through Nurek’s HPS normal account flood with<br />

expenses of 5400 m 3 /sec inevitably lead to<br />

catastrophic sequences. Another example can be<br />

Kayrakum’s hydro – unit which safety and<br />

prediction of flowing regime to it existent raised<br />

due to building on upper flow of river Narin –<br />

Sirdarya’s cascade of HPS.<br />

The 3 – rd level: Changes of technical states,<br />

connected with changes of natural – climatic<br />

conditions. Here it is necessary to put as well as<br />

climate change, change of geological conditions.<br />

Besides changes of natural – climatic condition con<br />

be connected with their irregular estimation or under<br />

– estimation of some factors on stage of project. As<br />

examples underestimation of cars – rising in toil<br />

water of Nurek’s HPS and modern processes of<br />

course formation on GBAO rivers con be given.<br />

The 4 – th level: Changes of technical states,<br />

connected with change of planning and exploitation<br />

norms of hydro – technical constructions. Such<br />

changes are quite normal and determined by<br />

development of science and techniques and also<br />

world experience, gained in process of exploitation<br />

existent hydro – technical constructions. Here, first<br />

of all it is necessary to mention change of common<br />

approach to letting in flood trough constructions.<br />

With standards act at USSR for this purpose had<br />

been taken into account all water – outlets, including<br />

HPS turbines. Now, according to world standards<br />

there are only special water – outflows. It frequently<br />

lead to necessity of full reconstruction hydro – units<br />

and building in them new extra water – outflows.<br />

Now the standards of endurance and dam’s firmness<br />

accounts, including with taking into account seismic<br />

influence, are changed.<br />

The 5 – th level: Changes of technical states,<br />

connected with natural way out of constructions,<br />

shock – absorption main founds. These factors are<br />

well known and detail developed norms of their<br />

account exist. In our case the special interest has<br />

not total way out itself, determining by term of<br />

construction’s service, that good enough is<br />

conditional, but that part of it which can be<br />

liquidated at expense of it major repairs . the<br />

experience shows that real form of constructions<br />

service can be extended due to well – timed repairs.<br />

In power – system of Tajikistan the normal repairs<br />

are not realized during the last 10 year already. Of<br />

course the main reason of it is the hard economical<br />

� � �<br />

474<br />

statement of water – power complexes.<br />

The 6 – th level: Changes of technical states,<br />

connected with accidental situations. It is undoable<br />

the most dangerous level,. But unfortunately, it is<br />

not possible to avoid it now. It is shown particularly<br />

by all given above examples of accidents. No one<br />

of them is liquidated finally and all these<br />

construction are continued to exploration under the<br />

danger of further development of accidental<br />

situation.<br />

First of all it is connected with instrumental and<br />

natural observation after the constructions. The<br />

system of KNA establishing at building of hydro –<br />

units is not finished, up to now in mend cases<br />

automatized assembly and even initial processing<br />

of statistics are lacking.<br />

The serious technical analyses of them are not<br />

absolutely realized, since such functions were<br />

entrusted on specialized scientific and planning<br />

institutions of other GIS republics, connection with<br />

them has broken now. For adaptation of Tajikistan’s<br />

power – industry to sequences of climate changes<br />

is necessary for account all these levels of influence.<br />

In this case the determining role belongs to<br />

management and organizing forms.<br />

In this connection it is very important the<br />

question of carried out now in power – industry<br />

reforms, connected with transition to marked<br />

economies. Planned according to approvable by<br />

President of Republic of Tajikistan E. Sh. Rahmonov<br />

joint – stock and privatizing program of power –<br />

industry objects increases its competition ability and<br />

efficiency. But at this case it is important not to lose<br />

manageability and as consequence reliability of<br />

functioning.<br />

For this purpose in October 2000 the Ministry<br />

of power – industry was formed in Tajikistan. Its<br />

main objectives are to carry out state policy in area<br />

of power – industry control and management after<br />

all enterprises, interpedently from their form of<br />

property. The low on power – industry was passed<br />

in republic, the low on safety of hydro – technical<br />

construction is in stage of preparation. There are<br />

introduced the system of activity licensing in power<br />

– industry and experting of all projects. The question<br />

of introducing for enterprises declaration on safety<br />

is on agenda.