Accepted Papers - 3.pdf - UNESCO
Accepted Papers - 3.pdf - UNESCO
Accepted Papers - 3.pdf - UNESCO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 2 : Major Rivers, those are flowing through Atrai and Baral Basins<br />
Rivers Length (Km)<br />
Atrai 51.41<br />
Jamuna 46.59<br />
Nagar 41.13<br />
Nandakuja 21.68<br />
Fakirni 18.48<br />
Gur 24.10<br />
Gohala 22.49<br />
Barnai 39.36<br />
Gumani 43.68<br />
Baral 83.54<br />
Sundai 30.51<br />
Source : Chalan Beel Project: Problems and Prospects.<br />
Table 3 : Extent of Water Body and Prospect of Fish Production in Baral Basin.<br />
Fish habitat No. in basin Area in ha Annual fish Annual Fish Fish value<br />
Production Production (In Million<br />
(t/ha) (MT) Taka)<br />
(1997 price)<br />
Perennial Ponds 7000 670 2.70 1800 78.3<br />
Beels 12 269 0.41 110 4.7<br />
Baral river 1 13700 0.11 1438 63.3<br />
Total 14639 0.23 3348 146.3<br />
Source: Feasibility Study of Baral Basin Development Project, Final Report.<br />
Table 4 : Drainage Structures for Water Conservation in Atrai Basin.<br />
No. Name of drain Length in km Area in ha Discharge in No. of vent &<br />
(cubic feet/sec) opening size<br />
(1.52m x 1.83m)<br />
1 Shimultali 4.50 900 10.19 1-vent<br />
2 Udaysiri 4.00 1942 20.37 2-vent<br />
3 Mohatala 2.00 1000 10.19 1-vent<br />
4 Satbeela 1.50 1850 21.69 2-vent<br />
5 Sonadanga 3.00 1833 21.69 2-vent<br />
6 Katabari 2.00 3200 31.10 3-vent<br />
7 Mohishbathan 1.50 2800 31.10 3-vent<br />
8 Ramcharan 2.00 3560 31.10 3-vent<br />
9 Biddyapur 6.00 3800 32.00 3-vent<br />
Source: Feasibility Study of Baral Basin Development Project, Final Report.<br />
484