1. Sludge Pond water Management<br />
During the process of clarifloculation &<br />
separation and filtration at the Clarifloculators &<br />
Gravity filters at the Pre treatment plant of CPP<br />
sludge and Backwash waters are generated. During<br />
June-Sept around 300 M 3 /day waste water is<br />
generated. During the lean period this comes to 100<br />
M 3 /day. This water along with the fine silts and<br />
sludge are transported to the Sludge Pond located<br />
at the side of the Raw water reservoir. In the sludge<br />
pond, sludge, grit consisting of sand, gravel, or<br />
heavy solids are allowed to settle and around 270 -<br />
90 M 3 /day of water is recycled to the raw water<br />
reservoir, depending upon the prevailing season.<br />
412<br />
SLUDGES WITH WATER<br />
FROM<br />
CLARIFLOCULATOR<br />
SERVICE ATER<br />
FOR SCOURING<br />
SLUDGE PITS<br />
1. Coal dust extraction water recycling<br />
System :<br />
During the process of grinding of the Coal at<br />
the Coal Crusher ( capacity 750 T/hr ) in the Coal<br />
Handling plant lot of fine dusts are generated. These<br />
dusts are sucked through two no of dust extractor<br />
SLUDGE PUMPS<br />
SLUDGE POND<br />
fans ( Capacity 4700 SETTLING M POND<br />
3 /hr)In the Cyclone separator<br />
13 M3 /hr of water is sprayed on to it and a slurry is<br />
made.<br />
The slurry are then taken to the settling tank<br />
and passed through zigzag path, thus allowing<br />
SLUDGE POND<br />
OVERFLOW<br />
PIT<br />
settling the coal dust. Clean water is then allowed<br />
to pass through open channels and are guided to the<br />
ash slurry sump no-1.<br />
RAW<br />
WATER<br />
RESOIRVOIR<br />
11.2 – 3.75 cub<br />
M/hr<br />
BACK WAS<br />
FRO<br />
GRAVITY