REFERENCE LIST
REFERENCE LIST REFERENCE LIST
REFERENCE LIST THE MOST ADVANCED ENERGY-SAVING TECHNOLOGIES Heat only where necessary
- Page 2 and 3: RUSSIA ОАО «Тujmazinskij Zavod
- Page 4 and 5: RUSSIA Ceramiche MARAZZI Project de
- Page 6 and 7: RUSSIA GPZ-1 Project details: PANRA
- Page 8 and 9: RUSSIA OOO “Elativ” Project det
- Page 10 and 11: RUSSIA OOO “NefteGazMash” Proje
- Page 12 and 13: POLAND GIRAD PRONOX TECHNOLOGY EASY
- Page 14 and 15: GERMANY GIRAD DHL Express Service C
- Page 16 and 17: NORWAY GIRAD Torp Flyplass Sandefjo
- Page 18 and 19: NORWAY GIRAD BETONG AS Skurve Proje
- Page 20 and 21: DENMARK ROYAL copenhagen Project de
- Page 22 and 23: CHINA GIRAD Inner Mongolia Sunnergy
- Page 24 and 25: CHINA Hangar GIRAD Project details:
- Page 26 and 27: KOREA Jamsil Gymnasium Project deta
- Page 28 and 29: KOREA Hokey stadium Project details
- Page 30 and 31: SPAIN GIRAD COCA-COLA Project detai
- Page 32 and 33: SPAIN GIRAD Sabadell Athletics Stad
- Page 34 and 35: SWITZERLAND Jet Aviation Project de
- Page 36 and 37: ITALY Baron Industries Project deta
- Page 38 and 39: ITALY Thyssen Krupp - Italy Project
- Page 40 and 41: ITALY IKEA ITALY Retail S.r.l. Proj
- Page 42 and 43: MORE REFERENCES Coca Cola (Madrid)
- Page 44 and 45: MORE REFERENCES VOGEL & NOOT - Bito
<strong>REFERENCE</strong> <strong>LIST</strong><br />
THE MOST ADVANCED ENERGY-SAVING TECHNOLOGIES<br />
Heat only where necessary
RUSSIA<br />
ОАО «Тujmazinskij Zavod Autobetonovozov»<br />
Project details:<br />
PANRAD<br />
Tujmazy (Republic of Bashkortostan)<br />
Year of installation and start-up: 2008<br />
Heating area: 60.000 m 2<br />
External temperature: -25°c<br />
Required internal temperature: 18°c<br />
Maximum height: 14 m
RUSSIA<br />
ОАО “Тяzhmаsh”<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Syzran (Samara Region)<br />
Year of installation and start-up: 2005<br />
Heating area: 38.000 m 2<br />
External temperature: -25°c<br />
Required internal temperature: 18°c<br />
Maximum height: 12 m<br />
232 PANRAD (52 FRB4.1 lenght 9m power 45 kW +180 FRB5 lenght 9m power 50 kW)
RUSSIA<br />
Ceramiche MARAZZI<br />
Project details:<br />
Layout:<br />
PANRAD<br />
Malino (Moscow region)<br />
Year of installation and start-up: 2005<br />
Heating area: 60.000 m 2<br />
External temperature: -25°c<br />
Required internal temperature: 18°c<br />
Maximum height: 12m
RUSSIA<br />
Ceramiche Atlas Concorde<br />
Project details:<br />
Layout:<br />
GIRAD<br />
Stupino (Moscow region)<br />
Year of installation and start-up: 2005<br />
Heating area: 60.000 m 2<br />
External temperature: -25°c<br />
Required internal temperature: 18°c<br />
Maximum height: 12m
RUSSIA<br />
GPZ-1<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Moscow<br />
Year of installation and start-up: 2004<br />
Heating area: 35.000 m 2<br />
External temperature: -25°c<br />
Required internal temperature: 18°c<br />
Maximum height: 12m<br />
84 PANRAD
RUSSIA<br />
OOO “Saratov”<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Engels (Saratov Region)<br />
Refigerator production<br />
60 PANRAD - Power installed 2400 kW
RUSSIA<br />
OOO “Elativ”<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Engels (Saratov Region)<br />
Metal pattern production<br />
6 PANRAD - Power installed: 270 kW
RUSSIA<br />
OAO “Saratovskaja fabrika polimernyh izdelii”<br />
Project details:<br />
Relevant details:<br />
PANRAD<br />
Saratov<br />
Production of PVC items<br />
15 PANRAD - 655 kW
RUSSIA<br />
OOO “NefteGazMash”<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Saratov<br />
Industrial equipment production<br />
36 PANRAD - Power installed: 1690 kW
AZERBAIGIAN<br />
Ganja Automotive Plant<br />
Project details:<br />
Relevant details:<br />
PANRAD<br />
Ganja<br />
Year of installation and start-up: october 2007<br />
Heating area: 20.000 m 2<br />
External temperature: -15°c<br />
Required internal temperature: 18°c<br />
Maximum height: 12m<br />
72 PANRAD mod. FRB5 fuel G20
POLAND<br />
GIRAD<br />
PRONOX TECHNOLOGY EASY TOUCH POLAND S.A.<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Dąbrowa Górnicza<br />
Year of installation and start-up : 2008<br />
Heating area: 16.560 m 2<br />
External temperature : - 15°C<br />
Required internal temperature : + 10°C<br />
Maximum height: 12m<br />
Total installed power: 1.900 kW - Heating solution: GIRAD radiant modules<br />
Appliances installed : 10 pcs. generator GSR roof mounted<br />
Total length (pipes) of the installation: 1.485m single pipe<br />
Control system: digital computer control + Software SCP200 Fraccaro
GERMANY<br />
GIRAD<br />
THYSSENKRUPP NIROSTA Segmentwerkstatt<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Krefeld<br />
Year of installation and start-up: 2009<br />
Heating area: 3.900 m 2<br />
External temperature: - 10°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 18m<br />
Total installed power: 1.200 kW<br />
Heating solution: GIRAD radiant modules
GERMANY<br />
GIRAD<br />
DHL Express Service Center<br />
Project details:<br />
Raunheim<br />
Year of installation and start-up : 2009<br />
Heating area: 5.700 m 2<br />
External temperature : - 10°C<br />
Required internal temperature : +18°C<br />
Maximum height: 10m
GERMANY<br />
AERO-DIENST.<br />
Project details:<br />
Layout:<br />
GIRAD<br />
Nürnberg<br />
Year of installation and start-up : 2008<br />
Heating area: 1.500 m 2<br />
External temperature : - 16°C<br />
Required internal temperature : +21°C<br />
Maximum height: 14m
NORWAY<br />
GIRAD<br />
Torp Flyplass Sandefjord<br />
Project details:<br />
Sandefjord<br />
Year of installation and start-up: 2009<br />
Heating area: 2.300 m 2<br />
External temperature: - 20°C<br />
Required internal temperature: +17°C<br />
Maximum height: 17m
NORWAY<br />
GIRAD<br />
GMC MARITIME<br />
Project details:<br />
Stavanger<br />
Year of installation and start-up : 2007<br />
Heating area: 3.000 m 2<br />
External temperature : - 5°C<br />
Required internal temperature : +18°C<br />
Maximum height: 14m
NORWAY<br />
GIRAD<br />
BETONG AS Skurve<br />
Project details:<br />
Sandnes<br />
Year of installation and start-up: 2009<br />
Heating area: 12.300 m 2<br />
External temperature: - 5°C<br />
Required internal temperature: +20°C<br />
Maximum height: 10 m
DENMARK<br />
GIRAD<br />
ROYAL DANISH AIR FORCE<br />
Project details:<br />
Aalborg<br />
Year of installation and start-up: 2005<br />
Heating area: 3.500 m 2<br />
External temperature: - 10°C<br />
Required internal temperature: +20°C<br />
Maximum height: 18m
DENMARK<br />
ROYAL copenhagen<br />
Project details:<br />
WATERSTRIP<br />
Copenhagen<br />
Year of installation and start-up: 2005<br />
Heating area: 4.500 m 2<br />
External temperature: -10°C<br />
Required internal temperature: +18°C<br />
Maximum height: 12m
CHINA<br />
GIRAD<br />
FUYAO GROUP<br />
Project details:<br />
Fuzhou<br />
Year of installation and start-up : 2006<br />
Heating area: 10.000 m 2<br />
External temperature : - 5°C<br />
Required internal temperature : +18°C<br />
Maximum height: 10m
CHINA<br />
GIRAD<br />
Inner Mongolia Sunnergy<br />
Project details:<br />
Inner Monogolia<br />
Year of installation and start-up: 2004<br />
Heating area: 9.000 m 2<br />
External temperature: -10°C<br />
Required internal temperature: +16°C<br />
Maximum height: 10m
CHINA<br />
GIRAD<br />
China Southern Airlines<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Urumqi<br />
Year of installation and start-up: 2006<br />
Heating area: 10.500 m 2<br />
External temperature: - 26°C<br />
Internal temperature: range from 18°C to 25°C to melt the ice on the aircrafts<br />
when they get into the hangar<br />
Maximum height: 35m<br />
19 GIRAD radiant modules 300kW 3 stages
CHINA<br />
Hangar<br />
GIRAD<br />
Project details:<br />
Shenyang<br />
Year of installation and start-up: 2005<br />
Heating area: 15.000 m 2<br />
External temperature: -15°C<br />
Required internal temperature: +18°C<br />
Maximum height: 18m
KOREA<br />
GIRAD<br />
WOOJIN Industrial Systems co.<br />
Project details:<br />
Goesan-gun<br />
Year of installation and start-up : 2006<br />
Heating area: 10.000 m 2<br />
External temperature : - 5°C<br />
Required internal temperature : +18°C<br />
Maximum height: 14m
KOREA<br />
Jamsil Gymnasium<br />
Project details:<br />
WATERSTRIP<br />
Relevant details:<br />
Seoul<br />
Year of installation and start-up: 2009<br />
Maximum height: 20 m<br />
1.944 m WATERSTRIP Radiant Panels
KOREA<br />
Seoul Metro Shin Jung repairing shop<br />
Project details:<br />
WATERSTRIP<br />
Relevant details:<br />
Seoul<br />
Year of installation and start-up: 2009<br />
Maximum height: 14 m<br />
2.880 m WATERSTRIP Radiant Panels
KOREA<br />
Hokey stadium<br />
Project details:<br />
WATERSTRIP<br />
Relevant details:<br />
Mokdong Ice Rink<br />
Required internal temp.: 15° C<br />
External temperature: -8° C<br />
1.200 m WATERSTRIP Radiant Panels
ROMANIA<br />
GIRAD<br />
NBR - Nuova Neon Bassano Romania S.r.l.<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Arad<br />
Year of installation and start-up : 2008<br />
Heating area: 5.832 m 2<br />
External temperature: - 15°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 10m<br />
Heating solution: GIRAD radiant modules<br />
Appliances installed: 6 pcs. generator GSR wall mounted
SPAIN<br />
GIRAD<br />
COCA-COLA<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Madrid<br />
Year of installation and start-up : 2008<br />
Heating area: 5.832 m 2<br />
External temperature: -15°C<br />
Required internal temperature: +18°C<br />
Maximum height: 10m<br />
GIRAD radiant modules<br />
Appliances installed: 6 pcs. generator GSR wall mounted
SPAIN<br />
RENAULT<br />
GIRAD<br />
Project details:<br />
Madrid<br />
Year of installation and start-up : 2005<br />
Heating area: 20.000 m 2<br />
External temperature : - 5°C<br />
Required internal temperature : +18°C<br />
Maximum height: 15m
SPAIN<br />
GIRAD<br />
Sabadell Athletics Stadium<br />
Project details:<br />
Relevant details:<br />
Layout:<br />
Barcelona<br />
Heating area: 7.340 m 2<br />
External temperature: 0° C<br />
Required internal temperature: +16° C<br />
Average height: 17m<br />
GIRAD radiant modules<br />
Appliances installed: 8 pcs. GIRAD generators 150 kW<br />
4 5 6<br />
1 2 3<br />
4 5 6<br />
1 2 3
BULGARIA<br />
Lufthansa Airport<br />
Project details:<br />
Layout:<br />
GIRAD<br />
Sofia<br />
Year of installation and start-up: 2007<br />
Heating area: 8.000 m 2<br />
External temperature: - 15°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 17m
SWITZERLAND<br />
Jet Aviation<br />
Project details:<br />
Layout:<br />
GIRAD<br />
Basilea<br />
Year of installation and start-up: 2007<br />
Heating area: 9.500 m 2<br />
External temperature: - 15°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 21m
ITALY<br />
FIAT Auto S.p.a.<br />
Project details:<br />
WATERSTRIP<br />
Relevant details:<br />
Frosinone, Rome<br />
Year of installation and start-up: 2003<br />
Heating area: 8.000 m 2<br />
External temperature: 0°C<br />
Required internal temperature: + 20°C<br />
Maximum height: 10m<br />
960m WATERSTRIP hot water panels
ITALY<br />
Baron Industries<br />
Project details:<br />
Layout:<br />
VAPORAD<br />
Pordenone<br />
Year of installation and start-up: 2007<br />
Heating area: 3.500 m 2<br />
External temperature: - 5°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 8 m<br />
Layout:
ITALY<br />
FINCANTIERI S.p.a.<br />
Project details:<br />
Layout:<br />
PANRAD<br />
Genova<br />
Year of installation and start-up: 2006<br />
Heating area: 3.000 m 2<br />
External temperature: 0°C<br />
T required internal comfort temperature: + 20°C<br />
Maximum height: 11m
ITALY<br />
Thyssen Krupp - Italy<br />
Project details:<br />
PANRAD<br />
Relevant details:<br />
Layout:<br />
Terni<br />
Year of installation and start-up: 2008<br />
Heating area: 3.300 m 2<br />
External temperature: - 5°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 7 m<br />
Radiant tubes with centralized exhausting gas
CABINA ELETTRICA<br />
FICEP<br />
PIANO PRIMO<br />
ITALY<br />
PIANTA PIANO TERRA UFFICI<br />
TECNICI/PRODUZIONE<br />
5<br />
bosco<br />
bosco<br />
s e n t i e r o<br />
bosco<br />
GIRAD<br />
FICEP S.p.a.<br />
Project details:<br />
Relevant details:<br />
CED<br />
Layout:<br />
bosco<br />
5<br />
PIANTA PIANO PRIMO UFFICI<br />
TECNICI/PRODUZIONE<br />
s e n t i e r o<br />
palo<br />
Enel<br />
CALDAIETTE A<br />
< 30.000 Kcal/h B<br />
bosco<br />
Varese<br />
Year of installation and start-up: from 2003 to 2008<br />
Heating area: 45.000 m 2<br />
External temperature: -7°C<br />
Required internal temperature: + 18°C<br />
Maximum height: 12m<br />
42 radiant modules managed with centralized termoregulation system<br />
120<br />
210<br />
500<br />
500<br />
5<br />
1 2 3<br />
3<br />
120<br />
210<br />
500<br />
500<br />
FERROVIE DELLO STATO<br />
Q.E. ALLACCIAMENTO FM<br />
FOSSA<br />
4<br />
4"<br />
3<br />
372,70<br />
108<br />
4<br />
stacchi gas<br />
valvola<br />
bruciatori fraccaro chiusura gas<br />
in parete verticale risalita aerea<br />
CANALINA CAVI COLLEGAMENTO MACCHINARI<br />
CANALINA CONTENIMENTO FORZA MOTRICE<br />
2<br />
MAGAZZINI<br />
AUTOMATICI<br />
MODULA<br />
CT OFFICINA<br />
PREMONTAGGIO<br />
A A A<br />
1<br />
A<br />
10<br />
C<br />
C 11<br />
4" 18<br />
4"<br />
4"<br />
1<br />
TOOL ROOM<br />
A A A A A A<br />
A A<br />
2 1/2"<br />
1 1/4"<br />
7<br />
5<br />
REPARTO INNSE<br />
1 1/4"<br />
4<br />
6<br />
3<br />
2<br />
2<br />
17<br />
1 1/4"<br />
1<br />
2<br />
N° 2 GLOBOSONDE<br />
ESTERNE<br />
372,50<br />
3"<br />
8<br />
*<br />
3 4<br />
5<br />
6<br />
2"<br />
A<br />
MONTAGGIO<br />
FORGIA<br />
107 4<br />
16 15<br />
PREMONTAGGIO<br />
MAGAZZINO PEZZI<br />
14<br />
2"<br />
kcal/h 160.000 - KW 200<br />
CT 4 - 1998<br />
Ferr Mark N 160<br />
Bruciatore RIELLO<br />
GS20 - Mat. 560398<br />
GSR 200<br />
CT4<br />
13<br />
7 8<br />
9 A<br />
12 11<br />
10<br />
CAL80.000/MAT 806058<br />
C<br />
C<br />
C<br />
3<br />
2<br />
1<br />
robur GR1-matr. 803248<br />
robur GR1-matr. 803252<br />
robur GR1-matr. 803254<br />
MAGAZZINO<br />
PREFABBRICATO<br />
GSR 300<br />
sistema<br />
copri-scopri 1<br />
REPARTO OMC<br />
1<br />
5<br />
4<br />
C<br />
C<br />
3"<br />
GSR 200<br />
2<br />
C.T. 1<br />
PE 80 Ø 140<br />
± 0,00<br />
(+372,70)<br />
3<br />
4"<br />
LOCALE<br />
TRATTAMENTO<br />
TERMICI<br />
centrale di<br />
decompressione<br />
( gestione COGENGAS srl )<br />
REPARTO FALEGNAMERIA<br />
CALDAIA UNO PROFESSIONAL<br />
KW 34,20 MATRICOLA 225070296<br />
4"<br />
ANNO 2003<br />
3"<br />
3"<br />
2 1/2"<br />
M<br />
3"<br />
2 1/2"<br />
Q.E. ALIMENTAZIONE FM<br />
1<br />
PE 80 Ø 140<br />
2 1/2"<br />
2"<br />
9<br />
5<br />
A<br />
6<br />
A<br />
A<br />
7<br />
A<br />
8<br />
GLOBOSONDE<br />
INTERNE<br />
4"<br />
PE 80 Ø 140<br />
4"<br />
4"<br />
13<br />
4"<br />
PE 80 Ø 140<br />
deposito<br />
ri?uti speciali<br />
deposito olii<br />
GLOBOSONDE<br />
ESTERNE 2<br />
GLOBOSONDA<br />
INTERNA<br />
MONTAGGIO LINEE<br />
CENTRALINA CONTROLLO<br />
BRUCIATORI<br />
5<br />
D<br />
106 6<br />
3<br />
4<br />
2 1/2"<br />
5<br />
GLOBOSONDE<br />
ESTERNE<br />
Mat. 45431288<br />
CM 2 - KW 17,9 - 1997<br />
Sile inox ME 20 BL<br />
5"<br />
106 7 E'<br />
1 2 3 4 5<br />
sale training<br />
UFFICIO POSIZIONAMENTO 8<br />
CENTRALINA COMANDO<br />
2 1/2"<br />
1<br />
2<br />
SHOW ROOM<br />
C<br />
C<br />
MITROL<br />
CT 5<br />
MAGAZZINO<br />
CARBOFURL AUTOMATICO<br />
GMP 150<br />
370,76<br />
12 DEPOSITO<br />
5"<br />
parcheggio<br />
pubblico<br />
3"<br />
VIA KENNEDY<br />
CENTRALINA<br />
4 3 2 1<br />
M<br />
INFER-<br />
MERIA<br />
G<br />
LINEA GAS INTERRATA<br />
DISTRIBUZIONE GAS<br />
VIA MATTEOTTI<br />
3"<br />
3"<br />
2 1/2"<br />
11<br />
contatore metano<br />
( caldaia centrale e<br />
rep. seghetti)<br />
MITROL<br />
PIANTA PIANO TERRA UFFICI<br />
MITROL<br />
PIANTA PIANO PRIMO UFFICI COMMERCIALI<br />
B<br />
2<br />
SALA CONTROLLO<br />
1<br />
B<br />
1 1/2"<br />
GLOBOSONDE<br />
INTERNE h 180<br />
M<br />
CT 6<br />
CARBOFURL<br />
GMP 110<br />
VIA BARBIERI<br />
INGRESSO<br />
MAESTRANZE<br />
ABITAZIONE<br />
CUSTODE<br />
RECEPTION<br />
11<br />
ARCHIVIO<br />
M<br />
ENTRATA<br />
PRINCIPALE<br />
INGRESSO<br />
AUTOMEZZI<br />
1"<br />
VIALE MATTEOTTI<br />
1 1/4"<br />
INFER-<br />
MERIA<br />
1<br />
10 1"<br />
1 1/4"<br />
2<br />
MENSA<br />
G<br />
RECEPTION<br />
11<br />
contatore metano<br />
( mensa spogliatoi<br />
e portineria)<br />
1 1/4"<br />
1 1/4"<br />
1<br />
3<br />
K<br />
C<br />
C A<br />
1"<br />
C<br />
GENERATORI ARIA CALDA<br />
NASTRI RADIANTI ASOFFITTO<br />
A<br />
GR1 80:75000 KCAL/H-attacco Ø 1"<br />
B<br />
GR1 60:57000 KCAL/H-attacco Ø 1"<br />
C<br />
GR1 40:38000 KCAL/H-attacco Ø 3/4"<br />
RIVELATORE FUGHE GAS CON<br />
ALLARME OTTICO E ACUSTICO<br />
CALDAIA SERVIZI:18000 KCAL/H<br />
K<br />
FORNELLI : 50000 KCAL/H<br />
M<br />
CALDAIA SERVIZI:18000 KCAL/H<br />
BOLLITORE:20.000 KCAL/h<br />
LEGENDA GAS-METANO<br />
G<br />
CONTATORE GAS<br />
VALVOLA INTERCETTAZIONE<br />
TUBAZIONE GAS ESTERNA A VISTA<br />
TUBAZIONE GAS ESTERNA INTERRATA<br />
TUBAZIONE GAS INTERNA A VISTA<br />
C.T.<br />
CENTRALE TERMICA APPROVATA<br />
1 _ 1.100.000 KCAL/H<br />
2 _ 1.400.000 KCAL/H<br />
4 _ 160.000 KCAL/h<br />
REPARTO LINEE -106nastri<br />
radianti matricola potenza marca anno note<br />
ubicazione<br />
n°<br />
kw<br />
1 02070037G8 ....... GSR 200 2003<br />
zona D<br />
2 03030036G8 ....... GSR 100.1 2003<br />
//<br />
3 03000037G8 ....... GSR 100.1 2003<br />
//<br />
4 02040147G8 ....... GSR 200 2003<br />
//<br />
5 03030029DY ....... GSR 300.1 2003<br />
zona E<br />
1 03030032G8 ....... GSR 100.1 2003<br />
zona E1<br />
2 03030033G8 ....... GSR 100.1 2003<br />
//<br />
3 03030031G8 ....... GSR 100.1 2003<br />
//<br />
4 03030035G8 ....... GSR 100.1 2003<br />
//<br />
REPARTO MONTAGGIO NORD (FORGIA) -107nastri<br />
radianti matricola potenza marca anno note<br />
ubicazione<br />
n°<br />
kw<br />
1 02070002G9 200 GSR 200 2003<br />
zona F<br />
2 02050159G9 200 GSR 200 2003<br />
//<br />
3 02060172G9 200 GSR 200 2003<br />
//<br />
4 02050164G9 200 GSR 200 2003<br />
//<br />
5 02050167G9 200 GSR 200 2003<br />
//<br />
6 02070008G9 200 GSR 200 2003<br />
//<br />
7 02060173G9 200 GSR 200 2003<br />
//<br />
8 02060182G9 200 GSR 200 2003<br />
//<br />
9 02020108G9 200 GSR 200 2003<br />
//<br />
10 03010018G8 70/100 GSR 100.1 2004<br />
//<br />
11 03010020G8 70/100 GSR 100.1 2004<br />
//<br />
12 03090004G8 70/100 GSR 100.1 2004<br />
//<br />
13 03090006G8 70/100 GSR 100.1 2004<br />
//<br />
14 03090008G8 70/100 GSR 100.1 2004<br />
//<br />
15 03090005G8 70/100 GSR 100.1 2004<br />
//<br />
16 03100021G8 70/100 GSR 100.1 2004<br />
//<br />
17 03040044G8 70/100 GSR 100.1 2004<br />
//<br />
18 03100018G8 70/100 GSR 100.1 2004<br />
//<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 803258 66 GR1E 60 1998<br />
lato magazzino<br />
2 803253 66 GR1E 60 1998<br />
2° campata<br />
3 ......... 87 GR1E 80 .....<br />
3° campata<br />
4 811446 87 GR1E 80 1989<br />
lato caldaia<br />
5 808058 80 GR1E 80<br />
lato sud 3° campata<br />
6 704111 80 GR1E 80<br />
lato sud 3° campata<br />
7 806055 80 GR1E 80<br />
lato sud 2° campata<br />
8 ......... 80 GR1E 80<br />
lato sud 2° campata<br />
9 806058 80 GR1E 80<br />
" " magazz gen<br />
10 704023 60 GR1E 60<br />
11 704015 60 GR1E 60<br />
REPARTO -108nastri<br />
radianti matricola potenza marca anno note<br />
ubicazione<br />
n°<br />
kw<br />
1 02090027DY 300 GSR 300.1 2002<br />
zona A+B<br />
2 02070014G9 200 GSR 200 2002<br />
//<br />
3 02090025DY 300 GSR 300.1 2002<br />
//<br />
4 ........... 200 GSR 200 2008<br />
//<br />
5 ........... 300 GSR 300.1 2008<br />
//<br />
REPARTO INNSE<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 104225 87 GR1E 80 1991 Tutti con condotte parete S da destra<br />
2 104229 87 GR1E 80 1991 di aspirazione e di<br />
3 104213 87 GR1E 80 1991 espulsione fumi<br />
4 104221 87 GR1E 80 1991 resi stagni rispetto<br />
5 104212 87 GR1E 80 1991 all'ambiente<br />
6 104227 87 GR1E 80 1991<br />
7 104186 87 GR1E 80 1991<br />
8 104223 87 GR1E 80 1991<br />
parete S da sistra<br />
FICEP SUD<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 904511 87 GR1E 60 1989<br />
2 904509 87 GR1E 60 1989<br />
3 904512 87 GR1E 80 1989<br />
4 901301 87 GR1E 80 1989<br />
5 904510 87 GR1E 60 1989<br />
6 904514 87 GR1E 60 1989<br />
7 904513 87 GR1E 80 1989<br />
MENSA<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 101609 44 GR1E 40 1991<br />
2 102830 44 GR1E 40 1991<br />
3 ..... ..... ..... .....<br />
SHOW ROOM<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 804272 44 GR1E 40 1998<br />
2 804279 44 GR1E 40 1998<br />
SPOGLIATOIO<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 707189 44 GR1E 40 1988<br />
REPARTO CONTROLLO QUALITÀ<br />
n° robur matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 808255 66 GR1E 60 .....<br />
2 7046... 66 GR1E 60 .....<br />
REPARTO OMC (ex SEGHETTI)<br />
n° robur matricola potenza marca anno<br />
kw<br />
note<br />
ubicazione<br />
4 704098 44 GR1E .....<br />
5 704096 44 GR1E .....<br />
nastri<br />
radianti<br />
1 ....... ....... GSR 300 2006<br />
REPARTO -MONTAGGIO PESANTEnastri<br />
radianti matricola potenza marca anno note<br />
ubicazione<br />
n°<br />
kw<br />
2 ....... ....... GSR 200 2006<br />
3 ....... ....... GSR 200 2006<br />
REPARTO -FALEGNAMERIAn°<br />
robur<br />
matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
1 225070296 34,20 UNO 2003<br />
PROFES-<br />
SIONAL<br />
MITROL AMMINISTRAZIONE E COMMERCIALE<br />
n°<br />
matricola potenza marca anno note<br />
ubicazione<br />
kw<br />
CT 5<br />
150 carbofurl .....<br />
CT6<br />
110 carbofurl .....
ITALY<br />
IKEA ITALY Retail S.r.l.<br />
Project details:<br />
Layout:<br />
PANRAD<br />
Torino<br />
Year of installation and start-up : 2006<br />
Heating area: 4.500 m 2<br />
External temperature: - 8°C<br />
Required internal temperature: + 20°C<br />
Maximum height: 17 m
ITALY<br />
Oru S.p.a.<br />
GIRAD<br />
Project details:<br />
Relevant details:<br />
Roma<br />
Year of installation and start-up: 2008<br />
Heating area: 26.000 m 2<br />
External temperature: -3°C<br />
Required internal temperature: + 19°C<br />
Maximum height: 8m<br />
21 GIRAD radiant modules<br />
Layout:
MORE <strong>REFERENCE</strong>S<br />
Coca Cola<br />
(Madrid)<br />
:: SPAIN ::<br />
RENAULT<br />
FASA- Fábrica de Automóviles SA<br />
(VALLADOLID)<br />
:: GREECE ::<br />
Metka Metal Constructions of Greece S.A<br />
:: KOREA ::<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with PANRAD<br />
radiant Pre-Assembled Modules<br />
Stabilimento SsangYong Motor in Korea Heating system with SUNRAD<br />
infrared ceramic heaters<br />
HYUNDAI<br />
Hyundai Motor Company<br />
Kia Motor<br />
:: CHINA ::<br />
ZOLLERN MACHINERY CO., LTD<br />
Peoples Republic of China<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules
MORE <strong>REFERENCE</strong>S<br />
Logistic Centre -<br />
Frankfurt Airport<br />
Hettich<br />
Logistic Centre<br />
Bünde<br />
:: GERMANY ::<br />
Heating system with<br />
WATERSTRIP hot water panels.<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
and PANRAD radiant tubes<br />
ThyssenKrupp<br />
Dillenburg Heating system with GIRAD<br />
radiant and PANRAD radiant<br />
tubes<br />
Suzuki - Bucharest<br />
:: ROMANIA ::<br />
Nissan Motor Co - Bucharest<br />
CROMSTEEL INDUSTRIES S.A.<br />
Targoviste<br />
S.C. HIDROSIB S.A.<br />
Sibiu<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
Heating system with PANRAD<br />
radiant tubes
MORE <strong>REFERENCE</strong>S<br />
VOGEL & NOOT -<br />
Bitola<br />
Mercedes-Benz<br />
Skopje<br />
VOLKSWAGEN<br />
Skopje<br />
:: MACEDONIA ::<br />
:: BULGARIA ::<br />
Heating system with PANRAD radiant<br />
tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Nicos International - Botevgrad Heating system with PANRAD<br />
radiant tubes<br />
:: HUNGARY ::<br />
ASAHI GLASS<br />
Tatabanya Heating system with SUNRAD<br />
infrared ceramic heaters<br />
RPT PRODUCTION<br />
Klepp St.<br />
Block Berge Bygg AS<br />
Klepp st.<br />
:: NORWAY ::<br />
Heating system with GIRAD<br />
radiant Pre-Assembled Modules<br />
and PANRAD radiant tubes<br />
Heating system with GIRAD<br />
radiant Pre-Assembled<br />
Modules, PANRAD radiant tubes<br />
and SUNRAD infrared ceramic<br />
heaters
MORE <strong>REFERENCE</strong>S<br />
Siemens -<br />
Michalovce<br />
Ford<br />
Roubicek Melninl.<br />
MITSUBISHI MOTORS<br />
Hradec Kraloce<br />
SKODA<br />
Plzen<br />
SCANIA<br />
Ljubljana<br />
Pilkington Group<br />
Wroclaw<br />
:: SLOVAKIA ::<br />
:: CZECH REPUBLIC::<br />
:: SLOVENIA::<br />
:: POLAND ::<br />
Heating system with PANRAD radiant<br />
tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with PANRAD<br />
radiant tubes<br />
Heating system with PANRAD<br />
radiant tubes