BUILDING C/Lepant, 255 OFFICE 1 QUALITIES REPORT FAÇADES ...
BUILDING C/Lepant, 255 OFFICE 1 QUALITIES REPORT FAÇADES ...
BUILDING C/Lepant, 255 OFFICE 1 QUALITIES REPORT FAÇADES ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>BUILDING</strong> C/<strong>Lepant</strong>, <strong>255</strong><br />
<strong>OFFICE</strong> 1<br />
<strong>QUALITIES</strong> <strong>REPORT</strong><br />
<strong>FAÇADES</strong><br />
The rear façade and the façades of the internal patios will be finished externally<br />
with single layer stucco.<br />
All of the façades will have thermal insulation in the air chamber and plastered<br />
internal partition wall.<br />
ROOF<br />
Washing line area: transitable, flat, made up of slopes, approved asphalt cloth,<br />
thermal insulation, protection plate and tiled with long thin bricks.<br />
Technical area: non-transitable flat, made up of slopes, approved asphalt cloth,<br />
thermal insulation gravel finishing.<br />
FLOORS<br />
The open spaces and the kitchen will have laminated parquet flooring, with<br />
skirting board painted. The treads of the staircase giving access to the loft will<br />
also be of laminated parquet.<br />
In the bathrooms flooring will be fitted matching the wall tiles.<br />
In the terrace of the rear façade and in the patio there will be anti-slip tiles.<br />
PARTITION WALLS AND FALSE CEILINGS<br />
The stairwell will be of “gero” 15 cm perforated brick, plastered.<br />
The separations between offices will be of sound absorbent<br />
15 cm perforated brick, plastered.<br />
The internal partition walls of the bathrooms and kitchen will be of 4 cm hollow<br />
brick plastered in the open spaces and the kitchen, and tiled in the bathrooms.<br />
The bathrooms and the kitchen will have false ceilings.<br />
TILES<br />
The vertical surfaces in the bathrooms will be ceramic tiled to the height of the<br />
ceiling.<br />
SANITARY EQUIPMENT<br />
In the loft bathroom:<br />
Shower floor of silestone with anti-slippery strips.<br />
Glass screen with one fixed panel and one moving for the shower.<br />
Surround and wash basin of silestone FORO model from ROCA, white, with<br />
mirror above surround.<br />
Low WC tank DAMA SENSO COMPACTO model from ROCA, with ABS seat<br />
and lid, white.<br />
Bidet DAMA SENSO from ROCA, with ABS lid, white.<br />
In the ground floor washroom:
Surround and wash basin of silestone FORO model from ROCA, white, with<br />
mirror above surround.<br />
Low WC tank DAMA SENSO COMPACTO model from ROCA, with ABS seat<br />
and lid, white.<br />
There will be water, electricity and drainage connections for an automatic<br />
washing machine and dryer in the external area situated in the terrace of the<br />
rear façade.<br />
TAPS<br />
HANSGROHE single control in the bathrooms, with visible equipment with bar<br />
and shower head in the shower.<br />
RAMON SOLER monoblock with rotating spout in the sink.<br />
KITCHEN CUPBOARDS<br />
Low cupboards and column unit for oven and microwave melamine clad, with<br />
surface and front plate in silestone.<br />
ELECTRICAL APPLIANCES<br />
Single stainless steel sink and one draining rack.<br />
Balay 4 burner vitroceramic hob.<br />
Stainless steel 6 function Balay electric oven.<br />
Decorative stainless steel Pando hood of 90 cm.<br />
Stainless steel Balay microwave with simultaneous grill.<br />
Inbuilt Balay dishwasher with 4 wash programmes.<br />
Inbuilt combined Balay refrigerator.<br />
INTERNAL CARPENTRY<br />
Plain reinforced entrance door, finished with semi lacquer paint, standard<br />
system, 3-bolt security lock, chrome-plated interior handle, exterior handle and<br />
optical peephole.<br />
Plain internal doors 35 mm thick, solid, finished with semi lacquer paint,<br />
standard system, 3 chrome hinges and chrome-plated handles.<br />
Sliding frosted glass in the internal distribution of the loft bathroom.<br />
EXTERNAL CARPENTRY<br />
In lacquered aluminium, sliding sheets with inlaid lock.<br />
The closure of the external area of the terrace set up for washing machine and<br />
dryer will be of aluminium, practicable ventilation panels.<br />
BLINDS AND SHUTTERS<br />
The external openings will be fitted with aluminium roller blinds and operated by<br />
an electric motor.
ELECTRICAL INSTALLATION<br />
Installation and circuits in accordance with low voltage regulations, for a<br />
maximum power of 15,000 W, with Bticino mechanisms.<br />
In the ground floor and in the loft bathroom the installation will be left finished<br />
but in the open space of the loft it will be done by uniformly distributed<br />
connection boxes for later installation of sockets and lights by the owner.<br />
Non-halogen bull’s eyes in bathrooms.<br />
PLUMBING<br />
Hot and cold water in all sanitary fittings except the WC.<br />
Installation in accordance with basic regulations for water installation.<br />
All damp areas will be fitted with appropriate stop-cocks.<br />
The party wall will have the pre-installation for a second bathroom in the loft.<br />
Production of hot water by electric thermal-accumulator-exchanger, with<br />
additional support from solar panels in the roof.<br />
CLIMATISATION<br />
Installation of heating-air conditioning by split heat pump system, with 2 internal<br />
splits in the ground floor and 2 in the loft.<br />
The loft bathroom will be fitted with 1 electric radiator towel rack.<br />
ALARM<br />
Installation of burglar alarm with microprocessed central unit with basic domotic<br />
kit, control keyboard and 3 radio detectors. Includes 9 months free connection<br />
to security centre.<br />
SOLAR ENERGY<br />
Installation of solar panels in the roof, with electric thermal-accumulatorexchanger.<br />
MISCELLANEOUS INSTALLATIONS<br />
The office will be fitted with TV and FM connections, two in the ground floor and<br />
two in the loft. Collective UHF and FM aerial located on the roof of the building.<br />
A video door phone will be installed that will operate the opening of the street<br />
door of the entrance hall.<br />
Also there will be pre-installation of telephone system with seven connections,<br />
four in the ground floor and three in the loft.<br />
GLAZING<br />
Double glazing with internal air chamber (8 + 6 + 6) in openings of façades.
PAINTWORK<br />
Walls and ceilings with plain plastic paint.<br />
COMMON AREAS<br />
ENTRANCE HALL AND STAIRCASE: Flooring marble, skirting board of marble<br />
and stippled stuccoed with latex finishing on walls.<br />
LIFTS: Electromechanical, speed 1 m/sec. Automatic stainless steel doors on<br />
landing and in cabin. Access to car park with security key.<br />
NOTE: THE PROFESSIONAL MANAGEMENT OF THE WORK RESERVES<br />
THE RIGHT TOMAKE CHANGES OR TO MODIFY SOME MATERIALS TO BE<br />
USED IN THE CONSTRUCTION OF THE <strong>BUILDING</strong>, MAINTAINING AT ALL<br />
TIMES AN EQUIVALENT QUALITY.<br />
Barcelona, 14 June 2006