>es <strong>in</strong><br />

M<strong>in</strong>nesota and Perú and petroleum production facilities<br />

<strong>in</strong> Texas and Louisiana.<br />

Prepared Toxic Release Inv<strong>en</strong>tory evaluations for m<strong>in</strong><strong>in</strong>g<br />

and mill<strong>in</strong>g facilities, <strong>in</strong>clud<strong>in</strong>g copper, molybd<strong>en</strong>um,<br />

gold and coal facilities and provided TRI tra<strong>in</strong><strong>in</strong>g at some<br />

of the facilities.<br />

Performed a Global Report<strong>in</strong>g Initiative assurance review<br />

of a large gold m<strong>in</strong>e <strong>in</strong> Perú.<br />

As part of the Colorado M<strong>in</strong><strong>in</strong>g Association Coal<br />

Committee, was active <strong>in</strong> negotiations with the state<br />

lead<strong>in</strong>g to revisions of the coal m<strong>in</strong><strong>in</strong>g regulations.<br />

Conducted hydrology <strong>in</strong>vestigations for due dilig<strong>en</strong>ce<br />

studies of large copper m<strong>in</strong><strong>in</strong>g and process<strong>in</strong>g facilities <strong>in</strong><br />

Arizona.<br />

Worked with cyanide related issues at gold heap leach<br />

operations, gold tail<strong>in</strong>g operations, copper operations<br />

and molybd<strong>en</strong>um operations. These <strong>in</strong>cluded <strong>in</strong>cid<strong>en</strong>t<br />

studies, <strong>en</strong>vironm<strong>en</strong>tal managem<strong>en</strong>t reviews,<br />

<strong>en</strong>vironm<strong>en</strong>tal audits and due dilig<strong>en</strong>ce reviews.<br />

Performed the hydrogeologic portion of a Phase II study<br />

of a major airport <strong>in</strong> Bolivia.<br />

5/16/2011 NALVEN 2011-01MIN.DOC


Performed a f<strong>in</strong>al <strong>en</strong>vironm<strong>en</strong>tal review of a proposed<br />

gold m<strong>in</strong>e <strong>in</strong> New Zealand prior to the company<br />

approv<strong>in</strong>g the project.<br />

Performed basel<strong>in</strong>e hydrologic monitor<strong>in</strong>g and analyses<br />

for uranium m<strong>in</strong><strong>in</strong>g, coal m<strong>in</strong><strong>in</strong>g and coal gasification<br />

projects <strong>in</strong> the western United States.<br />

Reviewed <strong>en</strong>vironm<strong>en</strong>tal, reclamation and closure<br />

portions of feasibility studies for two proposed m<strong>in</strong>es <strong>in</strong><br />

Mongolia. Reviewed and updated closure plan for large<br />

coal m<strong>in</strong>e <strong>in</strong> Colombia.<br />

Oversaw and conducted negotiations with the M<strong>in</strong>nesota<br />

<strong>en</strong>vironm<strong>en</strong>tal ag<strong>en</strong>cies lead<strong>in</strong>g to the successful<br />

acquisition and re-permitt<strong>in</strong>g of the <strong>en</strong>vironm<strong>en</strong>tally<br />

s<strong>en</strong>sitive and bankrupt Reserve M<strong>in</strong><strong>in</strong>g property.<br />

Revised m<strong>in</strong>e <strong>in</strong>flow estimates and hydrologic portion of<br />

a coal m<strong>in</strong>e permit.<br />

Participated as the m<strong>in</strong><strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal expert on a<br />

team evaluat<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance recovery<br />

pot<strong>en</strong>tial for a large m<strong>in</strong><strong>in</strong>g company.<br />

Provided the technical support for and expert testimony<br />

before the Colorado Water Quality Control Commission<br />

that successfully led to requested changes <strong>in</strong> the stream<br />

standards at a coal m<strong>in</strong>e.<br />

Developed and ma<strong>in</strong>ta<strong>in</strong>ed a water quality database and<br />

report<strong>in</strong>g procedures for five coal properties and a<br />

molybd<strong>en</strong>um m<strong>in</strong>e that <strong>en</strong>abled timely and accurate<br />

completion of six hydrology reports per year.<br />

Evaluated hydrologic data and produced m<strong>in</strong>e <strong>in</strong>flow<br />

estimates for an underground base metal m<strong>in</strong>e <strong>in</strong> Mexico.<br />

Performed 3rd party <strong>en</strong>vironm<strong>en</strong>tal audits of waste<br />

handl<strong>in</strong>g companies.<br />

Performed surface water quality mass-balance model<strong>in</strong>g<br />

for closure issues related to two m<strong>in</strong>es <strong>in</strong> the Rocky<br />

Mounta<strong>in</strong> west.<br />

Managed the m<strong>in</strong>e plann<strong>in</strong>g, geology and <strong>en</strong>vironm<strong>en</strong>tal<br />

aspects of a tar sand exploration project <strong>in</strong> Utah.<br />

Performed a water supply and water balance study for a<br />

large op<strong>en</strong> pit copper m<strong>in</strong>e <strong>in</strong> Arizona and water balance<br />

studies of a secondary lead smelter, underground coal<br />

m<strong>in</strong>e and pesticide plant.<br />

Developed ground water and <strong>in</strong>filtration gallery water<br />

supplies for m<strong>in</strong>es and real estate developm<strong>en</strong>ts <strong>in</strong> the<br />

western and southeastern United States.<br />

Evaluated ground water impacts of phosphate m<strong>in</strong><strong>in</strong>g<br />

gypsum stacks <strong>in</strong> Florida.<br />

Developed monitor<strong>in</strong>g programs to evaluate ground<br />

water impacts of an electronics manufactur<strong>in</strong>g facility <strong>in</strong><br />

Florida, a nitrate plant <strong>in</strong> Indiana and a chromate<br />

process<strong>in</strong>g facility <strong>in</strong> New Jersey.<br />

Decommissioned a pond used to store the water and<br />

sludge from test<strong>in</strong>g a well with radioactive water.<br />

Subsequ<strong>en</strong>tly, was able to dispose of the sludge on-site<br />

successfully term<strong>in</strong>at<strong>in</strong>g the radioactive materials lic<strong>en</strong>se.<br />

Designed and supervised drill<strong>in</strong>g program to assist <strong>in</strong> the<br />

evaluation of ground water contam<strong>in</strong>ation from a landfill<br />

and the evaluation of saltwater <strong>in</strong>trusion on Long Island,<br />

New York.<br />

Performed m<strong>in</strong>e dewater<strong>in</strong>g and m<strong>in</strong>e discharge studies<br />

for exist<strong>in</strong>g and proposed facilities <strong>in</strong> Louisiana,<br />

Colorado, and Wyom<strong>in</strong>g.<br />

Designed, performed and <strong>in</strong>terpreted pump<strong>in</strong>g tests and<br />

evaluated the long term yield of municipal wells <strong>in</strong><br />

unconsolidated material, sedim<strong>en</strong>tary formations and<br />

fracture controlled formations throughout the United<br />

States.<br />

Performed numerous pump<strong>in</strong>g tests and was the on-site<br />

hydrogeologist on the construction of a number of water<br />

wells rang<strong>in</strong>g from 50 to 2200 feet deep<br />

5/16/2011 NALVEN 2011-01MIN.DOC


George A. Krallis, Ph.D.<br />

Dr. George A. Krallis provides consult<strong>in</strong>g services to cli<strong>en</strong>ts<br />

for water resource managem<strong>en</strong>t and optimization from the<br />

standpo<strong>in</strong>t of <strong>en</strong>vironm<strong>en</strong>tal, ecological, and economic<br />

b<strong>en</strong>efit. He is curr<strong>en</strong>tly perform<strong>in</strong>g hydraulic, hydrologic,<br />

and <strong>en</strong>vironm<strong>en</strong>tal impact assessm<strong>en</strong>t studies for electric<br />

utilities, m<strong>in</strong><strong>in</strong>g, and oil & gas <strong>in</strong>dustries. He is also active <strong>in</strong><br />

the application of the latest hydrodynamic, transport, and<br />

fate models to assess the impact of thermal, sedim<strong>en</strong>t, and<br />

pollutant discharges on aquatic resources <strong>in</strong> estuaries, rivers,<br />

lakes, and reservoirs.<br />

Some of the models used are<br />

• GEMSS ® ,<br />

• GLLVHT,<br />

• CE-QUAL-W2,<br />

• HEC-HMS,<br />

• HEC-RAS,<br />

• WSPRO,<br />

• PSRM,<br />

• TR-20,<br />

• TR-55,<br />

• SWMM,<br />

• DR3M,<br />

• KYPIPE,<br />

• CE-QUAL-R1,<br />

• RIV1,<br />

• QUAL-2E,<br />

• CORMIX.<br />

Registration<br />

• Professional Eng<strong>in</strong>eer (Civil) Massachusetts, 1994<br />

• Professional Hydrologist, American Institute of Hydrology, 2004<br />

Fields of Compet<strong>en</strong>ce<br />

• Hydraulic and Hydrologic studies<br />

• Hydraulic and Hydrologic model<strong>in</strong>g<br />

• Water Quality<br />

• Sedim<strong>en</strong>t transport<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Education<br />

• Ph.D. (Civil Eng<strong>in</strong>eer<strong>in</strong>g), Lehigh University,<br />

Bethlehem, P<strong>en</strong>nsylvania<br />

• M.S. (Civil Eng<strong>in</strong>eer<strong>in</strong>g), The P<strong>en</strong>nsylvania State<br />

University, University Park, P<strong>en</strong>nsylvania<br />

• B.S. (Civil Eng<strong>in</strong>eer<strong>in</strong>g), Lehigh University, Bethlehem,<br />

P<strong>en</strong>nsylvania<br />

Key <strong>Project</strong>s<br />

Suralco Nassau Plateau Bauxite M<strong>in</strong>e, Sur<strong>in</strong>ame.<br />

Performed hydrology and stream flow assessm<strong>en</strong>t<br />

for streams feed<strong>in</strong>g Paramaka Creek. Evaluated<br />

effects of water reallocation on stream habitat and<br />

completed water managem<strong>en</strong>t alternatives analysis.<br />

Evaluated field data collection network and<br />

performed QA/QC on data. Developed<br />

precipitation statistical analysis.<br />

Guyana Goldfields Inc, Guyana. Proposed<br />

developm<strong>en</strong>t of m<strong>in</strong><strong>in</strong>g operations on the Cuyuni<br />

River <strong>in</strong> Guyana. ERM is prepar<strong>in</strong>g <strong>en</strong>vironm<strong>en</strong>tal<br />

and social impact managem<strong>en</strong>t plans and guidel<strong>in</strong>es<br />

for closure plans for the facilities that conform to IFC<br />

Performance Standards, Guyana Environm<strong>en</strong>tal<br />

Protection Ag<strong>en</strong>cy (EPA) guidel<strong>in</strong>es, and regulations<br />

rec<strong>en</strong>tly promulgated by the Guyana Geology and<br />

M<strong>in</strong>es Commission. One aspect of the ongo<strong>in</strong>g project<br />

is to apply predictive model<strong>in</strong>g to determ<strong>in</strong>e the<br />

conc<strong>en</strong>tration and ext<strong>en</strong>t of a pot<strong>en</strong>tial cyanide<br />

plume due to an accid<strong>en</strong>tal cyanide spill from the<br />

m<strong>in</strong><strong>in</strong>g facility and to assess pot<strong>en</strong>tial impacts to<br />

surround<strong>in</strong>g aquatic habitats due to the accid<strong>en</strong>tal<br />

spill. The analysis uses the 1-D hydrodynamic and<br />

transport module of GEMSS ® .<br />

El Cerrejon Coal M<strong>in</strong>e Expansion <strong>Project</strong>,<br />

Colombia. The primary objective of this project was<br />

to review the Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>t report and other related docum<strong>en</strong>ts for<br />

the proposed m<strong>in</strong>e expansion. The expansion<br />

<strong>in</strong>volves the relocation of approximately 20 km of the<br />

Rancheria River. ERM reviewed the docum<strong>en</strong>ts for<br />

adequacy and compliance with <strong>in</strong>ternational best<br />

managem<strong>en</strong>t practices (IFC and Equator Pr<strong>in</strong>ciples)<br />

and Colombian regulations and standards. ERM


id<strong>en</strong>tified gaps <strong>in</strong> the docum<strong>en</strong>ts, conclusions not supported<br />

by the ESIA, and conclusions not supported by <strong>in</strong>ternational<br />

best practices. ERM also provided recomm<strong>en</strong>dations regard<strong>in</strong>g<br />

additional field studies, model calibration, managem<strong>en</strong>t and<br />

monitor<strong>in</strong>g programs, and action plans to meet <strong>in</strong>ternational<br />

standards.<br />

Pacific Hydro, Chile. ERM performed a third party review of<br />

the 110 MW Chacayes Hydroelectric Plant <strong>in</strong> Chile, based on<br />

IFC Performance Standards, Equator Pr<strong>in</strong>ciples, and Chilean<br />

regulations. Specific tasks <strong>in</strong>cluded evaluation of the<br />

hydrologic and hydraulic <strong>en</strong>vironm<strong>en</strong>tal impact assessm<strong>en</strong>ts<br />

and gap analyses.<br />

Bui Developm<strong>en</strong>t Secretariat, Black Volta River. The<br />

purpose of this project was to assess pot<strong>en</strong>tial <strong>en</strong>vironm<strong>en</strong>tal<br />

impacts associated with the construction and operation of the<br />

Bui <strong>Project</strong>, a hydroelectric dam project located on the Black<br />

Volta River <strong>in</strong> western Ghana. Pot<strong>en</strong>tial water quality and<br />

sedim<strong>en</strong>tation impacts <strong>in</strong> the reservoir, and an un-seasonal<br />

water level regime <strong>in</strong> the river downstream were id<strong>en</strong>tified as<br />

issues that warranted further <strong>in</strong>vestigation. ERM undertook<br />

basic reservoir and downstream river model<strong>in</strong>g studies to<br />

quantify the nature and ext<strong>en</strong>t of these pot<strong>en</strong>tial impacts for<br />

pres<strong>en</strong>tation <strong>in</strong> the f<strong>in</strong>al EIA report. Methods <strong>in</strong>cluded HEC-<br />

RAS model<strong>in</strong>g of the downstream reach, a Voll<strong>en</strong>weidertype<br />

assessm<strong>en</strong>t of the eutrophic level of the proposed<br />

reservoir, and a sedim<strong>en</strong>t balance to determ<strong>in</strong>e reservoir<br />

fill<strong>in</strong>g rates.<br />

EIA/SIA Studies, Nam Sane 3 Hydroelectric Power <strong>Project</strong>,<br />

Xi<strong>en</strong>g Khouang Prov<strong>in</strong>ce, Laos PDR. The scope of work for<br />

this project was to perform hydrologic and water quality<br />

assessm<strong>en</strong>ts of this proposed hydroelectric dam and reservoir<br />

<strong>in</strong> Laos. The key hydrologic and water quality impacts<br />

id<strong>en</strong>tified were changes <strong>in</strong> water temperature, dissolved<br />

oxyg<strong>en</strong>, and sedim<strong>en</strong>t <strong>in</strong> the reservoir and <strong>in</strong> the reach<br />

downstream of the powerhouse, as well as the impacts of<br />

changes <strong>in</strong> the flow regime <strong>in</strong> the bypass reach and<br />

downstream of the powerhouse. A m<strong>in</strong>imum riparian release<br />

was proposed <strong>in</strong> the analysis to ma<strong>in</strong>ta<strong>in</strong> exist<strong>in</strong>g aquatic<br />

ecology and mitigate overall <strong>en</strong>vironm<strong>en</strong>tal, health, and<br />

social impacts.<br />

World Bank, Trung Son Reservoir CE-QUAL-W2 Model<br />

Application and Software Tra<strong>in</strong><strong>in</strong>g, Vietnam Trung Son<br />

Reservoir is a proposed hydroelectric power project on the<br />

Trung Son River <strong>in</strong> c<strong>en</strong>tral Vietnam for Vietnam Electric<br />

Utility (EVU). The cli<strong>en</strong>t requested assistance with<br />

developm<strong>en</strong>t and tra<strong>in</strong><strong>in</strong>g with the 2- dim<strong>en</strong>sional<br />

hydrodynamic and water quality model, CE-QUAL-W2. The<br />

goal was to assess the water quality of the proposed reservoir<br />

and the managem<strong>en</strong>t options for clear<strong>in</strong>g the flooded areas.<br />

The technology transfer took place as a 6-day <strong>in</strong>t<strong>en</strong>sive<br />

workshop pres<strong>en</strong>ted <strong>in</strong> Nha Trang, Vietnam. The workshop<br />

achieved two objectives: the model was fully customized to<br />

the Tung Son Reservoir problem def<strong>in</strong>ition, and the cli<strong>en</strong>t<br />

(fifte<strong>en</strong> <strong>en</strong>g<strong>in</strong>eers and sci<strong>en</strong>tists) were tra<strong>in</strong>ed <strong>in</strong> the<br />

use and theory of the model.<br />

Near-field Discharge Model<strong>in</strong>g, Jaguar, Guatemala.<br />

Cool<strong>in</strong>g tower blowdown water from the proposed<br />

Jaguar Energy Power G<strong>en</strong>erat<strong>in</strong>g project <strong>in</strong><br />

Guatemala is to be discharged <strong>in</strong>to La Mora River.<br />

ERM evaluated several prelim<strong>in</strong>ary discharge<br />

structure configurations us<strong>in</strong>g CORMIX as part of the<br />

effort to <strong>en</strong>sure the ESIA meets IFC Performance<br />

Standards and Equator Pr<strong>in</strong>ciples. The simulations<br />

were run to compute the dilution rate and the plume<br />

size (width and l<strong>en</strong>gth) and stream cross section<br />

blockage pot<strong>en</strong>tial for various ambi<strong>en</strong>t flow rates.<br />

The discharge consisted primarily of a thermal<br />

compon<strong>en</strong>t. Results of the simulations consisted of<br />

plume maps and dilution curves for the various<br />

discharge structure designs and ambi<strong>en</strong>t flow rates.<br />

Thermal Discharge Model<strong>in</strong>g, Aguirre Electric<br />

G<strong>en</strong>erat<strong>in</strong>g Station, Jobos Bay, Puerto Rico. The<br />

purpose of this study was to evaluate the impact of<br />

cool<strong>in</strong>g water <strong>in</strong>takes on the <strong>en</strong>tra<strong>in</strong>m<strong>en</strong>t of aquatic<br />

organisms and to estimate the ext<strong>en</strong>t and ori<strong>en</strong>tation<br />

of the thermal plume. A three dim<strong>en</strong>sional<br />

hydrothermal model, GEMSS ® , coupled with ENM<br />

(Entra<strong>in</strong>m<strong>en</strong>t Module), a spreadsheet based<br />

model capable of model<strong>in</strong>g several <strong>en</strong>tra<strong>in</strong>m<strong>en</strong>t<br />

regions, was used to demonstrate the exist<strong>in</strong>g<br />

impacts of the plant operation on the <strong>in</strong>dig<strong>en</strong>ous<br />

population. Analysis of the thermal plume showed<br />

that the discharge was with<strong>in</strong> the EPA, World Bank,<br />

and Puerto Rico Water Quality Standards. The<br />

<strong>en</strong>tra<strong>in</strong>m<strong>en</strong>t study estimated the <strong>in</strong>crease <strong>in</strong> the<br />

species mortality due to the <strong>in</strong>take structure<br />

operation to be as much as 35%.<br />

2011-03 G.KRALLIS


Rom<strong>in</strong>a Aramburu<br />

S<strong>en</strong>ior Environm<strong>en</strong>tal Consultant<br />

Rom<strong>in</strong>a is a S<strong>en</strong>ior Environm<strong>en</strong>tal Consultant with ERM<br />

based <strong>in</strong> the Wash<strong>in</strong>gton DC office with 8 years of<br />

experi<strong>en</strong>ce. She jo<strong>in</strong>ed ERM Peru <strong>in</strong> 2003 and was<br />

transferred to DC <strong>in</strong> 2007.<br />

As an Environm<strong>en</strong>tal Eng<strong>in</strong>eer, Rom<strong>in</strong>a has worked <strong>in</strong><br />

numerous <strong>en</strong>vironm<strong>en</strong>tal, health and socioeconomic<br />

impact assessm<strong>en</strong>ts; <strong>en</strong>vironm<strong>en</strong>tal audits; third party<br />

Equator Pr<strong>in</strong>ciple reviews; and susta<strong>in</strong>able developm<strong>en</strong>t<br />

strategies for projects <strong>in</strong> socio-economically and<br />

<strong>en</strong>vironm<strong>en</strong>tally complex regions (i.e., Offshore and<br />

Coastal Desert, Amazon Ra<strong>in</strong>forest, Middle East). She<br />

has worked for the oil & gas, electricity, hydropower and<br />

m<strong>in</strong><strong>in</strong>g sectors <strong>in</strong> Arg<strong>en</strong>t<strong>in</strong>a, Bolivia, Brasil, Colombia,<br />

Costa Rica, Chile, Ecuador, El Salvador, Guatemala,<br />

Mexico, Nicaragua, Panama, Peru, Iraq and the US.<br />

Her work out of the Wash<strong>in</strong>gton, DC office has be<strong>en</strong><br />

focused on develop<strong>in</strong>g susta<strong>in</strong>able <strong>en</strong>vironm<strong>en</strong>tal and<br />

socioeconomic strategies for project f<strong>in</strong>anc<strong>in</strong>g (i.e., under<br />

Equator Pr<strong>in</strong>ciples and /or IFC Performance Standards)<br />

as well as conduct<strong>in</strong>g ESIA to <strong>in</strong>ternational standards for<br />

the private sector and multilateral <strong>in</strong>stitutions and<br />

provid<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g on Equator Pr<strong>in</strong>ciples and IFC<br />

Performance Standards.<br />

Rom<strong>in</strong>a is flu<strong>en</strong>t <strong>in</strong> English and Spanish.<br />

In addition, Rom<strong>in</strong>a is the Health & Safety Leader for the<br />

Wash<strong>in</strong>gton DC office.<br />

Fields of Compet<strong>en</strong>ce<br />

• Impact Assessm<strong>en</strong>t and Plann<strong>in</strong>g<br />

• Third Party Review – Multilaterals/ F<strong>in</strong>ancial<br />

<strong>in</strong>stitutions<br />

• Environm<strong>en</strong>tal Audits – Due Dilig<strong>en</strong>ce<br />

• Environm<strong>en</strong>tal Managem<strong>en</strong>t Systems (ISO 14000)<br />

• Susta<strong>in</strong>able Developm<strong>en</strong>t<br />

• Conservation of Biodiversity and Natural Resources<br />

Education<br />

• Environm<strong>en</strong>tal Eng<strong>in</strong>eer. Faculty of Sci<strong>en</strong>ce. National<br />

Agrarian University, La Mol<strong>in</strong>a. Lima, Peru.<br />

November 2004 – November 2005. Top 5%. Cum<br />

Laude.<br />

• Specialization Program on Environm<strong>en</strong>tal and Quality<br />

Managem<strong>en</strong>t and Audit<strong>in</strong>g Diploma. National<br />

Agrarian University, La Mol<strong>in</strong>a. Lima, Peru. April -<br />

October 2004. Top 5%.<br />

• Bachelor <strong>in</strong> Sci<strong>en</strong>ce - Environm<strong>en</strong>tal Eng<strong>in</strong>eer<strong>in</strong>g.<br />

Faculty of Sci<strong>en</strong>ce. National Agrarian University, La<br />

Mol<strong>in</strong>a. Lima, Peru. March 1998 - December 2002. Top<br />

5%. Cum Laude.<br />

Languages<br />

• Spanish (native)<br />

• English (flu<strong>en</strong>t)<br />

• Fr<strong>en</strong>ch (conversational)<br />

Memberships<br />

• Peruvian Board of Professional Eng<strong>in</strong>eers (CIP #86284)<br />

• American Chamber of Commerce <strong>in</strong> Lima (AmCham)<br />

• Society of Petroleum Eng<strong>in</strong>eers (# 3437095)<br />

ROMINA ARAMBURU


Key <strong>Project</strong>s<br />

ERM MidAtlantic. S<strong>en</strong>ior Environm<strong>en</strong>tal Consultant.<br />

2007 - pres<strong>en</strong>t<br />

• Lead Environm<strong>en</strong>tal Specialist for an ongo<strong>in</strong>g<br />

Quarterly Indep<strong>en</strong>d<strong>en</strong>t Supervision Monitor<strong>in</strong>g<br />

of an 85 MW Pando and Monte Lirio<br />

Hydropower Plants <strong>in</strong> Chiriqui, Panama,<br />

sponsored by Electron Investm<strong>en</strong>ts S.A. For DEG,<br />

IFC, IDB and CAF. November 2010 – ongo<strong>in</strong>g.<br />

• Environm<strong>en</strong>tal Reviewer for the Environm<strong>en</strong>tal<br />

and Social Due Dilig<strong>en</strong>ce of the 58 MW Bajo Frio<br />

Hydropower <strong>Project</strong> <strong>in</strong> Chiriqui, Panama. DEG,<br />

November 2010.<br />

• Support to the Environm<strong>en</strong>tal and Social Group<br />

at the Inter-American Developm<strong>en</strong>t Bank (IDB)<br />

for private sector projects. S<strong>en</strong>ior review of the<br />

Environm<strong>en</strong>tal and Social Strategy (ESS) prior to<br />

Board approval for the 405-MW Porce IV<br />

Hydropower <strong>Project</strong> <strong>in</strong> Medell<strong>in</strong>, Colombia.<br />

October 2009.<br />

• <strong>Project</strong> Manager for an ongo<strong>in</strong>g Quarterly Third<br />

Party Equator Pr<strong>in</strong>ciple Supervision Monitor<strong>in</strong>g<br />

of a 110 MW Chacayes Hydroelectric Plant <strong>in</strong><br />

Chile, sponsored by Pacific Hydro Chile. Group<br />

of four EPFI’s led by Credit Agricole CIB. April<br />

2009 – ongo<strong>in</strong>g.<br />

• <strong>Project</strong> Manager for an ongo<strong>in</strong>g Quarterly<br />

Indep<strong>en</strong>d<strong>en</strong>t Supervision Monitor<strong>in</strong>g of a 200 km<br />

Red Vial 4 Toll Road from Trujillo to Casma <strong>in</strong><br />

Coastal Peru, sponsored by Odebrecht. CAF and<br />

Credit Agricole CIB. November 2010 – ongo<strong>in</strong>g.<br />

• Environm<strong>en</strong>tal Specialist for an Environm<strong>en</strong>tal<br />

and Social Assessm<strong>en</strong>t of the SIEPAC<br />

Transmission L<strong>in</strong>e <strong>Project</strong> <strong>in</strong> Panama, Guatemala<br />

and El Salvador aga<strong>in</strong>st IDB Safeguard Policies.<br />

IDB – ESG, September 2010.<br />

• Lead Tra<strong>in</strong>er on Equator Pr<strong>in</strong>ciples and IFC<br />

Performance Standards for CIFI Staff. CIFI,<br />

November 2010.<br />

• Lead Tra<strong>in</strong>er on IFC Performance Standards for<br />

OPIC Staff with focus on PS3 Pollution<br />

Prev<strong>en</strong>tion and Abatem<strong>en</strong>t and PS6 Biodiversity.<br />

OPIC, September 2010.<br />

• <strong>Project</strong> Manager for provid<strong>in</strong>g support <strong>in</strong> the<br />

Review of Annual Monitor<strong>in</strong>g Reports (AMRs) <strong>in</strong><br />

the Global Manufactur<strong>in</strong>g Departm<strong>en</strong>t. IFC,<br />

August 2010.<br />

• Updated l<strong>en</strong>der Due Dilig<strong>en</strong>ce Assessm<strong>en</strong>t<br />

aga<strong>in</strong>st Peruvian Regulations and Equator<br />

Pr<strong>in</strong>ciples for 520-MW Gas-Fired F<strong>en</strong>ix Power<br />

Plant <strong>in</strong> Chilca, Peru. July 2010.<br />

• <strong>Project</strong> Manager for the Developm<strong>en</strong>t of IFC’s<br />

F<strong>in</strong>ancial Intermediaries (FI) Website Cont<strong>en</strong>t for<br />

a Susta<strong>in</strong>ability Toolkit for IFC’s cli<strong>en</strong>ts. IFC,<br />

May 2010.<br />

• <strong>Project</strong> Manager for a Corporate Susta<strong>in</strong>ability<br />

B<strong>en</strong>chmark<strong>in</strong>g Study of the IFC and World Bank<br />

aga<strong>in</strong>st 10 similar organizations. World Bank<br />

Group. April 2010.<br />

• Environm<strong>en</strong>tal specialist for a Third Party<br />

Equator Pr<strong>in</strong>ciple Review aga<strong>in</strong>st IFC<br />

Performance Standards for a 2400-MW Ituango<br />

Hydropower Plan and Dam <strong>in</strong> Medell<strong>in</strong>,<br />

Colombia. Grupo Santander. March 2010.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple Review aga<strong>in</strong>st IFC Performance<br />

Standards for a large Wastewater Treatm<strong>en</strong>t Plant<br />

<strong>in</strong> Atotonilco de Hidalgo, Mexico. Credit Agricole<br />

– CIB. March 2010.<br />

• <strong>Project</strong> Manager for an Environm<strong>en</strong>tal and Social<br />

Due Dilig<strong>en</strong>ce and Risk Assessm<strong>en</strong>t for a for a<br />

750-MW Hydropower Plant and Dam <strong>in</strong><br />

Ayacucho, Peru. Norsk Hydro. February 2010.<br />

• <strong>Project</strong> Manager for a Gap Analysis and Action<br />

Plan aga<strong>in</strong>st Equator Pr<strong>in</strong>ciple and IFC<br />

Performance Standards for a Hydropower Plant<br />

and Dam <strong>in</strong> Ayacucho, Peru and Prelim<strong>in</strong>ary<br />

Social Risk Assessm<strong>en</strong>t. Norsk Hydro. November<br />

2009.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple Review for the Red Vial 4 Highway <strong>in</strong><br />

Peru. Calyon and CAF. October 2009.<br />

• <strong>Project</strong> Manager for an Environm<strong>en</strong>tal and Social<br />

Bankability Assessm<strong>en</strong>t prior to the Third Party<br />

Review aga<strong>in</strong>st Equator Pr<strong>in</strong>ciples for the<br />

f<strong>in</strong>anc<strong>in</strong>g of 150-km Megantoni Loop from<br />

Malv<strong>in</strong>as to Kepashiato <strong>in</strong> Peru and Tra<strong>in</strong><strong>in</strong>g<br />

Workshop on Equator Pr<strong>in</strong>ciples and IFC<br />

Performance Standards. Transportadora de Gas<br />

del Peru. June 2009.<br />

• Support to the Environm<strong>en</strong>tal and Social Group<br />

at the Inter-American Developm<strong>en</strong>t Bank (IDB)<br />

for public sector projects. Developed the<br />

30.11.10 ROMINA ARAMBURU


Environm<strong>en</strong>tal and Social Managem<strong>en</strong>t Report<br />

(ESMR) for the Misicuni Power Plant <strong>in</strong><br />

Cochabamba, Bolivia and the ESMR for the Coca<br />

Codo S<strong>in</strong>clair Hydropower Plant <strong>in</strong> Ecuador.<br />

October 2009.<br />

• Support to the World Bank <strong>in</strong> facilitat<strong>in</strong>g and<br />

develop<strong>in</strong>g a Toolkit “Towards Susta<strong>in</strong>able<br />

Decommission<strong>in</strong>g of Oil Fields and M<strong>in</strong>es: A<br />

Toolkit to Assist Governm<strong>en</strong>t Ag<strong>en</strong>cies” and<br />

stakeholder workshops for <strong>in</strong>put and<br />

improvem<strong>en</strong>t. The World Bank. January 2009 –<br />

ongo<strong>in</strong>g.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple Review and IFC Performance Standard<br />

compliance for a Thermal Power Plant <strong>in</strong><br />

Panama. G<strong>en</strong>eradora del Atlántico (GENA). June<br />

2009 - ongo<strong>in</strong>g.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple Review and IFC Performance Standard<br />

of a Dam and Hydroelectric Plant <strong>in</strong> Nicaragua.<br />

IFC and EGENICSA. June 2009 - ongo<strong>in</strong>g.<br />

• Advisor for the ESIA of an Ammonium Nitrate<br />

Plant <strong>in</strong> San Juan de Marcona, Peru to <strong>en</strong>sure<br />

compliance with Equator Pr<strong>in</strong>ciples and IFC<br />

Performance Standards. Orica M<strong>in</strong><strong>in</strong>g. June 2009.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple Review of 110 MW Chacayes<br />

Hydroelectric Plant <strong>in</strong> Chile, sponsored by Pacific<br />

Hydro Chile. Group of six EPFI’s. November 2008<br />

– April 2009.<br />

• Lead Tra<strong>in</strong>er on Equator Pr<strong>in</strong>ciples and IFC<br />

Performance Standards for several large m<strong>in</strong>es <strong>in</strong><br />

Chile, <strong>in</strong>clud<strong>in</strong>g K<strong>in</strong>ross, Barrick and Cerro<br />

Casale. March 2009.<br />

• Environm<strong>en</strong>tal Lead for an Environm<strong>en</strong>tal and<br />

Socioeconomic Basel<strong>in</strong>e Study <strong>in</strong> Northwest Iraq.<br />

Confid<strong>en</strong>tial cli<strong>en</strong>t. February 2009 – pres<strong>en</strong>t.<br />

• Research consultant for an Ecological Restoration<br />

and Remediation Plan <strong>in</strong> Block 8, Northern<br />

Amazon Region, Peru. Pluspetrol Norte.<br />

December 2008 – January 2009.<br />

• Lead Auditor for a Phase I Environm<strong>en</strong>tal Audit<br />

to HGM <strong>in</strong> Lima Peru for HP worldwide.<br />

Hewlett-Packard. October 2008.<br />

• <strong>Project</strong> Manager for the developm<strong>en</strong>t of an Air<br />

Dispersion model<strong>in</strong>g (AERMOD) and Sea Water<br />

Thermal Model<strong>in</strong>g (CORMIX) for a 520MW gas<br />

fired power plant <strong>in</strong> Chilca, Peru. F<strong>en</strong>ix Power<br />

Peru S.A. August 2008 – October 2008.<br />

• <strong>Project</strong> Manager for a Third Party Equator<br />

Pr<strong>in</strong>ciple review of the ESIA of a 520MW gas<br />

fired power plant <strong>in</strong> Chilca, Peru under IFC PS,<br />

Equator Pr<strong>in</strong>ciples and Peruvian regulations.<br />

F<strong>en</strong>ix Power Peru S.A. July 2008 – October 2008.<br />

• <strong>Project</strong> Manager for an Environm<strong>en</strong>tal and Social<br />

Impact Assessm<strong>en</strong>t of a 300MW Coal Fired Power<br />

Plant <strong>in</strong> Guatemala – <strong>Project</strong> Jaguar <strong>in</strong><br />

coord<strong>in</strong>ation with a Guatemalan consultant,<br />

ERM’s role was to <strong>en</strong>sure the ESIA meets IFC<br />

Performance Standards and Equator Pr<strong>in</strong>ciples.<br />

AEI Services LLC. March 2008 – March 2009.<br />

• <strong>Project</strong> Manager for the developm<strong>en</strong>t of an<br />

Environm<strong>en</strong>tal and Social Managem<strong>en</strong>t<br />

Framework (ESMF) for the Information<br />

Technology Industry Developm<strong>en</strong>t <strong>in</strong> Mexico,<br />

under World Bank Operational Policy standards.<br />

The World Bank Group. October 2007 – May<br />

2008.<br />

• <strong>Project</strong> Manager for the developm<strong>en</strong>t of an<br />

Environm<strong>en</strong>tal and Social Managem<strong>en</strong>t<br />

Framework (ESMF) for the Telecommunication<br />

Sector Modernization <strong>Project</strong> <strong>in</strong> Costa Rica, under<br />

World Bank Operational Policy standards. The<br />

World Bank Group. June 2007 – May 2008.<br />

• Team member for a Third Party ESIA Review and<br />

gap analysis with IFC Performance Standards.<br />

Confid<strong>en</strong>tial Cli<strong>en</strong>t, M<strong>in</strong><strong>in</strong>g Sector Colombia.<br />

December 2007.<br />

• H&S Officer for Technical Assistance <strong>in</strong> Context<br />

of Hydroelectric <strong>Project</strong>s <strong>in</strong> Mexico, La Yesca Site.<br />

For the private sector of the Inter American<br />

Developm<strong>en</strong>t Bank (IDB). November 2007.<br />

• QA/QC review for the Environm<strong>en</strong>tal<br />

Assessm<strong>en</strong>t of n<strong>in</strong>e pa<strong>in</strong>t retail sites <strong>in</strong> Mexico.<br />

Confid<strong>en</strong>tial cli<strong>en</strong>t. October 2007.<br />

• <strong>Project</strong> Manager for Phase I Environm<strong>en</strong>tal<br />

Assessm<strong>en</strong>t under Equator Pr<strong>in</strong>ciples for four<br />

hydroelectric plants <strong>in</strong> La Oroya, Peru.<br />

Confid<strong>en</strong>tial cli<strong>en</strong>t. August 2007.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator for an Environm<strong>en</strong>tal, Social<br />

and Health Impact Assessm<strong>en</strong>t for the Seismic<br />

Exploration <strong>in</strong> Block 104, Northern Amazon<br />

Bas<strong>in</strong>, Peru. ESIA was designed to be IFC<br />

compliant as well as to meet Peruvian<br />

30.11.10 ROMINA ARAMBURU


egulations. ConocoPhillips. January 2007 – May<br />

2008.<br />

ERM Peru. Consultant.<br />

2003 - 2007<br />

• Phase I Environm<strong>en</strong>tal Assessm<strong>en</strong>t for two sites<br />

<strong>in</strong> Talara and Iquitos, Peru. Schlumberger.<br />

February 2007.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator for a Health, Safety,<br />

Environm<strong>en</strong>t (EHS) and Susta<strong>in</strong>able<br />

Developm<strong>en</strong>t (SD) Assessm<strong>en</strong>t and Other<br />

Technical Services <strong>in</strong> Peru; with<strong>in</strong> the assessm<strong>en</strong>t<br />

program for assets <strong>in</strong> Colombia, Peru, Ecuador<br />

and Arg<strong>en</strong>t<strong>in</strong>a. Confid<strong>en</strong>tial cli<strong>en</strong>t. August 2006 –<br />

December 2006.<br />

• Health and Safety Leader for ERM Peru OpCo,<br />

with the follow<strong>in</strong>g activities: H&S tra<strong>in</strong><strong>in</strong>g and<br />

<strong>in</strong>duction; implem<strong>en</strong>t and monitor ERM 33 H&S<br />

Standards; ma<strong>in</strong>ta<strong>in</strong> I&I monthly reports; projects<br />

and fieldwork HASP developm<strong>en</strong>t with <strong>Project</strong><br />

Managers; annual H&S office <strong>in</strong>spection;<br />

coord<strong>in</strong>ation with Global H&S team. June 2006 –<br />

February 2007.<br />

• Team Coord<strong>in</strong>ator for Corporate Advisory<br />

Services (CAS) <strong>in</strong> updat<strong>in</strong>g and improv<strong>in</strong>g<br />

Environm<strong>en</strong>tal Managem<strong>en</strong>t Plans for Camisea<br />

Block 56 <strong>in</strong> accordance with the IADB standards<br />

and comm<strong>en</strong>ts made by local authorities prior to<br />

beg<strong>in</strong>n<strong>in</strong>g operations at Block 56. Pluspetrol Peru<br />

Corporation. May 2006 – September 2006.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator for the EIA of a Sodium<br />

Cyanide Plant <strong>in</strong> Callao. Orica Peru S.A., May<br />

2006 – September 2006.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator to consolidate <strong>in</strong>formation <strong>in</strong><br />

the TGP Cont<strong>in</strong>g<strong>en</strong>cy Action Plans for KP50+900<br />

Vilcabamba, KP126+000 Echarate and KP200+700<br />

Toccate, Peru, based on the agreem<strong>en</strong>t signed<br />

with the IADB. The study <strong>in</strong>cluded the follow<strong>in</strong>g<br />

tasks: (i) Consolidate spill impact assessm<strong>en</strong>ts on<br />

physical factors; (ii) Consolidate spill impact<br />

assessm<strong>en</strong>ts on social factors; (iii) consolidate<br />

cont<strong>in</strong>g<strong>en</strong>cy plan assessm<strong>en</strong>t developed dur<strong>in</strong>g<br />

spillage. Transportadora de Gas del Perú S.A.,<br />

August 2006.<br />

• Auditor for Phase I V<strong>en</strong>dor Due Dilig<strong>en</strong>ce <strong>in</strong> an<br />

Animal Nutrition Premix Plant, with<strong>in</strong> an audit<br />

Program <strong>in</strong> 24 countries, leaded by ERM<br />

Germany. Confid<strong>en</strong>tial cli<strong>en</strong>t. June 2006.<br />

• Pres<strong>en</strong>tation of Mathematical Model for<br />

dispos<strong>in</strong>g of drill<strong>in</strong>g mud and cutt<strong>in</strong>gs at sea and<br />

for mar<strong>in</strong>e seismic noise <strong>in</strong> Block Z-6 <strong>in</strong> order to<br />

obta<strong>in</strong> permits from DICAPI. Petro-Tech Peruana.<br />

June 2006.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator for Participatory Diagnose<br />

Workshops <strong>in</strong> the fieldwork phase for the EIA of<br />

an Exploratory Perforation and 2D - 3D Seismic<br />

Survey <strong>Project</strong> <strong>in</strong> Block Z-6. Petro-Tech Peruana.<br />

January 2006.<br />

• <strong>Project</strong> Coord<strong>in</strong>ator for an Environm<strong>en</strong>tal Impact<br />

Assessm<strong>en</strong>t of an Exploratory Perforation and 2D<br />

- 3D Seismic Survey <strong>Project</strong> <strong>in</strong> Block Z-6. Petro-<br />

Tech Peruana. November 2005 to date.<br />

• Supervision of a Complem<strong>en</strong>tary Archaeological<br />

Evaluation of the EIA for a Gas Pipel<strong>in</strong>e and<br />

Compression Station <strong>in</strong> Talara Piura, Peru. Petro-<br />

Tech Peruana. October, 2005.<br />

• Supervision and report<strong>in</strong>g for a Phase II Soil and<br />

Groundwater Characterization Study.<br />

Pedernales, Manabí, Ecuador. Confid<strong>en</strong>tial cli<strong>en</strong>t.<br />

September 2005.<br />

• Risk Assessm<strong>en</strong>t of two Alternatives for Disposal<br />

of Bilgewater and Sewage from Cargo Ships at<br />

the Mar<strong>in</strong>e Term<strong>in</strong>al of the Camisea <strong>Project</strong>.<br />

Pluspetrol Perú Corporation. August, 2005.<br />

• Phase I and Phase II Environm<strong>en</strong>tal Basel<strong>in</strong>e<br />

Assessm<strong>en</strong>t for 48 service stations <strong>in</strong> Ecuador.<br />

Confid<strong>en</strong>tial cli<strong>en</strong>t. June – September 2005.<br />

• Environm<strong>en</strong>tal Impact Assessm<strong>en</strong>t for a Gas<br />

Pipel<strong>in</strong>e and Compression Station <strong>in</strong> Talara.<br />

Petro-Tech Peruana S.A. July, 2005.<br />

• Phase I and Phase II Environm<strong>en</strong>tal Basel<strong>in</strong>e<br />

Assessm<strong>en</strong>t for 16 service stations <strong>in</strong> Ecuador.<br />

Confid<strong>en</strong>tial cli<strong>en</strong>t. April 2005 – ongo<strong>in</strong>g.<br />

• Environm<strong>en</strong>tal Managem<strong>en</strong>t Plans for the<br />

Exploration and Exploitation <strong>Project</strong>s of two Oil<br />

Fields <strong>in</strong> the Amazon Region. Pluspetrol Norte<br />

S.A. February, 2005.<br />

• Phase I Environm<strong>en</strong>tal Site Assessm<strong>en</strong>t for a<br />

Pharmaceutical company. Confid<strong>en</strong>tial cli<strong>en</strong>t.<br />

February, 2005.<br />

• Hydrobiological and Fish<strong>in</strong>g Monitor<strong>in</strong>g Program<br />

<strong>in</strong> the High and Lower Urubamba Region for<br />

Pluspetrol Peru Corporation S.A. and<br />

Transportadora de Gas del Peru. December 2004 –<br />

ongo<strong>in</strong>g.<br />

30.11.10 ROMINA ARAMBURU


• Transition Phase Monitor<strong>in</strong>g Program for the Off<br />

Shore Compon<strong>en</strong>t at the Fractionation Plant of<br />

Natural Gas and Mar<strong>in</strong>e Term<strong>in</strong>al, Playa Lobería,<br />

Pisco, Perú. September 2004 – ongo<strong>in</strong>g.<br />

• Docum<strong>en</strong>tation upgrad<strong>in</strong>g and updat<strong>in</strong>g,<br />

satisfactory to the Inter American Developm<strong>en</strong>t<br />

Bank standards and workshops assistance for the<br />

loan to the downstream compon<strong>en</strong>t of the<br />

Camisea <strong>Project</strong>. March – December 2004.<br />

• Environm<strong>en</strong>tal Monitor<strong>in</strong>g and Environm<strong>en</strong>tal<br />

Managem<strong>en</strong>t System for the exploration project<br />

Block 90. REPSOL YPF. October - December 2004.<br />

• Audits to the Environm<strong>en</strong>tal Managem<strong>en</strong>t<br />

System <strong>in</strong> the Fractionation Plant of Natural Gas,<br />

Playa Lobería, Pisco. Pluspetrol Perú<br />

Corporation. October 2004.<br />

• Phase I and Phase II reports for service stations<br />

assessm<strong>en</strong>ts <strong>in</strong> Peru. Confid<strong>en</strong>tial cli<strong>en</strong>t.<br />

September – November 2004.<br />

• House-style team for the upgrad<strong>in</strong>g of reports<br />

and formats with<strong>in</strong> the company. ERM Peru.<br />

March 2004 – February 2005.<br />

• EIA & EIS for Block 56 Oil field <strong>in</strong> the Lower<br />

Urubamba Region. Pluspetrol Peru Corporation<br />

S.A. February – November 2004.<br />

• Monitor<strong>in</strong>g Program for the Off Shore<br />

Compon<strong>en</strong>t at the Fractionation Plant of Natural<br />

Gas and Mar<strong>in</strong>e Term<strong>in</strong>al, Playa Lobería, Pisco,<br />

Perú. Pluspetrol Peru Corporation S.A.<br />

September 2003 – August 2004.<br />

Sem<strong>in</strong>ars and Confer<strong>en</strong>ces Giv<strong>en</strong><br />

• Technical Pres<strong>en</strong>tation at the 10 SPE International<br />

Confer<strong>en</strong>ce on Health, Safety & Environm<strong>en</strong>t <strong>in</strong><br />

Oil and Gas Exploration and Production. Author<br />

and Pres<strong>en</strong>ter. “Work<strong>in</strong>g with Stakeholders to<br />

Develop a Toolkit to Guide Plann<strong>in</strong>g and<br />

Implem<strong>en</strong>tation of Decommission<strong>in</strong>g and Closure<br />

Schemes <strong>in</strong> Resource-Rich Countries”. April 12-14<br />

2010. Río de Janeiro, Brazil.<br />

• Sem<strong>in</strong>ar “Collpa Use by Macaw and Parrot Species<br />

on the Tambopata River: Environm<strong>en</strong>tal Factors<br />

that Influ<strong>en</strong>ce a Site” Catholic University Peru,<br />

G<strong>en</strong>eral Studies. May 20, 2002.<br />

Publications<br />

• A. D. Rawa, SPE, Mill<strong>en</strong>nium Chall<strong>en</strong>ge<br />

Corporation; E. Mayorga Alba and C. C. Sheldon,<br />

World Bank; R. Aramburu, SPE, Environm<strong>en</strong>tal<br />

Resources Managem<strong>en</strong>t; and F. D. Rodriguez,<br />

SPE, HSE-International LLC. Work<strong>in</strong>g with<br />

Stakeholders to Develop a Toolkit to Guide<br />

Plann<strong>in</strong>g and Implem<strong>en</strong>tation of<br />

Decommission<strong>in</strong>g and Closure Schemes <strong>in</strong><br />

Resource-Rich Countries. SPE-126763-PP.<br />

Prepared for the XII HSE Confer<strong>en</strong>ce <strong>in</strong> Rio de<br />

Janeiro. April 2010. Society of Petroleum<br />

Eng<strong>in</strong>eers.<br />

• Brightsmith, D.J. and Aramburu, R. 2002. Avian<br />

Geophagy <strong>in</strong> Peru. Abstract Submission for the<br />

Third North American Ornithological<br />

Confer<strong>en</strong>ce. Sept. 2003. New Orleans, Louisiana.<br />

• Brightsmith, D.J. and Aramburu M.N., R. 2004.<br />

Avian Geophagy and Soil Characteristics <strong>in</strong><br />

Southeastern Peru. BIOTROPICA. Vol. 36, Issue<br />

4, Pgs. 534-543.<br />

• Aramburu, R.; Echevarría, E. y Salazar, L. 2005.<br />

A Cleaner Production Program Initiative at<br />

MAFRINSA Slaughterhouse. To obta<strong>in</strong> the Title<br />

of Environm<strong>en</strong>tal Eng<strong>in</strong>eer. National Agrarian<br />

University, La Mol<strong>in</strong>a. Honors (Cum Laude).<br />

30.11.10 ROMINA ARAMBURU


Andres Meglioli, Ph.D., MBA<br />

Partner<br />

Dr. Andres Meglioli is a Partner with ERM based <strong>in</strong><br />

D<strong>en</strong>ver, Colorado. He has over 24 years of experi<strong>en</strong>ce <strong>in</strong><br />

<strong>en</strong>vironm<strong>en</strong>tal and geologic consult<strong>in</strong>g with an emphasis<br />

on m<strong>in</strong>e reclamation and closure, AMD treatm<strong>en</strong>t, m<strong>in</strong>e<br />

permitt<strong>in</strong>g, pipel<strong>in</strong>e assessm<strong>en</strong>t, ref<strong>in</strong>ery cleanup,<br />

hydrocarbon <strong>in</strong>vestigation and remediation, site<br />

characterization, water supply, and risk assessm<strong>en</strong>t,<br />

managem<strong>en</strong>t and quantification.<br />

Dr. Meglioli has worked as an underground m<strong>in</strong><strong>in</strong>g<br />

geologist <strong>in</strong> Arg<strong>en</strong>t<strong>in</strong>a and <strong>in</strong> m<strong>in</strong><strong>in</strong>g exploration <strong>in</strong><br />

Arg<strong>en</strong>t<strong>in</strong>a and Norway. He has prepared aquifer<br />

protection permit applications for copper m<strong>in</strong><strong>in</strong>g<br />

operations <strong>in</strong> Arizona, and numerous cost analyses for<br />

m<strong>in</strong>e reclamation, reclamation bonds cost estimates, and<br />

closure/post-closure for active and <strong>in</strong>active m<strong>in</strong>es<br />

throughout the US, Canada, and New Zealand. M<strong>in</strong><strong>in</strong>g<br />

assessm<strong>en</strong>ts <strong>in</strong>cluded compliance audits, <strong>en</strong>vironm<strong>en</strong>tal<br />

audits and assessm<strong>en</strong>ts, and <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance<br />

surveys. He developed the technical guidel<strong>in</strong>es used by<br />

one of the world’s largest <strong>in</strong>surance corporations to<br />

conduct m<strong>in</strong>e reclamation work, <strong>in</strong>clud<strong>in</strong>g risk<br />

assessm<strong>en</strong>t, <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance underwrit<strong>in</strong>g, and<br />

reclamation bond replacem<strong>en</strong>t for m<strong>in</strong><strong>in</strong>g operations <strong>in</strong><br />

North and South America.<br />

Dr. Meglioli’s experi<strong>en</strong>ce <strong>in</strong> the m<strong>in</strong><strong>in</strong>g sector <strong>in</strong>cludes<br />

three years of manag<strong>in</strong>g the water treatm<strong>en</strong>t facility and<br />

underground collection system of the acid m<strong>in</strong>e dra<strong>in</strong>age<br />

<strong>in</strong> Iron Mounta<strong>in</strong> M<strong>in</strong>e <strong>in</strong> northern California, commonly<br />

considered one of the world’s most acidic m<strong>in</strong>e<br />

dra<strong>in</strong>ages. He rec<strong>en</strong>tly prepared the closure guidel<strong>in</strong>es<br />

for a large multi-national z<strong>in</strong>c corporation. The<br />

guidel<strong>in</strong>es <strong>in</strong>clude risk id<strong>en</strong>tification and managem<strong>en</strong>t,<br />

susta<strong>in</strong>able closure and post-closure analysis, and postclosure<br />

care and monitor<strong>in</strong>g.<br />

Deliver<strong>in</strong>g susta<strong>in</strong>able solutions <strong>in</strong> a more competitive world<br />

Dr. Meglioli is curr<strong>en</strong>tly the technical director on the<br />

preparation of the closure plans for one of the world’s<br />

largest coal m<strong>in</strong>es <strong>in</strong> Colombia. Dur<strong>in</strong>g the last year he<br />

conducted closure reviews for m<strong>in</strong><strong>in</strong>g operations <strong>in</strong><br />

Mongolia, Scotland, Namibia, Peru, California, and<br />

Nevada. Closure plann<strong>in</strong>g <strong>in</strong>cludes reviews of post<br />

m<strong>in</strong><strong>in</strong>g susta<strong>in</strong>able land use, stakeholder and community<br />

relations, water managem<strong>en</strong>t, cost model<strong>in</strong>g, and risk<br />

analyses. He is also experi<strong>en</strong>ced <strong>in</strong> the assessm<strong>en</strong>t of<br />

glaciers and rock glaciers <strong>in</strong> Andean regions.<br />

He also leads the HSEC audit program of several m<strong>in</strong>es<br />

for an <strong>in</strong>ternational m<strong>in</strong><strong>in</strong>g copper firm <strong>in</strong> Lat<strong>in</strong> America.<br />

He has conducted numerous <strong>en</strong>vironm<strong>en</strong>tal audits and<br />

phase I and II assessm<strong>en</strong>ts domestically and<br />

<strong>in</strong>ternationally of m<strong>in</strong><strong>in</strong>g operations, <strong>in</strong>dustrial parks,<br />

and manufactur<strong>in</strong>g plants. Dr. Meglioli is an<br />

accomplished leader work<strong>in</strong>g on start-up, growth, and<br />

optimization of global projects and bus<strong>in</strong>ess<br />

developm<strong>en</strong>t strategies <strong>in</strong> <strong>en</strong>vironm<strong>en</strong>tal platforms. He<br />

has a strong reputation for results achieved through<br />

comb<strong>in</strong>ed global bus<strong>in</strong>ess and project expertise,<br />

multil<strong>in</strong>gual flu<strong>en</strong>cy, and a Ph.D. <strong>in</strong> Geological Sci<strong>en</strong>ces<br />

and an MBA <strong>in</strong> Global Managem<strong>en</strong>t.<br />

Professional Affiliations & Registrations<br />

• Registered Professional Geologist, Arizona,<br />

P<strong>en</strong>nsylvania, Arg<strong>en</strong>t<strong>in</strong>a<br />

• Member, Geological Society of America<br />

• Member, American Institute of Professional<br />

Geologists (AIPG)<br />

• Member, Colorado M<strong>in</strong><strong>in</strong>g Association<br />

Fields of Compet<strong>en</strong>ce<br />

• M<strong>in</strong>e closure and reclamation cost estimates<br />

• Environm<strong>en</strong>tal audits and risk managem<strong>en</strong>t of<br />

m<strong>in</strong><strong>in</strong>g, ref<strong>in</strong>eries, and pipel<strong>in</strong>es for the<br />

<strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance <strong>in</strong>dustry


Education<br />

• M.B.A Global Managem<strong>en</strong>t., University of Pho<strong>en</strong>ix,<br />

Arizona, 2003<br />

• PhD Geology., Lehigh University, Bethlehem,<br />

P<strong>en</strong>nsylvania, 1992<br />

• B.Sc., Geology, San Juan State University, Arg<strong>en</strong>t<strong>in</strong>a,<br />

1984<br />

Languages<br />

• English<br />

• Spanish (flu<strong>en</strong>t – native language)<br />

• Portuguese (solid work<strong>in</strong>g knowledge)<br />

Publications<br />

• Nazaryk, P., and Meglioli, A., 2009. Developm<strong>en</strong>t of a<br />

Health, Safety, Environm<strong>en</strong>tal, and Community<br />

(HSEC) Managem<strong>en</strong>t System and How Its<br />

Implem<strong>en</strong>tation Can B<strong>en</strong>efit the Uranium M<strong>in</strong><strong>in</strong>g<br />

Industry. U2009, Keystone, Colorado.<br />

• Un-permitt<strong>in</strong>g a M<strong>in</strong>e – or Demonstrat<strong>in</strong>g Successful<br />

Completion of Reclamation Permit Requirem<strong>en</strong>ts.<br />

Meglioli, A; Trippel, A., Corbetta, P., and Taylor, M.;<br />

2009 Society of M<strong>in</strong><strong>in</strong>g, Metallurgy, and Exploration,<br />

Inc (SME), D<strong>en</strong>ver, Colorado, USA.<br />

• Demsey, K., Meglioli, A., Biggs, T., Pearthree, P., 1998.<br />

Surficial Geology and Geomorphology of C<strong>en</strong>tral<br />

Sauceda Valley, Goldwater Air Force Range, Southern<br />

Arizona. Arizona Geological Survey – Op<strong>en</strong> File<br />

Report.<br />

• Meglioli, A., 1997, Geologic Map of Surficial Deposits.<br />

Waterboro 7-1/2 m<strong>in</strong>ute quadrangle, Ma<strong>in</strong>e.<br />

GOGEOMAP <strong>Project</strong> – Ma<strong>in</strong>e Geological Survey.<br />

• Meglioli, A., 1997, Geologic Map of Surficial Deposits.<br />

Lim<strong>in</strong>gton 7-1/2 m<strong>in</strong>ute quadrangle, Ma<strong>in</strong>e.<br />

GOGEOMAP <strong>Project</strong> – Ma<strong>in</strong>e Geological Survey.<br />

• Meglioli, A., 1997, Geologic Map of Surficial Deposits.<br />

Mousam Lake 7-1/2 m<strong>in</strong>ute quadrangle, Ma<strong>in</strong>e.<br />

GOGEOMAP <strong>Project</strong> – Ma<strong>in</strong>e Geological Survey.<br />

• .Meglioli, A., 1995, Aquifer Map 38, Ma<strong>in</strong>e Geological<br />

Survey.<br />

• Meglioli, A., 1994, Geological map of surficial<br />

deposits. Milton 7-1/2 m<strong>in</strong>ute quadrangle, Ma<strong>in</strong>e.<br />

GOGEOMAP <strong>Project</strong> – Ma<strong>in</strong>e Geological Survey.<br />

• Bolduc, A., Thompson, W., Meglioli, A., 1989, Surficial<br />

Geological map of North W<strong>in</strong>dham 7-1/2 m<strong>in</strong>ute<br />

quadrangle, Ma<strong>in</strong>e. GOGEOMAP <strong>Project</strong> – Ma<strong>in</strong>e<br />

Geological Survey.<br />

Key <strong>Project</strong>s<br />

Honored with Meritorious Services Award and US<br />

Environm<strong>en</strong>tal Protection Ag<strong>en</strong>cy comm<strong>en</strong>dation letter<br />

for outstand<strong>in</strong>g performance and orchestration of largescale<br />

federal project acid m<strong>in</strong>e dra<strong>in</strong>age treatm<strong>en</strong>t (Iron<br />

Mounta<strong>in</strong>, CA).<br />

Technical director for the developm<strong>en</strong>t of the m<strong>in</strong>e<br />

closure plan of one of the world’s largest coal m<strong>in</strong>es <strong>in</strong><br />

northern Colombia. Closure plan <strong>in</strong>cluded water<br />

managem<strong>en</strong>t issues, susta<strong>in</strong>able vision for closure and<br />

post-closure managem<strong>en</strong>t, stakeholder consultations, and<br />

cost estimat<strong>in</strong>g. Facilities <strong>in</strong>clude, large op<strong>en</strong> pits, rail<br />

l<strong>in</strong>es, roadways, airports, camp, and maritime ports.<br />

Developed m<strong>in</strong><strong>in</strong>g guidel<strong>in</strong>es for <strong>en</strong>vironm<strong>en</strong>tal risk<br />

assessm<strong>en</strong>t of numerous reclamation projects for<br />

American International Group (AIG). The guidel<strong>in</strong>es are<br />

curr<strong>en</strong>tly used by the <strong>en</strong>vironm<strong>en</strong>tal underwrit<strong>in</strong>g, risk<br />

f<strong>in</strong>ance, re-<strong>in</strong>surance and global <strong>en</strong>ergy underwrit<strong>in</strong>g<br />

and f<strong>in</strong>ancial arms of AIG. Additionally developed all<br />

technical guidel<strong>in</strong>es for use by applicants and brokerage<br />

firms.<br />

Developed the corporate closure guidel<strong>in</strong>es for a large<br />

<strong>in</strong>ternational z<strong>in</strong>c corporation. Guidel<strong>in</strong>es <strong>in</strong>clude risk<br />

id<strong>en</strong>tification and managem<strong>en</strong>t tools, cost estimat<strong>in</strong>g,<br />

susta<strong>in</strong>able closure and post-closure care and monitor<strong>in</strong>g<br />

procedures.<br />

Coord<strong>in</strong>ated, supervised, and evaluated <strong>en</strong>vironm<strong>en</strong>tal<br />

exposures and closure and post closure and monitor<strong>in</strong>g<br />

costs for m<strong>in</strong><strong>in</strong>g properties <strong>in</strong> Nevada, Idaho, Alaska,<br />

Arizona, New Mexico, California, Colorado, Wyom<strong>in</strong>g,<br />

Wash<strong>in</strong>gton, Montana, South Dakota, Utah, Yukon,<br />

Colombia, Peru, Chile, Namibia, Scotland, Mongolia,<br />

and New Zealand.<br />

Conducted and orchestrated <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance<br />

surveys <strong>in</strong> hard rock op<strong>en</strong> pit and underground m<strong>in</strong>es<br />

(gold/silver/molybd<strong>en</strong>um/copper/cobalt/lead/<br />

uranium), and for coal m<strong>in</strong>es <strong>in</strong> Utah, West Virg<strong>in</strong>ia, and<br />

Wyom<strong>in</strong>g.<br />

4/12/11 MEGLIOLI 2011 (2).DOC


Managed the water treatm<strong>en</strong>t operation for more than<br />

three years of what is considered one of the world’s most<br />

acidic m<strong>in</strong>e dra<strong>in</strong>age (Iron Mtn., CA). Managem<strong>en</strong>t<br />

responsibilities <strong>in</strong>clude contract<strong>in</strong>g, report<strong>in</strong>g to state<br />

and federal report<strong>in</strong>g ag<strong>en</strong>cies, health and safety<br />

compliance, geotechnical analysis, and personnel<br />

managem<strong>en</strong>t (<strong>in</strong>ternal and contractors).<br />

Developed cost<strong>in</strong>g sc<strong>en</strong>arios, <strong>in</strong>clud<strong>in</strong>g preparation of<br />

risk profiles, to statistically evaluate project feasibility for<br />

more than sev<strong>en</strong>ty m<strong>in</strong><strong>in</strong>g operations and over tw<strong>en</strong>ty<br />

large pipel<strong>in</strong>e and ref<strong>in</strong>ery operations for multi-million<br />

f<strong>in</strong>ite <strong>in</strong>surance transactions.<br />

Slashed 5% of $6.5M project’s exp<strong>en</strong>ditures, garner<strong>in</strong>g an<br />

additional 25% <strong>in</strong> projected sav<strong>in</strong>gs, by id<strong>en</strong>tify<strong>in</strong>g and<br />

recomm<strong>en</strong>d<strong>in</strong>g alternative treatm<strong>en</strong>t options.<br />

Contributed to prospective acquisitions of Lat<strong>in</strong><br />

American real estate through account relations,<br />

<strong>en</strong>vironm<strong>en</strong>tal legal and regulatory evaluations, and site<br />

survey completions.<br />

Established market pres<strong>en</strong>ce for the first time for large<br />

<strong>en</strong>vironm<strong>en</strong>tal consult<strong>in</strong>g firms <strong>in</strong> Brazil, Mexico, and<br />

V<strong>en</strong>ezuela through strategic partnerships. Scope of<br />

services covered landfarm<strong>in</strong>g of petroleum-impacted<br />

soils (V<strong>en</strong>ezuela), and remediation of multiple metal and<br />

organic compound impacted sites <strong>in</strong> Brazil and Mexico<br />

for large multi-national corporations.<br />

Pioneered <strong>in</strong>troduction of Remediation Managem<strong>en</strong>t<br />

program that g<strong>en</strong>erated $11M <strong>in</strong> account growth,<br />

elim<strong>in</strong>ated project resource exp<strong>en</strong>ditures, and tight<strong>en</strong>ed<br />

controls over complex, multi-year <strong>en</strong>vironm<strong>en</strong>tal<br />

remediation projects.<br />

Established m<strong>in</strong><strong>in</strong>g and petroleum and gas pipel<strong>in</strong>e<br />

<strong>en</strong>g<strong>in</strong>eer<strong>in</strong>g underwrit<strong>in</strong>g guidel<strong>in</strong>es to <strong>en</strong>hance<br />

id<strong>en</strong>tification and control of acceptable risks and avoid<br />

unacceptable risks.<br />

Led evaluation of m<strong>in</strong><strong>in</strong>g reclamation and oil and<br />

pipel<strong>in</strong>e projects through staff<strong>in</strong>g strategy developm<strong>en</strong>t<br />

and execution of recruitm<strong>en</strong>t, tra<strong>in</strong><strong>in</strong>g, and managem<strong>en</strong>t<br />

of technical teams.<br />

Recomm<strong>en</strong>ded <strong>en</strong>hancem<strong>en</strong>ts to statistical model used<br />

for risk profil<strong>in</strong>g and evaluation that <strong>in</strong>troduced<br />

flexibility to <strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surrance underwrit<strong>in</strong>g<br />

pric<strong>in</strong>g tool and <strong>en</strong>hanced competitiv<strong>en</strong>ess <strong>in</strong> pric<strong>in</strong>g and<br />

services.<br />

Designed site characterization, remedy design and<br />

implem<strong>en</strong>tation for the cleanup of a foundry site with<br />

multiple contam<strong>in</strong>ant plumes impact<strong>in</strong>g several aquifers<br />

<strong>in</strong> Arizona. Responsibilities <strong>in</strong>cluded remedy design,<br />

report preparation, cli<strong>en</strong>t and regulatory <strong>in</strong>teraction, well<br />

design and <strong>in</strong>stallation, and budget<strong>in</strong>g.<br />

Successfully won bid to design and <strong>in</strong>stall numerous<br />

deep water supply wells <strong>in</strong> Mexico plants for a U.S.<br />

beverage company by orchestrat<strong>in</strong>g bid process and<br />

prepar<strong>in</strong>g bil<strong>in</strong>gual reports.<br />

Introduced project managem<strong>en</strong>t portfolio managem<strong>en</strong>t<br />

structure that optimized cross-functional team structure<br />

and streaml<strong>in</strong>ed cli<strong>en</strong>t relations.<br />

Technical Director responsible for the control and<br />

implem<strong>en</strong>tation of <strong>en</strong>vironm<strong>en</strong>tal mitigation measures<br />

associated with the expansion of the Panama Canal.<br />

Technical Director for the site characterization and<br />

remedy selection for pesticide impacted soil and<br />

groundwater <strong>in</strong>dustrial site <strong>in</strong> Colombia.<br />

Conducted hundreds of reviews to estimate reclamation<br />

costs for m<strong>in</strong><strong>in</strong>g operations with emphasis on<br />

reclamation bond placem<strong>en</strong>t and the use of<br />

<strong>en</strong>vironm<strong>en</strong>tal <strong>in</strong>surance to secure proper closure and<br />

post-closure procedures for national and <strong>in</strong>ternational<br />

m<strong>in</strong><strong>in</strong>g operations. Prepared closure plans for large coal<br />

and hardrock operations.<br />

Designed and implem<strong>en</strong>ted aquifer protection permits<br />

(APP) for m<strong>in</strong>es <strong>in</strong> Arizona.<br />

Participated <strong>in</strong> geochemical sampl<strong>in</strong>g and m<strong>in</strong><strong>in</strong>g<br />

exploration projects throughout western and southern<br />

Arg<strong>en</strong>t<strong>in</strong>a, Svalbard (Norway), and southwestern<br />

Arizona.<br />

4/12/11 MEGLIOLI 2011 (2).DOC


Annex B<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

Public Meet<strong>in</strong>g Record<br />

A1


1 PUBLIC MEETING RECORD PARAMARIBO<br />

Meet<strong>in</strong>g held on August 17, 2011 <strong>in</strong> Hotel Krasnapolsky, Paramaribo. Meet<strong>in</strong>g<br />

was conducted <strong>in</strong> Dutch.<br />

Pres<strong>en</strong>ters <strong>in</strong>cluded:<br />

Mr. Ryan Kamble, HSLP Coord<strong>in</strong>ator <strong>Surgold</strong><br />

Mr. Radjkoemar Sandjiets<strong>in</strong>gh, Head Geologist <strong>Merian</strong> Gold <strong>Project</strong><br />

Mr. Rutger de Wolf, ERM repres<strong>en</strong>tative<br />

Mr. Salomon Emanuels, ERM repres<strong>en</strong>tative<br />

Programma<br />

Welkomstwoord<br />

Introductie/huisregels/ag<strong>en</strong>da<br />

<strong>Project</strong> beschrijv<strong>in</strong>g<br />

Milieu studie<br />

<strong>Sociale</strong> studie<br />

Vrag<strong>en</strong> <strong>en</strong> antwoord<strong>en</strong><br />

Afsluit<strong>in</strong>g<br />

Sam<strong>en</strong>zijn<br />

Welkomstwoord – Hr. Kamble, HSLP Coörd<strong>in</strong>ator <strong>Surgold</strong><br />

Nam<strong>en</strong>s <strong>Surgold</strong> heet dhr. Kamble de aanwezig<strong>en</strong> van harte welkom.<br />

Aangegev<strong>en</strong> wordt dat <strong>het</strong> bij deze om de eerste van drie ontmoet<strong>in</strong>g<strong>en</strong> gaat.<br />

De volg<strong>en</strong>de publieke ontmoet<strong>in</strong>g wordt op Mo<strong>en</strong>go gehoud<strong>en</strong> <strong>en</strong> de laatste op<br />

Langa Tabiki.<br />

Voorts wordt aangegev<strong>en</strong> dat de aanwezig<strong>en</strong> tijd<strong>en</strong>s deze bije<strong>en</strong>komst zelf <strong>in</strong><br />

de geleg<strong>en</strong>heid word<strong>en</strong> gesteld <strong>in</strong>put te gev<strong>en</strong> <strong>in</strong> de vorm van <strong>het</strong> stell<strong>en</strong> van<br />

vrag<strong>en</strong>. Er word<strong>en</strong> notul<strong>en</strong> gemaakt van de bije<strong>en</strong>komst <strong>en</strong> die zull<strong>en</strong> over<br />

<strong>en</strong>ige tijd ter beschikk<strong>in</strong>g zijn.<br />

Na <strong>in</strong>structies gegev<strong>en</strong> te hebb<strong>en</strong> <strong>in</strong> geval van calamiteit<strong>en</strong>, neemt dhr. Kamble<br />

de basisregels <strong>en</strong> de ag<strong>en</strong>da door.<br />

WAT IS HET MERIAN GOLD PROJECT? – hr. Radjkoemar Sandjiets<strong>in</strong>gh,<br />

Head Geologist <strong>Merian</strong> Gold <strong>Project</strong><br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

Wie is <strong>Surgold</strong>?<br />

o E<strong>en</strong> bedrijf van Newmont & Alcoa met Newmont als de<br />

manager<br />

o Exploreert <strong>in</strong> <strong>het</strong> <strong>Merian</strong> gebied s<strong>in</strong>ds 2004 -> nog ge<strong>en</strong><br />

goudproductie<br />

o Nog ge<strong>en</strong> goudproductie – <strong>in</strong> afwacht<strong>in</strong>g van overe<strong>en</strong>komst met<br />

de overheid<br />

<strong>Project</strong>locatie<br />

<strong>Project</strong>onderdel<strong>en</strong><br />

Mach<strong>in</strong>eriën -> hyraulische graafmach<strong>in</strong>es, haul trucks, dozers, graders,<br />

loaders<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A2


<strong>Project</strong> werknemers:<br />

o Ongeveer 1,500-2,000 tijd<strong>en</strong>s constructie (<strong>in</strong>clusief tijdelijke<br />

contractors gebruikt voor constructie)<br />

o Ongeveer 900 tijd<strong>en</strong>s operations<br />

Afval van <strong>het</strong> project -> vast <strong>en</strong> vloeibaar afval. Vast afval is afkomstig<br />

uit de mijn <strong>en</strong> wordt getransporteerd naar e<strong>en</strong> waste rock storage (2x).<br />

Dit afval zal ge<strong>en</strong> schade aan <strong>het</strong> milieu toebr<strong>en</strong>g<strong>en</strong> <strong>en</strong> zal ook ge<strong>en</strong><br />

zure dra<strong>in</strong>agesystem<strong>en</strong> tot gevolg hebb<strong>en</strong>. Vloeibaar afval wordt<br />

getransporteerd naar e<strong>en</strong> tail<strong>in</strong>g storage facility. Er zull<strong>en</strong> damm<strong>en</strong><br />

gebouwd word<strong>en</strong> <strong>en</strong> water dat zich <strong>in</strong> de vijver heeft verzameld zal<br />

teruggepompt word<strong>en</strong>, welke deels gezuiverd zal word<strong>en</strong> <strong>en</strong> deels na<br />

re<strong>in</strong>ig<strong>in</strong>g <strong>in</strong> <strong>het</strong> milieu geloodst zal word<strong>en</strong><br />

Verwerk<strong>in</strong>gs diagram -> er zal met cyanide <strong>en</strong> koolstof gewerkt word<strong>en</strong><br />

om <strong>het</strong> goud uit <strong>het</strong> geste<strong>en</strong>te te hal<strong>en</strong>. Er zal sprake zijn van e<strong>en</strong><br />

recovery van 97%.<br />

Transport material<strong>en</strong> -> tijd<strong>en</strong>s de constructiefase <strong>en</strong> <strong>het</strong> mijn<strong>en</strong> zull<strong>en</strong> er<br />

material<strong>en</strong> word<strong>en</strong> geïmporteerd <strong>en</strong> voor al <strong>het</strong> geïmporteerd materiaal<br />

zal gebruik gemaakt word<strong>en</strong> van de Hav<strong>en</strong>. Het transport zal<br />

plaatsv<strong>in</strong>d<strong>en</strong> via de Oost-West verb<strong>in</strong>d<strong>in</strong>g naar Mo<strong>en</strong>go <strong>en</strong> van daaruit<br />

wordt <strong>het</strong> verder getransporteerd naar Langa Tabiki. De weg wordt<br />

door <strong>Surgold</strong> <strong>in</strong> orde gemaakt <strong>en</strong> van Langa Tabiki naar Mo<strong>en</strong>go wordt<br />

er e<strong>en</strong> weg van 60 km aangelegd<br />

Sluit<strong>in</strong>g van de mijn<br />

Voorbeeld<strong>en</strong> van mijnsluit<strong>in</strong>g<strong>en</strong> Indonesie<br />

MILIEU- EN SOCIALE EFFECTEN STUDIE (MER / ESIA) – Rutger de<br />

Wolf, ERM<br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

Wat is e<strong>en</strong> ESIA?<br />

Vier onderdel<strong>en</strong> van e<strong>en</strong> ESIA -> milieu, gezondheid, sociaal,<br />

stakeholder consultation<br />

Wie voert de ESIA uit? -> Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t<br />

(ERM)<br />

De rol van ERM<br />

Wat zijn de vereist<strong>en</strong> voor e<strong>en</strong> ESIA?<br />

Wat omvat e<strong>en</strong> ESIA?<br />

Milieustudies:<br />

- Grondwater: hoe lop<strong>en</strong> de strom<strong>en</strong> <strong>en</strong> wat kan er verander<strong>en</strong><br />

wanneer <strong>het</strong> project wordt uitgevoerd?<br />

- Luchtkwaliteit: met<strong>en</strong> van chemicaliën <strong>en</strong> deeltjes <strong>in</strong> de lucht <strong>en</strong><br />

nagegaan wordt hoe <strong>het</strong> e.e.a. zou kunn<strong>en</strong> gaan verander<strong>en</strong><br />

- Geluid: kijk<strong>en</strong> naar huidige geluidsniveau’s, wat kan je verwacht<strong>en</strong><br />

<strong>en</strong> welke maatregel<strong>en</strong> kunn<strong>en</strong> getroff<strong>en</strong> word<strong>en</strong><br />

- Bom<strong>en</strong> <strong>en</strong> plant<strong>en</strong>: nagegaan wordt of er bijzondere plant<strong>en</strong><br />

aanwezig zijn, of <strong>het</strong> gaat om kwetsbare ecosystem<strong>en</strong> <strong>en</strong> hoe de<br />

negatieve effect<strong>en</strong> gemitigeerd kunn<strong>en</strong> word<strong>en</strong><br />

- Dier<strong>en</strong>: verschill<strong>en</strong>de experts zull<strong>en</strong> e<strong>en</strong> <strong>in</strong>v<strong>en</strong>taris mak<strong>en</strong> <strong>en</strong><br />

nagaan of er kwetsbare of bedreigde diersoort<strong>en</strong> aanwezig zijn<br />

- Verkeer: de <strong>in</strong>t<strong>en</strong>siteit, onveilige situaties <strong>en</strong> ev<strong>en</strong>tuele to<strong>en</strong>ame<br />

daarvan na opstart<strong>en</strong> van <strong>het</strong> project<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A3


- Kwaliteit oppervlakte water: welke <strong>in</strong>vloed<strong>en</strong> zull<strong>en</strong> de<br />

opslagfaciliteit<strong>en</strong> hebb<strong>en</strong> op de waterlop<strong>en</strong> <strong>in</strong> die gebied<strong>en</strong><br />

Studiegebied voor milieustudies<br />

SOCIALE- EN GEZONDHEIDSSTUDIES – Salomon Emanuels<br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

In de dorp<strong>en</strong> die mogelijk beïnvloed word<strong>en</strong> door <strong>het</strong> project:<br />

• Huishoud <strong>en</strong>quêtes<br />

• Interviews <strong>en</strong> focus groep discussies<br />

• Volksgezondheidsstudies<br />

Start: september 2011<br />

Studiegebied voor de sociale- <strong>en</strong> gezondheidssituatie<br />

• gebied rondom de mijn<br />

• strook langs de weg -> Mo<strong>en</strong>go tot Paramaribo<br />

• Paramakaanse dorp<strong>en</strong><br />

Publieke consultatie<br />

• M<strong>en</strong>s<strong>en</strong> zull<strong>en</strong> hun m<strong>en</strong><strong>in</strong>g<strong>en</strong> kunn<strong>en</strong> gev<strong>en</strong> -> rapport<strong>en</strong> word<strong>en</strong><br />

gedistribueerd naar groep<strong>en</strong>/organisaties die hun m<strong>en</strong><strong>in</strong>g kunn<strong>en</strong><br />

gev<strong>en</strong>. NIMOS zal e<strong>en</strong> advies uitbr<strong>en</strong>g<strong>en</strong><br />

• Consultatie pr<strong>in</strong>cipes: alles omvatt<strong>en</strong>d, transparant, met aandacht<br />

voor o.a. cultuur & lev<strong>en</strong>sonderhoud<br />

Review <strong>en</strong> publicatie van ESIA bev<strong>in</strong>d<strong>in</strong>g<strong>en</strong><br />

ESIA ToR verkrijgbaar bij:<br />

• <strong>Surgold</strong> Kantoor - Paramaribo (Sur<strong>in</strong>ame Straat)<br />

• NIMOS kantoor – Paramaribo<br />

• <strong>Surgold</strong> Kamp – <strong>Merian</strong><br />

Volg<strong>en</strong>de stapp<strong>en</strong>:<br />

• Sociaal & Cultureel Erf<strong>en</strong>is onderzoek<br />

• Ecologisch onderzoek<br />

• Belangstell<strong>en</strong>d<strong>en</strong> ge<strong>in</strong>formeerd houd<strong>en</strong><br />

• Slot bije<strong>en</strong>komst teg<strong>en</strong> April 2012<br />

Slot opmerk<strong>in</strong>g<strong>en</strong><br />

• ESIA moet afgerond zijn voordat exploitatie recht<strong>en</strong> door de reger<strong>in</strong>g is<br />

uitgegev<strong>en</strong><br />

• ESIA is belangrijk voor de <strong>Project</strong> ontwikkel<strong>in</strong>g<br />

• U zal de geleg<strong>en</strong>heid krijg<strong>en</strong> om te participer<strong>en</strong><br />

• De reultat<strong>en</strong> van de ESIA zull<strong>en</strong> gepres<strong>en</strong>teerd word<strong>en</strong>, zodat uw<br />

opmerk<strong>in</strong>g<strong>en</strong> kunn<strong>en</strong> word<strong>en</strong> meeg<strong>en</strong>om<strong>en</strong>.<br />

VRAGENRONDE<br />

Hr. Courtar (nam<strong>en</strong>s de M<strong>in</strong>ister van ATM):<br />

- Hij v<strong>in</strong>dt <strong>het</strong> jammer dat <strong>het</strong> publiek e<strong>en</strong> gelimiteerde tijd heeft om<br />

vrag<strong>en</strong> te stell<strong>en</strong><br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A4


- De uitnodig<strong>in</strong>g was verwarr<strong>en</strong>d; hij dacht dat <strong>het</strong> gezondheidsaspect<br />

uitgebreid naar vor<strong>en</strong> zou kom<strong>en</strong>. Waarom is dat aspect niet uitgebreid<br />

meeg<strong>en</strong>om<strong>en</strong> <strong>in</strong> de pres<strong>en</strong>tatie?<br />

- Zal er geleerd word<strong>en</strong> van de best practices <strong>en</strong> lessons learned van<br />

Iamgold?<br />

Hr. Salomons: <strong>het</strong> gezondheidsaspect is <strong>in</strong>derdaad niet uitvoerig behandeld,<br />

wat niet betek<strong>en</strong>t dat <strong>het</strong> m<strong>in</strong>der belangrijk is. De gezondheidsaspect<strong>en</strong> zull<strong>en</strong><br />

tijd<strong>en</strong>s de ESIA uitvoerig onderzocht word<strong>en</strong> door o.m. <strong>in</strong>formatie op te vrag<strong>en</strong><br />

bij de polikl<strong>in</strong>iek<strong>en</strong> <strong>en</strong> rapport<strong>en</strong> te bestuder<strong>en</strong>. Ook de m<strong>en</strong>s<strong>en</strong> zal naar hun<br />

gezondheidssituatie gevraagd word<strong>en</strong>.<br />

Hr. Courtar: wat zal precies onderzocht word<strong>en</strong>?<br />

Hr. Emanuels: onderzocht zal word<strong>en</strong> wat de gezondheidssituatie van de<br />

m<strong>en</strong>s<strong>en</strong> op dit mom<strong>en</strong>t is voor wat betreft veel voorkom<strong>en</strong>de ziekt<strong>en</strong>. Voorts<br />

zal <strong>het</strong> voed<strong>in</strong>gspatroon onderzocht word<strong>en</strong> <strong>en</strong> welke <strong>in</strong>vloed <strong>het</strong> m<strong>in</strong>der jag<strong>en</strong><br />

zal hebb<strong>en</strong> op dat voed<strong>in</strong>gspatroon. Ook op welke manier m<strong>en</strong>s<strong>en</strong><br />

gezondheidszorg bereik<strong>en</strong> zal onderzocht word<strong>en</strong>.<br />

Hr. Meyers: the health aspect is critical, both for the communities and the<br />

workers. <strong>Surgold</strong> will work accord<strong>in</strong>g to <strong>in</strong>ternational standards. Part of the<br />

directive is not to only look at the risks, but what the opportunities are to<br />

improve people’s and the worker’s health and safety. This is the scop<strong>in</strong>g stage<br />

and health is m<strong>en</strong>tioned <strong>in</strong> the TOR, which docum<strong>en</strong>t is available.<br />

Hr. Courtar: zal m<strong>en</strong> <strong>in</strong> conclaaf gaan met Iamgold om met elkaar de worst<br />

constra<strong>in</strong>ts te besprek<strong>en</strong>?<br />

Hr. Kamble: <strong>het</strong> wiel hoeft niet opnieuw uitgevond<strong>en</strong> te word<strong>en</strong> <strong>en</strong> er kan van<br />

elkaar geleerd word<strong>en</strong> van Iamgold; op dit mom<strong>en</strong>t is er e<strong>en</strong> goed contact met<br />

ze.<br />

Hr. Boejoekoe (burger van Sur<strong>in</strong>ame): er word<strong>en</strong> milieustudies gedaan<br />

t<strong>en</strong>e<strong>in</strong>de te voorkom<strong>en</strong> dat <strong>het</strong> milieu beschadigd wordt; is er e<strong>en</strong> <strong>in</strong>stantie die<br />

vanwege de overheid toezicht zal houd<strong>en</strong> op <strong>het</strong> geheel?<br />

Hr. Meyers: mijnsluit<strong>in</strong>g is e<strong>en</strong> cruciaal aspect van e<strong>en</strong> mijnoperatie <strong>en</strong><br />

alvor<strong>en</strong>s over te gaan tot exploitatie, wordt er nagegaan hoe de sluit<strong>in</strong>g van de<br />

mijn moet plaatsv<strong>in</strong>d<strong>en</strong>. Voordat gekek<strong>en</strong> wordt naar de ecologische aspect<strong>en</strong>,<br />

wordt eerst gekek<strong>en</strong> naar de basel<strong>in</strong>e situatie (huidige situatie). Jammerg<strong>en</strong>oeg<br />

voor dit project is er <strong>in</strong> <strong>het</strong> gebied al heel veel verstor<strong>in</strong>g, nog voordat ze<br />

kunn<strong>en</strong> werk<strong>en</strong>. Er zijn wat voordel<strong>en</strong> voor m<strong>en</strong>s<strong>en</strong> die aan kle<strong>in</strong>schalige<br />

mijnbouw do<strong>en</strong>, maar <strong>het</strong> heeft de ecologie van <strong>het</strong> gebied behoorlijk<br />

aangetast. Wanneer we prat<strong>en</strong> over <strong>het</strong> ontwikkel<strong>en</strong> <strong>en</strong> sluit<strong>en</strong> van de mijn,<br />

moet eerst nagegaan word<strong>en</strong> hoe de huidige verstor<strong>in</strong>g verbeterd kan word<strong>en</strong>.<br />

Er is e<strong>en</strong> groot verschil tuss<strong>en</strong> kle<strong>in</strong>schalige- <strong>en</strong> <strong>in</strong>dustriële mijnbouw. Bij de<br />

<strong>in</strong>dustriële mijnbouw wordt vanaf <strong>het</strong> beg<strong>in</strong> gekek<strong>en</strong> naar <strong>het</strong> sluit<strong>in</strong>gsaspect <strong>en</strong><br />

welke de beste mogelijkhed<strong>en</strong> zijn voor rehabilitatie. Er zijn voorbeeld<strong>en</strong><br />

getoond van gebied<strong>en</strong> waar de rehabilitatie heeft plaatsgevond<strong>en</strong> <strong>en</strong> die<br />

gebied<strong>en</strong> hebb<strong>en</strong> dezelfde ecologische omstandighed<strong>en</strong> als Sur<strong>in</strong>ame.<br />

Hr. Boejoekoe: welk orgaan zal <strong>het</strong> e.e.a. monitor<strong>en</strong>?<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A5


Hr. de Wolf: uiteraard zal <strong>het</strong> bedrijf zelf monitor<strong>en</strong>, maar m<strong>en</strong> bedoelt e<strong>en</strong><br />

externe organisatie. Het NIMOS zou dat <strong>het</strong> beste kunn<strong>en</strong> do<strong>en</strong>. Er is e<strong>en</strong><br />

milieuwet <strong>in</strong> de maak, maar die is nog niet door de DNA gekom<strong>en</strong>. NIMOS<br />

heeft onvoldo<strong>en</strong>de mandaat om zak<strong>en</strong> goed te controler<strong>en</strong>, maar hij d<strong>en</strong>kt wel<br />

dat NIMOS zo goed als mogelijk probeert zak<strong>en</strong> te monitor<strong>en</strong>.<br />

Mw. Babb (NIMOS): bij zulke grote project<strong>en</strong> moet de monitor<strong>in</strong>g vanuit e<strong>en</strong><br />

commissie van de overheid gebeur<strong>en</strong>. Onafhankelijk van de<br />

overheidsmonitor<strong>in</strong>g, heeft NIMOS altijd contact met de bedrijv<strong>en</strong>.<br />

Mw. Simson (Moiwana M<strong>en</strong>s<strong>en</strong>recht<strong>en</strong>organisatie):<br />

- Er is gepraat over chemicaliën zoals koolstof <strong>en</strong> cyanide; zijn dat de<br />

<strong>en</strong>ige chemicaliën die gebruikt zull<strong>en</strong> word<strong>en</strong>?<br />

- Waaruit bestaat <strong>het</strong> vloeibaar afval?<br />

- Hoe secuur zull<strong>en</strong> de damm<strong>en</strong> zijn die <strong>het</strong> vloeibaar afval moet<strong>en</strong><br />

teg<strong>en</strong>houd<strong>en</strong>?<br />

- Wat zal er met <strong>het</strong> vloeibaar afval gebeur<strong>en</strong> na sluit<strong>in</strong>g van de mijn?<br />

Hr. Sandjiets<strong>in</strong>gh:<br />

- Bij <strong>het</strong> verwerk<strong>en</strong> van <strong>het</strong> geste<strong>en</strong>te wordt gebruik gemaakt van cyanide<br />

<strong>en</strong> koolstof. De conc<strong>en</strong>tratie die uite<strong>in</strong>delijk <strong>in</strong> <strong>het</strong> milieu terecht komt<br />

zal niet schadelijk zijn. Door zonlicht valt cyanide uite<strong>en</strong> <strong>in</strong> koolstof <strong>en</strong><br />

stikstof<br />

- T<strong>en</strong> aanzi<strong>en</strong> van de veiligheid van de damm<strong>en</strong> is <strong>het</strong> zo dat er tijd<strong>en</strong>s <strong>het</strong><br />

mijn<strong>en</strong> steeds onderzoek<strong>in</strong>g<strong>en</strong> word<strong>en</strong> uitgevoerd t<strong>en</strong>e<strong>in</strong>de na te gaan<br />

of er lekkages zijn.<br />

Hr. Meyers:<br />

- mijnmaatschappij<strong>en</strong> hebb<strong>en</strong> behoorlijk wat problem<strong>en</strong> gehad <strong>in</strong> <strong>het</strong><br />

verled<strong>en</strong> <strong>en</strong> daarom zijn er bepaalde b<strong>en</strong>ader<strong>in</strong>g<strong>en</strong> <strong>en</strong> wordt nagegaan<br />

welke de beste is. Bek<strong>en</strong>d is de <strong>in</strong>ternationale cyanide code die<br />

richtlijn<strong>en</strong> voorschrijft over alles dat met cyanide te mak<strong>en</strong> heeft. De<br />

code is sam<strong>en</strong>gesteld door e<strong>en</strong> prom<strong>in</strong><strong>en</strong>te groep van wet<strong>en</strong>schappers<br />

<strong>en</strong> omvat alle fas<strong>en</strong>, te wet<strong>en</strong> transport, opslag, gebruik <strong>en</strong> vernietig<strong>in</strong>g.<br />

Newmont is één van de medeondertek<strong>en</strong>aars van de code <strong>en</strong> moet zich<br />

aan de regels houd<strong>en</strong>. Op de opslag zal er regelmatig controle<br />

uitgevoerd word<strong>en</strong> <strong>en</strong> e<strong>en</strong> vereiste is dat de resulat<strong>en</strong> van die controle<br />

op<strong>en</strong>baar gemaakt moet<strong>en</strong> word<strong>en</strong>.<br />

- t<strong>en</strong> aanzi<strong>en</strong> van de veiligheid <strong>en</strong> stabiliteit van de damm<strong>en</strong> is <strong>het</strong> zo dat<br />

Golder, e<strong>en</strong> prom<strong>in</strong><strong>en</strong>t bedrijf op dat gebied, de damm<strong>en</strong> zal ontwerp<strong>en</strong><br />

volg<strong>en</strong>s <strong>in</strong>ternationale standaard<strong>en</strong>.<br />

Mw. Simson: zij v<strong>in</strong>dt <strong>het</strong> antwoord niet afdo<strong>en</strong>de. Het komt erop neer dat<br />

nadat Newmont is vertrokk<strong>en</strong>, er e<strong>en</strong> blijv<strong>en</strong>d meer van chemicaliën<br />

achterblijft?<br />

Hr. Meyers: dat is juist. Er zal afval zijn, maar <strong>het</strong> zal voornamelijk bestaan uit<br />

geste<strong>en</strong>te waar<strong>in</strong> er ge<strong>en</strong> goud is. Voordat <strong>het</strong> afval wordt gebracht naar <strong>het</strong><br />

meer, wordt de cyanide er<strong>in</strong> vernietigd. Nadat <strong>het</strong> water is gezuiverd, zal <strong>het</strong><br />

dr<strong>in</strong>kbaar zijn voor dier<strong>en</strong>.<br />

Mw. Simson: is <strong>het</strong> dr<strong>in</strong>kbaar voor m<strong>en</strong>s<strong>en</strong>?<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A6


Hr. Meyers: hij zou <strong>het</strong> niet dr<strong>in</strong>k<strong>en</strong>. Water that is released from the tail<strong>in</strong>g<br />

facilities will be safe for human consumption.<br />

Mw. Simson: will there be question of active rehabilitation (replant<strong>in</strong>g) or will<br />

there be question of lett<strong>in</strong>g plants grow aga<strong>in</strong> by themselves?<br />

Hr. Meyers: vanwege de ecologische omstandighed<strong>en</strong> <strong>in</strong> Sur<strong>in</strong>ame, zal er naast<br />

actieve herbeplant<strong>in</strong>g sprake zijn van e<strong>en</strong> natuurlijke reg<strong>en</strong>eratie.<br />

Mw. MacIntosch (NH):<br />

- zijn er maatregel<strong>en</strong> (ramp<strong>en</strong>plann<strong>en</strong>) gereed <strong>in</strong> geval van e<strong>en</strong><br />

dambreuk bij e<strong>en</strong> tail<strong>in</strong>g po<strong>in</strong>t?<br />

- hoe zal <strong>het</strong> opwekk<strong>en</strong> van electriciteit t<strong>en</strong> behoev<strong>en</strong> van de plant<br />

geschied<strong>en</strong>?<br />

- gezegd is dat er e<strong>en</strong> nieuwe weg wordt aangelegd; is er e<strong>en</strong> studie<br />

gedaan over de impact daarvan op flora <strong>en</strong> fauna?<br />

Hr. Sandjiets<strong>in</strong>gh: voor de aanleg van de weg word<strong>en</strong> er studies gedaan <strong>en</strong> dat<br />

is onderdeel van de ESIA.<br />

Hr. de Wolf:<br />

- de bouw van de weg is onderdeel van de te uit te voer<strong>en</strong> studie<br />

- t<strong>en</strong> aanzi<strong>en</strong> van de damm<strong>en</strong> zull<strong>en</strong> zak<strong>en</strong> onderzocht word<strong>en</strong> <strong>en</strong><br />

aanbevel<strong>in</strong>g<strong>en</strong> gedaan word<strong>en</strong><br />

Mr. Kirk Schmidt (GM <strong>Surgold</strong>): <strong>het</strong> bedrijf moet haar eig<strong>en</strong> electriciteit<br />

opwekk<strong>en</strong> <strong>en</strong> die opwekk<strong>in</strong>g zal op <strong>het</strong> project zelf geschied<strong>en</strong> middels heavy<br />

fuel oil of diesel. Studies hebb<strong>en</strong> uitgewez<strong>en</strong> dat Sur<strong>in</strong>ame over onvoldo<strong>en</strong>de<br />

capaciteit beschikt om zo e<strong>en</strong> grote aktiviteit uit te voer<strong>en</strong>.<br />

Hr. Meyers:<br />

- hij wil b<strong>en</strong>adrukk<strong>en</strong> dat Newmont zich zal houd<strong>en</strong> aan de<br />

<strong>in</strong>ternationale cyanide code <strong>en</strong> iedere<strong>en</strong> is welkom die te<br />

bestuder<strong>en</strong>.<br />

- t<strong>en</strong> aanzi<strong>en</strong> van ramp<strong>en</strong>plann<strong>en</strong> is <strong>het</strong> milieubeheerplan onderdeel is<br />

van de ESIA. Alle lokaties waar er zich grond- <strong>en</strong> oppervlaktewater<br />

bev<strong>in</strong>dt, zull<strong>en</strong> gecontroleerd word<strong>en</strong>. Indi<strong>en</strong> bij e<strong>en</strong> controle blijkt<br />

dat er problem<strong>en</strong> zijn, zull<strong>en</strong> er bepaalde ramp<strong>en</strong>plann<strong>en</strong> zijn zoals<br />

bijvoorbeeld <strong>het</strong> mete<strong>en</strong> terugvoer<strong>en</strong> van <strong>het</strong> water naar de<br />

opslagplaats.<br />

Mw. Hermi<strong>en</strong> Geykhorst:<br />

- bij <strong>het</strong> vermal<strong>en</strong> van rotsmateriaal komt er fijn poeder vrij die zich<br />

overal verplaatst. Thans zijn er hele grote half vloei<strong>en</strong>de mer<strong>en</strong> die<br />

heel erg gevaarlijk zijn omdat de bov<strong>en</strong>kant hard is, maar daaronder<br />

vloeibaar <strong>en</strong> <strong>het</strong> ‘t effect heeft van drijfzand.<br />

- Zij d<strong>en</strong>kt niet dat de gebied<strong>en</strong> zich snel gaan herstell<strong>en</strong>. Niet omdat<br />

<strong>het</strong> gro<strong>en</strong> zal zijn, betek<strong>en</strong>t <strong>het</strong> dat <strong>het</strong> hersteld is <strong>en</strong> zij d<strong>en</strong>kt dat er<br />

toch heel veel aan flora <strong>en</strong> fauna verlor<strong>en</strong> zal gaan.<br />

Hr. de Wolf: <strong>in</strong> <strong>het</strong> gebied is er al heel veel verstoord <strong>en</strong> je zal <strong>het</strong> niet <strong>in</strong> de<br />

orig<strong>in</strong>ele staat terug kunn<strong>en</strong> br<strong>en</strong>g<strong>en</strong>, maar er zal wel gepoogd word<strong>en</strong> dat<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A7


zoveel mogelijk te do<strong>en</strong>. <strong>Surgold</strong> is absoluut niet voornem<strong>en</strong>s om rommel<br />

achter te lat<strong>en</strong>.<br />

Hr. Kirk Schmidt: de kle<strong>in</strong>schalige mijnbouw heeft veel schade aangericht <strong>en</strong><br />

zij zull<strong>en</strong> naar method<strong>en</strong> zoek<strong>en</strong> hoe de huidige vervuil<strong>in</strong>g verwijderd kan<br />

word<strong>en</strong>, waarna nagegaan zal word<strong>en</strong> of er goud aanwezig is. De kost<strong>en</strong> voor<br />

<strong>het</strong> verwijder<strong>en</strong> van de huidige vervuil<strong>in</strong>g zull<strong>en</strong> heel hoog ligg<strong>en</strong>.<br />

Hr. Jab<strong>in</strong>i:<br />

- Indi<strong>en</strong> <strong>het</strong> ESIA rapport negatief is, zal <strong>het</strong> project doorgaan?<br />

- Wordt de weg Langa Tabiki e<strong>en</strong> bauxiet- of asfaltweg; wat houdt de<br />

upgrade <strong>in</strong>?<br />

- Is er sprake van FPIC (free prior <strong>in</strong>formed cons<strong>en</strong>t)? Word<strong>en</strong> de m<strong>en</strong>s<strong>en</strong><br />

werkelijk geïnformeerd wat de impact is van de aktiviteit<strong>en</strong> op hun lev<strong>en</strong><br />

<strong>en</strong> wel <strong>in</strong> hun eig<strong>en</strong> taal <strong>en</strong> eig<strong>en</strong> situatie?<br />

- Kle<strong>in</strong>schalige mijnbouwers hebb<strong>en</strong> veel schade aangericht <strong>en</strong> dat moet<br />

meeg<strong>en</strong>om<strong>en</strong> word<strong>en</strong>. Wat zal er met h<strong>en</strong> gebeur<strong>en</strong>? Word<strong>en</strong> ze<br />

contracters of zal m<strong>en</strong> ze door lat<strong>en</strong> gaan met <strong>het</strong> beschadig<strong>en</strong> van <strong>het</strong><br />

milieu? Is er e<strong>en</strong> policy met betrekk<strong>in</strong>g tot <strong>het</strong> betrekk<strong>en</strong> van de mann<strong>en</strong><br />

bij <strong>het</strong> werk<strong>en</strong> met betere system<strong>en</strong>?<br />

- Zull<strong>en</strong> de geme<strong>en</strong>schapp<strong>en</strong> vergoed word<strong>en</strong> voor de grote offers die ze<br />

moet<strong>en</strong> br<strong>en</strong>g<strong>en</strong>? Wordt er e<strong>en</strong> fonds <strong>in</strong> <strong>het</strong> lev<strong>en</strong> geroep<strong>en</strong>?<br />

Hr. de Wolf:<br />

- Indi<strong>en</strong> <strong>het</strong> rapport negatief is, zou <strong>het</strong> theoretisch gezi<strong>en</strong> gestopt kunn<strong>en</strong><br />

word<strong>en</strong>, maar <strong>in</strong> de praktijk is dat niet zo. Nagegaan wordt hoe de<br />

negatieve effect<strong>en</strong> gemitigeerd kunn<strong>en</strong> word<strong>en</strong>. Het ligt uite<strong>in</strong>delijk aan<br />

<strong>Surgold</strong> zelf om op basis van de rapport<strong>en</strong> te besliss<strong>en</strong> wat zij wil do<strong>en</strong>.<br />

De overheid kan ook aangev<strong>en</strong> wat hun eig<strong>en</strong> ideeën zijn <strong>en</strong> wat voor<br />

overe<strong>en</strong>komst <strong>het</strong> wil sluit<strong>en</strong> met <strong>Surgold</strong>.<br />

- Het project heeft ook vele positieve effect<strong>en</strong> zoals de ontwikkel<strong>in</strong>g van<br />

<strong>het</strong> gebied, de ontwikkel<strong>in</strong>g van <strong>het</strong> land <strong>en</strong> werkgeleg<strong>en</strong>heid.<br />

Hr. Emanuels:<br />

- t<strong>en</strong> aanzi<strong>en</strong> van de <strong>in</strong>formatie naar de geme<strong>en</strong>schapp<strong>en</strong> toe <strong>en</strong> FPIC is <strong>het</strong><br />

bedrijf met de Sur<strong>in</strong>aamse overheid <strong>in</strong> gesprek om te kom<strong>en</strong> tot <strong>het</strong> do<strong>en</strong><br />

van zak<strong>en</strong>. Het toepass<strong>en</strong> van <strong>het</strong> pr<strong>in</strong>cipe van FPIC is juist iets dat de<br />

overheid zou moet<strong>en</strong> aangrijp<strong>en</strong> om te do<strong>en</strong>. To<strong>en</strong> Granman Levi nog <strong>in</strong><br />

lev<strong>en</strong> was, heeft <strong>het</strong> geprobeerd de m<strong>en</strong>s<strong>en</strong> <strong>in</strong> <strong>het</strong> gebied te <strong>in</strong>former<strong>en</strong>.<br />

Ook is e<strong>en</strong> persoon aangetrokk<strong>en</strong> om <strong>het</strong> contact met de lokale<br />

geme<strong>en</strong>schapp<strong>en</strong> te onderhoud<strong>en</strong>.<br />

- Er zijn bije<strong>en</strong>komst<strong>en</strong> gepland op Langa Tabiki <strong>en</strong> Mo<strong>en</strong>go <strong>en</strong> hij zelf is<br />

e<strong>en</strong> paar keer bij de Granman geweest. Er v<strong>in</strong>dt regelmatig<br />

<strong>in</strong>formatieuitwissel<strong>in</strong>g plaats tuss<strong>en</strong> <strong>het</strong> bedrijf <strong>en</strong> de lokale<br />

geme<strong>en</strong>schapp<strong>en</strong>. Heel <strong>in</strong> <strong>het</strong> beg<strong>in</strong> zijn er zelfs commissies daartoe<br />

<strong>in</strong>gesteld.<br />

Hr. Jab<strong>in</strong>i: <strong>het</strong> bedrijf is er medeverantwoordelijk voor om de m<strong>en</strong>s<strong>en</strong> vooraf te<br />

<strong>in</strong>former<strong>en</strong>. Lessons learned van Iamgold zoud<strong>en</strong> meeg<strong>en</strong>om<strong>en</strong> moet<strong>en</strong> word<strong>en</strong><br />

<strong>en</strong> e<strong>en</strong> behoorlijk deel van de opbr<strong>en</strong>gst<strong>en</strong> moet terugvloei<strong>en</strong> naar de<br />

geme<strong>en</strong>schapp<strong>en</strong>. Zal er e<strong>en</strong> fonds opgericht word<strong>en</strong>?<br />

Hr. Asadang:<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A8


- gekek<strong>en</strong> wordt wat er met de lokale goudzoekers zal gebeur<strong>en</strong> <strong>en</strong> sam<strong>en</strong><br />

met de overheid wordt gekek<strong>en</strong> naar e<strong>en</strong> duurzame oploss<strong>in</strong>g van <strong>het</strong><br />

probleem. Het is niet de bedoel<strong>in</strong>g dat ze daar steeds word<strong>en</strong> weggehaald,<br />

maar dat ze daar kunn<strong>en</strong> doorwerk<strong>en</strong> <strong>en</strong> wel op e<strong>en</strong> verantwoorde manier<br />

<strong>en</strong> daarmee e<strong>en</strong> <strong>in</strong>kom<strong>en</strong> hebb<strong>en</strong>. Het is wel belangrijk van h<strong>en</strong> te<br />

vernem<strong>en</strong> wat ze will<strong>en</strong>. Ev<strong>en</strong>wel is <strong>het</strong> niet duidelijk met wie er gepraat<br />

moet word<strong>en</strong> want er zijn diverse organisaties.<br />

- In <strong>het</strong> gebied zal er na <strong>het</strong> opstart<strong>en</strong> van de aktiviteit<strong>en</strong> werkgeleg<strong>en</strong>heid<br />

ontstaan <strong>en</strong> er zal zoveel mogelijk met lokale m<strong>en</strong>s<strong>en</strong> gewerkt word<strong>en</strong>.<br />

Ook zull<strong>en</strong> lokale m<strong>en</strong>s<strong>en</strong> aangezet word<strong>en</strong> tot <strong>het</strong> opzett<strong>en</strong> van<br />

toelever<strong>in</strong>gsbedrijv<strong>en</strong> <strong>en</strong> daartoe zal hun capaciteit versterkt word<strong>en</strong>.<br />

Eerderg<strong>en</strong>oemde zak<strong>en</strong> zull<strong>en</strong> mak<strong>en</strong> dat e<strong>en</strong> deel van <strong>het</strong> geld <strong>in</strong> <strong>het</strong><br />

gebied achterblijft.<br />

- Alhoewel <strong>het</strong> bedrijf nog niet verdi<strong>en</strong>t, wordt er nu al <strong>in</strong> de geme<strong>en</strong>schap<br />

geïnvesteerd, zoals f<strong>in</strong>anciële ondersteun<strong>in</strong>g voor de best geslaagd<strong>en</strong>. Er<br />

zal e<strong>en</strong> fonds opgezet word<strong>en</strong>, zoals dat <strong>in</strong> de andere land<strong>en</strong> is gebeurd.<br />

Hr. Johannes Tojo: zal er met bestaande organisaties <strong>in</strong> <strong>het</strong> gebied gewerkt<br />

word<strong>en</strong>? Hij heeft rare ervar<strong>in</strong>g<strong>en</strong> met <strong>het</strong> bedrijf. Hun organisatie is e<strong>en</strong><br />

regionale organisatie van de dorp<strong>en</strong> <strong>en</strong> ze hadd<strong>en</strong> zich aangemeld bij <strong>het</strong><br />

bedrijf t<strong>en</strong>e<strong>in</strong>de e<strong>en</strong> bijdrage te lever<strong>en</strong> aan de sociale organisatie, maar ze zijn<br />

g<strong>en</strong>egeerd.<br />

Hr. Asadang: <strong>Surgold</strong> wil zeer zeker met iedere<strong>en</strong> sam<strong>en</strong>werk<strong>en</strong>. Wijl<strong>en</strong><br />

Granman Levi had e<strong>en</strong> platform opgezet <strong>en</strong> wat <strong>Surgold</strong> graag wil is e<strong>en</strong><br />

platform opzett<strong>en</strong> waar<strong>in</strong> elk segm<strong>en</strong>t van de sam<strong>en</strong>lev<strong>in</strong>g is<br />

verteg<strong>en</strong>woordigd. Ge<strong>en</strong> <strong>en</strong>kele organisatie moet uitgeslot<strong>en</strong> word<strong>en</strong>, want<br />

<strong>Surgold</strong> is er niet om tweedracht te zaai<strong>en</strong>.<br />

Hr. Courtar: geeft <strong>het</strong> advies om <strong>het</strong> gezag van <strong>het</strong> traditioneel gezag niet te<br />

ondermijn<strong>en</strong>; er moet<strong>en</strong> ge<strong>en</strong> m<strong>en</strong>s<strong>en</strong> teg<strong>en</strong> elkaar uitgespeeld word<strong>en</strong>.<br />

Hr. Asadang: <strong>in</strong> <strong>het</strong> platform hebb<strong>en</strong> er kapite<strong>in</strong>s zitt<strong>in</strong>g die door de m<strong>en</strong>s<strong>en</strong><br />

van de geme<strong>en</strong>schapp<strong>en</strong> zelf zijn aangewez<strong>en</strong>.<br />

Hr. Courtar: hij ziet veel chaos <strong>en</strong> daarom adviseert hij <strong>het</strong> <strong>in</strong>stituut van de<br />

Granman <strong>in</strong> stand te houd<strong>en</strong>.<br />

AFSLUITING – hr. Kamble<br />

Door dhr. Kamble wordt aangegev<strong>en</strong> dat m<strong>en</strong>s<strong>en</strong> alsnog hun op- <strong>en</strong><br />

aanmerk<strong>in</strong>g<strong>en</strong> kunn<strong>en</strong> doorgev<strong>en</strong> <strong>en</strong> belangrijk is dat m<strong>en</strong> hun naam <strong>en</strong><br />

telefoonnummer erbij vermeldt.<br />

Alle aanwezig<strong>en</strong> word<strong>en</strong> nam<strong>en</strong>s <strong>Surgold</strong> van harte bedankt voor hun<br />

aanwezigheid <strong>en</strong> participatie.<br />

Notulist: Cynthia Ashruf ©<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A9


Box 1.1 Paramaribo Record of Photographs<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A10


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A11


A record was kept of all att<strong>en</strong>dees and this is listed <strong>in</strong> Box 1.2 below<br />

Box 1.2 Paramaribo Att<strong>en</strong>dees<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A12


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A13


2 VERSLAG OPENBARE BIJEENKOMST MOENGO<br />

Op 18 augustus werd er e<strong>en</strong> bije<strong>en</strong>komst gehoud<strong>en</strong> <strong>in</strong> de Recreatiezaal te<br />

Mo<strong>en</strong>go. De voertal<strong>en</strong> op deze bije<strong>en</strong>komst war<strong>en</strong> Nederlands <strong>en</strong> Sranan<br />

Tongo.<br />

De pres<strong>en</strong>tator<strong>en</strong> war<strong>en</strong>:<br />

Dhr. Ryan Kamble, HSLP Coord<strong>in</strong>ator <strong>Surgold</strong><br />

Dhr. Radjkoemar Sandjiets<strong>in</strong>gh, Head Geologist <strong>Merian</strong> Gold <strong>Project</strong><br />

Dhr. Rutger de Wolf, ERM-verteg<strong>en</strong>woordiger<br />

Dhr. Salomon Emanuels , ERM-verteg<strong>en</strong>woordiger<br />

Ag<strong>en</strong>da van de bije<strong>en</strong>komst:<br />

Welkomstwoord<br />

Inleid<strong>in</strong>g /huisregels/ ag<strong>en</strong>da<br />

<strong>Project</strong>beschrijv<strong>in</strong>g<br />

Milieu-analyse<br />

<strong>Sociale</strong> analyses<br />

Vrag<strong>en</strong> <strong>en</strong> antwoord<strong>en</strong><br />

Sluit<strong>in</strong>g<br />

Informeel sam<strong>en</strong>zijn<br />

Welomstwoord <strong>en</strong> Inleid<strong>in</strong>g/ huisreges/ ag<strong>en</strong>da<br />

Dhr. Kamble, HSLP Coord<strong>in</strong>ator <strong>Surgold</strong><br />

Dhr. Kamble heette de aanwezig<strong>en</strong> van harte welkom nam<strong>en</strong>s <strong>Surgold</strong>.<br />

Aangegev<strong>en</strong> wordt dat <strong>het</strong> <strong>in</strong> dez<strong>en</strong> om de tweede van drie bije<strong>en</strong>komst<strong>en</strong><br />

gaat. De vorige bije<strong>en</strong>komst werd gehoud<strong>en</strong> <strong>in</strong> Paramaribo <strong>en</strong> de laatste<br />

op<strong>en</strong>bare bije<strong>en</strong>komst zal word<strong>en</strong> gehoud<strong>en</strong> op Langa Tabiki.<br />

Voorts wordt aangegev<strong>en</strong> dat de aanwezig<strong>en</strong> tijd<strong>en</strong>s deze bije<strong>en</strong>komst zelf <strong>in</strong><br />

de geleg<strong>en</strong>heid word<strong>en</strong> gesteld <strong>in</strong>put te gev<strong>en</strong> <strong>in</strong> de vorm van <strong>het</strong> stell<strong>en</strong> van<br />

vrag<strong>en</strong>. Er word<strong>en</strong> notul<strong>en</strong> gemaakt van de bije<strong>en</strong>komst <strong>en</strong> die zull<strong>en</strong> over<br />

<strong>en</strong>ige tijd ter beschikk<strong>in</strong>g zijn.<br />

Na <strong>in</strong>structies gegev<strong>en</strong> te hebb<strong>en</strong> <strong>in</strong> geval van calamiteit<strong>en</strong>, neemt dhr. Kamble<br />

de basisregels <strong>en</strong> de ag<strong>en</strong>da door.<br />

<strong>Project</strong>beschrijv<strong>in</strong>g `<br />

Mr. Radjkoemar Sandjiets<strong>in</strong>gh, Head Geologist <strong>Merian</strong> Gold <strong>Project</strong><br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

Wie is <strong>Surgold</strong>?<br />

o E<strong>en</strong> bedrijf van Newmont & Alcoa met Newmont als de<br />

manager<br />

o Exploreert <strong>in</strong> <strong>het</strong> <strong>Merian</strong>gebied s<strong>in</strong>ds 2004 -> nog ge<strong>en</strong><br />

goudproductie<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A14


o Nog ge<strong>en</strong> goudproductie – <strong>in</strong> afwacht<strong>in</strong>g van overe<strong>en</strong>komst met<br />

de overheid<br />

<strong>Project</strong>locatie<br />

<strong>Project</strong>onderdel<strong>en</strong><br />

Mach<strong>in</strong>erieën -> hydraulische graafmach<strong>in</strong>es, haul trucks, dozers,<br />

graders, loaders<br />

<strong>Project</strong>werknemers:<br />

o Ongeveer 1.500-2.000 tijd<strong>en</strong>s constructie (<strong>in</strong>clusief tijdelijke<br />

contractors gebruikt voor constructiewerkzaamhed<strong>en</strong>)<br />

o Ongeveer 900 tijd<strong>en</strong>s operations ofwel exploitatiefase<br />

Afval van <strong>het</strong> project -> vast <strong>en</strong> vloeibaar afval. Vast afval is afkomstig<br />

uit de mijn <strong>en</strong> wordt getransporteerd naar e<strong>en</strong> opslagplaats voor<br />

afvalgeste<strong>en</strong>te. Dit afval zal ge<strong>en</strong> schade aan <strong>het</strong> milieu toebr<strong>en</strong>g<strong>en</strong> <strong>en</strong><br />

zal ook ge<strong>en</strong> zure dra<strong>in</strong>agesystem<strong>en</strong> tot gevolg hebb<strong>en</strong>. Vloeibaar afval<br />

wordt getransporteerd naar e<strong>en</strong> tail<strong>in</strong>g storage facility (faciliteit voor de<br />

opslag van afvalslik). Er zull<strong>en</strong> damm<strong>en</strong> gebouwd word<strong>en</strong> <strong>en</strong> water dat<br />

zich <strong>in</strong> de vijver heeft verzameld, zal teruggepompt word<strong>en</strong>, welke na<br />

zuiver<strong>in</strong>g <strong>in</strong> <strong>het</strong> milieu geloodst zal word<strong>en</strong><br />

Verwerk<strong>in</strong>gsdiagram -> er zal met cyanide <strong>en</strong> koolstof gewerkt word<strong>en</strong><br />

om <strong>het</strong> goud uit <strong>het</strong> geste<strong>en</strong>te te hal<strong>en</strong>. Er zal sprake zijn van e<strong>en</strong><br />

recovery van 97%.<br />

Transportmaterial<strong>en</strong> -> tijd<strong>en</strong>s de constructiefase <strong>en</strong> <strong>het</strong> mijn<strong>en</strong> zull<strong>en</strong> er<br />

material<strong>en</strong> word<strong>en</strong> geïmporteerd <strong>en</strong> voor al <strong>het</strong> geïmporteerd materiaal<br />

zal gebruik gemaakt word<strong>en</strong> van de Hav<strong>en</strong>. Het transport zal<br />

plaatsv<strong>in</strong>d<strong>en</strong> via de Oost-West verb<strong>in</strong>d<strong>in</strong>g naar Mo<strong>en</strong>go <strong>en</strong> van daaruit<br />

wordt <strong>het</strong> verder getransporteerd naar Langa Tabiki. De weg wordt<br />

door <strong>Surgold</strong> <strong>in</strong> orde gemaakt <strong>en</strong> vanuit Langa Tabiki naar Mo<strong>en</strong>go<br />

wordt er e<strong>en</strong> weg van 60 km aangelegd<br />

Mijnsluit<strong>in</strong>g<br />

Voorbeeld<strong>en</strong> van mijnsluit<strong>in</strong>g<strong>en</strong> Indonesië<br />

Milieu- <strong>en</strong> <strong>Sociale</strong> Effect<strong>en</strong>analyse<br />

Dhr. Rutger de Wolf, ERM-verteg<strong>en</strong>woordiger<br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

Wat is e<strong>en</strong> ESIA?<br />

Vier onderdel<strong>en</strong> van e<strong>en</strong> ESIA -> milieu, gezondheid, sociaal, overleg<br />

met stakeholders<br />

Wie voert de ESIA uit? -> Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t<br />

(ERM)<br />

De rol van ERM<br />

Wat zijn de vereist<strong>en</strong> voor e<strong>en</strong> ESIA?<br />

Wat omvat e<strong>en</strong> ESIA?<br />

Milieustudies:<br />

- Grondwater: hoe lop<strong>en</strong> de strom<strong>en</strong> <strong>en</strong> wat kan er verander<strong>en</strong><br />

wanneer <strong>het</strong> project wordt uitgevoerd?<br />

- Luchtkwaliteit: met<strong>en</strong> van chemicaliën <strong>en</strong> deeltjes <strong>in</strong> de lucht <strong>en</strong><br />

nagegaan wordt hoe <strong>het</strong> e.e.a. zou kunn<strong>en</strong> gaan verander<strong>en</strong><br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A15


- Geluid: kijk<strong>en</strong> naar huidige geluidsniveaus, wat kan je verwacht<strong>en</strong><br />

<strong>en</strong> welke maatregel<strong>en</strong> kunn<strong>en</strong> getroff<strong>en</strong> word<strong>en</strong><br />

- Bom<strong>en</strong> <strong>en</strong> plant<strong>en</strong>: nagegaan wordt of er bijzondere plant<strong>en</strong><br />

aanwezig zijn, of <strong>het</strong> gaat om kwetsbare ecosystem<strong>en</strong> <strong>en</strong> hoe de<br />

negatieve effect<strong>en</strong> gemitigeerd kunn<strong>en</strong> word<strong>en</strong><br />

- Dier<strong>en</strong>: verschill<strong>en</strong>de experts zull<strong>en</strong> e<strong>en</strong> <strong>in</strong>v<strong>en</strong>taris mak<strong>en</strong> <strong>en</strong><br />

nagaan of er kwetsbare of bedreigde diersoort<strong>en</strong> aanwezig zijn<br />

- Verkeer: de <strong>in</strong>t<strong>en</strong>siteit, onveilige situaties <strong>en</strong> ev<strong>en</strong>tuele to<strong>en</strong>ame<br />

daarvan na opstart<strong>en</strong> van <strong>het</strong> project<br />

- Kwaliteit oppervlaktewater: welke <strong>in</strong>vloed<strong>en</strong> zull<strong>en</strong> de<br />

opslagfaciliteit<strong>en</strong> hebb<strong>en</strong> op de waterlop<strong>en</strong> <strong>in</strong> die gebied<strong>en</strong><br />

Social and Health Assessm<strong>en</strong>ts<br />

Dhr. Salomon Emanuels, verteg<strong>en</strong>woordiger of ERM<br />

Hoofdpunt<strong>en</strong> van de pres<strong>en</strong>tatie:<br />

In de dorp<strong>en</strong> die mogelijk beïnvloed word<strong>en</strong> door <strong>het</strong> project:<br />

• Huishoud<strong>en</strong>quêtes<br />

• Interviews <strong>en</strong> focusgroep-discussies<br />

• Studies <strong><strong>in</strong>zake</strong> de volksgezondheid<br />

Start: september 2011<br />

Studiegebied voor de sociale- <strong>en</strong> gezondheidssituatie<br />

• gebied rondom de mijn<br />

• strook langs de weg -> Mo<strong>en</strong>go naar Paramaribo<br />

• Paramakaanse dorp<strong>en</strong><br />

Overleg met <strong>het</strong> Publiek<br />

• M<strong>en</strong>s<strong>en</strong> zull<strong>en</strong> hun m<strong>en</strong><strong>in</strong>g<strong>en</strong> kunn<strong>en</strong> gev<strong>en</strong> -> rapport<strong>en</strong> word<strong>en</strong><br />

gedistribueerd naar groep<strong>en</strong> / organisaties die hun m<strong>en</strong><strong>in</strong>g kunn<strong>en</strong><br />

gev<strong>en</strong>. (NIMOS zal e<strong>en</strong> advies uitbr<strong>en</strong>g<strong>en</strong>)<br />

• Consultatiepr<strong>in</strong>cipes: allesomvatt<strong>en</strong>d, transparant, met aandacht<br />

voor o.a. cultuur, lev<strong>en</strong>sonderhoud.<br />

Review <strong>en</strong> publicatie van ESIA-bev<strong>in</strong>d<strong>in</strong>g<strong>en</strong><br />

ESIA ToR beschikbaar gesteld op/bij:<br />

• <strong>Surgold</strong> Kantoor - Paramaribo (Sur<strong>in</strong>amestraat)<br />

• NIMOS kantoor – Paramaribo<br />

• <strong>Surgold</strong> Kamp – <strong>Merian</strong><br />

Volg<strong>en</strong>de stapp<strong>en</strong>:<br />

• Onderzoek <strong><strong>in</strong>zake</strong> Sociaal & Cultureel Erfgoed<br />

• Ecologisch onderzoek<br />

• Belangstell<strong>en</strong>d<strong>en</strong> geïnformeerd houd<strong>en</strong><br />

• Slotbije<strong>en</strong>komst teg<strong>en</strong> April 2012<br />

Slotopmerk<strong>in</strong>g<strong>en</strong><br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A16


• ESIA moet afgerond zijn voordat <strong>het</strong> exploitatierecht door de reger<strong>in</strong>g<br />

is uitgegev<strong>en</strong><br />

• ESIA is belangrijk voor de <strong>Project</strong>ontwikkel<strong>in</strong>g<br />

• U zal de geleg<strong>en</strong>heid krijg<strong>en</strong> om te participer<strong>en</strong><br />

• De resultat<strong>en</strong> van de ESIA zull<strong>en</strong> gepres<strong>en</strong>teerd word<strong>en</strong>, zodat uw<br />

opmerk<strong>in</strong>g<strong>en</strong> kunn<strong>en</strong> word<strong>en</strong> meeg<strong>en</strong>om<strong>en</strong>.<br />

Vrag<strong>en</strong> <strong>en</strong> antwoord<strong>en</strong><br />

1. Verteg<strong>en</strong>woordiger van de districtscommissaris. Hij vroeg om <strong>het</strong> proces<br />

van <strong>in</strong>formatieverzamel<strong>in</strong>g transparant te lat<strong>en</strong> verlop<strong>en</strong>, alsook alle <strong>in</strong>formatie.<br />

Ryan Kambel<br />

Hij antwoordde dat <strong>het</strong> ESIA-proces transparant zal zijn.<br />

2. Mariska Poesee, verteg<strong>en</strong>woordiger van STEP<br />

a. Ze vroeg of de MBO’s of CBO’s bij <strong>het</strong> ESIA-proces betrokk<strong>en</strong> zijn. Ze<br />

legde uit dat ze deze vraag stelde omdat er organisaties <strong>in</strong> Mo<strong>en</strong>go zijn, zoals<br />

PAS <strong>en</strong> STEP die met NGO’s, CBO’s, vrouw<strong>en</strong>organisaties <strong>en</strong><br />

jonger<strong>en</strong>organisaties werk<strong>en</strong> <strong>en</strong> ze k<strong>en</strong>n<strong>en</strong> <strong>het</strong> veld heel goed. Zij kunn<strong>en</strong> e<strong>en</strong><br />

belangrijke bijdrage lever<strong>en</strong> aan <strong>het</strong> proces.<br />

b. Ze bracht naar vor<strong>en</strong> dat de geme<strong>en</strong>schap van Mo<strong>en</strong>go erg geïnteresseerd is<br />

<strong>in</strong> <strong>het</strong> ESIA-proces <strong>en</strong> <strong>in</strong> werkgeleg<strong>en</strong>heid. De meeste m<strong>en</strong>s<strong>en</strong> hebb<strong>en</strong> ge<strong>en</strong><br />

opleid<strong>in</strong>g g<strong>en</strong>ot<strong>en</strong> of zijn niet gekwalificeerd om voor <strong>het</strong> bedrijf te werk<strong>en</strong>. Ze<br />

vroeg wat <strong>het</strong> bedrijf zou kunn<strong>en</strong> do<strong>en</strong> om de m<strong>en</strong>s<strong>en</strong> klaar te stom<strong>en</strong> voor de<br />

beschikbare jobs <strong>in</strong> <strong>het</strong> bedrijf.<br />

Salomon Emanuels<br />

a. Hij stelde dat tijd<strong>en</strong>s <strong>het</strong> opstell<strong>en</strong> van de stakeholderslijst er e<strong>en</strong> uitnodig<strong>in</strong>g<br />

is verstuurd naar de coörd<strong>in</strong>ator<strong>en</strong> van deze NGO’s <strong>in</strong> Mo<strong>en</strong>go. Deze moest<strong>en</strong><br />

de boodschap verspreid<strong>en</strong>. Hij stelde ook dat ze <strong>het</strong> idee <strong>in</strong> overweg<strong>in</strong>g zoud<strong>en</strong><br />

nem<strong>en</strong> om apart met de verschill<strong>en</strong>de groep<strong>en</strong> te prat<strong>en</strong> om zodo<strong>en</strong>de<br />

<strong>in</strong>dividuele <strong>in</strong>put van alle groep<strong>en</strong> te krijg<strong>en</strong>.<br />

Santjits<strong>in</strong>g Radjkoemar<br />

b. Hij bracht naar vor<strong>en</strong> dat de kwestie van werkgeleg<strong>en</strong>heid nog niet<br />

gedef<strong>in</strong>ieerd is. Zodra er <strong>in</strong>formatie beschikbaar is <strong><strong>in</strong>zake</strong> werkgeleg<strong>en</strong>heid, zal<br />

deze met de stakeholders word<strong>en</strong> gedeeld. Hij weet dat m<strong>en</strong> van plan is om<br />

zoveel als mogelijk lokale <strong>in</strong>woners (Paramaccaners) <strong>in</strong> te hur<strong>en</strong>. Het is<br />

mogelijk dat lokale m<strong>en</strong>s<strong>en</strong> <strong>en</strong> m<strong>en</strong>s<strong>en</strong> uit Paramaribo voor wat betreft<br />

bepaalde posities niet voldo<strong>en</strong> aan de vastgestelde eis<strong>en</strong>; <strong>in</strong> die gevall<strong>en</strong> zal <strong>het</strong><br />

bedrijf m<strong>en</strong>s<strong>en</strong> uit <strong>het</strong> buit<strong>en</strong>land aantrekk<strong>en</strong>. Hij bracht naar vor<strong>en</strong> dat <strong>het</strong><br />

bedrijf mom<strong>en</strong>teel lokale bewoners <strong>en</strong> m<strong>en</strong>s<strong>en</strong> uit Paramaribo <strong>en</strong> Mo<strong>en</strong>go<br />

tra<strong>in</strong>t om b<strong>in</strong>n<strong>en</strong> <strong>het</strong> bedrijf te werk<strong>en</strong>.<br />

3. Francis, verteg<strong>en</strong>woordiger van de organisatie “Kon mek wi Taki Makandi”<br />

(Let Us Talk Together).<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A17


a. Ze vroeg welke b<strong>en</strong>ader<strong>in</strong>g <strong>Surgold</strong> zou toepass<strong>en</strong> <strong>in</strong>di<strong>en</strong> zij waardevolle<br />

fauna <strong>en</strong> flora <strong>in</strong> <strong>het</strong> exploitatiegebied aantreff<strong>en</strong>. Ze wilde wet<strong>en</strong> of <strong>het</strong> bedrijf<br />

dan toch door zou gaan met <strong>het</strong> project.<br />

b. Ze vroeg ook wat <strong>Surgold</strong> zal betek<strong>en</strong><strong>en</strong> voor de lokale bewoners <strong>in</strong> <strong>het</strong><br />

Marowijnegebied.<br />

Rutger de Wolf<br />

a. Hij antwoordde dat dit allemaal red<strong>en</strong><strong>en</strong> zijn waarom er e<strong>en</strong> ESIA wordt<br />

verricht. Indi<strong>en</strong> zij kwetsbare gebied<strong>en</strong>, beschermde dier<strong>en</strong> <strong>en</strong> bedreigde<br />

diersoort<strong>en</strong> aantreff<strong>en</strong>, zull<strong>en</strong> de specialist<strong>en</strong> aanbevel<strong>in</strong>g<strong>en</strong> do<strong>en</strong> aan <strong>Surgold</strong><br />

om de negatieve effect<strong>en</strong> op deze gebied<strong>en</strong> <strong>en</strong> plant- <strong>en</strong> diersoort<strong>en</strong> te<br />

verm<strong>in</strong>der<strong>en</strong>. Op dit mom<strong>en</strong>t kunn<strong>en</strong> zij ge<strong>en</strong> specifiek antwoord gev<strong>en</strong> met<br />

betrekk<strong>in</strong>g tot de aanwezigheid van bov<strong>en</strong>g<strong>en</strong>oemde onderwerp<strong>en</strong> omdat zij<br />

eerst onderzoek moet<strong>en</strong> verricht<strong>en</strong>.<br />

W<strong>en</strong>dell Asadang<br />

b. Hij antwoordde dat <strong>Surgold</strong> e<strong>en</strong> positieve impact zal hebb<strong>en</strong> op de lokale<br />

bevolk<strong>in</strong>g <strong>en</strong> dat <strong>het</strong> project h<strong>en</strong> t<strong>en</strong> goede zal kom<strong>en</strong>. Er zal werkgeleg<strong>en</strong>heid<br />

gecreëerd word<strong>en</strong> <strong>en</strong> de lokale bewoners zull<strong>en</strong> getra<strong>in</strong>d word<strong>en</strong> om bedrijv<strong>en</strong><br />

op te zett<strong>en</strong>, zodat zij goeder<strong>en</strong> aan <strong>het</strong> bedrijf kunn<strong>en</strong> lever<strong>en</strong>. Het is mogelijk<br />

dat <strong>het</strong> bedrijf niet <strong>in</strong> staat zal zijn om al haar noodzakelijke goeder<strong>en</strong> van de<br />

lokale bevolk<strong>in</strong>g op te kop<strong>en</strong>.<br />

Hij legde uit dat <strong>het</strong> bedrijf haar eig<strong>en</strong> manier van werk<strong>en</strong> heeft. In andere<br />

land<strong>en</strong> heeft Newmont e<strong>en</strong> fonds opgezet met als doel de lokale geme<strong>en</strong>schap<br />

te ontwikkel<strong>en</strong>. Wanneer Newmont vertrekt uit zo’n land, zal <strong>het</strong> geld <strong>in</strong> <strong>het</strong><br />

fonds achterblijv<strong>en</strong> om de lokale geme<strong>en</strong>schap <strong>en</strong> <strong>het</strong> gebied te ontwikkel<strong>en</strong>.<br />

Dit fonds is onderworp<strong>en</strong> aan veel vereist<strong>en</strong>. E<strong>en</strong> van deze vereist<strong>en</strong> is<br />

educatie. De lokale bevolk<strong>in</strong>g zal word<strong>en</strong> geleerd hoe te overlev<strong>en</strong> <strong>in</strong> de<br />

geme<strong>en</strong>schap <strong>en</strong> als gevolg daarvan de ontwikkel<strong>in</strong>g van <strong>het</strong> gez<strong>in</strong> te<br />

bevorder<strong>en</strong>.<br />

In de afgelop<strong>en</strong> drie jaar is er beurs verstrekt aan de best geslaagde stud<strong>en</strong>t van<br />

de drie lagere schol<strong>en</strong> te Langa Tabiki, Nazon <strong>en</strong> Loka Loka. Er werd<strong>en</strong> e<strong>en</strong><br />

jong<strong>en</strong> <strong>en</strong> e<strong>en</strong> meisje uitgekoz<strong>en</strong> <strong>en</strong> elk ontv<strong>in</strong>g<strong>en</strong> zij USD 1.000. Verder heeft<br />

<strong>Surgold</strong> USD 1.000 geschonk<strong>en</strong> om e<strong>en</strong> gebouw op te zett<strong>en</strong> te Langa Tabiki.<br />

De weg van Mo<strong>en</strong>go naar Basecamp zal cont<strong>in</strong>u word<strong>en</strong> onderhoud<strong>en</strong>.<br />

4. Verteg<strong>en</strong>woordiger van de DC<br />

a. Hij gaf aan dat hij e<strong>en</strong> heleboel heeft gehoord over STEP <strong>en</strong> hij wilde wet<strong>en</strong><br />

of STEP de voordel<strong>en</strong> afkomstig van de exploitatie van <strong>het</strong> project zal<br />

beheers<strong>en</strong>.<br />

b. Hij vroeg ook waarom alle<strong>en</strong> stud<strong>en</strong>t<strong>en</strong> van de lokale geme<strong>en</strong>schap e<strong>en</strong><br />

beurs van <strong>Surgold</strong> hebb<strong>en</strong> ontvang<strong>en</strong>.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A18


Salomon Emanuels<br />

a. Hij antwoordde dat <strong>het</strong> de bedoel<strong>in</strong>g is van de maatschappij om alle<br />

person<strong>en</strong> <strong>en</strong> groep<strong>en</strong> die e<strong>en</strong> positieve bijdrage zull<strong>en</strong>/kunn<strong>en</strong> lever<strong>en</strong> aan de<br />

maatschappij, te betrekk<strong>en</strong>.<br />

W<strong>en</strong>dell Asadang<br />

b. Hij antwoordde dat <strong>het</strong> bedrijf er mom<strong>en</strong>teel de voorkeur aan geeft om de<br />

lokale leefgeme<strong>en</strong>schap die <strong>het</strong> dichtstbij woont van <strong>het</strong> project, te<br />

ondersteun<strong>en</strong>. In de toekomst wanneer <strong>het</strong> bedrijf zich <strong>in</strong> de productiefase<br />

bev<strong>in</strong>dt, zull<strong>en</strong> waarschijnlijk meer gebied<strong>en</strong> steun van <strong>het</strong> bedrijf ontvang<strong>en</strong>.<br />

5. Ramijatal Bouwlid,<br />

a. Ze vroeg hoe groot <strong>het</strong> gebied is, waar de gr<strong>en</strong>z<strong>en</strong> zijn van <strong>het</strong> project; welk<br />

gebied <strong>Surgold</strong> zal gebruik<strong>en</strong> voor de exploitatiewerkzaamhed<strong>en</strong>.<br />

b. Ze gaf aan dat ze onderwijzeres is <strong>en</strong> vroeg wat de mogelijkhed<strong>en</strong> zijn voor<br />

haar om te kunn<strong>en</strong> werk<strong>en</strong> op e<strong>en</strong> van de schol<strong>en</strong> <strong>in</strong> <strong>het</strong> Paramacca-gebied.<br />

Ingrid Pradon<br />

a. Ze antwoordde dat bepaald was dat de ESIA zal word<strong>en</strong> verricht <strong>in</strong> ti<strong>en</strong><br />

dorp<strong>en</strong> langs de Marowijneriver, de geme<strong>en</strong>schap <strong>in</strong> <strong>het</strong> gebied van de<br />

bov<strong>en</strong>loop van de Commewijne, de geme<strong>en</strong>schap langs de weg van Paramaribo<br />

naar Mo<strong>en</strong>go <strong>en</strong> de geme<strong>en</strong>schap langs de weg van Mo<strong>en</strong>go naar Langa<br />

Tabiki. Het bedrijf zal ook kijk<strong>en</strong> naar de gr<strong>en</strong>s waarnaar verwez<strong>en</strong> is <strong>in</strong> de<br />

pres<strong>en</strong>tatie.<br />

Santjits<strong>in</strong>g Radjkoemar<br />

a. Hij gaf wat additionele <strong>in</strong>formatie met betrekk<strong>in</strong>g tot de gr<strong>en</strong>z<strong>en</strong>. <strong>Surgold</strong><br />

zal ook werk<strong>en</strong> met de exploitatiegr<strong>en</strong>s, welke e<strong>en</strong> gebied beslaat van 18.000<br />

hectare. Van die 18.000 ha, zal 1500 ha word<strong>en</strong> gebruikt om de mijn <strong>en</strong> de<br />

betreff<strong>en</strong>de faciliteit<strong>en</strong> op te zett<strong>en</strong>.<br />

Salomon Emanuels<br />

b. Hij antwoordde dat <strong>het</strong> niet de verantwoordelijkheid van <strong>het</strong> bedrijf is om te<br />

bepal<strong>en</strong> waar leerkracht<strong>en</strong> les moet<strong>en</strong> gev<strong>en</strong>. Dat besluit moet door de overheid<br />

word<strong>en</strong> g<strong>en</strong>om<strong>en</strong>.<br />

Mike Meyer<br />

b. Mike voegde hieraan toe dat tijd<strong>en</strong>s <strong>het</strong> ESIA-proces, <strong>het</strong> bedrijf de<br />

mogelijkhed<strong>en</strong> voor sociale ontwikkel<strong>in</strong>g zal id<strong>en</strong>tificer<strong>en</strong>. Dit zal geschied<strong>en</strong><br />

<strong>in</strong> sam<strong>en</strong>werk<strong>in</strong>g met de lokale leefgeme<strong>en</strong>schap zoals die van <strong>het</strong> bov<strong>en</strong>-<br />

Marowijnegebied, <strong>het</strong> Paramaccagebied. Hij stelde voorts dat zij ook als doel<br />

hebb<strong>en</strong> e<strong>en</strong> beter <strong>in</strong>zicht <strong>in</strong> wat nodig is voor <strong>het</strong> kamp tijd<strong>en</strong>s de<br />

exploitatiewerkzaamhed<strong>en</strong>. Op dit mom<strong>en</strong>t verwacht<strong>en</strong> zij dat er e<strong>en</strong> kamp zal<br />

zijn voor de arbeiders <strong>en</strong> niet voor gez<strong>in</strong>n<strong>en</strong>. Verwacht wordt dat <strong>het</strong> grootste<br />

deel van de m<strong>en</strong>s<strong>en</strong> zal kom<strong>en</strong> uit de lokale leefgeme<strong>en</strong>schap om te werk<strong>en</strong> <strong>en</strong><br />

dan terug te ker<strong>en</strong> naar hun gez<strong>in</strong> wanneer <strong>het</strong> werk voltooid is.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A19


6. Mej. Simone Betterson<br />

a. Ze stelt dat ze begrijpt dat de ESIA handelt over drie onderwerp<strong>en</strong>, nl.<br />

milieu, sociale aspect<strong>en</strong> <strong>en</strong> gezondheid. Maar ze heeft ge<strong>en</strong> bewijs gezi<strong>en</strong> dat<br />

de drie verantwoordelijke m<strong>in</strong>isteries betrokk<strong>en</strong> zijn bij de sam<strong>en</strong>werk<strong>in</strong>g<br />

gedur<strong>en</strong>de <strong>het</strong> ESIA-proces. Ze adviseerde om deze drie m<strong>in</strong>isteries <strong>in</strong> <strong>het</strong><br />

ESIA-proces te betrekk<strong>en</strong>.<br />

Salomon Emanuels<br />

Hij bracht naar vor<strong>en</strong> dat <strong>in</strong> <strong>het</strong> algeme<strong>en</strong> tijd<strong>en</strong>s <strong>het</strong> EISA-proces de<br />

antwoord<strong>en</strong> op de vrag<strong>en</strong> van de m<strong>en</strong>s<strong>en</strong> duidelijk zull<strong>en</strong> word<strong>en</strong> <strong>en</strong> aan de<br />

geme<strong>en</strong>schap zull<strong>en</strong> word<strong>en</strong> doorgespeeld.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A20


Vakje 2.1 Foto’s van de bije<strong>en</strong>komst te Mo<strong>en</strong>go<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A21


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A22


Er werd e<strong>en</strong> lijst bijgehoud<strong>en</strong> van alle aanwezig<strong>en</strong>. Deze lijst is opg<strong>en</strong>om<strong>en</strong> <strong>in</strong> onderstaand Error! Refer<strong>en</strong>ce source not found.<br />

Box 2.2 Aanwezig<strong>en</strong> te Mo<strong>en</strong>go<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A23


3 VERSLAG OPENBARE BIJEENKOMST TE LANGA TABIKI<br />

Op 19 augustus werd er e<strong>en</strong> bije<strong>en</strong>komst gehoud<strong>en</strong> <strong>in</strong> de Krutu Oso, Langa<br />

Tabiki. De voertal<strong>en</strong> op deze bije<strong>en</strong>komst war<strong>en</strong> Nederlands <strong>en</strong> Sranan Tongo.<br />

De pres<strong>en</strong>tator<strong>en</strong> war<strong>en</strong>:<br />

Dhr. W<strong>en</strong>dell Asadang, HSLP Coord<strong>in</strong>ator <strong>Surgold</strong><br />

Dhr. Radjkoemar Sandjiets<strong>in</strong>gh, Head Geologist <strong>Merian</strong> Gold <strong>Project</strong><br />

Dhr. Rutger de Wolf, ERM-verteg<strong>en</strong>woordiger<br />

Dhr. Salomon Emanuels , ERM-verteg<strong>en</strong>woordiger<br />

De verschill<strong>en</strong>de pres<strong>en</strong>taties op deze bije<strong>en</strong>komst war<strong>en</strong> dezelfde als die van<br />

Paramaribo <strong>en</strong> Mo<strong>en</strong>go, <strong>en</strong> zull<strong>en</strong> dus niet word<strong>en</strong> herhaald hier.<br />

Vrag<strong>en</strong> <strong>en</strong> Antwoord<strong>en</strong><br />

1. Dhr. Adriaan Adawde<br />

a. Dhr. Adriaan bracht naar vor<strong>en</strong> dat dhr. Salomon <strong>en</strong> dhr. Santjits<strong>in</strong>g <strong>in</strong> hun<br />

pres<strong>en</strong>tatie hadd<strong>en</strong> gesteld dat de overheid zal bepal<strong>en</strong> wat <strong>in</strong> de overe<strong>en</strong>komst<br />

met Newmont moet word<strong>en</strong> opg<strong>en</strong>om<strong>en</strong>. Hij stelde dat de overheid dit zal<br />

bepal<strong>en</strong>, maar dat <strong>het</strong> ook belangrijk is dat lokale geme<strong>en</strong>schap haar <strong>in</strong>br<strong>en</strong>g <strong>in</strong><br />

dez<strong>en</strong> heeft. Volg<strong>en</strong>s hem is er ge<strong>en</strong> sam<strong>en</strong>werk<strong>in</strong>g tuss<strong>en</strong> de overheid, <strong>het</strong><br />

bedrijf <strong>en</strong> de lokale leefgeme<strong>en</strong>schap. Ook stelde hij dat dit niet aan <strong>het</strong> bedrijf<br />

ligt, omdat hij gezi<strong>en</strong> heeft dat zij, <strong>het</strong> bedrijf, vanaf 2004 regelmatig aanwezig<br />

is <strong>in</strong> <strong>het</strong> gebied.<br />

b. He bracht ook naar vor<strong>en</strong> dat <strong>het</strong> bedrijf <strong>in</strong> 2014 met de mijnwerkzaamhed<strong>en</strong><br />

van start zal gaan. Hij vroeg <strong>Surgold</strong> om e<strong>en</strong> tra<strong>in</strong><strong>in</strong>gsc<strong>en</strong>trum op te zett<strong>en</strong> om<br />

de lokale bewoners te tra<strong>in</strong><strong>en</strong>. Dit zou e<strong>en</strong> goede geleg<strong>en</strong>heid zijn voor de<br />

m<strong>en</strong>s<strong>en</strong> van de lokale geme<strong>en</strong>schap om zichzelf te ontwikkel<strong>en</strong> <strong>en</strong> e<strong>en</strong> betere<br />

kans te hebb<strong>en</strong> om door <strong>het</strong> bedrijf te word<strong>en</strong> aangetrokk<strong>en</strong>.<br />

c. Hij vervolgde door te stell<strong>en</strong> dat <strong>het</strong> project e<strong>en</strong>maal 24 uur zal draai<strong>en</strong>. Hij<br />

stelde dat dit feit de situatie <strong>in</strong> de geme<strong>en</strong>schap zal verander<strong>en</strong> omdat de<br />

mann<strong>en</strong> weg zull<strong>en</strong> zijn van hun vrouw<strong>en</strong> <strong>en</strong> de vrouw<strong>en</strong> m<strong>in</strong>der hulp van de<br />

mann<strong>en</strong> zull<strong>en</strong> krijg<strong>en</strong> voor hun landbouwactiviteit<strong>en</strong>.<br />

d. Hij stelde voor dat <strong>Surgold</strong> e<strong>en</strong> delegatie van de lokale geme<strong>en</strong>schap naar<br />

e<strong>en</strong> ander deel <strong>in</strong> de wereld br<strong>en</strong>gt waar Newmont ook werkzaam is, zodat zij<br />

misschi<strong>en</strong> kunn<strong>en</strong> zi<strong>en</strong> hoe de bedrijv<strong>en</strong> operer<strong>en</strong>.<br />

e. Hij vroeg ook of de lokale geme<strong>en</strong>schap gebruik zou kunn<strong>en</strong> mak<strong>en</strong> van de<br />

weg die Newmont van plan is aan te legg<strong>en</strong> van Mo<strong>en</strong>go naar Langa Tabiki.<br />

f. Hij vroeg of <strong>Surgold</strong> terug zal kom<strong>en</strong> om de resultat<strong>en</strong> van de ESIA-studie te<br />

pres<strong>en</strong>ter<strong>en</strong> <strong>en</strong> of de lokale geme<strong>en</strong>schap e<strong>en</strong> <strong>in</strong>br<strong>en</strong>g zal hebb<strong>en</strong> <strong>in</strong> <strong>het</strong> e<strong>in</strong>d-<br />

EISA-rapport. .<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A24


g. Ook stelde hij dat de meeste lokale bewoners reg<strong>en</strong>water voor eig<strong>en</strong> gebruik<br />

verzamel<strong>en</strong> <strong>in</strong> grote tanks, maar dat wanneer <strong>het</strong> project van start gaat, ze niet<br />

meer <strong>in</strong> staat zull<strong>en</strong> zijn om dat nog te do<strong>en</strong> vanwege de <strong>en</strong>orme stofwolk<strong>en</strong> die<br />

zull<strong>en</strong> ontstaan.<br />

h. Hij vroeg ook of de lokale bevolk<strong>in</strong>g betrokk<strong>en</strong> zal word<strong>en</strong> bij de milieubasel<strong>in</strong>estudies.<br />

Salomon Emanuels<br />

a-g. Hij antwoordde dat al deze vrag<strong>en</strong> tijd<strong>en</strong>s <strong>het</strong> ESIA-proces aan de orde<br />

zull<strong>en</strong> kom<strong>en</strong> <strong>en</strong> dat de weg zou kunn<strong>en</strong> word<strong>en</strong> gebruikt door de lokale<br />

geme<strong>en</strong>schap. ERM zal <strong>in</strong> april 2012 terugkom<strong>en</strong> om de resultat<strong>en</strong> van de<br />

ESIA te pres<strong>en</strong>ter<strong>en</strong> <strong>en</strong> <strong>het</strong> ESIA-rapport zal ook beschikbaar zijn voor <strong>het</strong><br />

publiek ter evaluatie.<br />

Rutger de Wolf<br />

h. Hij antwoordde dat e<strong>en</strong> lokale bewoner, nl. Van Troon betrokk<strong>en</strong> is bij de<br />

florastudie. De mogelijkheid bestaat dat meer Paramaccaners aan de groep<br />

word<strong>en</strong> toegevoegd.<br />

2. Redmond, Hoofd van de Lagere School van Loka Loka .<br />

Hij stelt dat <strong>het</strong> bedrijf de best geslaagd<strong>en</strong> van de drie lagere schol<strong>en</strong> te Langa<br />

Tabiki, Nazon <strong>en</strong> Loka Loka e<strong>en</strong> beurs van USD 1.000 heeft gegev<strong>en</strong> om hun<br />

studies <strong>in</strong> Paramaribo voort te zett<strong>en</strong>. Hij zei dat zij <strong>het</strong> geld e<strong>en</strong>malig hebb<strong>en</strong><br />

ontvang<strong>en</strong> <strong>en</strong> dat <strong>het</strong> bedrag niet voldo<strong>en</strong>de is voor deze stud<strong>en</strong>t<strong>en</strong> om hun<br />

studies <strong>in</strong> Paramaribo af te rond<strong>en</strong>. Hij vroeg of <strong>het</strong> bedrijf deze stud<strong>en</strong>t<strong>en</strong> niet<br />

elk jaar e<strong>en</strong> beurs kan gev<strong>en</strong>, <strong>in</strong>geval ze vorder<strong>in</strong>g<strong>en</strong> boek<strong>en</strong>, om h<strong>en</strong> te<br />

stimuler<strong>en</strong> hun best te blijv<strong>en</strong> do<strong>en</strong>.<br />

W<strong>en</strong>dell Asadang<br />

Hij zei dat dit verzoek zal word<strong>en</strong> doorgegev<strong>en</strong>.<br />

3. Adam Ceder, ondernemer<br />

Hij stelde dat hij nam<strong>en</strong>s zijn leefgeme<strong>en</strong>schap praat. Granman Levi heeft de<br />

lokale geme<strong>en</strong>schap gegarandeerd dat de led<strong>en</strong> van de geme<strong>en</strong>schap goud<br />

zoud<strong>en</strong> mog<strong>en</strong> exploiter<strong>en</strong> <strong>in</strong> <strong>het</strong> Paramaccaansgebied <strong>en</strong> <strong>het</strong> goud aan de<br />

C<strong>en</strong>trale Bank van Sur<strong>in</strong>ame zoud<strong>en</strong> kunn<strong>en</strong> verkop<strong>en</strong>. Vanaf de porkknockers<br />

verwijderd zijn uit <strong>het</strong> Gowtu Bergi-gebied, was beloofd dat er e<strong>en</strong> weg zou<br />

word<strong>en</strong> aangelegd voor de porkknockers maar dit is nog steeds niet gebeurd.<br />

Verder gaf hij aan dat er e<strong>en</strong> heleboel militair<strong>en</strong> <strong>in</strong> <strong>het</strong> gebied zijn <strong>en</strong> dat de<br />

lokale geme<strong>en</strong>schap hier niet tevred<strong>en</strong> over is. Hij vroeg om de militair<strong>en</strong> te<br />

verwijder<strong>en</strong> uit dit gebied.<br />

W<strong>en</strong>dell Asadang<br />

Hij stelde dat <strong>het</strong> bedrijf sam<strong>en</strong> met de lokale geme<strong>en</strong>schap zal werk<strong>en</strong> <strong>en</strong> hij<br />

d<strong>en</strong>kt dat de tijd daarvoor nu echt rijp is. Dit zal ervoor zorg<strong>en</strong> dat e<strong>en</strong> ieder<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A25


zijn zegje kan do<strong>en</strong> <strong>en</strong> dat voorkom<strong>en</strong> zal word<strong>en</strong> dat verschill<strong>en</strong>de m<strong>en</strong>s<strong>en</strong><br />

zich opwerp<strong>en</strong> als verteg<strong>en</strong>woordigers van de lokale organisaties.<br />

Hij stelde dat <strong>het</strong> bedrijf ge<strong>en</strong> controle heeft over waar de politie opereert. Hij<br />

stelde verder dat op dit mom<strong>en</strong>t er ge<strong>en</strong> militair<strong>en</strong> <strong>in</strong> <strong>het</strong> kamp aanwezig zijn.<br />

4. Dhr. Johannes Amautan, kapite<strong>in</strong><br />

Hij erk<strong>en</strong>de dat er porkknockers uit <strong>het</strong> gebied zijn verwijderd. Hij bevestigde<br />

dat ze beloofd hadd<strong>en</strong> e<strong>en</strong> weg te bouw<strong>en</strong> zodat de porknockers hun<br />

activiteit<strong>en</strong> kunn<strong>en</strong> voortzett<strong>en</strong>.<br />

5. Johannes Toyo.<br />

Hij gaf aan dat de geme<strong>en</strong>schap altijd wil werk<strong>en</strong> met <strong>het</strong> bedrijf.<br />

Ezechiel, kapite<strong>in</strong><br />

Hij vroeg om de lokale geme<strong>en</strong>schap te betrekk<strong>en</strong> <strong>in</strong> <strong>het</strong><br />

onderhandel<strong>in</strong>gsproces met de overheid <strong>en</strong> dat er ook naar mogelijkhed<strong>en</strong> voor<br />

de porkknockers wordt gekek<strong>en</strong>.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A26


Box 3.1 Langa Tabiki Record of Photographs<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A27


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A28


A record was kept of all att<strong>en</strong>dees and this is listed <strong>in</strong> Error! Refer<strong>en</strong>ce source not found. below<br />

Box 3.2 Langa Tabiki Att<strong>en</strong>dees<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A29


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

A30


Annex C<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

Notifications of Public<br />

Meet<strong>in</strong>gs<br />

B1


1 PRIOR NOTIFICATIONS OF PUBLIC MEETINGS<br />

Prior to the public meet<strong>in</strong>gs public notifications were made <strong>in</strong> public places<br />

and via the media <strong>in</strong>form<strong>in</strong>g a stakeholder of the times dates and locations.<br />

All notifications were made <strong>in</strong> Dutch, Sranan Tongo or other local languages.<br />

Box 1.1 lists the text that was used to announce the public meet<strong>in</strong>gs through<br />

the media.<br />

Box 1.1 Public Announcem<strong>en</strong>t Text<br />

<strong>Surgold</strong> <strong>in</strong>vites all <strong>in</strong>terested parties to att<strong>en</strong>d public meet<strong>in</strong>gs to learn about the proposed<br />

<strong>Merian</strong> Gold M<strong>in</strong><strong>in</strong>g <strong>Project</strong>.<br />

<strong>Surgold</strong> has commissioned Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t (ERM), an <strong>in</strong>ternational<br />

<strong>en</strong>vironm<strong>en</strong>tal consultancy, to complete an <strong>in</strong>dep<strong>en</strong>d<strong>en</strong>t study of the <strong>en</strong>vironm<strong>en</strong>tal, social and<br />

health impacts of the project. The Environm<strong>en</strong>tal, Social and Health Impact Assessm<strong>en</strong>t<br />

(ESHIA), carried out by ERM, will id<strong>en</strong>tify, reduce or avoid negative impacts and promote<br />

positive impacts. These meet<strong>in</strong>gs are a key elem<strong>en</strong>t of the ongo<strong>in</strong>g ESHIA and are be<strong>in</strong>g held to<br />

<strong>in</strong>form the public about the project and to <strong>in</strong>vite them to ask questions and express their views.<br />

The meet<strong>in</strong>gs will <strong>in</strong>volve a pres<strong>en</strong>tation provid<strong>in</strong>g <strong>in</strong>formation about the project and the<br />

ESHIA process, and will discuss the av<strong>en</strong>ues by which the public may seek further details or<br />

submit questions. Maps, <strong>in</strong>formational brochures and the proposed methodology for the<br />

assessm<strong>en</strong>t will be available for review. Repres<strong>en</strong>tatives of both <strong>Surgold</strong> and ERM will be<br />

pres<strong>en</strong>t at the ev<strong>en</strong>ts.<br />

We want to hear from you! Please jo<strong>in</strong> us at one of the follow<strong>in</strong>g meet<strong>in</strong>gs:<br />

Paramaribo | Wednesday 17 August 2011<br />

Hotel Krasnapolsky Confer<strong>en</strong>ce Ballroom | 6.00PM – 9.00PM<br />

Mo<strong>en</strong>go | Thursday 18 August 2011<br />

Recreatie zaal | 3.00PM – 6.00PM<br />

Langa Tabiki | Friday 19 August 2011<br />

Krutu Osu | 10.00AM – 1.00 PM<br />

Learn about the <strong>Merian</strong> <strong>Project</strong> and let the <strong>Merian</strong> <strong>Project</strong> learn from you!<br />

If you would like to att<strong>en</strong>d one of these meet<strong>in</strong>gs but require transport, please contact Claus<strong>in</strong>e<br />

Tjappa at (08831090).<br />

For further details regard<strong>in</strong>g the public meet<strong>in</strong>gs and the <strong>Project</strong>, please contact:<br />

W<strong>en</strong>dell Asadang<br />

Community Relation Coord<strong>in</strong>ator<br />

Email: w<strong>en</strong>del.asadang@newmont.com<br />

Tel: 8638655<br />

Table 1.1 lists the dates that this announcem<strong>en</strong>t was made <strong>in</strong> the local media.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

B2


Table 1.1 Public notifications<br />

Radio Station Date announced Newspaper Date published<br />

Radio 10 03-Aug De ware Tijd 04-Aug<br />

Radio Ap<strong>in</strong>tie 04-Aug Times of Sur<strong>in</strong>am 04-Aug<br />

Skyradio 04-Aug Dagblad 04-Aug<br />

Radio Koyeba 04-Aug De ware Tijd 04-Aug<br />

Radio 10 10-Aug<br />

Radio Ap<strong>in</strong>tie 10-Aug<br />

Skyradio 10-Aug<br />

Radio Koyeba 10-Aug<br />

In addition to these public meet<strong>in</strong>gs writt<strong>en</strong> <strong>in</strong>vitations were s<strong>en</strong>t to key<br />

stakeholders and banners (see Box 1.2) and posters (see Box 1.3) were hung <strong>in</strong><br />

relevant locations.<br />

Box 1.2 Public Meet<strong>in</strong>g Banners<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

B3


Box 1.3 Public Meet<strong>in</strong>g Poster<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

B4


Annex D<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

Public Meet<strong>in</strong>g Materials<br />

C1


1 PUBLIC MEETING MATERIALS<br />

Box 1.1 <strong>Merian</strong> Flyer<br />

In order to dissem<strong>in</strong>ate <strong>in</strong>formation regard<strong>in</strong>g the ESIA and the <strong>Project</strong> flyers<br />

and pres<strong>en</strong>tations where prepared for stakeholders. All flyers and<br />

pres<strong>en</strong>tations were available <strong>in</strong> Dutch and English and the pres<strong>en</strong>tation slides<br />

were displayed <strong>in</strong> Dutch.<br />

Box 2.1 shows the flyer available to stakeholders and shows the pres<strong>en</strong>tation<br />

giv<strong>en</strong> to stakeholders.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

C2


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

C3


ENVIRONMENTAL RESOURCES MANAGEMENT<br />

C4


Box 1.2 <strong>Merian</strong> Pres<strong>en</strong>tation<br />

ENVIRONMENTAL RESOURCES MANAGEMENT<br />

C5


<strong>Merian</strong> Gold<br />

<strong>Project</strong><br />

Environm<strong>en</strong>tal and Social Impact Assessm<strong>en</strong>t<br />

Public Meet<strong>in</strong>gs - August 2011


Welcome & Introductions<br />

Purpose of Public Meet<strong>in</strong>g:<br />

• Inform <strong>in</strong>terested groups about the <strong>Project</strong><br />

• Describe <strong>Merian</strong> <strong>Project</strong><br />

• List<strong>en</strong> to your pot<strong>en</strong>tial concerns


Ground Rules<br />

• Mutual respect, courtesy, and pati<strong>en</strong>ce.<br />

• Please help ma<strong>in</strong>ta<strong>in</strong> an atmosphere where<br />

everyone feels comfortable and welcome.<br />

• Please don’t <strong>in</strong>terrupt anyone while they are<br />

speak<strong>in</strong>g.<br />

• Please rema<strong>in</strong> quiet so everyone can hear; please<br />

leave the room for side discussions.<br />

• Please turn off cell phones or set them to vibrate.<br />

• Raise hands to ask a question.


1. <strong>Project</strong> Description<br />

Ag<strong>en</strong>da<br />

2. The Environm<strong>en</strong>tal and Social Impact<br />

Assessm<strong>en</strong>t (ESIA)<br />

3. Questions and Answers<br />

4. Clos<strong>in</strong>g Remarks


Who Are <strong>Surgold</strong>?<br />

• A company held by Newmont<br />

& Alcoa with Newmont as the<br />

manager<br />

• Explor<strong>in</strong>g <strong>in</strong> <strong>Merian</strong> area s<strong>in</strong>ce<br />

2004<br />

• No gold production yet –<br />

await<strong>in</strong>g agreem<strong>en</strong>t with state


<strong>Merian</strong><br />

<strong>Project</strong><br />

Langa<br />

Tabiki<br />

What is the <strong>Merian</strong><br />

<strong>Project</strong>?<br />

<strong>Project</strong> Location<br />

• Approximately 66km<br />

South of Mo<strong>en</strong>go<br />

• Betwe<strong>en</strong> Commewijne<br />

and Marowijne Rivers<br />

• Langa Tabiki is the<br />

nearest village<br />

(approximately 10km<br />

from site)<br />

• Approximately 40km<br />

north of Nassau<br />

Mounta<strong>in</strong>s


Pits<br />

Tail<strong>in</strong>gs<br />

Right of Exploitation<br />

Boundary<br />

<strong>Project</strong> Compon<strong>en</strong>ts<br />

The <strong>Project</strong> will need the<br />

follow<strong>in</strong>g compon<strong>en</strong>ts:<br />

• 3 – 4 op<strong>en</strong> pits<br />

• Process<strong>in</strong>g Plant<br />

• Waste rock storage<br />

• Tail<strong>in</strong>g storage<br />

• Power g<strong>en</strong>eration<br />

• Water Treatm<strong>en</strong>t facilities<br />

• Offices and<br />

accommodation


Example Op<strong>en</strong> Pit


Examples of<br />

Process<strong>in</strong>g<br />

Above: example of gold process<strong>in</strong>g plant<br />

Left: example of leach tanks


Example<br />

Mach<strong>in</strong>ery


Waste from the <strong>Project</strong><br />

Above: example of waste rock storage<br />

Below: example of tail<strong>in</strong>gs facility


<strong>Project</strong> employees:<br />

• Approximately 1,500-<br />

2,000 dur<strong>in</strong>g<br />

construction (<strong>in</strong>clud<strong>in</strong>g<br />

temporary contractor for<br />

construction)<br />

• Approximately 900<br />

dur<strong>in</strong>g operations<br />

Curr<strong>en</strong>t <strong>Merian</strong> Exploration Camp


Input: M<strong>in</strong>ed Rock Crush Rock<br />

Float <strong>in</strong> Tanks<br />

Output:<br />

Recover 95% Gold<br />

Simple M<strong>in</strong><strong>in</strong>g Flow Diagram<br />

Gr<strong>in</strong>d Rock<br />

Total production approximately 350,000<br />

oz per annum.<br />

Approximately 11 year ‘m<strong>in</strong>e-life’


Transport<br />

Route<br />

M<strong>in</strong>e Transport Route


M<strong>in</strong>e Closure<br />

• Protect <strong>en</strong>vironm<strong>en</strong>t & public health & safety –<br />

<strong>en</strong>sure physical and geological stability of land<br />

• Susta<strong>in</strong>able use of site after closure – cont<strong>in</strong>uous<br />

reclamation & rehabilitations of land back <strong>in</strong>to<br />

forest<br />

• M<strong>in</strong>imize negative effects after closure to<br />

<strong>en</strong>vironm<strong>en</strong>t and community - monitor<strong>in</strong>g<br />

• Overall positive impact to wildlife, animals and<br />

people - susta<strong>in</strong>able social and economic b<strong>en</strong>efits


Example M<strong>in</strong>e Closure - Indonesia<br />

APRIL 2003


Example M<strong>in</strong>e Closure - Indonesia<br />

May 2008 – Five years later


Example M<strong>in</strong>e Closure - Indonesia


FEBRUARY 1999<br />

MARCH<br />

2000<br />

MAY 2000<br />

Example Reclamation of M<strong>in</strong>e - Indonesia<br />

SEPTEMBER 2006 MAY 2007


2003 2004<br />

Example Reclamation of Waste Rock - Indonesia<br />

2005 2007


Environm<strong>en</strong>tal and Social Impact<br />

What is an ESIA?<br />

Assessm<strong>en</strong>t<br />

A process to determ<strong>in</strong>e the<br />

effects of a <strong>Project</strong> on people<br />

and the <strong>en</strong>vironm<strong>en</strong>t.<br />

Promote positive impacts &<br />

reduce or avoid negative<br />

impacts


Four Compon<strong>en</strong>ts of an ESIA<br />

Social<br />

Cultural/heritage<br />

Employm<strong>en</strong>t/livelihoods<br />

Education<br />

Environm<strong>en</strong>t<br />

Air and water quality<br />

Waste and noise<br />

Plants and animals<br />

Health<br />

Community health<br />

Health services<br />

Behaviors


Who will do the ESIA?<br />

Environm<strong>en</strong>tal Resources Managem<strong>en</strong>t<br />

(ERM) will conduct the ESIA.<br />

• Indep<strong>en</strong>d<strong>en</strong>t, <strong>in</strong>ternational consultant specialis<strong>in</strong>g <strong>in</strong> ESIAs<br />

• ERM is an <strong>in</strong>ternational <strong>en</strong>vironm<strong>en</strong>tal consult<strong>in</strong>g firm with over 30<br />

years of experi<strong>en</strong>ce <strong>in</strong> impact assessm<strong>en</strong>t<br />

• 40 countries, 3,000 employees - global expertise & local context<br />

• A team of <strong>en</strong>vironm<strong>en</strong>tal, social, and health specialists with<br />

experi<strong>en</strong>ce <strong>in</strong> m<strong>in</strong>e <strong>Project</strong>s<br />

• Approach to ESIA <strong>in</strong>volves partnership with local specialists, <strong>in</strong>clud<strong>in</strong>g<br />

the specialists here today from ESS and others


ERM’s Role<br />

• <strong>Surgold</strong> has contracted ERM to prepare the ESIA<br />

for the Proposed <strong>Merian</strong> <strong>Project</strong><br />

• ERM is separate from <strong>Surgold</strong>, they have<br />

commissioned ERM to:<br />

– Act as <strong>in</strong>dep<strong>en</strong>d<strong>en</strong>t consultant to conduct the ESIA<br />

– Recomm<strong>en</strong>d measures to promote the positive and<br />

m<strong>in</strong>imize the negative effects of the <strong>Project</strong><br />

– Facilitate public <strong>in</strong>volvem<strong>en</strong>t - <strong>en</strong>courage and <strong>en</strong>able<br />

<strong>in</strong>terested people or organizations to participate <strong>in</strong> this<br />

process


What are the requirem<strong>en</strong>ts for an<br />

ESIA?<br />

ERM will follow best practice guidel<strong>in</strong>es for the<br />

ESIA:<br />

• Sur<strong>in</strong>amese National Institute of Environm<strong>en</strong>t and Developm<strong>en</strong>t <strong>in</strong><br />

Sur<strong>in</strong>ame (NIMOS) guidel<strong>in</strong>es<br />

• International Standards (International F<strong>in</strong>ance Corporation<br />

Performance Standards)<br />

This means the ESIA will:<br />

– Involves public <strong>in</strong>put throughout<br />

– Docum<strong>en</strong>ts curr<strong>en</strong>t <strong>en</strong>vironm<strong>en</strong>tal and social conditions<br />

– Predicts future conditions<br />

– Recomm<strong>en</strong>ds measures for maximiz<strong>in</strong>g positive and m<strong>in</strong>imiz<strong>in</strong>g<br />

negative effects


What does an ESIA <strong>in</strong>volve?<br />

• Scop<strong>in</strong>g – Id<strong>en</strong>tify likely<br />

impacts and studies required<br />

• Impact Assessm<strong>en</strong>t<br />

– undertake studies to understand<br />

exist<strong>in</strong>g conditions & predict<br />

pot<strong>en</strong>tial changes.<br />

– Design ways to promote positive<br />

& reduce negative impacts<br />

• Monitor<strong>in</strong>g and Evaluation


Environm<strong>en</strong>tal Studies<br />

• Groundwater Study<br />

• Air Quality Studies<br />

• Noise Study<br />

• Plant Study<br />

• Animal Study<br />

• Soil Study<br />

• Traffic Study<br />

• Surface Water Quality<br />

Study


M<strong>in</strong>e Site<br />

Right of<br />

Exploitation<br />

Boundary<br />

Langa<br />

Tabiki<br />

Environm<strong>en</strong>tal<br />

Study Area<br />

The area that may be<br />

affected by changes to<br />

the <strong>en</strong>vironm<strong>en</strong>t caused<br />

by the <strong>Project</strong><br />

Studies – August 2011<br />

to February 2012


Social and Health Studies<br />

In the villages that could be<br />

affected<br />

• Survey of households that<br />

may be impacted<br />

• Interviews and groups<br />

discussions <strong>in</strong> impacted<br />

villages<br />

• Health studies<br />

September 2011 onwards


Transport<br />

Route Study<br />

Area (<strong>in</strong> blue)<br />

M<strong>in</strong>e Site<br />

<strong>Merian</strong> Study<br />

Area (<strong>in</strong> yellow)<br />

Pamaka Study<br />

Area (<strong>in</strong> blue)<br />

Social and Health<br />

Study Area<br />

The area that may be<br />

affected by changes to<br />

the conditions <strong>in</strong> local<br />

villages:<br />

• area surround<strong>in</strong>g m<strong>in</strong>e site<br />

• area along road<br />

• Pamaka villages


Public Consultation<br />

• Public <strong>in</strong>put is a critical compon<strong>en</strong>t of the<br />

ESIA process<br />

– Solicit <strong>in</strong>put from you throughout the ESIA process<br />

– Ongo<strong>in</strong>g communication via mail, radio, email, and<br />

newspapers<br />

Consultation Pr<strong>in</strong>ciples:<br />

Inclusive, culturally s<strong>en</strong>sitive,<br />

transpar<strong>en</strong>t


Review & Publication of ESIA<br />

F<strong>in</strong>d<strong>in</strong>gs<br />

• Distribute ESIA report to<br />

NIMOS, governm<strong>en</strong>t &<br />

other <strong>in</strong>terested groups<br />

• Hold meet<strong>in</strong>gs to pres<strong>en</strong>t<br />

impacts, the assessm<strong>en</strong>t &<br />

mitigation / managem<strong>en</strong>t<br />

measures<br />

• Receive public comm<strong>en</strong>ts<br />

on the impacts & mitigation


ESIA Terms of Refer<strong>en</strong>ce<br />

To Describe the purpose and structure of<br />

the ESIA<br />

Available from:<br />

• <strong>Surgold</strong> Office - Paramaribo (Sur<strong>in</strong>ame Straat)<br />

• NIMOS office – Paramaribo<br />

• <strong>Surgold</strong> Camp - <strong>Merian</strong>


Date<br />

August, 2011<br />

March – April 2012<br />

June 2012<br />

Overall ESIA Schedule<br />

August 2011-Februrary<br />

2012<br />

February –March, 2012<br />

May 2010<br />

Public meet<strong>in</strong>g<br />

Basel<strong>in</strong>e Studies<br />

Impact Assessm<strong>en</strong>t Studies<br />

Prepare Draft ESIA report & hold public meet<strong>in</strong>g<br />

to disclose f<strong>in</strong>d<strong>in</strong>gs<br />

F<strong>in</strong>alize ESIA report<br />

Deliver F<strong>in</strong>al ESIA<br />

ESIA Process/Activity


Next Steps<br />

• Social & Cultural Heritage studies<br />

• Environm<strong>en</strong>tal studies<br />

• Will keep <strong>in</strong>terested groups <strong>in</strong>formed<br />

• Disclosure meet<strong>in</strong>g around April 2012


<strong>Project</strong> Contacts and Information<br />

ERM<br />

For ESIA questions or<br />

comm<strong>en</strong>ts: Salomon Emanuels<br />

Phone: (0) 8553324<br />

Email:salomonemanuels@yahoo.com<br />

/ merian.esia@erm.com<br />

<strong>Surgold</strong><br />

For <strong>Project</strong> related questions or comm<strong>en</strong>ts:<br />

<strong>Project</strong> po<strong>in</strong>t of contact: W<strong>en</strong>dell Asadang<br />

Phone: (0) 8638655 / 7172880<br />

Email: w<strong>en</strong>del.asadang@newmont.com


Clos<strong>in</strong>g Remarks<br />

• ESIA must be complete before exploitation<br />

right awarded by governm<strong>en</strong>t<br />

• ESIA is crucial to <strong>Project</strong> developm<strong>en</strong>t<br />

• You will have the opportunity to participate<br />

• The ESIA results will be pres<strong>en</strong>ted to you<br />

so you can comm<strong>en</strong>t.


Thank you for your<br />

time!<br />

Questions?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!