Citizens’ Bond Advisory Committee<br />

Thursday, June 21, 2012<br />

6:00 PM – 9:00 PM<br />

Board Auditorium<br />

Charge<br />

The CBAC is charged with developing recommendations on the scope of work for a proposed<br />

new district bond program.<br />

The goal of the CBAC shall be to develop a scope of work that minimizes tax impact by focusing<br />

on projects of highest need, yet is comprehensive enough to equitably safeguard the long-term<br />

investments of taxpayers.<br />

In developing its recommendations, the CBAC shall carefully consider all information provided by<br />

the district administration.<br />

In its deliberations, the CBAC may consider, but is not limited to:<br />

Needs of academic, fine arts, athletic, and other district programs<br />

Overall tax impact on the community<br />

Future growth<br />

Overcrowded and underutilized schools<br />

New facilities and maintenance of existing facilities<br />

Other capital improvement needs<br />

Energy efficiency and environmental responsiveness<br />

Time-sensitive opportunities<br />

6:00 – 6:10 Call to Order and Approval of Minutes (6/5/12) CBAC Chairs<br />

6:10 - 6:20 Review of <strong>Materials</strong> Paul Turner<br />

Recognition of Visitors<br />

CBAC Meeting – Open Meeting<br />

6:20 – 6:35 Citizens’ Communication Citizens<br />

6:35 – 6:50 COO Update Lawrence Fryer<br />

6:50 – 7:35 Discussion of District-Wide Needs<br />

Safety & Security Eric Mendez<br />

Transportation Kris Hafezi<br />

7:35 – 7:45 History of Bond Program Development Paul Turner<br />

CIBPAC Report<br />

Lessons Learned<br />

7:45 – 8:15 Operating Procedures and Adoption of Charter CBAC Chairs<br />

8:15 – 8:45 Responses to Requests for Information, Updates & Staff<br />

Agenda Items for Next Meeting<br />

8:45 – 9:00 Follow-up questions, Requests for Information, CBAC Chairs<br />

Updates & Agenda Items for Next Meeting<br />

Next meeting is July 10- CAC Board Auditorium<br />

Demographic Analysis and Student Projections for the <strong>Austin</strong> Independent<br />

School District<br />

Capital Improvement Projects to address capacity needs<br />

District-Wide Needs-Technology<br />

1


2013 CITIZENS’ BOND ADVISORY COMMITTEE (CBAC)<br />

Meeting Summary<br />

June 5, 2012<br />

Committee Members in Attendance Staff Members in Attendance<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Others in Attendance<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Agenda<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

2


3


4


5


6


7


Life Safety Systems Needs Assessment <br />

Committee<br />

June 21, 2012<br />

These recommendations for life safety systems equipment repair, replacement and or<br />

upgrades are to comply with the goals and values encompassed in the A<strong>ISD</strong> 2010-2015<br />

Strategic Plan.<br />

The safety items identified are in keeping with the <strong>Austin</strong> Independent School District's<br />

strategic g All schools will meet or exceed state accountability standards, and the<br />

district will meet federal standards <br />

The goals and standards<br />

are intended to provide a afe and Healthy school environment.<br />

The items listed in this Life Safety Systems Needs Assessment document are based on<br />

data collected from campuses and recommendations of architects, construction<br />

professionals, district maintenance personnel and construction management staff.<br />

Below is an explanation of the requested life safety improvements:<br />

Fire-Alarm Strobes<br />

1. The Federal ADA standard requires that all fire alarm strobes within a field of view<br />

be synchronized to flash at the same rate. Compliance will require an upgrade to<br />

the fire alarm notification systems installed prior to 2004 at 89 A<strong>ISD</strong> facilities.<br />

(Strobe synchronization is now required by NFPA 72, ANSI 117.1 (National Standard for Accessible<br />

and Usable Buildings and Facilities and UL Standard 1971 (Signaling Devices for the Hearing<br />

Impaired). The reason behind this code requirement is to help prevent what is called photosensitive<br />

epilepsy.)<br />

Smoke Detectors<br />

2. Although, the majority of A<strong>ISD</strong> classrooms are protected by smoke detectors. It is<br />

recommended that approximately 540 smoke detectors be added to seven A<strong>ISD</strong><br />

facilities to bring all classrooms up to district standards.<br />

Intrusion Systems<br />

3. The majority of the Intrusion Systems in the District were installed over 15 years<br />

ago as part of the 1996 Bond Program. Over the years. the wiring has been<br />

deteriorated and should be reinstalled to current standards. A phased wiring<br />

replacement is recommended at 72 A<strong>ISD</strong> facilities.<br />

4. The majority of the Intrusion Systems in the District were installed over 15 years<br />

ago as part of the 1996 Bond Program. Many of the components associated with<br />

the systems are beyond the end of their normal expected life. It is recommended<br />

8


that a phased replacement begin including system controls and detection<br />

components at 72 A<strong>ISD</strong> facilities.<br />

Fire-Extinguisher Cabinets<br />

5. Thirteen elementary schools had fire extinguisher cabinets (approximately 185<br />

cabinets) with sharp corners. These corners protrude approximately two inches<br />

from the wall in corridors. The edges present a potential hazard to students and it<br />

is recommend that 185 cabinets be replaced.<br />

Cameras for Monitoring Hands-Free Phones<br />

6. As a part of the 2004 Bond Program to increase school security and safety and to<br />

allow for public building access, the district installed a hands-free phone at the main<br />

entrance of each elementary school. The identified schools need cameras that<br />

allow A<strong>ISD</strong> personnel to see the person requesting entry. It is recommended that a<br />

camera be added at schools that do not have a camera monitoring the hands-free<br />

phone at 75 A<strong>ISD</strong> campuses.<br />

Security Cameras<br />

7. Principals and administrators have made numerous requests for additional<br />

cameras. Cameras are needed in approximately 316 stairwells and 480 other<br />

difficult-to-monitor areas district wide. It is recommended that cameras be added<br />

to improve campus safety and security.<br />

8. District-wide, 3,000 IP Cameras have been installed as part of the A<strong>ISD</strong> 2004 Bond<br />

Program. Approximately 20% each year will be at or past the end of normal<br />

expected life. A goal of 20% or 600 per year phased camera replacement over the<br />

next five years is recommended.<br />

Video-Management Servers<br />

9. The video-management servers, purchased with funds from the 2004 Bond<br />

Program. are nearing or past the end of their expected life and will require phased<br />

replacement. Thirty-seven servers are recommended for phased replacement.<br />

Access Control Panels<br />

10. <br />

over 12 years old,<br />

have been discontinued, or are past the end of their normal expected life. These<br />

panels slow the district-wide access system functions, and prevent the district from<br />

utilizing several beneficial features found on newer version panels. The<br />

recommendation is to replace 75 access control panels located at 44 schools.<br />

Portable buildings do not have access control. In addition, it is recommended that<br />

9


access control be added to 635 portable classroom buildings to eliminate exterior<br />

door keys.<br />

Kitchen Exhaust Hoods<br />

11. A<strong>ISD</strong> personnel have identified 43 obsolete kitchen exhaust hood fire suppression<br />

system control heads. It is recommended that these be replaced.<br />

12. In addition, one kitchen exhaust hood has been identified that is not in compliance<br />

with NFPA 96 fire code and is recommended for replacement.<br />

Portable Classroom Safety and Security Improvements<br />

13. The district's 635 portable classroom buildings currently are not protected by an<br />

<br />

current fire code requires a Group E educational<br />

building with an occupancy load <br />

for the 635 <br />

portable buildings.<br />

14. A network connection to the 635 portable classroom building intrusion systems<br />

would improve security, provide remote diagnostics reduce travel, and improve<br />

service. It is recommended that the district intrusion, systems be connected to the<br />

network.<br />

15. As stated above, portable buildings do not have access control. In addition, it is<br />

recommended that access control be added to 635 portable classroom buildings to<br />

eliminate exterior door keys.<br />

Replacement of Radio System<br />

16. Replace Radio System used by Police, Transportation, and Service Center.<br />

Voice Over Internet Protocol Conversion<br />

17. The existing A<strong>ISD</strong> fire alarm systems communication to the central monitoring<br />

station by the use of ATT or (POT) Plain Old Telephone Lines, which are being<br />

phased out. A<strong>ISD</strong> is converting to (VOIP) Voice over Internet Protocol. It is<br />

recommended that all district120<br />

fire alarm control panels communication be<br />

updated to comply with current communication protocol.<br />

10


Life Safety Systems Needs Assessment<br />

Cost Estimate Summary Facilities<br />

Item Description Estimate Affected<br />

Item 1 Synchronize Fire Alarm Strobe signal devices $ 2,283,019 90<br />

Item 2 Add Smoke Detectors $ 645,908 7<br />

Item 3<br />

Item 4<br />

Replace Intrusion System wire<br />

Replace End of Life Intrusion devices<br />

$ 7,610,108 119<br />

Item 5 Replace Fire Extinguisher Cabinets $ 280,641 13<br />

Item 6 Install entry door cameras $ 447,000 77<br />

Item 7 Stairwell / Problem area cameras $ 3,719,682 All<br />

Item 8 End of Life Camera replacement $ 9,549,393 All<br />

Item 9 Video Server replacement $ 376,000 All<br />

Item 10 Access Control Camera replacement $ 2,289,846 42 +All Portables<br />

Item 11 Kitchen Fire Control device replacement $ 133,084 39<br />

Item 12 Kitchen Exhaust Hood $ 84,881 1<br />

Item 13 Fire Alarm in Portable Classrooms $ 7,172,313 All Portables<br />

Item 14 & 15 Network connection of portable Intrusion System $ 847,637 All Portables<br />

Total $ 35,439,513<br />

Wayne, just wanted you to know we also have these in our database.<br />

Item 16 *<br />

Replace Radio System used by Police,<br />

Transportation, Service Center.<br />

Item 17<br />

Convert existing Fire Alarm systems to use the new<br />

VOIP network.<br />

Total $ 6,276,704<br />

$ 6,020,000 Varies<br />

$ 256,704 120<br />

* Note: We have a District-wide deficiency to upgrade the Telephone system to VOIP. Item 16 was entered<br />

Grand Total (If including Items 15 & 16) 41,716,216.38<br />

6/21/2012 11Insert


A<strong>ISD</strong> Transportation uses a 14 year school bus replacement cycle to ensure optimum standards for student safety, to take advantage of design and engineering changes and<br />

upgrades that have environmental impact, and to maximize operational efficiency by reducing maintenance costs. Industry standards recommend a replacement cycle of<br />

12-­‐15 years or 250,000 miles/vehicle.<br />

A<strong>ISD</strong> Transportation 14 year replacement plan<br />

Year Reg. Ed. Bus Sped. Bus Est. Cost Reg. Est. Cost Sped.<br />

1997 62 1 $5,890,000.00 $100,000.00<br />

1999 16 0 $1,520,000.00 $0.00<br />

2001 5 15 $475,000.00 $1,500,000.00<br />

2002 14 12 $1,330,000.00 $1,200,000.00<br />

2003 6 21 $570,000.00 $2,100,000.00<br />

Contingency for Population Growth and/or Programmatic Changes 15 15 $1,425,000.00 $1,500,000.00<br />

Athletic department four additional activity buses $240,000.00<br />

Total Est. for 2013 Bond $17,850,000.00<br />

Regular Ed. bus Special Ed. Bus Activity bus<br />

Estimated cost for brand new bus plus all options including two way radios $ 95,000.00 $ 100,000.00 $60,000<br />

12


HISTORY OF BOND<br />

Working Draft 6-21-12 1<br />

PROGRAM DEVELOPMENT<br />

<br />

13<br />

Presenter: Mr. Paul Turner, Executive Director of Facilities


2<br />

Highlights of 1996 A<strong>ISD</strong> Bond Program<br />

<br />

Propositions<br />

Priorities: Student achievement,<br />

technology, safety, equity,<br />

deteriorating facilities, taxes, and<br />

overcrowding<br />

First Functional Equity study<br />

Major IT infrastructure in all schools<br />

Total $369,475,000<br />

Renovated 96 schools<br />

Built 11 New schools<br />

8 Elementary Schools<br />

2 Middle Schools<br />

1 High School<br />

Added 156 classrooms<br />

Prop. 1:<br />

Renovation<br />

33%<br />

$120,555,000<br />

Working Draft 6-21-12<br />

Prop. 3: Safety &<br />

Security,<br />

Technology,<br />

District-wide<br />

facilities, ADA<br />

Access & Site<br />

Acquisitions<br />

19%<br />

$71,953,000<br />

Prop. 2: New<br />

Construction &<br />

Additions<br />

48%<br />

$176,967,000<br />

14


3<br />

Highlights of 2004 A<strong>ISD</strong> Bond Program<br />

Priorities<br />

Safety, overcrowding,<br />

deteriorating facilities, and<br />

student achievement<br />

Total $519,526,616<br />

Included partial funding for<br />

district-wide Fine Arts Center<br />

Acquired site for southeast<br />

Middle School<br />

Installed cameras and card<br />

access in schools<br />

First time buses were purchased<br />

Built 8 New Schools<br />

6 Elementary Schools<br />

2 Middle Schools<br />

92 additional classrooms<br />

Propositions<br />

Prop. 4: Low-<br />

Emission Buses<br />

$12,234,166<br />

3%<br />

Prop. 3: Security<br />

$20,954,097<br />

4%<br />

Prop. 2: New<br />

Construction and<br />

Land Acquisition<br />

$228,197,826<br />

44%<br />

Working Draft 6-21-12<br />

Prop. 5:<br />

Refinancing<br />

Contractual<br />

Obligations<br />

$24,495,000<br />

4%<br />

Prop. 1:<br />

Renovations<br />

$233,645,527<br />

45%<br />

15


4<br />

Highlights of 2008 A<strong>ISD</strong> Bond Program<br />

Narrowly focused on<br />

Health Code upgrades<br />

Urgent systemic repairs<br />

Buses<br />

Energy and environment<br />

Minimal tax rate impact<br />

Total $343,717,819<br />

Includes Uphaus Early<br />

Childhood Center<br />

Performing Arts Center<br />

South High School site<br />

Propositions<br />

Prop. 3: Special<br />

Programs and<br />

Expansion<br />

$82,000,000<br />

24%<br />

Prop. 2: Health,<br />

Safety,<br />

Environment,<br />

Critical<br />

Renovations and<br />

Other District<br />

Needs<br />

$73,920,504<br />

Working 21% Draft 6-21-12<br />

Prop. 1: Relief for<br />

overcrowding and<br />

support academic<br />

achievement<br />

$187,797,315<br />

55%<br />

16


5<br />

<br />

Advisory Committee (CBAC)<br />

<br />

<br />

model was created to establish a process to engage the<br />

community in developing bond program recommendations.<br />

In the past, CBACs were committees of the Board.<br />

This CBAC is an A<strong>ISD</strong> District committee which makes<br />

recommendations to the Superintendent.<br />

The Superintendent makes recommendations to the Board.<br />

Working Draft 6-21-12<br />

17


6<br />

Capital Improvement and Bond Planning<br />

Advisory Committee (CIBPAC) REPORT<br />

The CIBPAC is an ad hoc advisory body established at the request of the<br />

Board of Trustees to complete a preliminary high level review of facility<br />

conditions and needs to determine if a future bond program is necessary.<br />

The committee met from January through March 2012. Highlights include<br />

presentations on <strong>Austin</strong> Demographic Trends by the City Demographer;<br />

Economic Forecasts by Economist from the Federal Reserve Bank; and State<br />

Budget and School Finance, Tax Rate and Debt Overview, and Bond<br />

<br />

Members closely analyzed and considered the following:<br />

Facility Condition Data Functional Equity<br />

Educational Adequacy Americans with Disabilities Act (ADA)<br />

Demographics and Capacity and<br />

Related Capital Improvement needs<br />

Safety & Security, Transportation and<br />

Information Services<br />

Working Draft 6-21-12<br />

18


7<br />

Capital Improvement and Bond Planning<br />

Advisory Committee (CIBPAC) REPORT<br />

Working Draft 6-21-12<br />

CIBPAC members also utilized the following Decision Framework:<br />

Does the District have major capital improvement needs that are unfunded?<br />

Is it urgent to address these needs in the short term?<br />

Does the amount of funding needed require longer-term financing?<br />

Is there sufficient capacity to incur additional long-term debt?<br />

Do economic and community indicators seem favorable for a bond election?<br />

The CIBPAC voted unanimously that the District did have major<br />

capital improvement needs that should be addressed, and that<br />

those needs would best be funded through a bond program.<br />

The Superintendent should move forward with the formation of a<br />

<br />

The Superintendent made the recommendation to the Board of<br />

<br />

19<br />

Advisory Committee on March 26, 2012.


8<br />

<br />

(CBOC) Lessons Learned<br />

Identify new schools using the names of schools to be relieved<br />

instead of geographic designations.<br />

Obtain site analysis from professional firms to determine<br />

scopes of work and budgets for complex projects.<br />

Use the 2004 Bond Program oversight model.<br />

Increase contingency funds in future bond programs to<br />

address the unforeseen costs of renovating older facilities.<br />

Clearly define scopes of work to prevent misunderstanding<br />

by the community.<br />

Working Draft 6-21-12<br />

20


9<br />

<br />

(CBOC) Lessons Learned<br />

An additional 15% of square footage should be added to<br />

educational specifications to allow for circulation.<br />

Front load implementation of the bond construction program to<br />

minimize the impact of inflation on available bond funds.<br />

Establish a process with criteria for equitably using contingency<br />

funds, for projects scheduled in both earlier and later phases.<br />

Provide training to principals in the construction process.<br />

Break projects into smaller packages to include small contractors.<br />

Coordinate with the City to resolve permitting issues.<br />

The District should consider selling surplus property and<br />

reinvesting in potential future sites to reduce costs.<br />

Working Draft 6-21-12<br />

21


10<br />

Working Draft 6-21-12<br />

CBAC 2004 Collateral Issues<br />

The number of portables used on a given campus should be reduced.<br />

A process should be developed to regularly report bond and<br />

maintenance work to the entire A<strong>ISD</strong> community.<br />

It should be determined if cafeteria size is the cause of some<br />

campuses scheduling unreasonable early lunch periods.<br />

<br />

organization the size of A<strong>ISD</strong>.<br />

Deferred maintenance funded by debt, intermittently, i.e. upon bond<br />

passage, complicates implementation of systemic maintenance.<br />

Education specifications should be available through the A<strong>ISD</strong><br />

website.<br />

The reasonable use of sustainable materials should become a 22


11<br />

CBAC 2008 Collateral Issues<br />

Working Draft 6-21-12<br />

The timeline presented challenges because information<br />

continued to emerge throughout the process.<br />

<br />

and support it as a necessary instructional expense.<br />

Develop a fiscally sound, viable technology refresh<br />

schedule.<br />

Accelerate the facility master planning process to support<br />

the instructional vision of the District and move to a model<br />

that plans for school population trends and utilization of<br />

available capacity to ensure the efficient use of all 23<br />

facilities.


12<br />

CBAC 2008 Collateral Issues<br />

Extending the planning horizon to understand the impact<br />

of the facilities of elementary, middle and high schools in<br />

each vertical team.<br />

Explore opportunities for partnerships with other<br />

governmental entities as an integral part of a wider<br />

regional planning effort.<br />

Working Draft 6-21-12<br />

24


13<br />

Questions and answers.<br />

Working Draft 6-21-12<br />

25


Process and Conduct of Meetings<br />

Citizens’ Bond Advisory Committee<br />

Proposed Operating Procedures an Adoption of Charter<br />

Working Draft for Discussion<br />

June 21, 2012<br />

o TrI-­‐chairs will meet with the COO prior to the meeting to develop the meeting agenda.<br />

o Members shall be free to discuss matters openly in an atmosphere of trust and shall not disclose the<br />

comments of other members outside of the meetings.<br />

o The committee shall act on behalf of A<strong>ISD</strong> students and its entire community.<br />

o The committee will accommodate the diverse opinions that may arise during discussions.<br />

o Summary minutes will include general consensus and collateral views without attributing specific<br />

remarks to individual members (with the exception of the trichairs).<br />

o <strong>Austin</strong> Independent School District (A<strong>ISD</strong>) Citizens Communications policy applies to all meetings.<br />

o Robert’s Rules of Order as revised shall govern when Operating Procedures or A<strong>ISD</strong> policy is silent.<br />

o If questions arise or further discussion is needed on a scheduled agenda item, it will be included in<br />

the next meeting agenda.<br />

o All meeting visitors will sit in the audience and will not participate in the meetings.<br />

Subcommittees<br />

o Tri-­‐chairs may form subcommittees to assist in carrying out the CBAC charge.<br />

o Only CBAC members may serve on CBAC subcommittees.<br />

o Subcommittees shall be chaired or co-­‐chaired by at least one tri-­‐chair.<br />

o Subcommittees shall report back to the full body of the CBAC.<br />

o Subcommittees must be smaller than a full quorum of the CBAC.<br />

Member Expectations<br />

o Members shall maintain confidentiality of privileged information which is marked working draft.<br />

o Members shall attend meetings regularly and be on time.<br />

Committee Participation<br />

o The committee will periodically review and evaluate its performance.<br />

o Members will make decisions after thorough discussion and explanation of various perspectives.<br />

o Members shall attempt to reach decisions by consensus. However, if a clear consensus cannot be<br />

obtained, decisions shall be reached by a majority vote of members present.<br />

o Members must be present to vote; proxy or email votes are not allowed.<br />

o Once a decision is made, committee members will cease debate and uphold the decision of the<br />

committee.<br />

o The committee will work together as a team to accomplish the work outlined in the CBAC Charge.<br />

26


1. Annual Academic and Facility Recommendations pp. 9-­‐14<br />

2. 2004 and 2008 Bond Election Results pp. 15-­‐17<br />

3. CBAC 2004, CBOC 2004 and CBOC 2008 Lessons Learned (Agenda Item) pp. 18-­‐36<br />

4. Facility Condition Index and Replacement Cost Report pp. 37-­‐52<br />

5. Facility Data Summary Example pp. 53-­‐80<br />

6. Capital Improvement and Bond Planning Advisory Committee Report (Agenda Item) pp. 81-­‐104<br />

7. Additions to CBAC recommendations made by the Board to previous bond programs pp. 105-­‐109<br />

8. Campus Individual Plans pp. 110-­‐112<br />

(Sample campus will be included in subsequent email)<br />

9. Previous bond programs analyzed by spending categories pp. 113-­‐114<br />

10. Bond decision timelines (2013 and 2014) pp. 115-­‐117<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

27


1<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

28


Overview of A<strong>ISD</strong> Annual Academic and Facilities Recommendations<br />

29


Approved AAFRs for 2012-13 Implementation<br />

1<br />

2<br />

3<br />

Learning support<br />

center to replace<br />

Alternative<br />

Learning Center<br />

(ALC) and<br />

Alternative Center<br />

(ACES) for<br />

elementary<br />

students<br />

Better use of<br />

existing A<strong>ISD</strong><br />

facility capacity to<br />

address north<br />

central elementary<br />

school<br />

overcrowding<br />

Designation of<br />

2008 Bond<br />

The recommended delivery model for this scenario is an agreement with an outside provider to<br />

operate a Learning Support Center that will serve all mandatory removals, and only those<br />

discretionary removals will be reviewed by the Associate Superintendents' offices.<br />

New discretionary removal will be served at the home campus by an additional 16 FTEs,<br />

including teachers and social support staff that will be assigned based on campus and student<br />

need and related services. These additional staff would be part of the existing Child Study<br />

Teams.<br />

Campus administrators would not be permitted to remove a student for discretionary reasons<br />

unless the student is considered a safety concern. To serve students who are removed for<br />

discretionary reasons, additional teachers and counselors would be assigned based on campus<br />

and student need and related services. These staff members would be added to the existing<br />

Child Study Teams.<br />

The district would enter into a contractual agreement with an outside provider to operate a<br />

Learning Support Center that would serve all students who are removed from the classroom for<br />

mandatory purposes, as well as students removed from the classroom for discretionary reasons if<br />

the student is considered to present a safety concern.<br />

If an outside provider is not identified, these students would continue to attend the Alternative<br />

Learning Center, but with a new delivery model that would include rigorous and aligned<br />

academic programming. Social and Emotional Learning through individual and group<br />

counseling, service learning projects, additional Child Study supports and mental health<br />

screening.<br />

Re-locate the remaining 6th grade programs at Barrington, Brown and Walnut Creek<br />

elementary schools to their designated middle schools, eliminating all 6th grade classes at those<br />

elementary schools.<br />

Create a pre-kindergarten center at Dobie Middle School. Pre-kindergarten students who<br />

would have attended Graham and Hart elementary schools will be assigned to Dobie Middle<br />

School.<br />

Create a pre-kindergarten through 8th grade model at Webb Middle School and reassign a<br />

portion of the Barrington Elementary School attendance area to Webb Middle School, retaining<br />

the same boundaries for the existing middle school students and growing the model with<br />

specific grade levels as appropriate.<br />

Reassign remaining pre-kindergarten students at Barrington to Reilly Elementary School.<br />

The recommendation to address overcrowding in north central elementary schools in the 2012-<br />

13 school year would alleviate overcrowding by an estimated 812 seats.<br />

30


4<br />

5<br />

Program For longer term relief, designate the 2008 Bond Program elementary school with a capacity of<br />

669 students, either through the construction of a new school or the purchase and adaptive<br />

reuse of an existing facility.<br />

In-District Charter:<br />

Graduation<br />

Pathways<br />

Education<br />

Program<br />

In-District Charter:<br />

College<br />

Preparation (IDEA<br />

Public Schools)<br />

The recommended delivery model for this scenario is an in-district charter program agreement<br />

with Responsive Education Solutions serving Travis and Lanier High Schools.<br />

The graduation pathway program focuses on the learning process in learning centers.<br />

Emphasizing a personalized approach, the program delivers individual students a prescribed<br />

course of study. Using individualized curriculum plans, as well as direct teaching, paper-based<br />

curriculum and computer-based instruction, students recover credits, accelerate credit accrual<br />

and receive high dosage tutoring in math and other needed areas.<br />

The Board voted to approve the Annual Academic and Facilities Recommendation proposing an indistrict<br />

charter partnership with IDEA Public Schools on Dec. 19. For more information about the Dec. 19<br />

Board Meeting, please click here.<br />

The new program is a partnership between the <strong>Austin</strong> school district and IDEA Public Schools to offer a<br />

college preparatory curriculum that prepares students for success in college and citizenship by<br />

developing academic, social and leadership skills needed to succeed in a four-year college. It is still an<br />

A<strong>ISD</strong> school.<br />

Starting next school year, families who live in the Martin Middle School attendance zone, including<br />

Allan Elementary School, will have a new school option at the Allan campus. In the 2012-13 school<br />

year, the new program at Allan will offer pre-kindergarten, kindergarten, and grades 1, 2 and 6. Over<br />

the next few years, the program will expand to serve students in grades pre-K through 12 at the current<br />

Allan Elementary Campus and at Eastside Memorial High School at the Johnston Campus. Students<br />

who graduate from the program will receive a diploma from A<strong>ISD</strong>.<br />

Important <strong>Materials</strong> for Parents:<br />

Frequently Asked Questions: English - Spanish<br />

IDEA Board Item/ Fact Sheet<br />

IDEA In-district Charter Contract: Dec. 20, 2011 final contract (signed)<br />

31


Potential AAFRs for implementation in 2013-14<br />

1<br />

2<br />

Two Single Sex<br />

Middle Schools<br />

School for Young<br />

Men<br />

3 South High School<br />

4 Parity in CTE<br />

5<br />

Dual Language<br />

Expansion<br />

6 Graduation<br />

Education Program<br />

7<br />

Eastside Vertical<br />

Team<br />

Two middle school attendance areas (Garcia and Pearce) will be combined<br />

Males will attend one school, and females will attend the other middle school<br />

Single-Sex schools at James E. Pearce College Preparatory Academy and Gus Garcia<br />

Middle School would serve to maximize the academic achievement, learning styles,<br />

aspirations and interests of students, while meeting their social and emotional genderspecific<br />

needs.<br />

Students who live in the combined attendance zone and who do not want to attend a<br />

single-sex school will have the option to enroll in a designated middle school(s).<br />

A<strong>ISD</strong> has been awarded up to $4.6 million dollars by The Moody Foundation for<br />

strategic planning and school operations.<br />

College and career preparatory academy that develops:<br />

o A community of character-centered young men:<br />

who have high moral principles and high integrity, and<br />

who are dedicated to serving others<br />

Land acquisition for a future south high school is included in the 2008 Bond Program<br />

Site selection process was updated in the approved Facilities Master Plan Framework<br />

Determine expansion needs for Career and Technical Education to provide equitable<br />

access to programming in all regions of the district<br />

Implementation could require additional capital improvement funding for facilities<br />

The goal of the dual language model is to promote students who are bilingual,<br />

bicultural, and biliterate through learning experiences in both English and another<br />

world language<br />

Expand the number of elementary schools offering dual language<br />

Begin planning for dual language implementation at selected middle schools<br />

Vertical teams/campuses will apply for future program expansion<br />

Provides extended and flexible time, learning communities and computer-based, selfcorrecting<br />

credit recovery and accrual program to students in grades 9-12 who have<br />

dropped out, or who are at risk of dropping out<br />

Determine continuation of initial year at Lanier and Travis high schools, and whether to<br />

expand the program to other high schools<br />

Support for Eastside Memorial Vertical Team 2012-13 Academic Plan, currently in draft<br />

form consisting of five tenets to affect:<br />

o Improving human capital;<br />

32


8<br />

9<br />

10<br />

11<br />

In-District Charter for<br />

Travis Heights ES<br />

Special Populations:<br />

African-American<br />

Student<br />

Performance<br />

Adequate Yearly<br />

Progress (AYP)<br />

Special Education<br />

Student<br />

Performance<br />

Secondary English<br />

as a Second<br />

Language (ESL)<br />

Student<br />

Athletic Facilities<br />

Assesment Results<br />

(Secondary Level)<br />

Kennedy Center<br />

Fine Arts Study<br />

Results<br />

o Time on task;<br />

o Implementation of high dosage tutoring;<br />

o High expectations; no excuses culture; and<br />

o Implementation of data-driven instruction<br />

Partnership with Education <strong>Austin</strong> and <strong>Austin</strong> Interfaith to initiate an in-district charter<br />

model that may allow for greater community involvement and campus autonomy<br />

Travis Heights ES has expressed an interest in developing a proposal for this in-district<br />

charter program<br />

This opportunity is still open to other A<strong>ISD</strong> schools<br />

Academic program is currently in development<br />

Achievement test data results will inform and shape academic programming<br />

adjustments and associated operational (facility) modifications<br />

A critical component of this analysis as reflected in Goal 2 of the Strategic Plan is the<br />

disaggregation of all student group achievement data<br />

Long-range planning for secondary athletic programs and facilities improvement<br />

Implementation could require additional capital improvement funding for facilities<br />

Development of a 10-year plan to support Arts-rich schools in an Arts-rich city<br />

Any Given Child Team to provide strategic plan in June 2012<br />

Planning for recommendations identified in the Kennedy Center Fine Arts Study<br />

includes both academic programming and facilities improvement<br />

Implementation could require additional capital improvement funding for facilities<br />

33


2<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

34


May 10, 2008 Joint General and Special Elections<br />

Travis County<br />

May 10, 2008<br />

Total May 10, 2008 Joint General and Special Elections Registered Voters<br />

Total Precincts Completed<br />

Total Ballots Cast<br />

% of Total Registered Voters<br />

A<strong>ISD</strong> DISTRICT 2 SINGLE MEMBER TRUSTEE<br />

21 of 21 Precincts Reporting<br />

Sam Guzman<br />

A<strong>ISD</strong> DISTRICT 3 SINGLE MEMBER TRUSTEE<br />

21 of 21 Precincts Reporting<br />

Christine Brister<br />

Jerry Garcia<br />

A<strong>ISD</strong> DISTRICT 5 SINGLE MEMBER TRUSTEE<br />

31 of 31 Precincts Reporting<br />

Mark J. Williams<br />

A<strong>ISD</strong> AT-LARGE POSITION 8<br />

153 of 153 Precincts Reporting<br />

Annette LoVoi<br />

A<strong>ISD</strong> PROPOSITION NO. 1<br />

153 of 153 Precincts Reporting<br />

FOR<br />

AGAINST<br />

A<strong>ISD</strong> PROPOSITION NO. 2<br />

153 of 153 Precincts Reporting<br />

FOR<br />

AGAINST<br />

A<strong>ISD</strong> PROPOSITION NO. 3<br />

153 of 153 Precincts Reporting<br />

FOR<br />

AGAINST<br />

Official Results<br />

<strong>Austin</strong> Independent School District Cumulative Report<br />

Total Votes Counted in this Race: 530<br />

364,925<br />

153 of 153 100.00%<br />

05/16/2008 10:54 AM<br />

Early Voting Election Day Total Vote<br />

13,983 18,397 32,380<br />

3.83% 5.04% 8.87%<br />

Early Voting Election Day Total Vote<br />

530 100.00% 530 100.00%<br />

1,060 100.00%<br />

445<br />

277<br />

Total Votes Counted in this Race: 722<br />

Total Votes Counted in this Race: 1,355<br />

Total Votes Counted in this Race: 8,513<br />

530 1,060<br />

61.63% 746 64.20%<br />

1,191 63.22%<br />

38.37% 416 35.80%<br />

693 36.78%<br />

1,162 1,884<br />

1,355 100.00% 1,835 100.00%<br />

3,190 100.00%<br />

1,835 3,190<br />

8,513 100.00% 10,015 100.00%<br />

18,528 100.00%<br />

9,784<br />

3,825<br />

Total Votes Counted in this Race: 13,609<br />

9,602<br />

3,983<br />

Total Votes Counted in this Race: 13,585<br />

9,176<br />

4,412<br />

Total Votes Counted in this Race: 13,588<br />

Page 1 of 1<br />

10,015 18,528<br />

71.89% 13,511 74.97%<br />

23,295 73.65%<br />

28.11% 4,511 25.03%<br />

8,336 26.35%<br />

18,022 31,631<br />

70.68% 13,191 73.41%<br />

22,793 72.23%<br />

29.32% 4,779 26.59%<br />

8,762 27.77%<br />

17,970 31,555<br />

67.53% 12,546 69.93%<br />

21,722 68.90%<br />

32.47% 5,395 30.07%<br />

9,807 31.10%<br />

17,941 31,529<br />

35


Total Number of Voters : 26,378 of 365,683 = 7.21%<br />

Cumulative Report — Official<br />

<strong>Austin</strong> Independent School District — SPECIAL BOND ELECTION — September 11, 2004<br />

Page 1 of 1<br />

Party Candidate Early<br />

Election<br />

Total<br />

PROPOSITION NO. 1, Vote For 1<br />

FOR<br />

AGAINST<br />

PROPOSITION NO. 2, Vote For 1<br />

FOR<br />

AGAINST<br />

PROPOSITION NO. 3, Vote For 1<br />

FOR<br />

AGAINST<br />

PROPOSITION NO. 4, Vote For 1<br />

FOR<br />

AGAINST<br />

PROPOSITION NO. 5, Vote For 1<br />

FOR<br />

AGAINST<br />

PROPOSITION NO. 6, Vote For 1<br />

FOR<br />

AGAINST<br />

6,619 76.41% 12,158 69.70% 18,777 71.93%<br />

2,043 23.59% 5,285 30.30% 7,328 28.07%<br />

Cast Votes: 8,662 99.06% 17,443 98.92% 26,105 99.27%<br />

6,615 76.41% 12,645 72.67% 19,260 73.91%<br />

2,042 23.59% 4,756 27.33% 6,798 26.09%<br />

Cast Votes: 8,657 99.01% 17,401 98.68% 26,058 99.11%<br />

6,568 75.78% 12,406 71.18% 18,974 72.71%<br />

2,099 24.22% 5,024 28.82% 7,123 27.29%<br />

Cast Votes: 8,667 99.12% 17,430 98.84% 26,097 99.22%<br />

6,170 71.33% 11,520 66.19% 17,690 67.89%<br />

2,480 28.67% 5,885 33.81% 8,365 32.11%<br />

Cast Votes: 8,650 98.92% 17,405 98.70% 26,055 99.13%<br />

5,857 67.93% 10,011 57.21% 15,868 60.75%<br />

2,765 32.07% 7,487 42.79% 10,252 39.25%<br />

Cast Votes: 8,622 98.60% 17,498 99.23% 26,120 99.48%<br />

6,157 72.16% 11,962 69.00% 18,119 70.04%<br />

2,375 27.84% 5,375 31.00% 7,750 29.96%<br />

Cast Votes: 8,532 97.58% 17,337 98.32% 25,869 98.86%<br />

09/17/2004 02:05 PM<br />

Precincts Reporting 95 of 95 = 100.00%<br />

36


3<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

37


Bond Program History<br />

2004 and 2008 CBAC Collateral Issues<br />

2004 and 2008 Community Bond Oversight<br />

Committee (CBOC) Lessons Learned<br />

38


During the committee’s deliberations, a number of<br />

significant ancillary issues, related to but not central to<br />

the charge of the committee, emerged. The committee<br />

charged members or staff to articulate the committee’s<br />

position on each of these issues. This is the purpose for<br />

this section of the report.<br />

39


Development and Implementation of a Campus and<br />

District-Wide Bond Planning Program<br />

As part of long-term planning for capital improvements, it is expected that a bond<br />

program will be proposed on a regular five– to six-year cycle. To be ready for<br />

subsequent bond programs, a process must be developed to prepare, organize and<br />

update biannually all data required for future bond programs. Initially, this will be a<br />

significant amount of work. However, once institutionalized and computerized, the<br />

process will be easily executed and updated. This process should include master<br />

planning at both the campus and district-wide levels.<br />

At the campus level, each plan should assess assets, i.e., buildings and their systems<br />

and physical property, maintenance and repair, replacement of portables per district<br />

policy, safety and security, and facility enhancements or modifications that address<br />

functional deficiencies or arise from changes in academic requirements resulting from<br />

legislative or district actions, or district strategic planning efforts. District staff would be<br />

assigned to each school to assist in the development of campus master plans and to<br />

ensure the consistency of final products from campus to campus.<br />

At the district level, master planning should include impacts on the facility enhancements<br />

or modifications mentioned above, the planning to implement safety and security policies<br />

and procedures, district policies related to replacement of portables with permanent<br />

structures, and asset management of district-wide facilities. All items in each plan would<br />

include associated implementation costs.<br />

The output from the campus and district master planning process would be a document<br />

that identifies four categories of capital improvements and their associated costs. These<br />

categories are:<br />

1) critical – items that must be included in the next bond cycle;<br />

2) priority – items that will be assessed and prioritized by the CBAC;<br />

3) long term – items like roofs, HVAC systems, etc., that have predictable service<br />

lives with high capital replacement costs; and,<br />

4) M&O –chronic repair items that are more cost effective to replace than to<br />

continue to repair.<br />

<br />

<br />

<br />

<br />

<br />

<br />

40


Policy/Guidance for Portables<br />

<br />

A policy should be developed and implemented for reducing the maximum number of<br />

portables used on a given campus and for improving the condition of many of the<br />

portables now in use. The policy should address the improved siting of portables in<br />

consideration of factors such as site drainage and land topography, parking, safety and<br />

security, lighting, and relative proximity to restrooms, main office/support rooms and core<br />

facilities.<br />

The design of the portables themselves should be modified to include:<br />

installation of awnings over doors;<br />

replacement of wall HVAC systems with quieter split-systems that provide<br />

adequate quantities of outside air and are more energy efficient;<br />

site systems to ensure that rainwater does not flow under the portables once they<br />

settle; and,<br />

incorporation of restrooms in middle and high school portables.<br />

This policy should include the scheduled replacement of portables with permanent space<br />

when: the number of portables exceeds some critical number; e.g., more than eight; a<br />

portable has been on campus in excess of its expected service life; or the school’s<br />

population has not decreased for a decade or more and permanent space is warranted.<br />

41


42


43


44


45


The District should continue to use its time-tested building standards and develop new<br />

and additional results-based standards for the use of building materials, products and<br />

systems. Lessons learned from A<strong>ISD</strong>’s mold remediation projects in the 2002 Health &<br />

Safety Bond Program should be applied in future bond programs. The extensive use of<br />

moisture retaining organic building materials should be abandoned in favor of less<br />

absorptive, more durable materials with lower maintenance characteristics.<br />

The reasonable use of more sustainable and environmentally responsive materials<br />

should also become a part of the District’s building standards.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

46


During the Committee’s deliberations, a number of<br />

significant ancillary issues emerged. The Committee<br />

charged staff to articulate the Committee’s position on<br />

each of these issues. This is the purpose for this section<br />

of the report.<br />

47


Compressed Planning Timeline<br />

The CBAC began its work in October 2007 well aware of the timeline required for the<br />

Committee to make a recommendation to the Board of Trustees in time for it to call an election<br />

on a bond referendum for May 10, 2008. During the course of the CBAC’s work, categories of<br />

work were introduced for the Committee’s consideration in addition to the initial list of categories<br />

and proposed projects submitted by staff. Some additional items for consideration were<br />

generated by A<strong>ISD</strong> department heads, others resulted from a Committee-sponsored survey of<br />

campus principals, and others surfaced from the two public hearings that the committee<br />

conducted.<br />

In general, the timeline presented challenges because information continued to emerge<br />

throughout the process. Several members of the Committee expressed the opinion that they<br />

just did not have enough time to adequately form an opinion on the validity of including, in their<br />

recommendations, certain specific requests or categories of requests. The Committee also<br />

heard from several speakers at the public hearings that more time should be taken to develop a<br />

comprehensive bond program that addresses the full range of needs.<br />

Finally, the Committee made no recommendation as to whether or not the bond referendum<br />

should be put forth in May or November. Committee members deferred to the Board of<br />

Trustees. However, the Committee did note that the planning process for a comprehensive<br />

bond program start now.<br />

48


The technology upgrades, included in the program, are of the utmost importance because they<br />

serve the best interest of all A<strong>ISD</strong> students. Committee members threw their full support behind<br />

this initiative; however, they were challenged in supporting the use of bond funds for the<br />

purchase of these items. Members questioned the fiscal wisdom of financing short-life-cycle<br />

items (2- to 5-year term) with long-term debt (25-year term).<br />

Due to the ever-increasing role of technology in the professional, academic, and everyday lives,<br />

the District must be prepared to provide its students with the appropriate tools and training to<br />

meet these challenges. The District must view technology as today’s “blackboard” and support<br />

it as a necessary instructional expense. It should not be forced to compete with teachers’ raises<br />

for funding.<br />

The CBAC urges the Board of Trustees, along with A<strong>ISD</strong> administrators, to develop a fiscally<br />

sound, long-range plan that will provide for a viable technology refresh schedule and sufficient<br />

staff to support and maintain the computers and systems.<br />

49


Several projects, in the initial staff recommendations, are not included in the projects being<br />

recommended to the Board of Trustees by the Citizens’ Bond Advisory Committee (CBAC).<br />

Each of these projects is addressed below:<br />

Southeast Middle School<br />

Although Paredes Middle School’s projected membership is 136% of permanent capacity for the<br />

2012-13 school year, the potential impact of the current economic conditions on the projected<br />

build out of the area and the current capacities of adjacent middle schools led the Committee to<br />

conclude that the construction of an additional middle school is not urgent at this time.<br />

Linder Elementary School<br />

The Committee strongly endorsed a long-term solution for providing overcrowding relief in the<br />

Linder community. As observed by the Overcrowding and Future Growth Subcommittee, the<br />

location of the portables, in relation to the main building, and the movement of students from<br />

this area are especially problematic due to the steep slope of the site and the challenges of<br />

inclement weather. The students most affected are those in the primary grades, who face<br />

greater hardships in maneuvering these obstacles due to their age. The Committee supports a<br />

short-term relief strategy for 2008-09 through boundary adjustments, and supports the addition<br />

of a Pre-K, kindergarten, first-grade center as a long-range strategy to relieve Linder and honor<br />

and support the faculty’s and administration’s efforts to build a strong and involved community.<br />

The Committee did not include funding for either the center or a classroom addition to allow the<br />

Board of Trustees maximum flexibility in determining the appropriate strategy to address the<br />

overcrowding at the school. If the Board were to decide that the best strategy is to build a<br />

center in this area, the classroom addition and land proposed in the original staff<br />

recommendation could be postponed until the next comprehensive bond or eliminated if<br />

population trends stabilize.<br />

Mueller Elementary<br />

The Committee voted not to include a Mueller Elementary at this time because of the available<br />

capacity in the neighboring schools given the current demographic projections. The<br />

demographics in this area need to be studied closely, including the consideration of additional<br />

data, from the developer, about how rapidly the development will move forward.<br />

Murchison Middle School<br />

The Committee did not recommend Murchison for a classroom addition based on the current<br />

and projected percentage of permanent capacity, which is between 110% and 115% and does<br />

not meet the overcrowding criteria established by the District.<br />

Undesignated Elementary School<br />

In the original staff recommendation for the bond proposal, staff included the construction of a<br />

Southwest Elementary School. After reviewing updated demographic data, staff proposed that<br />

50


a Southwest Elementary School be considered as one of the 2004 Bond Program undesignated<br />

elementary schools. With this new recommendation, the staff suggested substituting a<br />

Southeast Elementary School in lieu of the originally recommended Southwest Elementary<br />

School. Rather than designate an elementary school to the southeastern portion of the District,<br />

the Committee chose to declare this an undesignated elementary school to provide flexibility in<br />

placing the school in the location of greatest need.<br />

Other Considerations<br />

The Committee supports the staff recommendation for the placement of the 2004 undesignated<br />

elementary schools in the North Central and Southwest geographic areas.<br />

The Committee took no action on a request to fund additional classrooms at Anderson High<br />

School; however, the Committee did request staff to assess the need for an additional science<br />

lab and if deemed necessary, it would be added to the number of labs that are proposed to<br />

meet the increased science graduation requirements.<br />

The Committee suggested that the Board carefully consider the use of available capacity in<br />

existing facilities before constructing additional schools or classrooms.<br />

The Committee voted not to include funding for the purchase of land for a southwest high<br />

school. This issue was included in the additional project requests and also emerged in the<br />

public forums, and the Committee did not have the opportunity to study this item sufficiently to<br />

make a recommendation.<br />

51


Performing Arts Center<br />

The 2004 Bond Program included funding of $8.8 million for purchasing land and constructing a<br />

performing arts center (PAC) for district-wide use. These funds were contingent on funding at<br />

least $7 million of the cost of the PAC from community benefactors. At the time the Committee<br />

began meeting in October, matching contributions had not yet materialized, and the District was<br />

considering a shared facility with the Long Center. In mid-December, it became clear that a<br />

joint venture with the Long Center was no longer an option due to parking and cost<br />

considerations. This result led the Committee to consider a stand-alone PAC as not meeting<br />

the criteria for consideration.<br />

In late December, a land contribution for a PAC at the Mueller area became a possibility.<br />

Because the Committee needed to present its recommendations to the Board by the end of<br />

January, it was impossible to research this issue.<br />

Despite the outpouring of community support at the public forums for a district-wide PAC, the<br />

Committee felt that a resolution to the Mueller option was necessary before moving forward with<br />

a recommendation.<br />

While studying the issue of a district-wide PAC, Committee members visited auditoriums at<br />

McCallum and Crockett high schools. These visits, and input from the community at the public<br />

forums, brought to the Committee’s attention the daily instructional needs of fine arts students.<br />

It was clear from the visits and input that funds needed to be allocated to address the existing<br />

deficiencies at McCallum, Lanier, and Johnston high schools. The Committee voted to include,<br />

in the final recommendations, renovations and expansions to the McCallum and Lanier high<br />

school auditoriums; however, Johnston was not included based upon the current and projected<br />

student membership and the assumption that the existing facility meets the student needs. This<br />

assumption needs further discussion.<br />

52


Master Planning<br />

Since A<strong>ISD</strong> owns and operates one of the largest real-estate portfolios in the region, members<br />

felt it important that facilities staff accelerate the facility master planning process to ensure<br />

support of the instructional vision of the District. This model would institutionalize facility master<br />

planning and build on the work that has been done on the facility condition assessment<br />

database. The process should begin with the identification of needed renovations through the<br />

use of the database and move to a model that plans for school population trends and utilization<br />

of available capacity to ensure the efficient use of all facilities.<br />

This fiscally sound model would provide more efficient and cost-effective schools and would<br />

ensure equitable resources for all schools. Extending the planning horizon may be necessary to<br />

ensure understanding of the impact on the facilities of the elementary, middle and high schools<br />

in each vertical team.<br />

Additionally, the District should explore opportunities for joint efforts with other governmental<br />

entities that would yield a wiser use of tax-payer money with little or no duplication of efforts.<br />

However, A<strong>ISD</strong>’s participation in these efforts should not be limited to identified opportunities,<br />

but should be an integral part of a regional planning effort.<br />

53


Community Bond Oversight Committee (CBOC)<br />

Lessons Learned<br />

A. Pre-Election Activities/Bond Program Planning:<br />

1. Identify new schools using the description of schools to be relieved, rather than<br />

geographic designations.<br />

2. For larger, more complex projects, enlist paid services of architects, engineers,<br />

and appropriate construction professionals to conduct extensive and<br />

comprehensive site analysis to determine the scope and budget for the project.<br />

3. As the A<strong>ISD</strong> gears up for the next bond program, it should utilize the oversight<br />

model established in the 2004 Bond Program.<br />

4. Additional contingency funds should be included in future bond programs to cover<br />

unexpected issues that may arise when older district facilities are renovated or<br />

repaired.<br />

5. Project scope of work needs to be clearly defined to prevent misunderstandings<br />

by the community as to what the project should entail. (Added in November 2010.)<br />

B. CBOC<br />

1. Appoint CBOC members immediately after the bond initiative is passed.<br />

2. A thorough discussion of committee processes, procedures and charge is needed<br />

when the CBOC is first appointed.<br />

3. A simple English statement of what the charge is would help future committees.<br />

4. Responsible stewardship involves providing adequate resources to maintain and<br />

operate new schools and new construction properly.<br />

5. The process used by the CBOC to establish its structure and working committees<br />

was very successful.<br />

6. Schedule a retreat immediately after the CBOC is appointed and completes the<br />

self-evaluation tool at least twice annually.<br />

7. The Survey Committee should develop its own list of “lessons learned”.<br />

a. There should NOT be different surveys for each campus due to the need to<br />

compile data. Therefore, one survey will be created with all campuses listed<br />

and the first question will ask them to select their campus. Note: There will still<br />

be personalized emails, with individual project descriptions, sent to each<br />

campus.<br />

b. One person should have central responsibility for collection and distribution of<br />

surveys.<br />

C. Program Management:<br />

1. An additional 15% of square footage should be added to the educational<br />

specifications to allow for circulation. (Barton Hills)<br />

2. Front load the implementation of the bond construction program. Spending funds<br />

earlier helps reduce the impact of inflation on available bond funds.<br />

3. Differentiate between the dates for the completion of construction and when a<br />

building can be occupied. The general public believes the “completion of<br />

construction” date is the same as the date a building can be occupied.<br />

4. Establish a process with well-delineated criteria for determining the use of<br />

contingency funds.<br />

54


5. Since contingency funds are more readily available in earlier projects and less<br />

available for projects scheduled in later phases, committee and staff need to be<br />

mindful of maintaining equity for all projects.<br />

6. Because principals are key participants in the success of a construction project, a<br />

training workshop by construction management staff should be provided to new<br />

principals who have no experience with construction projects.<br />

7. Projects should be broken down into smaller packages to allow smaller<br />

contractors to bid these projects. The benefits of this approach are that bids would<br />

be at or below the project budget, and the District would be less dependent on the<br />

large contractors.<br />

8. In order to better deal with problems related to obtaining permits from the City of<br />

<strong>Austin</strong>, which have caused numerous delays and have increased the number of<br />

change orders, CBOC members recommended that staff:<br />

a. Research the city requirements before establishing a budget for renovations.<br />

b. Have the Construction Management staff and City Health Department conduct<br />

a survey of the kitchens to determine in advance what an architect should<br />

include in the design.<br />

c. Have a debriefing session with city officials at the director level and strategize<br />

on how to improve the permitting process.<br />

9. Separate items not requiring a permit from projects so that these components may<br />

be completed while the other project components obtain the necessary permits.<br />

An example of this was seen with the kitchen renovation projects; the installation<br />

of dishwashers, which does not require any permit, was separated from other<br />

project components that require permits. This allowed the dishwasher installations<br />

to proceed.<br />

10. When designing a building, allow sufficient space in the crawl space for easy<br />

access. This will make it easier to repair pipes or other fixtures that must be<br />

accessed through the crawl space.<br />

11. The Superintendent and the City Manager should meet and work together to<br />

establish a culture of cooperation between two public entities, which would<br />

facilitate permitting and code issues that frequently arise during construction or<br />

renovation projects. Too often, lower level city staff does not feel authorized to<br />

deviate from the letter of a regulation, which hinders any flexibility in creating<br />

solutions that could benefit both the District and the City.<br />

12. The City should distinguish between code issues that are relevant and necessary<br />

versus those that are clearly outside the scope of work presented and very<br />

expensive for the District to undertake. The City should grant the District leniency<br />

for those code issues that fall into the latter category.<br />

13. Delays in land acquisition are costly. The District should consider selling surplus<br />

property and reinvesting in potential future sites as a cost reduction mechanism.<br />

55


Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

56


<strong>Austin</strong> Independent School District<br />

ESB_q2<br />

ESB_Loc_Loc_q002<br />

Total Square Feet<br />

2400K<br />

2000K<br />

1600K<br />

1200K<br />

800K<br />

400K<br />

0K<br />

30,754<br />

70,071<br />

177,537<br />

391,447<br />

Facility Condition Assessment Report<br />

79,178<br />

Building Age by Age Bracket<br />

Includes Permanent Buildings Only<br />

2,006,641 2,044,312<br />

2,179,499<br />

1,924,747<br />

1,583,733 1,618,793<br />

Pre 1900 1900-1909 1910-1919 1930-1939 1940-1949 1950-1959 1960-1969 1970-1979 1980-1989 1990-1999 2000-2009 2010-2019<br />

6/12/2012<br />

8:15 am<br />

200,544<br />

57


<strong>Austin</strong> Independent School District<br />

ESB_w1<br />

ESB_Loc_Loc_w001<br />

Facility Portfolio<br />

Buildings by Primary Use Type<br />

Number of<br />

School / Facilities<br />

Permanent Buildings Temporary Buildings<br />

School / Facility Primary Use Type Count Sq Ft Count<br />

Sq Ft<br />

Elementary School 79<br />

158 5,221,519 425 647,136<br />

Middle School 18<br />

45 2,634,632 98 147,530<br />

High School 12<br />

70 3,373,774 77 114,869<br />

Special Campus 4<br />

11 282,239 16 26,004<br />

Athletic Facility 5<br />

53 331,735 0 0<br />

Support Facility 7<br />

24 426,167 2 3,072<br />

Pre-K Center 1<br />

2 37,188 7 10,752<br />

Total<br />

Permanent vs. Temporary Space<br />

Temporary Buildings<br />

7.16%<br />

949,362<br />

126<br />

363<br />

12,307,255 625 949,362<br />

Permanent Buildings<br />

92.84%<br />

12,307,255<br />

6/15/2012<br />

3:55 pm<br />

58


<strong>Austin</strong> Independent School District<br />

ESB_w10<br />

ESB_Loc_Loc_w010<br />

Facility Portfolio<br />

Buildings by Primary Use Type<br />

Number of<br />

School / Facilities<br />

Permanent Buildings Temporary Buildings<br />

School / Facility Primary Use Type Count Sq Ft Count<br />

Sq Ft<br />

Elementary School 79<br />

158 5,221,519 425 647,136<br />

Middle School 18<br />

45 2,634,632 98 147,530<br />

High School 12<br />

70 3,373,774 77 114,869<br />

Special Campus 4<br />

11 282,239 16 26,004<br />

Athletic Facility 5<br />

53 331,735 0 0<br />

Support Facility 7<br />

24 426,167 2 3,072<br />

Pre-K Center 1<br />

2 37,188 7 10,752<br />

Total 126<br />

Middle School<br />

26%<br />

363<br />

12,307,255 625 949,362<br />

Percent Space by Primary Use Type<br />

21%<br />

High School<br />

Special Campus<br />

Athletic Facility<br />

2%<br />

3%<br />

3% Support Facility<br />

0%<br />

Others<br />

44% Elementary<br />

School<br />

6/15/2012<br />

3:57 pm<br />

59


<strong>Austin</strong> Independent School District<br />

ESB_w15<br />

ESB_Loc_Loc_w015<br />

Facility Portfolio<br />

Current Replacement Cost by Primary Use Type<br />

Includes Permanent Buildings Only<br />

Includes Project-Level Soft Costs<br />

Number of<br />

District Buildings<br />

School / Facility Primary Use Type School / Facilities Count Sq Ft Current Replacement Value %<br />

Elementary School 79<br />

158 5,221,519 $1,462,517,155 40%<br />

Middle School 18<br />

45 2,634,632 $763,367,981 21%<br />

High School 12<br />

70 3,373,774 $1,173,108,491 32%<br />

Special Campus 4<br />

11 282,239 $82,313,812 2%<br />

Athletic Facility 5<br />

53 331,735 $66,679,506 2%<br />

Support Facility 7<br />

24 426,167 $122,186,670 3%<br />

Pre-K Center 1<br />

2 37,188 $9,739,256 0%<br />

Total<br />

Elementary School<br />

40%<br />

126<br />

363 12,307,255 $3,679,912,872 100%<br />

Current Replacement Value by Primary Use Type<br />

Middle School<br />

21%<br />

High School<br />

32%<br />

Special Campus<br />

2%<br />

Athletic Facility<br />

2%<br />

Support Facility<br />

3%<br />

Pre-K Center<br />

0%<br />

6/15/2012<br />

3:57 pm<br />

60


<strong>Austin</strong> Independent School District<br />

FA_p3<br />

FACA_Loc_p003<br />

FCI Campuses / Building<br />

0% - 15%<br />

GOOD<br />

MODERATE<br />

Facilities<br />

60<br />

Area<br />

6,802,154<br />

15%- 30%<br />

FAIR<br />

51 4,476,008<br />

30%- 50%<br />

POOR<br />

14 993,470<br />

> 50%<br />

1 35,623<br />

Total 126 12,307,255<br />

A<strong>ISD</strong> Average Facility FCI =<br />

Facility Condition Index Report<br />

Districtwide Facility Condition Index (FCI) by Location<br />

16.49<br />

Includes Permanent Buildings and Sites<br />

FCI Based on Soft Costs<br />

Count<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

60<br />

51<br />

14<br />

50%<br />

1<br />

6/12/2012<br />

8:26 am<br />

61


A<strong>ISD</strong> School / Facility Summary<br />

Based on Soft Cost Estimates<br />

For Permanent Buildings and Sites<br />

MG_SFS_a010_e<br />

No. Campus Name<br />

Elementary School<br />

Grades School<br />

Served Type Historic Age<br />

Size Total Bldg<br />

Acres<br />

Priorities 1 & 2<br />

Sq Ft Priority 1 Priority 2<br />

SubTotal Facility<br />

Condition Cost Priority 3 Priority 4<br />

Not<br />

Prioritized<br />

Total Facility<br />

Condition Cost<br />

142 Allan Elementary School<br />

PK-5 ES 1957 19.5 111,937 4,654,312 1,260,488 5,914,799 3,094,154 326,203 2,076,627 11,411,784 8,226,777 35,687,211 23.1 167,740 1,071,587 893,175 695,400 248,143<br />

0 108,962<br />

0<br />

0 4,425,275<br />

101 Allison Elementary School<br />

PK-6 ES 1955 10.7 61,426 365,933 455,140 821,073 1,208,192 151,056 1,101,911 3,282,232 1,744,108 19,551,259 8.9 81,151<br />

0 298,349 995,562 58,063 21,320 83,679<br />

0<br />

0 804,836<br />

102 Andrews Elementary School<br />

PK-5 ES 1962 7.7 60,032 897,601 1,939,535 2,837,136 1,331,570 613,147 2,955,216 7,737,069 4,070,682 18,788,131 21.7 130,048 1,764,834 537,198 790,743 359,781 21,320 62,464<br />

0<br />

0 2,241,012<br />

187 Baldwin Elementary School<br />

PK-5 ES 2010 14.2 86,896 0 0 0<br />

0 0 0 0 0 27,317,305 0.0 0<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

182 Baranoff Elementary School<br />

K-5 ES 1999 15.6 80,088 125,532 203,782 329,314 725,056 287,288 409,432 1,751,090 1,021,642 25,130,546 4.1 232,799<br />

0 122,120 168,123 167,738 21,320 17,348<br />

0<br />

0 760,970<br />

149 Barrington Elementary School<br />

PK-6 ES 1969 12.1 75,385 308,064 415,630 723,694 4,934,797 192,045 4,281,776 10,132,313 5,367,909 24,031,244 22.3 154,941 3,205,591 279,855 956,999 80,277<br />

0 86,740<br />

0<br />

0 3,224,142<br />

103 Barton Hills Elementary School<br />

K-6 ES 1964 9.9 38,290 1,054,572 66,568 1,121,140 1,355,346 596,948 544,931 3,618,366 2,130,442 12,603,391 16.9 95,008<br />

0 847,461 499,097 13,494 21,320 11,543<br />

0<br />

0 916,459<br />

104 Becker Elementary School<br />

PK-5 ES Historical 1936 3.7 59,296 686,083 1,074,745 1,760,828 2,352,054 225,334 1,312,135 5,650,350 3,680,228 18,028,579 20.4 166,317<br />

0 152,037 582,312 667,996 21,320 380,140<br />

0<br />

0 972,394<br />

105 Blackshear Elementary School<br />

PK-5 ES Historical 1903 5.3 70,071 320,980 1,678,405 1,999,385 3,504,353 866,365 1,269,698 7,639,800 5,893,059 21,575,719 27.3 109,301<br />

0 311,388 893,797 327,437 21,320 83,498<br />

0<br />

0 4,062,699<br />

106 Blanton Elementary School<br />

PK-5 ES 1964 8.0 71,609 819,345 888,994 1,708,339 1,628,156 590,562 525,257 4,452,313 2,625,234 22,240,513 11.8 186,392<br />

0 437,674 347,183 143,732 21,320 690,778<br />

0<br />

0 963,181<br />

185 Blazier Elementary School<br />

PK-5 ES 2007 15.4 82,897 0 39,085 39,085 11,393 104,385 27,950 182,813 106,195 28,595,490 0.4 30,459<br />

0<br />

0 0 0<br />

0 46,160<br />

0<br />

0<br />

0<br />

170 Boone Elementary School<br />

PK-5 ES 1986 12.5 72,858 639,072 99,357 738,429 1,010,000 356,617 1,443,451 3,548,497 1,303,333 23,733,244 5.5 152,566<br />

0 483,301 695,886 704,600 52,047 156,765<br />

0<br />

0 683,212<br />

107 Brentwood Elementary School<br />

PK-5 ES 1951 16.7 62,890 472,350 547,597 1,019,947 2,381,653 477,448 3,897,743 7,776,791 2,775,793 20,824,418 13.3 226,936 1,812,268 421,350 1,954,128 21,340 21,320 543,655<br />

0<br />

0 1,173,888<br />

108 Brooke Elementary School<br />

PK-5 ES 1954 5.9 51,588 594,620 399,779 994,399 1,863,815 270,046 1,425,538 4,553,799 2,721,853 16,520,825 16.5 53,241<br />

0 331,238 1,194,983 213,815 21,320 17,348<br />

0<br />

0 1,455,708<br />

109 Brown Elementary School<br />

PK-6 ES 1957 10.1 53,853 344,241 1,002,587 1,346,829 1,816,065 794,337 3,905,915 7,863,145 3,485,892 17,659,492 19.7 93,771 3,389,428 321,550 478,038 14,185 21,320 58,961<br />

0<br />

0 1,178,595<br />

110 Bryker Woods Elementary School<br />

K-6 ES 1939 6.3 37,499 927,377 760,122 1,687,499 1,745,368 282,472 924,132 4,639,471 2,486,498 12,326,021 20.2 126,565<br />

0 416,438 628,109 243,436 21,320 717,104<br />

0<br />

0 1,401,065<br />

111 Campbell Elementary School<br />

PK-5 ES 1992 9.7 61,322 503,188 208,060 711,248 1,976,859 455,101 1,426,197 4,569,405 1,950,589 20,413,391 9.6 150,812<br />

0 345,511 678,541 692,474 33,399 718,079<br />

0<br />

0 1,375,760<br />

173 Casey Elementary School<br />

PK-5 ES 1998 17.9 81,506 334,102 50,304 384,406 304,134 2,434,811 490,697 3,614,048 2,641,482 26,655,485 9.9 138,010<br />

0 330,690 318,458 129,458 21,320 34,629<br />

0<br />

0 2,224,540<br />

112 Casis Elementary School<br />

PK-5 ES 1951 14.2 77,061 467,914 336,767 804,681 1,807,929 1,021,729 1,791,611 5,425,950 2,979,545 24,743,846 12.0 248,717<br />

0 464,502 1,341,666 341,888 21,320 28,313<br />

0<br />

0 877,685<br />

184 Clayton Elementary School<br />

K-5 ES 2006 16.8 99,883 7,119 253,256 260,375<br />

0 221,895 66,002 548,271 197,308 31,465,391 0.6 287,522<br />

0<br />

0 0 0<br />

0 63,440<br />

0<br />

0 109,184<br />

161 Cook Elementary School<br />

K-5 ES 1974 12.7 67,355 1,304,902 2,894,121 4,199,023 1,758,757 281,083 4,992,240 11,231,102 5,404,034 22,076,603 24.5 98,510 3,890,801 589,902 764,181 317,159 33,399 133,116<br />

0<br />

0 2,930,973<br />

183 Cowan Elementary School<br />

PK-5 ES 1999 22.5 70,234 524,367 133,525 657,892 278,305 205,757 547,843 1,689,797 513,283 23,592,694 2.2 124,174<br />

0 443,102 93,102 435,854 21,320 58,961<br />

0<br />

0 27,325<br />

113 Cunningham Elementary School<br />

PK-5 ES 1963 8.8 71,191 473,815 134,524 608,338 7,444,920 206,039 6,360,873 14,620,170 6,952,069 22,793,956 30.5 137,159 4,428,333 188,987 1,643,581 248,241 21,320 1,000,479<br />

0<br />

0 3,055,574<br />

179 Davis Elementary School<br />

PK-5 ES 1993 13.2 71,734 521,050 285,580 806,629 3,296,960 396,857 1,334,825 5,835,272 2,891,434 23,876,408 12.1 227,850<br />

0 455,846 980,820 297,630 36,688 945,004<br />

0<br />

0 1,407,686<br />

114 Dawson Elementary School<br />

PK-5 ES 1954 8.7 55,301 1,098,214 1,880,508 2,978,722 958,252 186,440 3,737,020 7,860,434 2,934,473 17,693,997 16.6 115,151 1,695,178 1,074,763 1,863,425 147,528<br />

0 29,915<br />

0<br />

0 1,056,779<br />

154 Doss Elementary School<br />

PK-5 ES 1970 9.7 60,521 386,734 1,533,158 1,919,892 2,962,861 179,460 1,194,248 6,256,460 4,470,275 18,718,739 23.9 237,201 623,003 344,063 277,981 207,679 21,320 74,938<br />

0<br />

0 3,315,101<br />

176 Galindo Elementary School<br />

PK-5 ES 1989 10.8 85,513 635,074 310,478 945,551 348,384 183,801 1,425,438 2,903,174 605,293 27,608,799 2.2 258,494<br />

0 619,009 909,832 459,799 33,399 17,348<br />

0<br />

0 281,801<br />

116 Govalle Elementary School<br />

PK-5 ES 1940 8.4 75,468 758,108 1,157,125 1,915,234 3,287,162 1,403,923 6,340,782 12,947,101 5,716,496 23,375,155 24.5 93,101 4,274,568 754,696 1,487,862 545,787 28,431 46,160<br />

0<br />

0 2,230,382<br />

159 Graham Elementary School<br />

PK-5 ES 1972 9.9 70,590 989,745 2,280,074 3,269,820 1,323,973 331,655 1,489,975 6,415,423 4,228,722 23,245,464 18.2 119,466<br />

0 561,030 1,131,379 309,576 47,903 17,348<br />

0<br />

0 1,022,572<br />

117 Gullett Elementary School<br />

K-5 ES 1956 17.9 39,986 396,641 455,578 852,219 2,991,957 195,511 7,564,631 11,604,318 2,800,221 13,825,676 20.3 246,160 6,765,084 382,369 487,210 227,823 33,399 662,053<br />

0<br />

0 1,263,616<br />

118 Harris Elementary School<br />

PK-5 ES 1955 7.3 55,794 181,511 637,209 818,721 2,242,923 412,814 855,767 4,330,224 2,623,243 17,988,838 14.6 179,025<br />

0 154,230 676,377 98,558<br />

0 598,791<br />

0<br />

0 1,574,609<br />

163 Hart Elementary School<br />

PK-5 ES 1998 15.7 81,042 349,739 268,518 618,257 678,471 228,086 732,807 2,257,621 1,020,999 26,660,919 3.8 118,275<br />

0 342,818 433,526 274,522 21,320 46,160<br />

0<br />

0 173,852<br />

119 Highland Park Elementary School<br />

K-5 ES 1952 6.3 58,557 498,008 322,125 820,133 4,539,812 453,479 3,886,857 9,700,281 4,796,634 18,576,669 25.8 156,521 2,967,536 303,310 639,701 239,300 21,320 575,958<br />

0<br />

0 2,764,781<br />

155 Hill Elementary School<br />

PK-5 ES 1970 8.9 69,626 775,728 916,886 1,692,614 3,711,641 493,368 4,254,767 10,152,390 4,615,146 22,082,088 20.9 108,626 3,280,488 644,682 834,115 85,296 33,399 550,638<br />

0<br />

0 2,945,311<br />

162 Houston Elementary School<br />

PK-5 ES 1976 13.8 80,229 984,874 4,622,991 5,607,865 3,174,592 279,745 1,874,632 10,936,833 7,567,345 25,542,725 29.6 230,294 234,903 698,102 1,296,560 295,843 21,320 592,465<br />

0<br />

0 6,338,367<br />

178 Jordan Elementary School<br />

PK-5 ES 1992 11.5 73,893 447,380 85,369 532,748 3,413,582 272,076 1,345,495 5,563,902 2,812,354 24,099,672 11.7 119,505<br />

0 329,224 782,646 538,150 12,078 969,945<br />

0<br />

0 2,111,072<br />

120 Joslin Elementary School<br />

PK-5 ES 1954 5.1 44,829 334,167 1,131,641 1,465,808 2,211,328 544,621 2,828,956 7,050,713 3,287,553 14,377,497 22.9 194,836 1,935,239 17,399 725,919 117,633 21,320 750,814<br />

0<br />

0 2,032,506<br />

180 Kiker Elementary School<br />

PK-5 ES 1992 12.4 74,156 481,220 50,304 531,524 2,414,496 297,830 1,516,475 4,760,325 1,958,830 23,991,987 8.2 101,813<br />

0 414,753 1,062,343 443,729<br />

0 778,857<br />

0<br />

0 1,274,515<br />

172 Kocurek Elementary School<br />

PK-5 ES 1986 12.3 76,346 393,397 587,869 981,266 4,017,869 265,809 1,210,070 6,475,015 4,542,352 24,920,198 18.2 336,318<br />

0 310,471 903,391 230,756 21,320 130,406<br />

0<br />

0 3,889,905<br />

168 Langford Elementary School<br />

PK-5 ES 1980 10.7 77,748 4,384,576 1,548,889 5,933,465 1,605,482 211,676 1,322,467 9,073,089 7,020,669 24,706,633 28.4 181,848<br />

0 314,562 590,607 691,550 21,320 252,533<br />

0<br />

0 5,770,191<br />

121 Lee Elementary School<br />

K-6 ES 1939 4.8 45,098 1,349,564 1,429,793 2,779,357 2,566,566 212,611 632,705 6,191,239 3,138,897 14,318,849 21.9 194,497<br />

0 1,349,564 479,566 78,704 21,320 928,690<br />

0<br />

0 1,710,852<br />

160 Linder Elementary School<br />

PK-5 ES 1972 9.1 69,544 167,773 1,302,642 1,470,415 1,688,590 535,973 8,089,605 11,784,583 2,745,778 22,035,186 12.5 114,115 6,965,169 127,486 704,710 394,087 33,399 699,839<br />

0<br />

0 1,740,205<br />

122 Maplewood Elementary School<br />

PK-6 ES 1951 6.4 45,389 1,066,803 1,484,958 2,551,762 3,313,684 138,720 3,137,961 9,142,127 4,481,944 14,665,072 30.6 94,111 1,806,027 546,116 1,031,497 268,424<br />

0 914,008<br />

0<br />

0 1,307,077<br />

123 Mathews Elementary School<br />

PK-6 ES Historical 1916 2.3 42,124 200,583 1,847,913 2,048,496 1,224,421 206,724 3,528,698 7,008,338 2,471,006 12,843,546 19.2 85,523 117,451 192,763 590,187 136,706<br />

0 759,279<br />

0 2,655,422 1,051,393<br />

165 McBee Elementary School<br />

K-5 ES 1999 10.9 69,716 153,232 275,417 428,649 359,516 382,373 263,891 1,434,429 914,210 23,301,331 3.9 135,646<br />

0 90,261 145,322 87,315 21,320 40,354<br />

0<br />

0 358,679<br />

FCI Related<br />

Facility Cost<br />

Total Replacement<br />

Cost<br />

FCI<br />

Educational<br />

Adequacy<br />

Functional<br />

Equity<br />

ADA-TAS<br />

(Public)<br />

ADA-TAS<br />

(Program)<br />

ADA-TAS<br />

(Renovation)<br />

Code<br />

Compliance<br />

System<br />

Addition<br />

Facility<br />

(New)<br />

Facility<br />

(Add/Ren)<br />

62<br />

6-15-12<br />

4:05 pm<br />

Energy<br />

Efficiency


A<strong>ISD</strong> School / Facility Summary<br />

Based on Soft Cost Estimates<br />

For Permanent Buildings and Sites<br />

MG_SFS_a010_e<br />

No. Campus Name<br />

Grades School<br />

Served Type Historic Age<br />

Size Total Bldg<br />

Acres<br />

Priorities 1 & 2<br />

Sq Ft Priority 1 Priority 2<br />

SubTotal Facility<br />

Condition Cost Priority 3 Priority 4<br />

Not<br />

Prioritized<br />

Total Facility<br />

Condition Cost<br />

147 Menchaca Elementary School<br />

PK-5 ES 1975 19.8 60,005 765,237 2,981,007 3,746,243 1,260,241 291,004 1,787,238 7,084,726 3,822,918 19,739,559 19.4 219,380<br />

0 626,293 1,253,800 466,225<br />

0 696,110<br />

0<br />

0 2,659,265<br />

124 Metz Elementary School<br />

PK-5 ES 1993 6.4 61,356 323,045 2,396,577 2,719,622 2,042,422 183,251 1,337,198 6,282,494 4,076,153 19,490,277 20.9 152,930<br />

0 257,018 887,632 400,835 12,078 495,848<br />

0<br />

0 3,649,562<br />

181 Mills Elementary School<br />

PK-5 ES 1998 10.7 81,368 189,300 158,151 347,451 689,518 513,598 875,450 2,426,017 616,945 25,771,931 2.4 128,557<br />

0 185,888 551,622 298,844 21,320 622,840<br />

0<br />

0 269,740<br />

150 Norman Elementary School<br />

PK-5 ES 1970 10.2 58,519 689,570 694,935 1,384,506 2,751,704 243,586 3,243,995 7,623,791 3,039,635 18,955,823 16.0 80,327 2,135,685 348,361 709,953 369,173 21,320 919,337<br />

0<br />

0 1,602,901<br />

148 Oak Hill Elementary School<br />

PK-5 ES 1974 13.7 75,143 885,255 1,747,807 2,633,063 3,649,774 203,029 1,582,651 8,068,517 5,371,197 24,351,054 22.1 140,730<br />

0 870,786 1,336,676 203,813 14,469 130,845<br />

0<br />

0 2,025,031<br />

125 Oak Springs Elementary School<br />

PK-5 ES 1958 8.6 47,102 674,784 1,778,183 2,452,967 908,945 263,400 543,623 4,168,934 2,426,847 15,341,051 15.8 174,373<br />

0 464,005 326,479 171,161 21,320 584,748<br />

0<br />

0 1,359,720<br />

156 Odom Elementary School<br />

PK-5 ES 1970 8.6 61,009 731,056 201,740 932,796 3,729,118 354,761 1,704,444 6,721,119 3,879,065 19,624,049 19.8 204,136<br />

0 727,643 1,209,638 423,807 21,320 255,509<br />

0<br />

0 2,808,589<br />

126 Ortega Elementary School<br />

PK-5 ES 1959 7.4 47,301 493,743 476,822 970,564 2,876,592 1,248,839 823,875 5,919,869 3,848,866 15,803,459 24.4 205,762<br />

0 325,080 569,315 194,548 43,794 732,504<br />

0<br />

0 2,464,504<br />

189 Overton Elementary School<br />

PK-5 ES 2007 70.4 83,405 6,825 45,976 52,801<br />

0 79,219 41,569 173,589 26,766 47,046,511 0.1 117,932<br />

0<br />

0 0 0<br />

0 28,891<br />

0<br />

0<br />

0<br />

171 Palm Elementary School<br />

PK-5 ES 1987 13.2 78,101 474,469 124,008 598,477 551,452 245,984 1,482,952 2,878,866 710,546 25,460,713 2.8 106,279<br />

0 474,207 1,025,974 417,533 21,320 123,007<br />

0<br />

0 79,093<br />

143 Patton Elementary School<br />

PK-5 ES 1986 24.1 76,213 316,637 147,340 463,977 1,880,424 183,233 2,542,482 5,070,117 1,947,510 25,536,802 7.6 169,111<br />

0 304,040 1,702,575 798,853 33,399 114,630<br />

0<br />

0 1,738,147<br />

128 Pease Elementary School<br />

K-6 ES Historical 1876 2.8 35,623 418,544 2,837,453 3,255,997 2,977,569 962,351 365,028 7,560,944 5,950,420 11,094,338 53.6 83,436<br />

0 302,498 199,938 108,885 21,320 894,447<br />

0<br />

0 2,283,745<br />

129 Pecan Springs Elementary School<br />

PK-6 ES 1957 7.6 56,992 604,015 118,809 722,824 3,750,908 2,094,338 1,111,966 7,680,036 5,889,870 18,380,074 32.0 139,453<br />

0 483,314 851,289 227,465 29,682 58,961<br />

0<br />

0 4,536,401<br />

190 Perez Elementary School<br />

PK-5 ES 2006 28.0 82,223 0 79,597 79,597 109,182 215,271 21,641 425,691 242,253 27,758,465 0.9 163,847<br />

0<br />

0 0 0<br />

0 19,591<br />

0<br />

0 79,001<br />

164 Pickle Elementary School<br />

PK-5 ES 2001 17.5 116,427 103,785 96,279 200,065 110,057 255,460 370,716 936,298 214,252 37,113,359 0.6 249,185<br />

0 100,373 181,450 131,895 21,320 37,823<br />

0<br />

0 86,881<br />

151 Pillow Elementary School<br />

PK-5 ES 1969 10.0 54,247 678,381 204,845 883,226 5,233,354 1,017,794 3,840,086 10,974,460 5,857,071 17,484,313 33.5 220,865 2,641,804 519,190 1,009,757 119,125 21,320 585,326<br />

0<br />

0 4,311,662<br />

130 Pleasant Hill Elementary School<br />

PK-5 ES 1985 10.1 65,298 527,615 335,080 862,695 2,016,188 160,229 1,132,451 4,171,563 2,191,417 21,193,377 10.3 108,787 389,235 527,615 425,206 301,474 21,320 206,509<br />

0<br />

0 1,895,965<br />

132 Reilly Elementary School<br />

PK-5 ES 1954 10.8 41,646 339,937 175,457 515,395 2,226,462 159,591 1,282,274 4,183,721 2,417,607 13,669,514 17.7 77,946<br />

0 66,380 1,164,991 64,996<br />

0 391,801<br />

0<br />

0 1,660,020<br />

133 Ridgetop Elementary School<br />

PK-5 ES 1939 5.0 34,617 765,141 845,437 1,610,578 1,263,688 625,155 1,097,717 4,597,138 2,657,022 11,388,605 23.3 135,991<br />

0 235,633 911,215 127,215 21,320 508,742<br />

0<br />

0 1,069,469<br />

174 Rodriguez Elementary School<br />

PK-5 ES 1999 15.0 79,918 150,766 94,995 245,762 203,437 167,626 520,516 1,137,340 294,393 27,426,398 1.1 150,384<br />

0 147,354 384,446 103,940 21,320 35,503<br />

0<br />

0 152,425<br />

127 Sanchez Elementary School<br />

PK-5 ES 1976 9.2 78,951 373,055 2,869,568 3,242,623 1,957,760 399,832 4,872,599 10,472,814 4,978,398 24,817,646 20.1 193,377 3,405,315 257,081 986,125 434,553 37,973 179,992<br />

0<br />

0 3,996,329<br />

139 Sims Elementary School<br />

PK-5 ES 1956 8.4 44,337 914,229 313,745 1,227,974 3,032,086 250,100 2,016,763 6,526,924 2,921,039 15,511,640 18.8 165,235 881,736 765,446 898,066 175,755 21,320 698,326<br />

0<br />

0 1,643,620<br />

136 St. Elmo Elementary School<br />

PK-5 ES 1960 9.4 48,922 493,057 274,356 767,413 2,818,498 225,231 2,116,158 5,927,300 3,071,876 15,799,000 19.4 144,745 1,789,573 493,057 275,823 18,449 21,320 112,457<br />

0<br />

0 1,561,885<br />

138 Summitt Elementary School<br />

PK-5 ES 1986 14.5 75,903 904,929 408,269 1,313,198 3,661,916 731,339 1,788,553 7,495,006 4,838,443 24,856,709 19.5 200,964<br />

0 614,801 1,231,044 501,934 33,399 74,421<br />

0<br />

0 4,023,611<br />

158 Sunset Valley Elementary School<br />

PK-5 ES 1971 10.4 66,777 350,262 565,305 915,567 6,519,791 477,817 3,906,676 11,819,851 7,309,872 20,851,761 35.1 128,748 2,903,942 332,622 970,421 0 33,399 128,813<br />

0<br />

0 6,390,344<br />

140 Travis Heights Elementary School<br />

PK-5 ES 1938 3.2 59,328 1,882,319 2,727,405 4,609,725 1,709,456 531,353 3,066,764 9,917,298 4,548,206 18,156,167 25.1 102,190 1,202,883 1,369,073 1,580,169 251,089 21,320 842,367<br />

0<br />

0 2,583,486<br />

141 Walnut Creek Elementary School<br />

PK-6 ES 1961 11.5 79,223 212,264 1,170,008 1,382,272 1,869,453 222,805 326,791 3,801,321 2,727,913 25,645,281 10.6 134,698<br />

0 134,748 248,445 54,820 21,320 479,376<br />

0<br />

0 1,755,374<br />

175 Widen Elementary School<br />

PK-5 ES 1986 10.7 74,523 519,511 318,802 838,313 1,363,131 256,566 1,516,102 3,974,112 1,725,984 24,218,276 7.1 152,414<br />

0 492,889 887,954 589,000 33,399 92,471<br />

0<br />

0 949,064<br />

166 Williams Elementary School<br />

PK-5 ES 1976 14.0 64,436 314,974 3,502,343 3,817,317 1,839,458 558,808 3,526,149 9,741,732 5,742,923 21,529,619 26.7 146,349 2,148,168 254,840 951,969 397,205 54,119 46,160<br />

0<br />

0 4,180,953<br />

157 Winn Elementary School<br />

PK-5 ES 1970 10.0 60,758 692,897 51,732 744,630 1,366,972 1,148,362 9,698,111 12,958,075 1,992,681 18,780,573 10.6 191,236 8,518,497 664,689 846,629 284,656 21,320 438,366<br />

0<br />

0 956,884<br />

152 Wooldridge Elementary School<br />

K-5 ES 1969 11.6 70,474 991,861 2,249,834 3,241,695 1,033,776 1,205,409 919,611 6,400,490 4,981,538 22,602,554 22.0 129,265<br />

0 203,749 869,538 17,338 21,320 177,742<br />

0<br />

0 2,671,907<br />

144 Wooten Elementary School<br />

PK-5 ES 1955 6.7 53,689 563,278 2,430,448 2,993,725 4,588,693 240,181 2,027,596 9,850,196 6,445,421 17,083,397 37.7 71,218 1,365,159 494,098 585,803 54,899 21,320 812,277<br />

0<br />

0 4,931,420<br />

145 Zavala Elementary School<br />

PK-6 ES 1937 3.4 69,142 1,543,155 197,847 1,741,003 4,154,072 626,570 464,359 6,986,003 4,508,155 20,855,554 21.6 119,979<br />

0 714,886 320,815 111,177 21,320 1,189,670<br />

0<br />

0 542,907<br />

146 Zilker Elementary School<br />

PK-5 ES 1950 11.8 50,176 991,539 1,757,826 2,749,365 4,575,646 526,459 11,784,012 19,635,482 6,643,269 17,194,532 38.6 97,687 2,924,162 403,347 986,144 18,238 21,320 688,499<br />

0 7,815,646 3,264,497<br />

Elementary School Subtotal:<br />

FCI Related<br />

Facility Cost<br />

Total Replacement<br />

Cost<br />

927.1 acres<br />

5,221,519 sf<br />

52,265,047 73,635,382 125,900,428 173,587,140 35,642,771 174,083,359 509,213,698 263,838,302 1,705,342,583<br />

11,848,032 80,533,647 32,404,351 60,095,766 19,444,405 1,641,351 28,887,572<br />

0 10,471,068 154,670,131<br />

FCI<br />

Educational<br />

Adequacy<br />

Functional<br />

Equity<br />

ADA-TAS<br />

(Public)<br />

ADA-TAS<br />

(Program)<br />

ADA-TAS<br />

(Renovation)<br />

Code<br />

Compliance<br />

System<br />

Addition<br />

Facility<br />

(New)<br />

Facility<br />

(Add/Ren)<br />

63<br />

6-15-12<br />

4:05 pm<br />

Energy<br />

Efficiency


A<strong>ISD</strong> School / Facility Summary<br />

Based on Soft Cost Estimates<br />

For Permanent Buildings and Sites<br />

MG_SFS_a010_e<br />

No. Campus Name<br />

Middle School<br />

Grades School<br />

Served Type Historic Age<br />

Size Total Bldg<br />

Acres<br />

Priorities 1 & 2<br />

Sq Ft Priority 1 Priority 2<br />

SubTotal Facility<br />

Condition Cost Priority 3 Priority 4<br />

Not<br />

Prioritized<br />

Total Facility<br />

Condition Cost<br />

059 Bailey Middle School<br />

6-8 MS 1993 41.3 147,444 657,452 2,327,856 2,985,308 2,939,140 505,998 1,478,633 7,909,079 4,440,106 48,859,982 9.1 676,781<br />

0 623,771 737,760 298,646 40,314 1,091,702<br />

0<br />

0 3,167,747<br />

054 Bedichek Middle School<br />

6-8 MS 1972 23.3 132,284 5,128,258 2,771,386 7,899,644 3,416,443 441,168 20,204,990 31,962,245 10,575,562 43,570,807 24.3 715,104 4,997,072 643,979 300,715 269,025 28,235 359,954<br />

0 14,072,599 7,920,489<br />

046 Burnet Middle School<br />

6-8 MS 1961 23.7 136,563 606,736 6,994,267 7,601,003 7,174,910 462,456 3,230,190 18,468,559 14,475,911 43,561,948 33.2 697,890 1,430,358 452,528 998,838 339,819 12,078 61,137<br />

0<br />

0 9,941,554<br />

057 Covington Middle School<br />

6-8 MS 1986 21.3 172,364 1,508,874 3,488,419 4,997,293 4,203,152 575,034 3,035,000 12,810,478 8,094,665 57,976,340 14.0 478,815 1,585,309 1,077,507 933,497 369,035 71,393 200,257<br />

0<br />

0 6,463,878<br />

055 Dobie Middle School<br />

6-8 MS 1973 20.2 133,675 1,208,782 906,432 2,115,214 2,321,750 772,977 9,439,130 14,649,070 4,120,924 42,601,293 9.7 804,285 7,736,830 637,738 990,033 186,799 45,054 127,407<br />

0<br />

0 1,683,436<br />

043 Fulmore Middle School<br />

6-8 MS 1911 9.8 156,804 1,891,264 7,429,086 9,320,351 9,583,305 1,246,283 1,266,598 21,416,537 18,826,068 57,126,628 33.0 349,825<br />

0 831,848 684,886 399,314 28,235 296,360<br />

0<br />

0 13,581,309<br />

056 Garcia Middle School<br />

6-8 MS 2007 41.3 161,147 5,178 55,107 60,285 202,661 247,887 102,897 613,729 46,960 50,845,906 0.1 300,588<br />

0<br />

0 0 0 202,661 63,520<br />

0<br />

0<br />

0<br />

062 Gorzycki Middle School<br />

6-8 MS 2009 14.2 169,045 5,178 0 5,178 136,292 316,843 252,925 711,238 60,188 48,745,875 0.1 433,922<br />

0<br />

0 0 0 136,292 80,834<br />

0<br />

0<br />

0<br />

044 Kealing Middle School<br />

6-8 MS 1986 13.2 192,552 81,636 2,963,885 3,045,521 3,548,739 468,289 1,126,679 8,189,228 6,712,359 67,949,095 9.9 430,889<br />

0 44,393 321,624 524,091 28,235 127,637<br />

0<br />

0 4,661,710<br />

045 Lamar Middle School<br />

6-8 MS 1955 14.3 130,714 1,279,268 2,892,759 4,172,028 1,914,845 503,825 1,568,953 8,159,650 5,717,351 41,973,833 13.6 665,461<br />

0 553,530 974,669 109,168<br />

0 139,470<br />

0<br />

0 2,949,906<br />

051 Martin Middle School<br />

6-8 MS 1966 9.9 107,342 600,243 6,069,124 6,669,367 2,518,287 893,245 5,465,384 15,546,282 9,261,391 33,740,306 27.4 322,879 3,933,201 508,557 1,097,909 293,444 28,235 100,666<br />

0<br />

0 5,071,812<br />

058 Mendez Middle School<br />

6-8 MS 1987 20.7 173,382 1,835,062 4,095,728 5,930,789 1,352,266 671,961 3,260,932 11,215,949 6,557,884 58,056,756 11.3 478,427 1,658,390 948,173 1,077,618 364,857 40,314 90,286<br />

0<br />

0 3,822,848<br />

052 Murchison Middle School<br />

6-8 MS 1967 26.2 122,677 712,080 1,717,166 2,429,247 4,641,059 1,146,519 12,645,106 20,861,930 7,178,883 39,740,970 18.1 543,810 10,694,901 536,917 1,095,081 615,060 40,314 156,965<br />

0<br />

0 5,057,940<br />

047 O. Henry Middle School<br />

6-8 MS 1953 13.8 141,413 179,730 716,114 895,845 3,523,163 413,467 4,847,603 9,680,078 4,313,043 44,823,520 9.6 286,048 914,645 140,933 527,757 172,288 55,853 205,562<br />

0 3,063,948 529,003<br />

061 Paredes Middle School<br />

6-8 MS 2000 78.2 143,037 497,040 740,087 1,237,127 756,567 389,685 1,073,779 3,457,158 1,629,832 62,520,039 2.6 516,512<br />

0 312,787 519,751 310,031 36,531 131,713<br />

0<br />

0 350,955<br />

048 Pearce Middle School<br />

6-8 MS 1958 14.8 132,596 1,026,243 1,704,200 2,730,443 1,700,155 2,314,380 1,381,283 8,126,260 5,737,860 41,105,509 14.0 430,568 923,724 533,196 219,852 75,603 28,235 177,223<br />

0<br />

0 1,411,901<br />

060 Small Middle School<br />

6-8 MS 1999 36.5 160,608 213,988 1,050,009 1,263,997 295,554 297,332 774,269 2,631,152 1,384,832 52,473,965 2.6 348,865<br />

0 174,392 259,116 304,811 28,235 130,903<br />

0<br />

0 345,691<br />

053 Webb Middle School<br />

6-8 MS 1961 15.6 120,985 676,218 3,841,918 4,518,137 800,746 1,337,355 2,616,635 9,272,873 5,599,347 38,799,378 14.4 731,454 922,021 667,628 948,612 167,658 28,235 207,918<br />

0<br />

0 3,748,108<br />

High School<br />

Middle School Subtotal:<br />

FCI Related<br />

Facility Cost<br />

Total Replacement<br />

Cost<br />

438.4 acres<br />

2,634,632 sf<br />

18,113,231 49,763,544 67,876,775 51,029,035 13,004,702 73,770,984 205,681,497 114,733,167 874,472,151<br />

9,212,123 34,796,452 8,687,877 11,687,717 4,799,647 878,451 3,749,516<br />

0 17,136,547 70,708,287<br />

017 Akins High School<br />

9-12 HS 2000 57.7 345,493 327,173 1,020,714 1,347,887 1,438,514 491,211 1,090,208 4,367,819 2,180,871 139,093,827 1.6 700,066<br />

0 309,755 613,659 151,442 268,711 143,315<br />

0<br />

0 7,779<br />

009 Anderson High School<br />

9-12 HS 1973 38.8 314,927 1,358,366 6,432,780 7,791,146 2,935,454 4,057,195 14,082,553 28,866,348 13,003,811 120,271,057 10.8 1,619,326 10,704,725 449,343 2,282,980 384,497<br />

0 421,665<br />

0<br />

0 6,474,509<br />

002 <strong>Austin</strong> High School<br />

9-12 HS Historical 1975 44.3 330,759 1,852,135 9,080,226 10,932,361 19,014,884 2,440,963 15,207,021 47,595,229 31,009,259 129,721,931 23.9 1,004,972 5,655,821 569,607 1,874,952 846,131 53,013 147,184<br />

0 6,434,291 8,947,770<br />

013 Bowie High School<br />

9-12 HS 1988 66.0 419,593 618,824 11,359,813 11,978,637 7,821,931 3,968,363 3,290,120 27,059,051 22,310,933 153,761,088 14.5 1,188,919<br />

0 604,482 1,737,136 914,060 53,013 250,508<br />

0<br />

0 15,805,922<br />

008 Crockett High School<br />

9-12 HS 1969 39.5 329,265 3,125,840 10,716,494 13,842,334 17,395,825 3,090,554 2,676,747 37,005,460 30,275,445 125,909,556 24.0 986,075<br />

0 2,870,408 1,158,745 1,050,745 53,013 611,029<br />

0<br />

0 17,340,431<br />

019 Eastside Memorial HS<br />

HS 1960 27.6 253,815 4,603,349 13,065,135 17,668,484 5,101,830 604,651 2,227,131 25,602,096 21,542,479 93,060,316 23.1 748,758<br />

0 1,152,807 1,100,243 695,333 12,078 350,398<br />

0<br />

0 8,522,253<br />

015 Garza Independence High School<br />

11-12 HS 1939 3.1 44,754 1,262,899 601,282 1,864,181 2,209,190 406,631 631,290 5,111,291 2,870,954 16,485,955 17.4 176,908<br />

0 1,226,060 96,745 425,517 99,344 215,763<br />

0<br />

0 457,794<br />

010 Johnson (LBJ) High School<br />

9-12 HS 1974 41.4 293,046 929,775 3,801,785 4,731,560 4,335,388 2,136,921 2,756,802 13,960,671 9,061,035 113,366,689 8.0 889,229<br />

0 828,617 1,869,837 543,627<br />

0 768,325<br />

0<br />

0 5,134,780<br />

004 Lanier High School<br />

9-12 HS 1966 28.5 262,582 936,671 3,932,020 4,868,691 12,465,163 838,160 2,441,164 20,613,178 16,889,734 102,400,016 16.5 868,258<br />

0 487,730 1,251,813 717,323 65,091 333,228<br />

0<br />

0 9,060,787<br />

005 McCallum High School<br />

9-12 HS 1953 31.1 251,287 1,069,935 3,759,461 4,829,396 8,125,431 1,415,804 36,624,547 50,995,178 12,403,970 101,013,422 12.3 1,121,389 14,831,417 787,341 639,946 611,777 53,013 486,618<br />

0 20,059,708 9,028,049<br />

006 Reagan High School<br />

9-12 HS 1965 31.8 252,363 1,360,750 938,510 2,299,260 8,961,613 2,865,175 4,961,353 19,087,401 11,804,831 100,408,944 11.8 1,596,936<br />

0 1,246,083 2,865,984 1,070,996 53,013 449,557<br />

0<br />

0 5,471,806<br />

007 Travis High School<br />

9-12 HS 1953 34.8 275,890 900,699 1,827,088 2,727,787 18,622,275 1,169,834 3,520,043 26,039,938 20,602,429 105,970,633 19.4 881,236 771,661 893,874 1,328,878 793,468 53,013 715,379<br />

0<br />

0 15,873,899<br />

Special Campus<br />

High School Subtotal:<br />

444.7 acres<br />

3,373,774 sf<br />

18,346,415 66,535,307 84,881,722 108,427,497 23,485,463 89,508,978 306,303,660 193,955,750 1,301,463,435<br />

11,782,071 31,963,624 11,426,109 16,820,918 8,204,916 763,303 4,892,969<br />

0 26,493,999 102,125,779<br />

028 Ann Richards School for Young Women Leaders 6-10 Alt. Ed. 1958 15.3 121,346 2,126,101 1,806,491 3,932,592 8,795,894 370,243 958,887 14,057,615 12,299,906 38,258,592 32.1 275,949<br />

0 308,826 440,628 341,133 29,789 361,385<br />

0<br />

0 6,804,480<br />

852 Clifton Career Development Center<br />

9-12 Alt. Ed. 1977 7.8 37,537 510,616 1,334,313 1,844,928 1,663,484 995,919 1,023,933 5,528,265 3,734,016 11,359,774 32.9 563,953<br />

0 507,203 516,451 206,642<br />

0<br />

0<br />

0<br />

0 2,098,428<br />

012 Ridgeview - Alternative Learning Center<br />

6-12 Alt. Ed. 1953 19.8 86,585 722,225 1,206,051 1,928,276 7,371,558 1,281,057 300,550 10,881,441 9,787,278 32,760,001 29.9 156,785<br />

0 415,948 150,024 97,314 21,320 252,771<br />

0<br />

0 7,395,935<br />

251 Rosedale School<br />

PK-12 Alt. Ed. 1939 4.9 36,772 769,188 831,966 1,601,154 2,598,885 282,617 854,676 5,337,332 3,483,743 11,228,156 31.0 169,823<br />

0 383,595 394,196 385,206 21,320 499,449<br />

0<br />

0 1,971,439<br />

Special Campus Subtotal:<br />

47.8 acres<br />

282,239 sf<br />

4,128,130 5,178,821 9,306,951 20,429,822 2,929,836 3,138,045 35,804,653 29,304,942 93,606,524<br />

1,166,510<br />

0 1,615,572 1,501,299 1,030,295 72,430 1,113,605<br />

0<br />

0 18,270,282<br />

FCI<br />

Educational<br />

Adequacy<br />

Functional<br />

Equity<br />

ADA-TAS<br />

(Public)<br />

ADA-TAS<br />

(Program)<br />

ADA-TAS<br />

(Renovation)<br />

Code<br />

Compliance<br />

System<br />

Addition<br />

Facility<br />

(New)<br />

Facility<br />

(Add/Ren)<br />

64<br />

6-15-12<br />

4:05 pm<br />

Energy<br />

Efficiency


A<strong>ISD</strong> School / Facility Summary<br />

Based on Soft Cost Estimates<br />

For Permanent Buildings and Sites<br />

MG_SFS_a010_e<br />

No. Campus Name<br />

Athletic Facility<br />

Grades School<br />

Served Type Historic Age<br />

Size Total Bldg<br />

Acres<br />

Priorities 1 & 2<br />

Sq Ft Priority 1 Priority 2<br />

SubTotal Facility<br />

Condition Cost Priority 3 Priority 4<br />

Not<br />

Prioritized<br />

Total Facility<br />

Condition Cost<br />

951 Burger Athletic Complex SF<br />

Support 1977 48.1 177,340 4,696,918 6,750,305 11,447,223 3,631,685 112,224 496,539 15,687,670 7,904,859 62,473,814 12.7 0<br />

0 4,665,952 271,280 225,258<br />

0 2,620,320<br />

0<br />

0 4,261,028<br />

949 Delco Activity Center<br />

Support 2003 44.1 60,294 153,785 157,279 311,063 229,736 37,829 55,040 633,668 403,524 18,212,815 2.2 0<br />

0 153,785 55,040 0 21,320<br />

0<br />

0<br />

0 37,923<br />

948 House Park<br />

Support 1936 11.1 31,864 427,424 78,489 505,912 980,183 0 888,809 2,374,904 1,098,435 10,297,697 10.7 0<br />

0 387,660 0 888,809<br />

0<br />

0<br />

0<br />

0 57,590<br />

281 Nelson Field<br />

Support 1963 20.1 59,005 1,024,759 2,544 1,027,303 976,270 523,127 1,880,443 4,407,143 1,438,621 23,922,171 6.0 0<br />

0 1,024,759 1,361,421 519,021<br />

0 63,321<br />

0<br />

0 235,075<br />

950 Noack Sports Complex<br />

Support 2004 11.2 3,231 142,472 0 142,472<br />

0 0 0 142,472 0 2,918,552 0.0 0<br />

0 142,472 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support Facility<br />

Athletic Facility Subtotal:<br />

FCI Related<br />

Facility Cost<br />

Total Replacement<br />

Cost<br />

134.7 acres<br />

331,735 sf<br />

6,445,358 6,988,617 13,433,974 5,817,874 673,180 3,320,830 23,245,858 10,845,439 117,825,049<br />

0<br />

0 6,374,628 1,687,742 1,633,088 21,320 2,683,641<br />

0<br />

0 4,591,616<br />

252 Baker Center<br />

Support 1911 4.8 65,868 28,125 1,458,086 1,486,211 1,663,189 73,604 610,756 3,833,760 3,223,004 24,122,096 13.4 0<br />

0<br />

0 0 610,756<br />

0<br />

0<br />

0<br />

0 2,267,230<br />

941 Carruth Administration Center<br />

Support 1991 2.8 133,321 11,861 372,347 384,208 4,945,980 254,992 0 5,585,180 4,254,324 38,865,279 10.9 0<br />

0<br />

0 0 0<br />

0 1,318,994<br />

0<br />

0 3,700,107<br />

922 Central Warehouse<br />

Support 1983 18.7 115,757 46,227 295,987 342,214 473,273 55,716 31,589 902,793 837,875 37,730,796 2.2 0<br />

0 33,329 0 31,589<br />

0<br />

0<br />

0<br />

0 536,991<br />

959 Nelson Field Bus Terminal<br />

Support 1995 6.6 14,507 82,665 33,691 116,356 438,840 145,996 39,661 740,852 686,977 7,570,352 9.1 0<br />

0 14,214 0 39,661<br />

0<br />

0<br />

0<br />

0 92,333<br />

942 Pleasant Hill Annex<br />

Support 1936 2.0 25,758 382,406 194,831 577,237 2,566,386 105,233 0 3,248,855 3,137,156 7,371,698 42.6 0<br />

0 106,768 0 0<br />

0 4,931<br />

0<br />

0 2,299,221<br />

960 Saegert Transportation<br />

Support 1975 10.6 18,003 109,323 832,353 941,677 873,986 168,210 161,742 2,145,614 1,874,549 10,416,800 18.0 0<br />

0 22,576 0 161,742<br />

0 86,747<br />

0<br />

0 685,865<br />

962 Service Center<br />

Support 1991 16.7 52,953 165,383 292,352 457,735 889,906 238,739 232,885 1,819,266 1,319,295 17,311,003 7.6 0<br />

0 165,234 0 232,885<br />

0 101,852<br />

0<br />

0 984,601<br />

Pre-K Center<br />

Support Facility Subtotal:<br />

62.2 acres<br />

426,167 sf<br />

825,990 3,479,646 4,305,637 11,851,559 1,042,491 1,076,634 18,276,320 15,333,180 143,388,024<br />

0<br />

0 342,121 0 1,076,634<br />

0 1,512,524<br />

0<br />

0 10,566,348<br />

947 Lucy Read Pre-kindergarten School<br />

PK Support 1961 9.9 37,188 334,954 444,342 779,295 602,938 126,180 875,441 2,383,854 1,102,951 12,071,342 9.1 62,199<br />

0 301,394 748,307 86,389 21,320 61,294<br />

0<br />

0 401,190<br />

District-Wide<br />

DW-0<br />

03<br />

DW-0<br />

07<br />

DW-0<br />

04<br />

DW-0<br />

09<br />

DW-0<br />

06<br />

DW-0<br />

10<br />

DW-0<br />

05<br />

DW-0<br />

08<br />

DW-0<br />

02<br />

DW-0<br />

01<br />

District-Wide - Desktop Refresh<br />

District-Wide - Innovation Stations<br />

District-Wide - Laptop Refresh<br />

District-Wide - New Radio System Upgrades<br />

District-Wide - PA System Upgrades<br />

District-Wide - Portables<br />

District-Wide - Printer Refresh<br />

District-Wide - Projection System Upgrades<br />

Pre-K Center Subtotal:<br />

District-Wide - Video Surveillance Servers EOL<br />

District-Wide - VOIP Phone Upgrades<br />

TOTALS:<br />

District-Wide Subtotal:<br />

9.9 acres<br />

37,188 sf<br />

334,954 444,342 779,295 602,938 126,180 875,441 2,383,854 1,102,951 12,071,342<br />

62,199<br />

0 301,394 748,307 86,389 21,320 61,294<br />

0<br />

0 401,190<br />

Support 2010 0.0 0 0 0 0 14,000,000 0 0 14,000,000 0<br />

0 0.0 14,000,000<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 0 18,000,000 18,000,000<br />

0 0 0 18,000,000 0<br />

0 0.0 18,000,000<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 0 0 0 7,000,000 0 0 7,000,000 0<br />

0 0.0 7,000,000<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2012 0.0 0 0 0 0 6,020,000 0 0 6,020,000 0<br />

0 0.0 0<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 3,510,000 0 3,510,000<br />

0 0 0 3,510,000 3,510,000<br />

0 0.0 0<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2012 0.0 0 0 1,665,342 1,665,342<br />

0 0 0 1,665,342 0<br />

0 0.0 0<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 0 0 0 1,000,000 0 0 1,000,000 0<br />

0 0.0 1,000,000<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 0 6,000,000 6,000,000<br />

0 0 0 6,000,000 0<br />

0 0.0 6,000,000<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 2010 0.0 0 0 0 0<br />

0 376,000 0 376,000 0<br />

0 0.0 0<br />

0<br />

0 0 0<br />

0<br />

0<br />

0<br />

0<br />

0<br />

Support 1881 0.0 0 0 0 0 7,000,000 0 0 7,000,000 0<br />

0 0.0 0<br />

0<br />

0 0 0<br />

0 7,000,000<br />

0<br />

0<br />

0<br />

0.0 acres 3,510,000 25,665,342 29,175,342 35,020,000 376,000 0 64,571,342 3,510,000 0<br />

46,000,000<br />

0<br />

0 0 0<br />

0 7,000,000<br />

0<br />

0<br />

0<br />

0sf<br />

2,064.7 acres<br />

12,307,255 sf<br />

103,969,125 231,691,000 335,660,125 406,765,865 77,280,622 345,774,271 1,165,480,883 632,623,731 4,248,169,108<br />

80,070,935 147,293,723 61,152,052 92,541,747 36,275,374 3,398,175 49,901,122<br />

FCI<br />

Educational<br />

Adequacy<br />

Functional<br />

Equity<br />

ADA-TAS<br />

(Public)<br />

ADA-TAS<br />

(Program)<br />

ADA-TAS<br />

(Renovation)<br />

Code<br />

Compliance<br />

System<br />

Addition<br />

Facility<br />

(New)<br />

0<br />

Facility<br />

(Add/Ren)<br />

54,101,614<br />

65<br />

6-15-12<br />

4:05 pm<br />

Energy<br />

Efficiency<br />

361,333,633


<strong>Austin</strong> Independent School District<br />

FMP_a009_sub_CatvsPriority<br />

Capital Renewal<br />

Code Compliance<br />

System Addition<br />

ADA-TAS (Public)<br />

Facility (Add/Ren)<br />

Total<br />

Category<br />

Deferred Maintenance<br />

Energy Efficiency (Capital Renewal)<br />

Educational Adequacy<br />

ADA-TAS (Program)<br />

ADA-TAS (Renovation)<br />

Functional Equity (Add/Ren)<br />

1<br />

$ Qty<br />

$103,630 45<br />

$22,762,166 205<br />

$18,593,902 76<br />

$457,171 35<br />

$627,915 24<br />

$289,962 112<br />

$61,152,052 287<br />

$103,986,797 784<br />

Deficiency Category vs. Priority<br />

2<br />

$ Qty<br />

$312,233 112<br />

$54,068,385 482<br />

$141,537,074 354<br />

$8,168,437 70<br />

$27,670,746 118<br />

$231,756,875 1,136<br />

3<br />

$ Qty<br />

$1,033,037 416<br />

$160,607,574 1,369<br />

$186,981,169 727<br />

$2,941,005 98<br />

$32,866,244 236<br />

$22,194,814 63<br />

$406,623,843 2,909<br />

4<br />

$ Qty<br />

$157,412 63<br />

$40,313,368 559<br />

$14,221,488 108<br />

$8,234,754 294<br />

$14,353,600 5,728<br />

$77,280,622 6,752<br />

Not Prioritized<br />

$ Qty<br />

$15,561,812 3,359<br />

$92,541,747 245<br />

$36,275,374 215<br />

$147,293,723 82<br />

$54,101,614 6<br />

$345,774,271 3,907<br />

06/15/2012<br />

Total<br />

$ Qty<br />

$1,606,312 636<br />

$277,751,493 2,615<br />

$361,333,633 1,265<br />

$3,398,175 133<br />

$49,897,350 624<br />

$80,070,935 9,380<br />

$61,152,052 287<br />

$92,541,747 245<br />

$36,275,374 215<br />

$147,293,723 82<br />

$54,101,614 6<br />

$1,165,422,409 15,488<br />

66


Deficiency Categories<br />

Deferred Maintenance<br />

Repairs and small partial replacements to building and site systems that are customarily provided by the A<strong>ISD</strong> maintenance forces.<br />

Capital Renewal<br />

Partial or complete replacement of building and site systems.<br />

Energy Efficiency (Capital Renewal)<br />

Partial or complete replacement of building and/or site systems that will result in energy consumption reduction.<br />

Code Compliance<br />

Improvements needed to achieve compliance with various current code requirements.<br />

System Addition<br />

The addition to an existing building and/or site system or the introduction of an additional building or site system<br />

Educational Adequacy<br />

A variety of improvements, primairly associated with instructional spaces, that eliminate impairments to the delivery of instruction.<br />

ADA-TAS (Public)<br />

Improvements that would provide appropriate access with respect to federal and state accessibility codes that affect public use of the school facility.<br />

ADA-TAS (Program)<br />

Improvements that would provide appropriate access with respect to federal and state accessibility codes that affect student or program use of the school<br />

ADA-TAS (Renovation)<br />

Improvements that would provide appropriate access to areas that are non-compliant with accessibility codes and guidelines but are not specifically related to<br />

public or program use.<br />

Functional Equity<br />

Provides additions, sometimes with supporting renovations, to primarily eliminate space related deficiencies relative to current applicable Educational<br />

Specifications and achieve an equitable enhancement. Although complete compliance with current Educational Specifications is not always possible,<br />

meaningful improvements can often be developed to achieve the maximum equitable solution on a school-by-school basis.<br />

Facility (Addition)<br />

Additions, sometimes including renovations, that are generally in response to compelling student population increases.<br />

67


<strong>Austin</strong> Independent School District<br />

FMP_a009_sub_SysGrpvsPriority<br />

Site<br />

Exterior<br />

Roofing<br />

Interior<br />

Other<br />

Total<br />

System Group<br />

Structural<br />

Fire and Life Safety<br />

Specialties<br />

Conveyances<br />

Plumbing<br />

Mechanical<br />

Electrical<br />

1<br />

$ Qty<br />

$1,450,212 23<br />

$375,187 20<br />

$2,973,798 21<br />

$46,924 7<br />

$292,405 72<br />

$249,825 20<br />

$331,743 117<br />

$224,840 1<br />

$13,522,168 76<br />

$15,309,103 58<br />

$8,058,540 82<br />

$61,152,052 287<br />

$103,986,797 784<br />

System Group vs. Priority<br />

2<br />

$ Qty<br />

$13,288,448 119<br />

$453,049 30<br />

$6,836,400 57<br />

$17,169,192 55<br />

$1,787,995 4<br />

$2,331,220 84<br />

$29,390,335 123<br />

$0 0<br />

$10,817,220 57<br />

$127,017,919 305<br />

$22,665,098 302<br />

$0 0<br />

$231,756,875 1,136<br />

3<br />

$ Qty<br />

$18,725,711 222<br />

$1,060,982 41<br />

$15,427,199 228<br />

$25,565,140 61<br />

$6,946,548 21<br />

$29,271,572 500<br />

$30,535,712 102<br />

$259,063 2<br />

$47,602,338 511<br />

$154,431,463 687<br />

$76,796,230 532<br />

$1,884 2<br />

$406,623,843 2,909<br />

4<br />

$ Qty<br />

$3,118,282 45<br />

$439,522 10<br />

$4,397,438 42<br />

$6,340,516 13<br />

$1,045,710 7<br />

$17,788,721 167<br />

$13,417,165 5,246<br />

$0 0<br />

$8,568,819 578<br />

$4,813,733 48<br />

$17,350,716 596<br />

$0 0<br />

$77,280,622 6,752<br />

Not Prioritized<br />

$ Qty<br />

$2,835,353 10<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$1,354,469 667<br />

$5,238,555 1,231<br />

$0 0<br />

$859,756 370<br />

$0 0<br />

$5,273,680 1,081<br />

$330,212,459 548<br />

$345,774,271 3,907<br />

06/15/2012<br />

Total<br />

$ Qty<br />

$39,418,006 419<br />

$2,328,741 101<br />

$29,634,835 348<br />

$49,121,772 136<br />

$10,072,659 104<br />

$50,995,807 1,438<br />

$78,913,509 6,819<br />

$483,902 3<br />

$81,370,299 1,592<br />

$301,572,219 1,098<br />

$130,144,264 2,593<br />

$391,366,395 837<br />

$1,165,422,409 15,488<br />

68


<strong>Austin</strong> Independent School District<br />

FA_r3<br />

FACA_BS_r003<br />

System Class<br />

/ Group<br />

G2010 Roadways<br />

G2020 Parking Lots<br />

G2030 Pedestrian Paving<br />

G2040 Site Development<br />

G2045 Playscapes - Elem<br />

G2047 Playfields - Tennis<br />

G2047 Playfields - Tracks<br />

G2049 Playslab Covers<br />

G2050 Landscaping<br />

G3010 Water Supply<br />

G3020 Sanitary Sewer<br />

G3030 Storm Sewer<br />

G4020 Site Lighting<br />

G4030 Site Communications & Se<br />

Site<br />

A10 Foundations<br />

A2020 Basement Walls<br />

B1010 Floor Construction<br />

B1020 Roof Construction<br />

Structural<br />

B2010 Exterior Walls<br />

B2020 Exterior Windows<br />

B2030 Exterior Doors<br />

Exterior<br />

B30 Roofing<br />

Roofing<br />

D4010 Sprinklers<br />

D4030 Fire Protection Specialties<br />

D4090 Other Fire Protection<br />

D5030 Security<br />

Fire and Life Safety<br />

C10 Interior Construction<br />

C20 Stairs<br />

C3010 Wall Finishes<br />

C3020 Floor Finishes<br />

Priority<br />

1<br />

$ Qty<br />

$0 0<br />

$0 0<br />

$67,405 6<br />

$91,445 8<br />

$0 0<br />

$29,557 1<br />

$0 0<br />

$0 0<br />

$8,909 3<br />

$0 0<br />

$1,170,975 3<br />

$0 0<br />

$81,921 2<br />

$0 0<br />

$1,450,212 23<br />

$78,471 3<br />

$0 0<br />

$183,765 3<br />

$112,951 14<br />

$375,187 20<br />

$225,465 13<br />

$2,746,074 7<br />

$2,259 1<br />

$2,973,798 21<br />

$46,924 7<br />

$46,924 7<br />

$242,282 68<br />

$0 0<br />

$32,183 3<br />

$0 0<br />

$274,465 71<br />

$38,178 7<br />

$5,675 2<br />

$3,443 1<br />

$97,890 2<br />

Facility Condition Assessment Report<br />

By Bldg/Site System Group/Class and Deficiency Priority<br />

Includes Permanent Buildings and Sites<br />

Includes Project-Level Soft Costs<br />

Selected Bond Assignment(s): TBD, 2008, 2004<br />

2<br />

$ Qty<br />

$662,040 4<br />

$147,306 5<br />

$238,655 21<br />

$8,162,013 55<br />

$12,352 1<br />

$421,883 2<br />

$340,527 1<br />

$0 0<br />

$55,089 9<br />

$1,345,801 4<br />

$1,489,662 6<br />

$60,860 3<br />

$351,935 7<br />

$325 1<br />

$13,288,448 119<br />

$182,633 6<br />

$52,872 1<br />

$60,662 5<br />

$156,883 18<br />

$453,049 30<br />

$145,640 22<br />

$5,849,864 19<br />

$840,896 16<br />

$6,836,400 57<br />

$17,169,192 55<br />

$17,169,192 55<br />

$0 0<br />

$0 0<br />

$0 0<br />

$1,665,342 1<br />

$1,665,342 1<br />

$919,459 33<br />

$8,582 1<br />

$214,805 10<br />

$944,974 21<br />

3<br />

$ Qty<br />

$58,406 5<br />

$6,533,940 36<br />

$244,894 28<br />

$891,823 63<br />

$0 0<br />

$276,927 4<br />

$340,527 1<br />

$28,898 1<br />

$308,267 31<br />

$3,932,423 12<br />

$3,687,659 17<br />

$339,421 6<br />

$2,082,185 17<br />

$341 1<br />

$18,725,711 222<br />

$854,030 22<br />

$0 0<br />

$80,934 12<br />

$126,019 7<br />

$1,060,982 41<br />

$2,227,637 92<br />

$9,841,121 51<br />

$3,358,441 85<br />

$15,427,199 228<br />

$25,565,140 61<br />

$25,565,140 61<br />

$0 0<br />

$280,641 13<br />

$645,908 7<br />

$6,020,000 1<br />

$6,946,548 21<br />

$3,812,421 197<br />

$4,279 1<br />

$3,361,931 45<br />

$10,355,893 160<br />

4<br />

$ Qty<br />

$74,046 1<br />

$1,168,505 13<br />

$46,254 5<br />

$547,077 15<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$159,932 3<br />

$374,998 2<br />

$228,948 1<br />

$38,750 2<br />

$417,639 2<br />

$62,133 1<br />

$3,118,282 45<br />

$9,430 1<br />

$0 0<br />

$58,680 8<br />

$371,412 1<br />

$439,522 10<br />

$408,745 15<br />

$3,083,144 10<br />

$905,549 17<br />

$4,397,438 42<br />

$6,340,516 13<br />

$6,340,516 13<br />

$611,928 1<br />

$0 0<br />

$0 0<br />

$376,000 1<br />

$987,928 2<br />

$2,104,680 87<br />

$16,551 1<br />

$950,391 7<br />

$6,899,341 39<br />

Not Prioritized<br />

$ Qty<br />

$0 0<br />

$0 0<br />

$0 0<br />

$2,835,353 10<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$2,835,353 10<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$183,210 293<br />

$0 0<br />

$1,171,259 374<br />

$0 0<br />

6/15/2012<br />

8:40 am<br />

Total<br />

$794,492 10<br />

$7,849,752 54<br />

$597,208 60<br />

$12,527,711 151<br />

$12,352 1<br />

$728,368 7<br />

$681,053 2<br />

$28,898 1<br />

$532,197 46<br />

$5,653,223 18<br />

$6,577,243 27<br />

$439,030 11<br />

$2,933,680 28<br />

$62,799 3<br />

$39,418,006 419<br />

$1,124,564 32<br />

$52,872 1<br />

$384,040 28<br />

$767,265 40<br />

$2,328,741 101<br />

$3,007,487 142<br />

$21,520,202 87<br />

$5,107,145 119<br />

$29,634,835 348<br />

$49,121,772 136<br />

$49,121,772 136<br />

$854,209 69<br />

$280,641 13<br />

$678,091 10<br />

$8,061,342 3<br />

$9,874,283 95<br />

$7,057,947 617<br />

$35,087 5<br />

$5,701,829<br />

69<br />

437<br />

$18,298,098 222


<strong>Austin</strong> Independent School District<br />

FA_r3<br />

FACA_BS_r003<br />

C3030 Ceiling Finishes<br />

Interior<br />

E1020 Institutional Equipment<br />

E2010 Fixed Furnishings<br />

E2020 Movable Furnishings<br />

Specialties<br />

D1010 Elevators & Lifts<br />

Conveyances<br />

D2010 Plumbing Fixtures<br />

D2020 Domestic Water Distributio<br />

D2030 Sanitary Waste<br />

D2040 Rain Water Drainage<br />

D2090 Other Plumbing Systems<br />

Plumbing<br />

D3020 Heat Generating Systems<br />

D3030 Cooling Generating System<br />

D3040 Distribution Systems<br />

D3050 Terminal & Package Syste<br />

D3060 Controls & Instrumentation<br />

D3070 Systems Testing & Balanc<br />

D3090 Other HVAC Systems & Eq<br />

G3050 Cooling Distribution<br />

G3054 Cooling Towers on Site<br />

Mechanical<br />

D5010 - Electrical Service & Distr<br />

D5020 Lighting & Branch Wiring<br />

D5030 Communications<br />

D5030 Security<br />

D5090 Other Electrical Systems<br />

Electrical<br />

F10 Special Construction<br />

Y3031 Facility Addition<br />

Y3032 Facility Renovation<br />

Y3033 Facility Addition & Renova<br />

Z4010 Public TAS-ADA Accessibi<br />

Z4011 Program TAS-ADA Access<br />

1<br />

$ Qty<br />

$104,640 8<br />

$249,825 20<br />

$313,885 113<br />

$17,857 4<br />

$0 0<br />

$331,743 117<br />

$224,840 1<br />

$224,840 1<br />

$30,468 2<br />

$93,911 4<br />

$13,314,672 67<br />

$83,117 3<br />

$0 0<br />

$13,522,168 76<br />

$1,739,842 10<br />

$2,988,028 11<br />

$6,945,839 17<br />

$2,079,288 14<br />

$954,160 2<br />

$0 0<br />

$0 0<br />

$55,887 2<br />

$546,060 2<br />

$15,309,103 58<br />

$2,227,083 10<br />

$785,524 35<br />

$3,590,917 2<br />

$32,894 6<br />

$1,440,062 30<br />

$8,076,481 83<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$61,152,052 287<br />

$0 0<br />

Facility Condition Assessment Report<br />

By Bldg/Site System Group/Class and Deficiency Priority<br />

Includes Permanent Buildings and Sites<br />

Includes Project-Level Soft Costs<br />

Selected Bond Assignment(s): TBD, 2008, 2004<br />

2<br />

$ Qty<br />

$243,399 19<br />

$2,331,220 84<br />

$28,156,455 114<br />

$1,011,971 8<br />

$221,909 1<br />

$29,390,335 123<br />

$0 0<br />

$0 0<br />

$2,363,740 30<br />

$3,532,840 10<br />

$4,710,879 11<br />

$25,617 4<br />

$184,144 2<br />

$10,817,220 57<br />

$1,981,285 10<br />

$6,711,086 41<br />

$84,138,127 142<br />

$23,791,338 70<br />

$5,772,962 26<br />

$607,227 6<br />

$27,801 1<br />

$0 0<br />

$3,988,092 9<br />

$127,017,919 305<br />

$2,525,583 8<br />

$6,922,563 54<br />

$1,657,390 4<br />

$7,623,903 162<br />

$4,058,312 77<br />

$22,787,751 305<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

3<br />

$ Qty<br />

$11,737,049 97<br />

$29,271,572 500<br />

$25,442,157 54<br />

$4,538,782 47<br />

$554,774 1<br />

$30,535,712 102<br />

$259,063 2<br />

$259,063 2<br />

$17,637,017 356<br />

$19,648,682 87<br />

$9,339,414 33<br />

$637,223 29<br />

$340,002 6<br />

$47,602,338 511<br />

$9,035,334 55<br />

$9,495,682 48<br />

$93,372,457 384<br />

$24,602,095 53<br />

$16,617,709 123<br />

$410,261 19<br />

$40,365 1<br />

$0 0<br />

$857,560 4<br />

$154,431,463 687<br />

$6,615,888 53<br />

$55,750,688 274<br />

$10,275,677 78<br />

$2,447,860 96<br />

$1,706,118 31<br />

$76,796,230 532<br />

$1,884 2<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

4<br />

$ Qty<br />

$7,817,758 33<br />

$17,788,721 167<br />

$456,261 3<br />

$12,960,904 5,243<br />

$0 0<br />

$13,417,165 5,246<br />

$0 0<br />

$0 0<br />

$7,462,241 560<br />

$1,088,269 17<br />

$0 0<br />

$18,309 1<br />

$0 0<br />

$8,568,819 578<br />

$169,009 2<br />

$316,150 3<br />

$3,266,902 34<br />

$748,510 5<br />

$17,448 1<br />

$295,715 3<br />

$0 0<br />

$0 0<br />

$0 0<br />

$4,813,733 48<br />

$814,034 3<br />

$6,546,867 133<br />

$805,451 39<br />

$9,242,145 426<br />

$0 0<br />

$17,408,498 601<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

Not Prioritized<br />

$ Qty<br />

$0 0<br />

$1,354,469 667<br />

$0 0<br />

$2,986,113 878<br />

$2,252,441 353<br />

$5,238,555 1,231<br />

$0 0<br />

$0 0<br />

$859,756 370<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$859,756 370<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$0 0<br />

$5,273,680 1,081<br />

$0 0<br />

$0 0<br />

$0 0<br />

$5,273,680 1,081<br />

$0 0<br />

$53,554,893 9<br />

$6,789,791 11<br />

$141,050,653 68<br />

$0 0<br />

$92,541,747 245<br />

6/15/2012<br />

8:40 am<br />

Total<br />

$19,902,846 157<br />

$50,995,807 1,438<br />

$54,368,758 284<br />

$21,515,627 6,180<br />

$3,029,124 355<br />

$78,913,509 6,819<br />

$483,902 3<br />

$483,902 3<br />

$28,353,222 1,318<br />

$24,363,701 118<br />

$27,364,965 111<br />

$764,265 37<br />

$524,146 8<br />

$81,370,299 1,592<br />

$12,925,469 77<br />

$19,510,946 103<br />

$187,723,326 577<br />

$51,221,231 142<br />

$23,362,279 152<br />

$1,313,203 28<br />

$68,166 2<br />

$55,887 2<br />

$5,391,712 15<br />

$301,572,219 1,098<br />

$12,182,588 74<br />

$75,279,323 1,577<br />

$16,329,435 123<br />

$19,346,802 690<br />

$7,204,492 138<br />

$130,342,640 2,602<br />

$1,884 2<br />

$53,554,893 9<br />

$6,789,791 11<br />

$141,050,653 68<br />

$61,152,052 287<br />

$92,541,747 70<br />

245


<strong>Austin</strong> Independent School District<br />

FA_r3<br />

FACA_BS_r003<br />

Z4012 TAS Renovation<br />

Other<br />

Total<br />

Priority<br />

1<br />

2<br />

3<br />

4<br />

Not Prioritized<br />

103,986,797<br />

231,756,875<br />

406,623,843<br />

77,280,622<br />

345,774,271<br />

1<br />

$ Qty<br />

$0 0<br />

$61,152,052 287<br />

$103,986,797 784<br />

Facility Condition Assessment Report<br />

By Bldg/Site System Group/Class and Deficiency Priority<br />

Includes Permanent Buildings and Sites<br />

Includes Project-Level Soft Costs<br />

Selected Bond Assignment(s): TBD, 2008, 2004<br />

2<br />

$ Qty<br />

$0 0<br />

$0 0<br />

$231,756,875 1,136<br />

3<br />

$ Qty<br />

$0 0<br />

$1,884 2<br />

$406,623,843 2,909<br />

Deficiency Cost by Priority<br />

4<br />

$ Qty<br />

$0 0<br />

$0 0<br />

$77,280,622 6,752<br />

Not Prioritized<br />

$ Qty<br />

$36,275,374 215<br />

$330,212,459 548<br />

$345,774,271 3,907<br />

6/15/2012<br />

8:40 am<br />

Total<br />

$36,275,374 215<br />

$391,366,395 837<br />

$1,165,422,409 15488<br />

$0 $50,000,000 $100,000,000 $150,000,000 $200,000,000 $250,000,000 $300,000,000 $350,000,000 $400,000,000 $450,000,000<br />

Deficiency Cost<br />

71


Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

72


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

005<br />

Facility Data<br />

Gross Area<br />

Area (GSF) per student<br />

Number of Classrooms<br />

Core Areas Capacity<br />

Library<br />

Gym<br />

Cafeteria<br />

Site Data<br />

Gross Site Area<br />

McCallum High School<br />

5600 Sunshine Dr.<br />

<strong>Austin</strong>, Texas 78756<br />

Facility Condition Index (FCI): 12.22%<br />

Perm<br />

251,287<br />

138<br />

76<br />

Sq. Ft.<br />

* Based on Sq.Ft./Student Ed. Spec. standards for each Core Area.<br />

A<br />

Site<br />

Roofing<br />

Structural<br />

Exterior<br />

Interior<br />

Mechanical<br />

Electrical<br />

Plumbing<br />

Fire and Life Safety<br />

Specialties<br />

Total<br />

C<br />

7,212<br />

15,765<br />

6,603<br />

Sq. Ft. Acres<br />

1,353,510<br />

Facility Data Summary<br />

Capacity Students *<br />

2,061<br />

1,827<br />

1,761<br />

31.1<br />

Facility Condition - System Group by Priority<br />

(Perm Bldgs & Site) (FCI Deficiencies Only)<br />

System<br />

Group<br />

Capital Renewal<br />

Code Compliance<br />

System Addition<br />

ADA-TAS (Public)<br />

Facility (Add/Ren)<br />

Total<br />

1<br />

0<br />

18,003<br />

166,309<br />

10,028<br />

6,858<br />

51,109<br />

26,874<br />

0<br />

3,412<br />

0<br />

282,594<br />

Priority<br />

2 3<br />

340,527<br />

2,519,013<br />

0<br />

5,699<br />

240,834<br />

320,919<br />

127,512<br />

45,168<br />

0<br />

0<br />

3,599,672<br />

0<br />

132,438<br />

2,749<br />

0<br />

311,812<br />

6,384,095<br />

536,443<br />

113,198<br />

0<br />

246,937<br />

7,727,671<br />

4<br />

0<br />

0<br />

0<br />

0<br />

0<br />

571,776<br />

166,610<br />

0<br />

0<br />

0<br />

738,386<br />

Total<br />

340,527<br />

2,669,453<br />

169,058<br />

15,727<br />

559,503<br />

7,327,900<br />

857,438<br />

B<br />

System<br />

Group<br />

Interior<br />

Mechanical<br />

Electrical<br />

Plumbing<br />

Specialties<br />

Other<br />

Building Data<br />

Perm Buildings<br />

06/15/2012<br />

Grades Served 9-12 (HS)<br />

Floors Date GSF FCI<br />

BLDG-005A - Education 3 1953 175,018 17.75<br />

BLDG-005B - Mechanical 1 1953 2,364 0.00<br />

BLDG-005C - Theater 2 1987 25,891 5.66<br />

BLDG-005D - Gym 1 1987 17,659 11.63<br />

BLDG-005E - Mechanical 1 1966 1,139 0.00<br />

BLDG-005F - Storage 1 1993 3,732 0.00<br />

BLDG-005G - Storage 1 1978 464 0.00<br />

BLDG-005H - Auditorium 2010 25,020 0.00<br />

Total:<br />

251,287<br />

Facility Condition - System Group by Priority<br />

(Perm Bldgs & Site) (Non-FCI Deficiencies Only)<br />

1<br />

0<br />

0<br />

0<br />

0<br />

0<br />

787,341<br />

158,367 Total 787,341<br />

3,412 * N/P = Not Prioritized<br />

246,937<br />

12,348,323<br />

2<br />

0<br />

0<br />

0<br />

0<br />

159,789<br />

0<br />

159,789<br />

Priority<br />

3<br />

0<br />

259,878<br />

53,013<br />

29,222<br />

0<br />

0<br />

342,113<br />

4<br />

0<br />

0<br />

194,097<br />

311,574<br />

171,746<br />

Facility Condition - Category by Priority (Perm Bldgs & Site) (FCI and Non-FCI Deficiencies)<br />

Category<br />

Deferred Maintenance<br />

Energy Efficiency (Capital Renewal)<br />

Educational Adequacy<br />

ADA-TAS (Program)<br />

ADA-TAS (Renovation)<br />

Functional Equity (Add/Ren)<br />

1<br />

6,858<br />

197,752<br />

77,984<br />

0<br />

0<br />

0<br />

787,341<br />

0<br />

0<br />

0<br />

0<br />

1,069,935<br />

2<br />

4,959<br />

754,781<br />

2,839,932<br />

0<br />

0<br />

159,789<br />

0<br />

0<br />

0<br />

0<br />

0<br />

3,759,461<br />

Priority<br />

3<br />

2,749<br />

2,069,895<br />

5,655,028<br />

53,013<br />

259,878<br />

29,222<br />

0<br />

0<br />

0<br />

0<br />

0<br />

8,069,784<br />

4<br />

0<br />

283,281<br />

455,105<br />

0<br />

226,740<br />

450,678<br />

0<br />

0<br />

0<br />

0<br />

0<br />

1,415,804<br />

N/P*<br />

58,326<br />

0<br />

174,815<br />

38,615<br />

209,943<br />

Total<br />

58,326<br />

259,878<br />

421,925<br />

379,411<br />

541,479<br />

0 36,142,848 36,930,189<br />

677,418 36,624,547 38,591,209<br />

Not Prioritized<br />

0<br />

0<br />

0<br />

0<br />

0<br />

481,699<br />

0<br />

639,946<br />

611,777<br />

14,831,417<br />

20,059,708<br />

36,624,547<br />

Total<br />

14,565<br />

3,305,709<br />

9,028,049<br />

53,013<br />

486,618<br />

1,121,389<br />

787,341<br />

639,946<br />

611,777<br />

14,831,417<br />

20,059,708<br />

50,939,532<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

1<br />

73


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

McCallum HS<br />

Deferred Maintenance<br />

BLDG-005A<br />

Structural<br />

B1010 Floor Construction<br />

2008-DI-6911 Floor access hatch deteriorated and<br />

dangerous<br />

Interior<br />

FCI System Deficiencies<br />

The floor access hatch in CC130 is rusted through 3 $2,749<br />

BSI Total:<br />

C10 Interior Construction<br />

2008-DI-6909 Interior wall damage Interior wall damage to walls in SOCSTOFC. 1 $1,412<br />

BLDG-005C<br />

Interior<br />

BSI Total:<br />

BLDG-005A<br />

Total:<br />

$2,749<br />

$1,412<br />

$4,161<br />

C10 Interior Construction<br />

2008-DI-6925 Stair treads and nosings damaged. Out<br />

side west side.<br />

Stair treads and nosings are damaged and create a trip hazard 1 $5,445<br />

BSI Total:<br />

$5,445<br />

C3030 Ceiling Finishes<br />

2008-DI-6923 Ceiling damage froml leaks Hard deck ceiling damage from leaks. 2 $4,959<br />

BSI Total:<br />

BLDG-005C<br />

Total:<br />

$4,959<br />

$10,404<br />

Deferred Maintenance Total: $14,565<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

2<br />

74


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Capital Renewal<br />

SITE-005<br />

Site<br />

G2040 Site Development<br />

2011-DI-36646 Resurface running track Running surface is aged, beyond expected service life 2 $340,527<br />

BLDG-005A<br />

Structural<br />

B1010 Floor Construction<br />

2008-DI-6914 Exterior concrete steps and steel step<br />

nosings failing<br />

Exterior<br />

BSI Total:<br />

SITE-005<br />

Exterior steps are spalling and the steel nosings are failing,<br />

damaged, missing<br />

BSI Total:<br />

B2030 Exterior Doors<br />

2008-DI-6919 Exterior wood door and frame failing Exterior wood door and frame are damaged from moisture and<br />

age, beyond useful life<br />

BSI Total:<br />

Interior<br />

Total:<br />

1<br />

2<br />

$340,527<br />

$340,527<br />

$106,868<br />

$106,868<br />

C10 Interior Construction<br />

2008-DI-6915 Interior door hardware failing Interior doors in the old classroom wings is worn, and beyond<br />

useful life<br />

3 $131,184<br />

2008-DI-6912 Accordion door beyond useful life The accordion door in 160/160OFC is torn, damaged, and<br />

beyond useful life<br />

3<br />

$5,786<br />

2008-DI-6904 Interior wood doors and frames<br />

damaged, beyond useful life<br />

Interior wood doors are worn, old, and have moisture damage to<br />

door and frames<br />

3<br />

$5,790<br />

2008-DI-6916 Interior doors and hardware failing Wood interior doors and frames in the Gym and boys dressing<br />

rooms areas show excessive wear, moisture damage, and are<br />

beyond useful life.<br />

3 $25,434<br />

BSI Total:<br />

$168,194<br />

C3020 Floor Finishes<br />

2008-DI-6903 Quarry tile floor tiles failing Quarry tile in the kitchen and locker rooms are failing.<br />

Delamination, broken tiles, failed grout. Large sections of the<br />

floor have delaminated from the base concrete.<br />

2 $181,696<br />

2008-DI-6910 Carpet is worn, dirty, beyond useful life Carpet shows excessive wear, is dirty, and beyond useful life 3 $130,089<br />

BSI Total:<br />

$311,785<br />

C3030 Ceiling Finishes<br />

2008-DI-6906 Ceiling grid and tile system failing Original grid and tile system is falling, failing, and beyond useful<br />

life<br />

2 $16,058<br />

2008-DI-6902 Ceiling grid and tile system beyond<br />

useful life<br />

The kitchen grid and tile system are old, stained, damaged, and<br />

beyond useful life. Additionally, the type of ceiling in the kitchen<br />

and the condition of the ceiling result in constant health<br />

inspection violations<br />

2 $38,121<br />

2008-DI-6908 Ceiling damage from condensate leaks Hard deck ceiling damage from condensate leaks 3 $6,519<br />

Mechanical<br />

D3040 Distribution Systems<br />

2008-DI-6937 McCallum A, Replace Cooling-Heating<br />

Water Piping for the replacement AHU's<br />

by the ton of refrigeration<br />

Electrical<br />

D5020 Lighting & Branch Wiring<br />

BSI Total:<br />

Some of the piping in the building is new, but some old pipe and<br />

valves in the building remain. For Units<br />

BSI Total:<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

3<br />

3<br />

75<br />

$5,699<br />

$5,699<br />

$60,698<br />

$885,594<br />

$885,594


Facility Data Summary<br />

<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2008-DI-6920 McCallum A, Replace broken Interior<br />

Lighting Fixtures and Incandescent<br />

fixtures in the building where found<br />

Some of the interior lighting fixtures covers are broken or missing.<br />

Incandescent lighting fixtures in the maintenenace rooms and<br />

Science room have not been changed.<br />

3 $99,827<br />

2008-DI-6917 McCallum A, Replace the Electrical<br />

Branch Panels<br />

Many of the lighting and Branch panels have been replaced.<br />

Some old panels still remain in the building.<br />

3 $190,626<br />

2009-DI-7105 McCallum A, Replace inoperative<br />

Exterior Lighting controls and Fixtures<br />

where needed.<br />

This deficiency is created to address comments from the<br />

Electrical Manager stating the new exterior lighting controls do<br />

not work properly.<br />

3 $85,678<br />

2008-DI-6921 McCallum, Replace Lighting Switches<br />

and Receptacles where needed<br />

There are also old switches and plugs in the building. 3 $160,312<br />

BSI Total:<br />

$536,443<br />

D5030 Security<br />

2011-DI-9877 Replace Intrusion Alarm System Intrusion Alarm has reached the end of its Serviceable Life 2 $94,205<br />

2011-DI-9878 Replace existing Access Control Point Access Control Panel requires replacement 2 $33,307<br />

2011-DI-9873 Replace existing Security Camera with<br />

Digital Camera<br />

2011-DI-36978 Convert Fire Alarm systems to VOIP<br />

communication<br />

Plumbing<br />

D2010 Plumbing Fixtures<br />

2009-DI-7946 McCallum HS - GYMMRR, GYMWRR,<br />

159RR<br />

Fire and Life Safety<br />

D4010 Sprinklers<br />

2011-DI-9871 Replace Fire Supression Heads with<br />

Current Technology Supression System<br />

Specialties<br />

E1020 Institutional Equipment<br />

2008-DI-6949 McCallum A, Replace the Kitchen Sinks<br />

in Life Skills room160.<br />

2008-DI-6939 McCallum, Replace Listed Kitchen<br />

Equipment, walk in freezer and<br />

refrigerator<br />

Surveillance Camera has reached the End of its Serviceable Life 4 $143,101<br />

Convert existing Fire Alarm systems to use the new VOIP<br />

network.<br />

BSI Total:<br />

Replace plumbing fixtures water closets, urinals, lavitories and<br />

fausets.<br />

BSI Total:<br />

4<br />

2<br />

$2,054<br />

$272,666<br />

$45,168<br />

$45,168<br />

Fire Suppression Head is obsolete and should be replaced 1 $3,412<br />

BSI Total:<br />

Some of the sinks and faucets are leaking and all are beyond<br />

service life<br />

The freezer is small and has failed a number of times causing<br />

food to spoil<br />

BSI Total:<br />

E2010 Fixed Furnishings<br />

2008-DI-6913 Built in cabinets beyond useful life Built in cabinets in the Life Skills kitchen show excessive wear,<br />

damage, age, and are beyond useful life. Rooms 159 & 160.<br />

BSI Total:<br />

BLDG-005C<br />

Mechanical<br />

D3040 Distribution Systems<br />

2008-DI-6938 McCallum C, Replace Cooling-Heating<br />

Water Piping for the replacement AHU's<br />

by the ton of refrigeration<br />

BLDG-005D<br />

Roofing<br />

BLDG-005A<br />

Some of the piping in the building is new, but some old pipe and<br />

valves in the building remain. For Units<br />

BSI Total:<br />

BLDG-005C<br />

3<br />

3<br />

3<br />

Total:<br />

4<br />

Total:<br />

$3,412<br />

$22,120<br />

$99,018<br />

$121,137<br />

$125,800<br />

$125,800<br />

$2,643,465<br />

$138,127<br />

$138,127<br />

$138,127<br />

B30 Roofing<br />

76<br />

<strong>Austin</strong> Independent School District 4<br />

McCallum HS


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2008-DI-6929 Roof leaks The second floor boiler room roof leaks around the exhaust stack.<br />

Roof leaks FFBLOC shower area<br />

BSI Total:<br />

Structural<br />

1<br />

$18,003<br />

$18,003<br />

B1010 Floor Construction<br />

2008-DI-6933 Exterior Stair / step nosings failing Concrete steps and nosings are damaged and missing 1 $59,441<br />

Exterior<br />

B2010 Exterior Walls<br />

2008-DI-6934 Exterior wall / sidewalk expansion joints<br />

failing<br />

Interior<br />

BSI Total:<br />

$59,441<br />

The exterior sidewalk / brick wall expansion joints have failed. 1 $10,028<br />

BSI Total:<br />

$10,028<br />

C3030 Ceiling Finishes<br />

2008-DI-6930 Ceiling damage from leaks Hard deck ceilings damaged from roof and/or HVAC leaks 3 $7,010<br />

Plumbing<br />

D2010 Plumbing Fixtures<br />

2008-DI-6945 McCallum D, Plumbing fixtures in the<br />

building require maintenance<br />

BSI Total:<br />

Plumbing fixtures in the building require maintenance. There are<br />

many shower valve leaking. There are faucets leaking. A urinal is<br />

missing.<br />

BSI Total:<br />

BLDG-005D<br />

3<br />

Total:<br />

$7,010<br />

$89,109<br />

$89,109<br />

$183,590<br />

Capital Renewal Total: $3,305,709<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

5<br />

77


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Energy Efficiency (Capital Renewal)<br />

BLDG-005A<br />

Roofing<br />

B30 Roofing<br />

2008-DI-6898 Built Up roof sections are beyond useful<br />

life<br />

2008-DI-6897 Metal roof sections are beyond useful<br />

life<br />

2008-DI-6900 SBS Modified roof sections wear and<br />

weathering<br />

2008-DI-6899 SBS Modified roof sections beyond<br />

useful life<br />

Mechanical<br />

D3040 Distribution Systems<br />

2008-DI-6940 McCallum A, Replace the listed HVAC<br />

Fan Coil units<br />

2008-DI-6936 McCallum A, Replace the Ductwork for<br />

the Package unit servicing the<br />

Gymnasium<br />

2008-DI-6578 McCallum A, Replace Building Exhaust<br />

Fans<br />

2008-DI-6924 McCallum A, Replace the listed HVAC<br />

Central Air Stations<br />

D3050 Terminal & Package Systems<br />

2011-DI-36670 McCallum - Replace Single zone unit<br />

with combination cooling/gas unit<br />

Kitchen<br />

2008-DI-6935 McCallum, Replace Single Zone cooling<br />

roof top unit serving the SMALLGYM<br />

Electrical<br />

Built Up roof sections are worn, old, and beyond useful life. Roof<br />

leaks reported.<br />

Metal roofs on HVAC Penthouses are old, deteriorating, and<br />

beyond useful life<br />

Sections of the SBS Modified roof are begining to show wear,<br />

weathering, and minor damage<br />

The older sections of SBS Modified roof are worn, blistered,<br />

delaminated, and beyond useful lilfe<br />

BSI Total:<br />

2<br />

3<br />

2<br />

2<br />

$1,199,676<br />

$132,438<br />

$400,434<br />

$918,902<br />

$2,651,450<br />

The Fan Coils have exceeded their expected life cycle. 3 $887,779<br />

The ductwork is old and should be changed with the replacement<br />

of the roof top units<br />

2<br />

$172,680<br />

Many exhaust fans are old and beyond service life 3 $306,644<br />

The Air Handlers have exceeded their expected service life. The<br />

motors, motor controls and/or associated components are<br />

beyond their useful life and/or exhibit deterioration as well. Many<br />

are rusted, and leaking condensate onto the floor. For Units<br />

BSI Total:<br />

3<br />

$3,792,240<br />

$5,159,342<br />

The cooling units are beyond service life. 1 $51,109<br />

The cooling units are beyond service life. 2 $148,240<br />

BSI Total:<br />

$199,349<br />

D5020 Lighting & Branch Wiring<br />

2011-DI-9872 Replace stage/theatre lighting Stage/Theatre lighting requires replacement 4 $21,455<br />

BLDG-005C<br />

Mechanical<br />

D3040 Distribution Systems<br />

2008-DI-6579 McCallum C, Replace Building Exhaust<br />

Fans<br />

2008-DI-6926 McCallum C, Replace the listed HVAC<br />

Central Air Stations<br />

Plumbing<br />

D2020 Domestic Water Distribution<br />

2008-DI-6944 McCallum C, Replace the Domestic<br />

Water Heaters<br />

BSI Total:<br />

BLDG-005A<br />

Total:<br />

$21,455<br />

$8,031,597<br />

Many exhaust fans are old and beyond service life 3 $20,132<br />

The Air Handlers have exceeded their expected service life. The<br />

motors, motor controls and/or associated components are<br />

beyond their useful life and/or exhibit deterioration as well. Many<br />

are rusted, and leaking condensate onto the floor. For Units<br />

BSI Total:<br />

The domestic hot water heaters have reached the end of their<br />

useful lives. The domestic heaters are located in AHU 31 and<br />

AHU 32 at the stage. The assets are not listed in the database<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

6<br />

4<br />

3<br />

78<br />

$433,650<br />

$453,782<br />

$24,090


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

BLDG-005D<br />

Mechanical<br />

D3030 Cooling Generating Systems<br />

2008-DI-6946 McCallum D, Replace the building HVAC<br />

condensing units and matching coils<br />

D3040 Distribution Systems<br />

2008-DI-6643 McCallum D, Replace Building Exhaust<br />

Fans<br />

Electrical<br />

D5090 Other Electrical Systems<br />

2008-DI-6948 McCallum D, Replace Emergency<br />

Lighting fixtures where required<br />

BSI Total:<br />

BLDG-005C<br />

Total:<br />

$24,090<br />

$477,871<br />

The condensing split system units with mtching coils are old 3 $473,154<br />

BSI Total:<br />

$473,154<br />

Many exhaust fans are old and beyond service life 3 $18,552<br />

BSI Total:<br />

Emergency lighting fixtures are inoperative or, are beyond their<br />

useful lives.<br />

BSI Total:<br />

BLDG-005D<br />

1<br />

Total:<br />

$18,552<br />

$26,874<br />

$26,874<br />

$518,581<br />

Energy Efficiency (Capital Renewal) Total: $9,028,049<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

7<br />

79


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Campus FCI Total: $12,348,323<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

8<br />

80


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

McCallum HS<br />

Code Compliance<br />

BLDG-005A<br />

Electrical<br />

Non-FCI System Deficiencies<br />

D5030 Security<br />

2011-DI-9874 Synchronize Fire Alarm Strobe Fire Alarm requires Synchronization to ADA Code 3 $53,013<br />

BSI Total:<br />

BLDG-005A<br />

Total:<br />

$53,013<br />

$53,013<br />

Code Compliance Total: $53,013<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

9<br />

81


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

System Addition<br />

BLDG-005A<br />

Mechanical<br />

D3040 Distribution Systems<br />

2008-DI-6733 McCallum A, Replace Kitchen Exhaust<br />

Hood and Install Kitchen Supply fan for<br />

Exhaust hood where needed<br />

Electrical<br />

The Exhaust hood requires additional supply air 3 $84,412<br />

BSI Total:<br />

$84,412<br />

D5020 Lighting & Branch Wiring<br />

2011-DI-9881 Install lighting control board Lighting control board is missing and is needed 4 $86,434<br />

BSI Total:<br />

$86,434<br />

D5030 Communications<br />

2011-DI-9876 Install sound system Sound system is missing and is needed 4 $38,405<br />

BSI Total:<br />

$38,405<br />

D5030 Security<br />

2011-DI-9875 Install surveillance camera. Difficult to monitor areas lack surveillance cameras. 4 $69,258<br />

Specialties<br />

BSI Total:<br />

$69,258<br />

E2010 Fixed Furnishings<br />

2011-DI-9914 Add Stage Equipment (Curtains) Stage Curtain is missing and is needed 4 $32,643<br />

BLDG-005B<br />

Mechanical<br />

D3060 Controls & Instrumentation<br />

2009-DI-7102 McCallum B, Install Variable Frequency<br />

Drive Motor Controllers motors and<br />

additional controls where needed<br />

BLDG-005D<br />

Mechanical<br />

D3060 Controls & Instrumentation<br />

2009-DI-7104 McCallum D, Install Variable Frequency<br />

Drive Motor Controllers motors and<br />

additional controls where needed<br />

BSI Total:<br />

BLDG-005A<br />

Variable Frequency Drive Controllers are not present. The<br />

installation of the Frequency Drives are recommended. Many of<br />

the building controls have been replaced. Replace old controls<br />

where needed.<br />

BSI Total:<br />

BLDG-005B<br />

Variable Frequency Drive Controllers are not present. The<br />

installation of the Frequency Drives are recommended. Many of<br />

the building controls have been replaced. Replace old controls<br />

where needed.<br />

BSI Total:<br />

BLDG-005D<br />

Total:<br />

3<br />

Total:<br />

3<br />

Total:<br />

$32,643<br />

$311,152<br />

$90,691<br />

$90,691<br />

$90,691<br />

$84,775<br />

$84,775<br />

$84,775<br />

System Addition Total: $486,618<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

10<br />

82


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Educational Adequacy<br />

BLDG-005A<br />

Interior<br />

C10 Interior Construction<br />

2011-DI-14709 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14648 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14807 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14629 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14672 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14646 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14738 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14740 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-16164 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14647 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14696 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14769 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14777 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14780 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14833 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14711 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14650 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14670 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14856 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14857 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14745 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14782 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14802 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14784 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14806 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14811 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14605 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14860 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14770 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14686 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14804 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14830 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14626 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14600 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14765 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14751 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14768 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14681 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14710 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14601 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14651 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14746 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14825 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14781 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14674 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14683 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14741 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P 83<br />

$505<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

11


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2011-DI-14823 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14799 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14778 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14858 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14862 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14736 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14747 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14767 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14630 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14787 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14603 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-14734 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

BSI Total:<br />

$29,778<br />

C3010 Wall Finishes<br />

2011-DI-14699 Install acoustical control panels. Room lacks appropriate sound control. N/P $6,416<br />

2011-DI-14700 Install acoustical control panels. Room lacks appropriate sound control. N/P $5,367<br />

Electrical<br />

BSI Total:<br />

$11,783<br />

D5020 Lighting & Branch Wiring<br />

2011-DI-14664 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,305<br />

2011-DI-14665 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,305<br />

2011-DI-14688 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $22,927<br />

2011-DI-15868 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $12,610<br />

2011-DI-14654 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,305<br />

2011-DI-14760 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $573<br />

2011-DI-14666 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,305<br />

2011-DI-14675 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $12,036<br />

2011-DI-14773 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $11,463<br />

2011-DI-14653 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,305<br />

2011-DI-14663 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,878<br />

2011-DI-14687 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $12,610<br />

2011-DI-14676 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $12,610<br />

2011-DI-14678 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $6,878<br />

2011-DI-14761 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $7,451<br />

2011-DI-14762 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $1,719<br />

2011-DI-14652 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $1,719<br />

2011-DI-14662 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $573<br />

2011-DI-14667 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $8,597<br />

2011-DI-14733 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $17,195<br />

Plumbing<br />

BSI Total:<br />

$167,364<br />

D2010 Plumbing Fixtures<br />

2011-DI-14607 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14863 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14866 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14827 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14612 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14839 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14719 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14594 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

2011-DI-14636 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

12<br />

4<br />

4<br />

84<br />

$40,565<br />

$10,141


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2011-DI-14826 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14837 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14631 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14595 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14610 Install a shower in the room. Room lacks a private shower area. N/P $10,398<br />

2011-DI-14621 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$10,141<br />

2011-DI-14851 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$15,212<br />

2011-DI-14865 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14593 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14835 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14702 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14718 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14841 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$15,212<br />

2011-DI-14596 Install a shower in the room. Room lacks a private shower area. N/P $10,398<br />

2011-DI-14597 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14598 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14869 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14620 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14637 Install a drinking fountain. Room lacks a drinking fountain. N/P $2,227<br />

2011-DI-14867 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14840 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14812 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14836 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14720 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14724 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14854 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14838 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14722 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14813 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14632 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$10,141<br />

2011-DI-14633 Install private toilets in the room. Room lacks private toilets. 4 $12,326<br />

2011-DI-14855 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14850 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14723 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14592 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14611 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14721 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-14852 Install shut-off valves for utilities. Room lacks shut-off valves for utilities. 3 $3,247<br />

2011-DI-14853 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$15,212<br />

2011-DI-14864 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-14849 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-14868 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

BSI Total:<br />

85<br />

$353,561<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

13<br />

4<br />

4<br />

4<br />

4<br />

4<br />

4<br />

4<br />

4<br />

4<br />

4


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Specialties<br />

E1020 Institutional Equipment<br />

2011-DI-14703 Install a dust collection system. Shop lacks a dust collection system. 2 $42,124<br />

2011-DI-14695 Install an emergency shower. Lab lacks an appropriate emergency shower. 2 $12,857<br />

2011-DI-14704 Install People Lift Lift for Physically Impaired is Missing and is Needed 2 $45,976<br />

2011-DI-14776 Install People Lift Lift for Physically Impaired is Missing and is Needed 2 $45,976<br />

2011-DI-14679 Install an emergency shower. Lab lacks an appropriate emergency shower. 2 $12,857<br />

BSI Total:<br />

$159,789<br />

E2010 Fixed Furnishings<br />

2011-DI-14729 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14756 Install new blinds. Blinds are missing or in poor condition. N/P $797<br />

2011-DI-14730 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14661 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14977 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14991 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14889 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14943 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14886 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14950 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14912 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14846 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14757 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14758 Install new blinds. Blinds are missing or in poor condition. N/P $372<br />

2011-DI-14615 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14715 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14938 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14956 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14963 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14870 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14975 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14978 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14880 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14918 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14915 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14713 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14797 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14816 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14795 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14843 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14714 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14958 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14973 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14881 Install new blinds. Blinds are missing or in poor condition. N/P $2,391<br />

2011-DI-14906 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14919 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14937 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-15885 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-15902 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-16268 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14712 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14755 Install new blinds. Blinds are missing or in poor condition. N/P $691<br />

2011-DI-14613 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14792 Install additional writing area. Room has insufficient writing area. 4 86<br />

$2,516<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

14


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2011-DI-14815 Install new blinds. Blinds are missing or in poor condition. N/P $691<br />

2011-DI-14819 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14655 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14616 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14727 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14639 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14971 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

2011-DI-14896 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14948 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14962 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14916 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14927 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-15886 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14754 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14796 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14818 Install new blinds. Blinds are missing or in poor condition. N/P $372<br />

2011-DI-14844 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14726 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14964 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

2011-DI-14908 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14979 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14949 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14909 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14934 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

2011-DI-14935 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14728 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14794 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14716 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14944 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14848 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14882 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14980 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14876 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14891 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14878 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14874 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16917 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14793 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14814 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14660 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14656 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14939 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14976 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14911 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14898 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14920 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14903 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14904 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14901 Install a demonstration table. Room lacks the required demonstration table. N/P $8,357<br />

2011-DI-14928 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14932 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-15870 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16899 Install additional writing area. Room has insufficient writing area. 4 87<br />

$2,516<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

15


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

2011-DI-14640 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14638 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14957 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-14913 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14890 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16897 Install new blinds. Blinds are missing or in poor condition. N/P $691<br />

BSI Total:<br />

$216,971<br />

E2020 Movable Furnishings<br />

2011-DI-16698 Procure and install an appropriate<br />

stove.<br />

Room lacks an appropriate stove. N/P $8,225<br />

2011-DI-16699 Procure and install a washer and dryer. The room lacks a washer and/or dryer. N/P $6,278<br />

2011-DI-16805 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16837 Procure and install a washer and dryer. The room lacks a washer and/or dryer. N/P $6,278<br />

2011-DI-16833 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16791 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16836 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16730 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16731 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16826 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16766 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16815 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16697 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16804 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16802 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16803 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16816 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16832 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16812 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

2011-DI-16825 Procure and install a refrigerator. Room lacks an appropriate refrigerator. N/P $5,792<br />

BLDG-005C<br />

Interior<br />

BSI Total:<br />

BLDG-005A<br />

Total:<br />

$119,251<br />

$1,058,497<br />

C10 Interior Construction<br />

2011-DI-16103 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

2011-DI-16191 Install a vision panel in the door. Classroom door lacks the appropriate vision panel. N/P $505<br />

BSI Total:<br />

$1,009<br />

C3010 Wall Finishes<br />

2011-DI-16780 Install acoustical control panels. Room lacks appropriate sound control. N/P $1,432<br />

2011-DI-16187 Install acoustical control panels. Room lacks appropriate sound control. N/P $3,566<br />

2011-DI-16104 Install acoustical control panels. Room lacks appropriate sound control. N/P $3,667<br />

2011-DI-16157 Install acoustical control panels. Room lacks appropriate sound control. N/P $2,872<br />

Electrical<br />

BSI Total:<br />

$11,537<br />

D5020 Lighting & Branch Wiring<br />

2011-DI-16097 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $573<br />

2011-DI-16092 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $573<br />

2011-DI-16096 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $1,146<br />

2011-DI-16185 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $1,146<br />

2011-DI-16130 Install additional electrical outlets. Room has insufficient electrical outlets. N/P $4,012<br />

BSI Total:<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

16<br />

88<br />

$7,451


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID<br />

Plumbing<br />

Deficiency Name Description Priority Costs<br />

D2010 Plumbing Fixtures<br />

2011-DI-16118 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-16067 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

4<br />

$5,071<br />

2011-DI-16120 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-16064 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-16065 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

2011-DI-16172 Install Sink(S). The Class Room Lavatories Plumbing Fixtures Are Missing And<br />

Should Be Installed<br />

$5,071<br />

2011-DI-16071 Install a drinking fountain. Room lacks a drinking fountain. N/P $1,114<br />

Specialties<br />

BSI Total:<br />

4<br />

4<br />

$23,623<br />

E2010 Fixed Furnishings<br />

2011-DI-16244 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16264 Install additional writing area. Room has insufficient writing area. 4 $2,516<br />

2011-DI-16726 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

2011-DI-16263 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16261 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16246 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-16252 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-16257 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

2011-DI-16256 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

BLDG-005D<br />

Interior<br />

BSI Total:<br />

BLDG-005C<br />

Total:<br />

$7,943<br />

$51,564<br />

C3010 Wall Finishes<br />

2011-DI-14988 Install acoustical control panels. Room lacks appropriate sound control. N/P $4,219<br />

Plumbing<br />

BSI Total:<br />

D2010 Plumbing Fixtures<br />

2011-DI-14965 Install a drinking fountain. Room lacks a drinking fountain. N/P $2,227<br />

Specialties<br />

BSI Total:<br />

E2010 Fixed Furnishings<br />

2011-DI-14966 Install new blinds. Blinds are missing or in poor condition. N/P $1,116<br />

2011-DI-14968 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-14983 Install additional writing area. Room has insufficient writing area. 4 $1,258<br />

2011-DI-16916 Install additional tackboard area. Room has insufficient tackboard area. 4 $417<br />

2011-DI-14967 Install additional tackboard area. Room has insufficient tackboard area. 4 $834<br />

BSI Total:<br />

BLDG-005D<br />

Total:<br />

$4,219<br />

$2,227<br />

$4,882<br />

$11,328<br />

Educational Adequacy Total: $1,121,389<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

17<br />

89


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

ADA-TAS (Public)<br />

SITE-005<br />

Other<br />

Z4010 Public TAS-ADA Accessibility<br />

2009-DI-7307 ADA / TAS Public Deficiency, Exterior Addresses various site improvements to provide ADA compliant<br />

public accessibility to the building, which may include parking<br />

spaces, curb-cuts, sidewalks, ramps, landings and handrails.<br />

BSI Total:<br />

BLDG-005A<br />

Other<br />

SITE-005<br />

Z4010 Public TAS-ADA Accessibility<br />

2009-DI-7309 ADA / TAS Public Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant public accessibility to "Public Use" areas within the<br />

building, which may include administrative areas, assembly areas<br />

such as cafeterias, stages, gymnasiums, libraries, and public use<br />

restrooms.<br />

BSI Total:<br />

BLDG-005C<br />

Other<br />

BLDG-005A<br />

Z4010 Public TAS-ADA Accessibility<br />

2009-DI-7315 ADA / TAS Public Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant public accessibility to "Public Use" areas within the<br />

building, which may include administrative areas, assembly areas<br />

such as cafeterias, stages, gymnasiums, libraries, and public use<br />

restrooms.<br />

BSI Total:<br />

BLDG-005D<br />

Other<br />

BLDG-005C<br />

Z4010 Public TAS-ADA Accessibility<br />

2009-DI-7314 ADA / TAS Public Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant public accessibility to "Public Use" areas within the<br />

building, which may include administrative areas, assembly areas<br />

such as cafeterias, stages, gymnasiums, libraries, and public use<br />

restrooms.<br />

BSI Total:<br />

BLDG-005D<br />

1<br />

Total:<br />

1<br />

Total:<br />

1<br />

Total:<br />

1<br />

Total:<br />

$103,644<br />

$103,644<br />

$103,644<br />

$407,326<br />

$407,326<br />

$407,326<br />

$101,801<br />

$101,801<br />

$101,801<br />

$174,571<br />

$174,571<br />

$174,571<br />

ADA-TAS (Public) Total: $787,341<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

18<br />

90


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

ADA-TAS (Program)<br />

BLDG-005A<br />

Other<br />

Z4011 Program TAS-ADA Accessibility<br />

2009-DI-7310 ADA / TAS Program Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant student access to program elements which may<br />

include classrooms, libraries, gymnasiums, cafeterias, and<br />

student and staff restrooms.<br />

BSI Total:<br />

BLDG-005C<br />

Other<br />

BLDG-005A<br />

Z4011 Program TAS-ADA Accessibility<br />

2009-DI-7312 ADA / TAS Program Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant student access to program elements which may<br />

include classrooms, libraries, gymnasiums, cafeterias, and<br />

student and staff restrooms.<br />

BSI Total:<br />

BLDG-005D<br />

Other<br />

BLDG-005C<br />

Z4011 Program TAS-ADA Accessibility<br />

2009-DI-7313 ADA / TAS Program Deficiency, Interior Addresses various building improvements to provide ADA<br />

compliant student access to program elements which may<br />

include classrooms, libraries, gymnasiums, cafeterias, and<br />

student and staff restrooms.<br />

BSI Total:<br />

BLDG-005D<br />

N/P<br />

Total:<br />

N/P<br />

Total:<br />

N/P<br />

Total:<br />

$229,351<br />

$229,351<br />

$229,351<br />

$28,772<br />

$28,772<br />

$28,772<br />

$381,823<br />

$381,823<br />

$381,823<br />

ADA-TAS (Program) Total: $639,946<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

19<br />

91


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

ADA-TAS (Renovation)<br />

SITE-005<br />

Other<br />

Z4012 TAS Renovation<br />

2009-DI-7308 ADA / TAS Renovation Deficiency,<br />

Exterior<br />

BLDG-005A<br />

Other<br />

Z4012 TAS Renovation<br />

2009-DI-7311 ADA / TAS Renovation Deficiency,<br />

Interior<br />

BLDG-005D<br />

Other<br />

Z4012 TAS Renovation<br />

2009-DI-7316 ADA / TAS Renovation Deficiency,<br />

Interior<br />

Addresses lower priority exterior improvements that do not impact<br />

public use or student program use, which may include employee<br />

parking separate from public areas, non-public use ramps,<br />

loading docks, etc., and abandoned buildings.<br />

BSI Total:<br />

SITE-005<br />

Addresses lower priority interior building improvements that do<br />

not impact public use or student program use, which may include<br />

restrooms and areas restricted to staff, nurses and coaches<br />

restrooms, private restrooms or abandoned shower rooms.<br />

BSI Total:<br />

BLDG-005A<br />

Addresses lower priority interior building improvements that do<br />

not impact public use or student program use, which may include<br />

restrooms and areas restricted to staff, nurses and coaches<br />

restrooms, private restrooms or abandoned shower rooms.<br />

BSI Total:<br />

BLDG-005D<br />

N/P<br />

Total:<br />

N/P<br />

Total:<br />

N/P<br />

Total:<br />

$78,838<br />

$78,838<br />

$78,838<br />

$367,967<br />

$367,967<br />

$367,967<br />

$164,972<br />

$164,972<br />

$164,972<br />

ADA-TAS (Renovation) Total: $611,777<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

20<br />

92


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Functional Equity (Add/Ren)<br />

BLDG-005A<br />

Other<br />

Y3033 Facility Addition & Renovation<br />

2010-DI-7921 Library Addition/Expansion and Interior<br />

Renovation<br />

Library Addition/Expansion and Interior Renovation<br />

*****ADA UPGRADES ARE REQUIRED APPROX. COST<br />

$29,400. DI-7307 $24,200 DI-7310 $5,200<br />

N/P<br />

$1,832,798<br />

2011-DI-37121 New Covered Extrior Canopy Provide a new covered exterior entrance canopy N/P $247,592<br />

2010-DI-7922 Weight Room addition and Gymnasium<br />

Bleachers Renovation<br />

Weight Room addition and Gymnasium Bleachers Renovation<br />

and addition of Wrestling Facility for Girls and Boys<br />

N/P<br />

$3,201,568<br />

2011-DI-37122<br />

***ADA UPDATE REQUIRED. APPROX COST $174,000<br />

DI-7309 $174,000<br />

Reconfigure Exterior Stari/Ramps in two Area K - reconfigure exterior stair/raps in two location.<br />

location<br />

N/P $299,689<br />

2011-DI-37117 Expansion of Rehearsel Space and<br />

addition of Wheel Chair Lift.<br />

Expansion of Rehearsel Space into Auditorium and "Black Box"<br />

Theatre with addition of Wheelchair Lift at Stage.<br />

N/P $1,207,010<br />

2011-DI-37116 Renovate Special Ed rooms, Consumer Renovate Special Education Rooms 157 & 159, Upgrade<br />

Science, ARD Conference Room and Consumer science/Food Lab Room 160, convert Credity<br />

Recovery Lab to new A.R.D. conference Room and Faculty Work<br />

Faculty Work Room<br />

Room<br />

N/P $1,280,514<br />

2011-DI-37118 Renovation of existing weight room,<br />

Expansion of Boys Locker room,<br />

Coaches office<br />

Renovate weight room into Girls Locker room, Provide new<br />

weight training room and athletic storage, expand and reconfigure<br />

Boys Athletics Locker Rooms, Convert Boys Locker Room into<br />

trainers Suite, Expand Coaches Office and Accessibility<br />

upgrades, Expand Boys Locker Room into Existing Storage.<br />

N/P $4,121,268<br />

BLDG-005H<br />

Other<br />

***ADA UPGRADES REQUIRED $49,600.00 DI-7315 $49,571.22<br />

BSI Total:<br />

BLDG-005A<br />

Total:<br />

$12,190,438<br />

$12,190,438<br />

Y3032 Facility Renovation<br />

2011-DI-37120 Expand to Add fourth Art Classroom Expand Arts Center to add fourth Art Classroom N/P $819,116<br />

2011-DI-37119 Expand to add new "Black Box" Expand Arts Center to add a new "Black Box" N/P $1,821,863<br />

BSI Total:<br />

BLDG-005H<br />

Total:<br />

$2,640,979<br />

$2,640,979<br />

Functional Equity (Add/Ren) Total: $14,831,417<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

21<br />

93


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Facility (Add/Ren)<br />

BLDG-005A<br />

Other<br />

Y3031 Facility Addition<br />

2011-DI-36557 Future (24) Classroom Addition Area B Construct 2 Story Classroom Block<br />

***ADA UPGRADES REQUIRED $21884.47.00 DI-7307 @<br />

$21884.47<br />

BSI Total:<br />

BLDG-005A<br />

N/P<br />

Total:<br />

$20,059,708<br />

$20,059,708<br />

$20,059,708<br />

Facility (Add/Ren) Total: $20,059,708<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

22<br />

94


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Campus Non-FCI Total: $38,591,209<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

23<br />

95


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

Campus FCI and Non-FCI Total: $50,939,532<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

24<br />

96


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

See Attached Site Plan and Floor Plans (below)<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

25<br />

97


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

See Attached Americans with Disabilities Act (ADA)<br />

Texas Accessibility Standards (TAS) Accessibility<br />

Deficiency Assessment and Upgrade<br />

Recommendations Report (below) - Note that the<br />

costs included in this report are for construction<br />

only and do not include other project related costs.<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

26<br />

98


<strong>Austin</strong> Independent School District<br />

FMP_a009<br />

Facility Data Summary<br />

06/15/2012<br />

Deficiency Summary<br />

Soft<br />

ID Deficiency Name Description Priority Costs<br />

See Attached Educational Specifications<br />

Functional Equity Deficiencies Report (below) -<br />

Note that the costs included in this report are for<br />

construction only and do not include other project<br />

related costs.<br />

<strong>Austin</strong> Independent School District McCallum HS<br />

27<br />

99


6<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

100


CAPITAL IMPROVEMENT AND BOND PLANNING ADVISORY<br />

COMMITTEE<br />

REPORT TO THE<br />

MEMBERS OF THE BOARD OF TRUSTEES<br />

AUSTIN INDEPENDENT SCHOOL DISTRICT<br />

MARCH 22, 2012<br />

101


TABLE OF CONTENTS<br />

Table of Contents ........................................................................................................................... 2<br />

Committee Members and Co-Chairs ............................................................................................... 3<br />

Committee Charge ......................................................................................................................... 4<br />

Process .......................................................................................................................................... 5<br />

Broad Categories Review ............................................................................................................... 7<br />

Key Considerations ........................................................................................................................ 8<br />

Comprehensive Review of Facility Condition Data .................................................................................. 8<br />

Summary of Use of Surplus 2008 Bond Program Contingency Funds .................................................. 11<br />

Information Services, A<strong>ISD</strong> Police/Security and Transportation ............................................................ 11<br />

Presentation by City of <strong>Austin</strong> Demographer: <strong>Austin</strong> Demographic Trends .......................................... 12<br />

Presentation by A<strong>ISD</strong> Planning Services: Demographic Trends and Implications for Capital<br />

Improvements ......................................................................................................................................... 12<br />

Presentation by Economist from the Federal Reserve Bank: Economic Forecast ................................ 13<br />

State Budget and School Finance, Tax Rate and Debt Overview and Bond Election Scenarios and Tax<br />

Rate Impacts ........................................................................................................................................... 14<br />

Key Findings ..................................................................................................................................22<br />

Recommendations .........................................................................................................................23<br />

102


COMMITTEE MEMBERS AND CO-CHAIRS<br />

Co-Chairs<br />

Richard Frazier<br />

Albert Hawkins<br />

Members<br />

Andy Anderson<br />

Lucio Calzada<br />

Kimiko Cartwright<br />

Nicole Conley-Abram<br />

Tommy Cowan<br />

Paul Cruz<br />

Brett Currie-Wood<br />

Ramon de Jesus<br />

Roxanne Evans<br />

Debra Haas<br />

Lawrence Huang<br />

LaDonna Massad<br />

Bill Mullane<br />

Rae Nwosu<br />

Marina Reynaga<br />

Drew Scheberle<br />

Vincent Torres<br />

Greg Weaver<br />

Ken Zarifis<br />

103


COMMITTEE CHARGE<br />

The CIBPAC is charged with evaluating all capital improvement needs of the district, and<br />

providing recommendations to the Superintendent.<br />

In developing its recommendations, the CIBPAC shall carefully consider any information<br />

provided by district administration.<br />

In its deliberations, the CIBPAC may consider, but it is not limited to, the following:<br />

o Conditions of schools and other district facilities<br />

o Facility equity<br />

o Strategic priorities<br />

o Current and projected growth<br />

o School overcrowding and under-utilization<br />

o New or expanded academic program offerings<br />

o Student transportation<br />

o Technology<br />

o Health and safety<br />

o Resource conservation and environmental protection<br />

o Community and regional plans<br />

o Future bond programs<br />

o Other areas as may be directed by the Superintendent<br />

104


PROCESS<br />

Establishment<br />

The Capital Improvement and Bond Planning Advisory Committee (CIBPAC) is established as<br />

an ad hoc advisory body of the district. Under provisions of district policy BDF-Local, the<br />

CIBPAC is responsible to, reports to, and serves at the will of the Superintendent.<br />

The Superintendent designates the Chief Operations Officer (COO) as Coordinator for the<br />

CIBPAC.<br />

Under provisions of district policy BDF-Local, the CIBPAC charter shall be developed by the<br />

Coordinator of District Advisory Bodies in consultation with the COO, based on any guidance<br />

that may be provided by the Superintendent, and approved by the CIBPAC.<br />

Membership<br />

The CIBPAC shall strive to reflect the geographic, ethnic, cultural, and economic diversity of the<br />

district, and include the following balance of perspectives: parents; community members;<br />

expertise in related areas such as business, finance, land development, and construction; and<br />

district employees from campuses and central offices.<br />

The CIBPAC shall consist of a minimum of 20 members. The membership may include up to six<br />

district employees.<br />

The Superintendent delegates the selection of CIBPAC members to the COO. In making<br />

membership selections, the COO may consider applications received by the Coordinator of<br />

District Advisory Bodies, as well as referrals from other appropriate sources.<br />

The Superintendent also delegates the selection of two CIBPAC Co-Chairs to the COO. No<br />

more than one Co-Chair may be an employee of the district.<br />

Regular attendance by members is expected, and is important to representation, thorough<br />

discussion, and decision-making.<br />

Members are expected to conduct themselves with courtesy at all times. Members shall not use<br />

their position on the CIBPAC to gain or attempt to gain an undue advantage for themselves or<br />

anyone else. Members shall not speak for the CIBPAC unless otherwise authorized by the<br />

CIBPAC; members shall not speak for the district unless otherwise authorized by the district.<br />

Meetings<br />

Unless otherwise directed by the Superintendent, the Co-Chairs shall consult with the COO to<br />

establish a meeting schedule for the CIBPAC, including a projected end date for the work of the<br />

committee.<br />

The Co-Chairs shall consult with the COO to establish agendas for each CIBPAC meeting.<br />

CIBPAC meeting agendas shall be posted at a location accessible by the public and on the<br />

CIBPAC website at least 72 hours in advance. CIBPAC meetings shall be open to the public,<br />

and the Co-Chairs shall ensure that the district’s standard guidelines for citizens<br />

communications and visitors are applied.<br />

The Co-Chairs may form CIBPAC subcommittees to perform various work and to make<br />

recommendations to the full CIBPAC for consideration. Subcommittees must be smaller than a<br />

quorum of the full CIBPAC. Subcommittees meetings are not open to the public.<br />

Members shall attempt to reach decisions by consensus. However, if a clear consensus cannot<br />

be obtained, decisions shall be reached by a majority vote of members present. The Co-Chairs<br />

may determine whether proxy votes or email votes are allowed.<br />

105


Responsibilities<br />

The CIBPAC Co-Chairs shall preside over meetings and represent the CIBPAC as necessary or<br />

appropriate.<br />

The COO shall coordinate arrangements for CIBPAC meetings, including meeting space,<br />

support staff, and materials.<br />

The COO shall ensure that basic minutes are kept for each CIBPAC meeting and posted on the<br />

CIBPAC website.<br />

The COO, through the Superintendent’s Board Weekly Update process, shall provide periodic<br />

progress reports on the CIBPAC’s work.<br />

Any formal CIBPAC recommendations or reports shall be provided to the Superintendent, and at<br />

the same time shall be provided for the information of the Board and posted on the CIBPAC<br />

website.<br />

The Superintendent shall make final administrative recommendations to the Board for<br />

consideration.<br />

The Superintendent shall consult with the Board in determining whether the CIBPAC should<br />

continue to serve as a district advisory body beyond its projected end date and, if so, in what<br />

form or function.<br />

106


BROAD CATEGORIES REVIEW<br />

The CIBPAC held four meetings, January 24, 2012, February 8, 2012, February 21, 2012, and<br />

March 21, 2012. During those meetings the committee, under the leadership of co-chairs Mr.<br />

Albert Hawkins and Mr. Richard Frazier, reviewed the following broad categories of information<br />

through presentations by both community experts and district staff:<br />

An overview of the CIBPAC membership, meeting schedule and charge.<br />

An overview of the Facility Master Plan Framework and the relationship of the CIBPAC<br />

recommendation regarding the possible formation of a Citizens’ Bond Advisory Committee<br />

(CBAC).<br />

A review of a proposed “Decision Framework” which included key criteria for consideration<br />

in making a committee decision, and questions and considerations to guide discussion of<br />

these criteria.<br />

An overview of the six successful <strong>Austin</strong> <strong>ISD</strong> Bond Programs that occurred in 1983, 1990,<br />

1996, 2002, 2004 and 2008.<br />

A copy of the District’s Strategic Plan 2010-15 and the Facility Master Plan Framework,<br />

which was approved by the Board of Trustees on November 21, 2011.<br />

A comprehensive review of compiled facility condition data for Priorities 1-5 systemic<br />

repairs (deferred maintenance), disaggregated by both school and by building/site system;<br />

educational adequacy; functional equity; and Americans with Disabilities Act public access,<br />

program and renovations improvements. Also reviewed was a staff report on energy<br />

efficiency improvements for the top two priorities in the facility condition database.<br />

A summary of the approved use of surplus 2008 Bond Program contingency funds for<br />

systemic repairs and 2012-13 Annual Academic and Facilities Recommendations (AAFRs).<br />

An overview of District needs in the areas of Information Systems (Technology), Safety and<br />

Security (Life Safety Systems) and Transportation (regular, special education and activity<br />

buses).<br />

A demographic presentation by the City of <strong>Austin</strong> demographer that highlighted the top<br />

demographic trends impacting <strong>Austin</strong>.<br />

A demographic presentation of projected growth in regions of the District, with staff<br />

recommendations for capital improvements (i.e., new schools and additions that are<br />

projected to be needed in the next bond program to address growth).<br />

An economic forecast for the United States, Texas, and <strong>Austin</strong> for 2012 by an economist<br />

from the Federal Reserve Bank.<br />

A presentation by the District’s CFO on the state budget and school finance, A<strong>ISD</strong>’s tax rate<br />

and debt obligations, and bond election scenarios.<br />

The committee reviewed all of this information and staff responses to questions that arose during<br />

the process of reviewing the information presented. This activity set the stage for a discussion of<br />

the recommendation to the Superintendent on the need for establishing a Citizens’ Bond Advisory<br />

Committee (CBAC) to begin the development of the scope of work for a bond program.<br />

107


KEY CONSIDERATIONS<br />

Mr. Albert Hawkins and Mr. Richard Frazier began the first meeting of the CIBPAC on January 24,<br />

2012, with introductions of members, a review of the meeting schedule and a review of the charge.<br />

The business portion of the meeting began with a presentation on the history of how the committee<br />

was formed, and the responsibilities of the CIBPAC vs. a Citizens’ Bond Advisory Committee<br />

(CBAC). The CIBPAC is a Superintendent’s advisory committee. It was emphasized that the<br />

CIBPAC work needed to focus, after the committee completed its review of the information in the<br />

categories that were summarized in the previous section, on whether a bond program was needed,<br />

and if a CBAC needed to be organized at this time. The chairs led a review of the committee’s<br />

charge to ensure understanding of purpose.<br />

The chairs noted that the committee’s recommendation would be made to the Superintendent and<br />

subsequently presented to the Board of Trustees, and the Board would have the final authority<br />

regarding the creation of a CBAC. If appointed by the Board, the CBAC would be responsible for<br />

determining the scope of work for a bond program and assisting the district in the communication<br />

of factual information to the community about the scope of work approved by the Board of Trustees<br />

for a future bond election.<br />

Also, during the first meeting, the chairs introduced a proposed “Decision Framework”, which<br />

identified five key criteria in the form of guiding questions to assist in the development of<br />

recommendation to the Superintendent..These criteria are discussed in the “Key Findings” section<br />

below.<br />

For additional context, staff gave an overview of the last six successful bond elections and<br />

resulting bond programs approved by <strong>Austin</strong> voters. These elections occurred in 1983 ($210M),<br />

1990 ($80M), 1996 ($369.5M), 2002 ($49.3M), 2004 ($519.5M) and 2008 ($343.7M).<br />

Members of the CIBPAC were also provided with copies of both the Facility Master Plan<br />

Framework, which was approved by the Board on November 21, 2011, and the District’s Strategic<br />

Plan 2010-15. These guiding documents identify the important goals and strategies to which the<br />

District aligns its work.<br />

COMPREHENSIVE REVIEW OF FACILITY CONDITION DATA<br />

As outlined in A<strong>ISD</strong>’s Facility Master Plan (FMP) framework, on an annual basis, facilities<br />

information for each school and support facility in the District is collected, analyzed and updated.<br />

The campus and facilities administrators participate by validating this data annually as well.<br />

In September 2011, as part of the FMP Framework development process, campus and support<br />

facility administrators were asked to validate the information furnished to them by A<strong>ISD</strong>’s Office of<br />

Facilities. This validation regarded existing site and building system deficiencies that had been<br />

identified at their respective facilities. The total cost for addressing deficiencies was used in the<br />

calculation of a Facility Condition Index (FCI) for each school and facility. The FCI is a<br />

standardized rating metric, defined as a ratio of the cost of making restorative repairs to a facility,<br />

divided by the current replacement value (CRV) of that facility (FCI = Cost of Repairs / Current<br />

Replacement Value).<br />

108


The identified site and building system deficiencies were prioritized relative to their critical nature<br />

and the immediacy of their need for repair or replacement. The cost to rectify each deficiency was<br />

estimated, which, in addition to construction costs, included associated costs for design, permitting,<br />

and project management, as well as allowances for addressing unforeseen conditions and other<br />

contingencies.<br />

The collection and regular updating of this facilities data, and expressing the physical status of the<br />

facilities in terms of their Facilities Condition Index (FCI) are important tools to those engaged in<br />

the management of facilities. With this information, facilities managers are able to quantitatively<br />

measure the physical condition of their facilities, and compare their status, one to another, or to<br />

similar types of facilities of other entities (school districts, hospital systems, or other multi-facility<br />

enterprises).<br />

The total remedial cost for the prioritized site and building system deficiencies for each school and<br />

support facility, and their FCI ratings, were included in the spreadsheet furnished to the CIBPAC.<br />

Considering just the Priority 1 (currently critical) and Priority 2 (potentially critical needs to be<br />

corrected in one year), there are $342.5 million of these systemic repairs captured in the<br />

database. In the event a CBAC is created to plan a bond program, these needs and all the other<br />

facilities deficiencies included in this report would be evaluated and further prioritized by the CBAC<br />

in its final recommendation to the Superintendent and the Board of Trustees.<br />

Educational Specifications<br />

A<strong>ISD</strong> has developed and maintains a set of Educational Specifications for its elementary schools,<br />

middle schools and high schools. The Educational Specificiations describe the current standards<br />

for program areas, equipment needs, space requirements (square footage), and special<br />

considerations for new facilities. These documents must be periodically reviewed and revised over<br />

time by the District’s instructional leaders and operations staff to respond to changes in educational<br />

programming and instructional delivery.<br />

These Educational Specifications are the standards to which all existing schools are compared as<br />

the District seeks to identify any space deficiencies that prevent the effective delivery of essential<br />

instruction at a campus, or do not provide adequate support to the educational mission and<br />

operation of the school.<br />

Functional Equity<br />

Functional Equity (FE) is a reference to the evaluation and identification of those core areas<br />

(cafeterias, libraries, gymnasiums, and administrative space) and specialized classroom space<br />

(science classrooms, art classrooms, etc.) in existing schools that are appreciably deficient when<br />

compared to the requirements specified in the District’s current Educational Specifications (Ed.<br />

Specs.). The FE assessment exercise is conducted by the Facilities staff on a regular basis, as<br />

changes are made to the District’s Ed. Specs. and/or the District begins its planning process for a<br />

new capital improvements (bond) program, under which FE deficiencies have the opportunity to be<br />

addressed.<br />

In addition to identifying these space deficiencies, the FE assessment exercise includes the<br />

development of a physical design and cost estimate for eliminating these deficiencies and for<br />

109


achieving equitable improvements through an addition/renovation project. Although complete<br />

compliance with current Educational Specifications is not always possible, meaningful<br />

improvements can often be developed to achieve the maximum equitable solution on a school-byschool<br />

basis.<br />

The most current results of the Functional Equity assessment that was performed by the Office of<br />

Facilities, which included the identification of core and/or specialized classroom space deficiencies<br />

at each school, were included in the spreadsheet furnished to the CIBPAC. The total cost if all<br />

these FE deficiencies were addressed would be $125.9 million.<br />

Educational Adequacy<br />

As part of A<strong>ISD</strong>’s facility master planning process, during the summer of 2010, an assessment was<br />

conducted at each school to determine how well each facility was equipped to deliver the District’s<br />

instructional program. The assessment included the examination of each instructional space in<br />

each school for deficiencies, when compared to District-developed standards that had the potential<br />

for impairing the delivery of instruction. Eight criteria were used to perform the Educational<br />

Adequacy assessment: 1) Capacity; 2) Support for Programs; 3) Technology; 4) Supervision and<br />

Security; 5) Instructional Aids; 6) Physical Characteristics; 7) Learning Environment; and (8)<br />

Relationship of Spaces.<br />

Educational Adequacy deficiencies include: inadequate teacher storage space; inadequate marker<br />

board or bulletin board space in the classrooms; insufficient numbers or the lack of overhead<br />

projectors in the classrooms; and insufficient numbers of classroom electrical outlets. Educational<br />

Adequacy deficiencies that have been identified at each of the schools and support facilities were<br />

included in the spreadsheet furnished to the CIBPAC. The total cost to address all Educational<br />

Adequacy improvements would be $58.9 million.<br />

Americans with Disability Act (ADA) / Texas Accessibility Standards (TAS) Needs<br />

As part of the District’s Facility Condition Assessment initiative, an assessment was made for each<br />

school and support facility regarding its compliance with current Federal and State accessibility<br />

standards. These needs were placed in three categories: 1) Public – Those improvements that<br />

provide barrier-free access to exterior and interior public areas; 2) Program – Those improvements<br />

that provide barrier-free access to a specific instructional program space (for students) or<br />

workplace area for faculty and staff; and 3) Renovation – Those improvements that will be required<br />

to provide barrier-free access whenever major renovations are performed in the future, or the<br />

primary use of an area is altered.<br />

The “Public” ADA/TAS deficiencies are prioritized as “Priority 1” improvements in the facility<br />

condition assessment database, although they are not included in the FCI calculations. The<br />

“Program” and “Renovation” ADA/TAS deficiencies are not prioritized (or are listed as “Priority 5”),<br />

since the need for those improvements is only triggered by a future, time-uncertain event.<br />

The costs to address all “Public”, “Program” and “Renovation” ADA/TAS deficiencies that have<br />

been identified at each of the schools and support facilities were included in the spreadsheet<br />

furnished to the CIBPAC. The total for all identified ADA/TAS deficiencies is $199.8 million.<br />

110


SUMMARY OF USE OF SURPLUS 2008 BOND PROGRAM CONTINGENCY FUNDS<br />

On January 23, 2012, the Board of Trustees approved the use of surplus 2008 Bond Program<br />

contingency funds for critical renovations (budgeted at $10.7M), and for the implementation of four<br />

of the six Annual Academic and Facilities Recommendations (budgeted at $5.4M) that the Board of<br />

Trustees approved on December 12 and December 19, 2011, for a total of $16.1M. This<br />

information is provided since these investments now will reduce by $10.7 million the amount<br />

needed for systemic repairs, and $5.4 million for the AAFR renovations will avoid that bond<br />

expense in a future bond program.<br />

The critical renovation projects include HVAC equipment replacement and the installation of digital<br />

controls, the replacement of plumbing piping and fixtures, the replacement of electrical equipment<br />

and improvements to other electrical systems, roofing replacement work, the replacement of one<br />

elevator at a high school, the replacement of kitchen flooring in one elementary school, and the<br />

repair and replacement of water and sanitary sewer piping in the kitchens of several elementary<br />

schools. The proposed projects involve 34 schools and one support facility.<br />

The AAFR projects include:<br />

Relief of overcrowding to North Central elementary schools by 1) creating a Pre-K center at<br />

Dobie MS; 2) creating elementary classroom space at Webb MS; and 3) creating additional<br />

Pre-K capacity on the Reilly ES campus in a phased manner.<br />

Initiating an IDEA College Prep In-District Charter for the vertical team tracking to Eastside<br />

Memorial High School at the Johnston Campus by 1) preparing Allan ES to serve as a<br />

grade pre-K to 5 (phased) campus; and 2) preparing Eastside Memorial High School at the<br />

Johnston Campus to serve as a grade 6 through 12 (phased) campus.<br />

Making classroom space improvements at Lanier and Travis high schools for the<br />

implementation of a credit recovery program administered through Responsive Education<br />

Solutions.<br />

Creating Alternative Education Learning Support Centers at all secondary school<br />

campuses.<br />

A report and spreadsheet was provided to the CIBPAC that provided the location, details on the<br />

improvements, and the costs to implement each of the renovation projects, and a detailed<br />

description and cost of each of the AAFR projects.<br />

INFORMATION SERVICES, A<strong>ISD</strong> POLICE/SECURITY AND TRANSPORTATION<br />

Staff from Information Services, A<strong>ISD</strong> Police/Security and Pupil Transportation departments<br />

presented proposed needs for technology enhancements and maintenance, life safety and security<br />

improvements and new buses to replace older buses with more fuel efficient and lower emission<br />

vehicles.<br />

The information systems needs included: the completion of the rollout of Innovations Stations;<br />

replacement of teacher laptops, system desktops and printers; replacement of the voice mail<br />

system, PA system, generators, and projection systems in classrooms; upgrading instructional<br />

111


assessment systems; and wireless network infrastructure upgrades. The total need for Information<br />

Systems identified is $91.5M.<br />

The life safety and security needs included: fire alarm, fire sprinkler system and fire extinguisher<br />

cabinet upgrades; the installation of smoke detectors; intrusion system replacement; additional<br />

entry cameras to monitor areas requested by campus administrators; video server replacement;<br />

and district-wide radio and access alarm panel replacement. The total need for life safety and<br />

security needs is $34.9M.<br />

The Pupil Transportation Department requested 152 regular and special education buses in order<br />

to maintain a 14-year replacement cycle, 30 regular and special education buses to provide for<br />

population growth and/or programmatic changes and four additional athletic activity buses. The<br />

total need for the Transportation Department is $17.9M.<br />

PRESENTATION BY CITY OF AUSTIN DEMOGRAPHER: AUSTIN DEMOGRAPHIC<br />

TRENDS<br />

A presentation by the City of <strong>Austin</strong> demographer illustrated that the City of <strong>Austin</strong> experienced<br />

tremendous growth over the past decade, making it the 14 th<br />

largest city in the US, and the third<br />

fastest growing metropolitan area. The majority of the growth in the <strong>Austin</strong> metropolitan area<br />

(71%) occurred in suburban areas.<br />

The Hispanic population dominates overall growth in <strong>Austin</strong>, with significant gains in the Asian<br />

population. African American households are moving from urban to suburban areas.<br />

Changes to <strong>Austin</strong>’s age structure includes growth in baby boomers, seniors and the very young,<br />

(under 5), with the younger cohorts being overwhelmingly Hispanic and 45% of these children<br />

living in poverty.<br />

PRESENTATION BY A<strong>ISD</strong> PLANNING SERVICES: DEMOGRAPHIC TRENDS AND<br />

IMPLICATIONS FOR CAPITAL IMPROVEMENTS<br />

Following the demographer’s presentation, the committee was given information regarding how<br />

growth trends will affect the different regions of the district. By school year 2016-17, continued<br />

growth will be seen in the north central, northeast and southeast regions of the district. The<br />

combined capacity of the elementary schools in each of the aforementioned regions will continue<br />

to be stressed, with a percent of permanent capacity by the area population exceeding 125%.<br />

For middle schools the percent of permanent capacity by the area population in the northwest and<br />

southeast will exceed 125%, and range between 115% and 125%, respectively.<br />

High school percent of permanent capacity by the area population in the southeast and north<br />

central will exceed 125%, and range between 115% and 125%, respectively.<br />

In an effort to address this future population growth, staff recommended the following capital<br />

improvements:<br />

112


Seven elementary school classroom additions in the northwest, north central, northeast,<br />

southwest and southeast regions of the district, at a cost of $40,668,911;<br />

Two middle school classroom additions in the northwest and north central regions of the<br />

district, at a cost of $14,455,467;<br />

Four new elementary schools, one in the northeast and one in the southeast regions of the<br />

district, and two undesignated elementary schools, at a cost of $113,300,544;<br />

One new middle school in the southeast region of the district, at a cost of $57,933,333; and<br />

One new high school in the south region of the district, at a cost of $111,197,309.<br />

The total projected cost for these capital improvements would be $337,555,564M. The CIBPAC<br />

noted the importance of fully utilizing available capacity in order to postpone or eliminate the need<br />

for some of these improvements, if possible or where feasible.<br />

PRESENTATION BY ECONOMIST FROM THE FEDERAL RESERVE BANK: ECONOMIC<br />

FORECAST<br />

An economic forecast for the United States, Texas, and <strong>Austin</strong> for 2012 by an economist from the<br />

Federal Reserve Bank highlighted the following:<br />

The overall U.S. economy is recovering, although sluggishly, and residential construction<br />

and consumer spending is not the catalyst for the improvement, as it has been in the past.<br />

United States policy and European debt uncertainty are restraining growth. Fewer new<br />

homes are needed and consumers and governments need to pay down debt.<br />

The Texas economy is growing stronger than the nation, however, it is still at a moderate<br />

rate. In 2011, the energy, high-tech, and export industries contributed to a Texas job<br />

growth rate of 2.1% compared to a national job growth rate of 1.3%. The housing market in<br />

Texas is less of a drag than nationally. Private sector jobs increased from 2.5% in 2010 to<br />

3.1% in 2011. Sharp declines in government employment caused overall job growth to<br />

stagnate. In 2012, growth in energy and exports will slow while the areas of construction<br />

and government will improve. The projected job growth in Texas is expected to be at least<br />

2%.<br />

<strong>Austin</strong> saw job growth of 2.8% in 2011, with strong growth over 4% for the first half of the<br />

year with a decline to 1.5% in the second half. Slowing growth attributed to weaker exports<br />

and slowing of high tech. High tech is likely to improve in the second quarter of 2012, with<br />

the drivers being cloud computing, mobile devices and automobiles. High tech growth is<br />

constrained by a labor skill shortage. <strong>Austin</strong> job growth in 2012 likely to be about 3% or<br />

24,000 jobs.<br />

113


STATE BUDGET AND SCHOOL FINANCE, TAX RATE AND DEBT OVERVIEW AND<br />

BOND ELECTION SCENARIOS AND TAX RATE IMPACTS<br />

A<strong>ISD</strong>’s Chief Financial Officer presented information on the budget and school finance, a tax rate<br />

and debt overview, and possible bond election scenarios and tax rate impacts. A summary of<br />

important highlights in each area is provided below.<br />

State Budget and School Finance<br />

For the first time in 60 years, the legislature failed to finance current law. The Foundation Program<br />

current service state aid was decreased by $4 billion and Special Program financing was<br />

decreased by $1.3 billion. As a result, the total decrease was $5.3 billion when the cost of<br />

enrollment growth, property value decline and other factors are taken into account.<br />

The impact of state cuts and federal revenue losses on A<strong>ISD</strong>, was state revenue losses of $35.6<br />

million in FY 2011-12 and $25.1 million in FY 2012-13, for a total of $60.7 million and a loss of over<br />

$60 million in federal ARRA (stimulus) funding. An out year challenge, the elimination of Additional<br />

State Aid for Tax Relief (ASATR) by 2018, would cause another $150 million in lost revenue for<br />

A<strong>ISD</strong>.<br />

The state’s funding formula for school districts is determined by two “layered” systems:<br />

Foundation School Program formulas<br />

“Target revenue” system implemented in 2006 when school district M&O rates were<br />

compressed.<br />

This results in districts bearing increased costs unless the formulas increase. The benefit of<br />

increased property values goes to the state budget. The formula is based on outdated weights and<br />

indexes that haven’t been updated in over 20 years.<br />

Target revenue provides funding to school districts for tax revenue lost to rate compression in<br />

2006. This maintains revenue per Weighted Average Daily Attendance (WADA) equivalent to FY<br />

2006/2007 levels which means no revenue growth.<br />

Target revenue causes an inverse relationship between tax collections and state aid:<br />

Increase in tax collections creates more state aid and a decrease in recapture.<br />

Decrease in tax collection creates more state aid and a decrease in recapture.<br />

State aid/tax collection increase only if student enrollment grows or the tax rate is increased.<br />

<strong>Austin</strong> <strong>ISD</strong> is a Chapter 41 district (i.e., a district that is “property rich”) and is required under the<br />

current school finance system to redistribute funds to “property poor” districts. The <strong>Austin</strong> <strong>ISD</strong> has<br />

paid $1.4 billion to the state in Chapter 41 payments since 2000-01, including $135.2 million in<br />

FY12.<br />

Austerity planning has resulted in budget reductions of $14.6 million in FY10, $13.1 million in FY11<br />

and $39.7 million in FY12, for a total of $67.4 million. Budget development for FY13 has to<br />

consider the following:<br />

114


A state revenue loss of $60.7 million compared to the previous year.<br />

A loss of Federal Edujobs Revenue of $13.8 million.<br />

Escalating costs to maintain “same services” budget requires $11.1 million in additional<br />

costs for energy, fuel, healthcare, new school start-ups and enrollment growth.<br />

Staff compensation has been frozen, causing lost competiveness in teacher salaries<br />

compared to Texas Urban peers (11.3%) and Local peers (3.6%).<br />

Commitments to stabilize staff.<br />

Consider funding for strategic priorities.<br />

Challenge to identify additional budget balancing and savings options after exhausting<br />

solutions.<br />

Tax Rate and Debt Overview<br />

Property taxable values are on the rise after a decline in fiscal year 2011. The chart below<br />

illustrates the property taxable values over the past decade.<br />

$75.00<br />

$70.00<br />

$65.00<br />

$60.00<br />

$55.00<br />

$50.00<br />

$45.00<br />

$40.00<br />

$35.00<br />

$39.89 $42.07<br />

Overlapping Property Taxes<br />

$48.47<br />

$54.19<br />

$60.66<br />

$63.91 $61.60 $61.90<br />

$64.10 $65.90 $67.20<br />

FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015<br />

Property tax rates for fiscal year 2012 have been adopted by all taxing entities as of September 30,<br />

2012. Taxable value varies by taxing jurisdiction based on exemptions available through each<br />

entity, as shown on the charts below.<br />

115


A<strong>ISD</strong> Taxing Structure<br />

The M&O tax rate for A<strong>ISD</strong> has remained unchanged for the last four fiscal years. The I&S tax rate<br />

remained unchanged for six fiscal years until fiscal year 2011, when the rate increased due to a<br />

significant decline in assessed value.<br />

116


M&O Tax Ratification Elections (TRE)<br />

For 25 years, school districts were only required to hold rollback elections if the Board-adopted tax<br />

rate exceeded the calculated rollback tax rate. The district’s calculated rollback rate typically<br />

represented a small increase as it is intended to maintain existing revenue levels.<br />

In May 2006, the Texas Legislature passed House Bill 1 (HB 1), creating a target revenue system<br />

for funding school districts and adjusting the tax rate calculation process, as well. The state<br />

requires districts to compress maintenance tax rates at 1.00 and gives them the option of<br />

approving up to four cents of additional tax. To increase local property tax rates further, school<br />

boards need to adopt a higher rate and then submit the rate for voter approval at a tax ratification<br />

election (TRE). Failure to pass a TRE leaves school districts with the same tax rate as the prior<br />

year, not a slightly higher rate as was the case with the former rollback process. A<strong>ISD</strong> successfully<br />

passed a TRE in 2008 to increase its tax rate by 3.9 cents.<br />

Tax Rate Limitations<br />

Under the tax code, a school district’s M&O tax rates may not exceed the rate equal to the sum of<br />

$0.17 and the product of the state compression multiplied by $1.50. The state compression<br />

percentage is currently 66.67 percent, so the M&O rate limit for most school districts is $1.17.<br />

A school district also may adopt a rate up to $0.50 for “new” debt plus a rate for “old” debt. “New”<br />

debt is debt authorized after April 1, 1991, and issued after September 1, 1992; “old” debt is debt<br />

authorized prior to those dates.<br />

117


Maintenance & Operations Tax Rate<br />

As shown in the chart below, .A<strong>ISD</strong> has the second lowest property tax rate in Central Texas<br />

during fiscal year 2012.<br />

$1.60<br />

$1.40<br />

$1.20<br />

$1.00<br />

$0.80<br />

$0.60<br />

$0.40<br />

$0.20<br />

Eanes<br />

<strong>ISD</strong><br />

<strong>Austin</strong><br />

<strong>ISD</strong><br />

Lake<br />

Travis<br />

Round<br />

Rock<br />

Hays<br />

C<strong>ISD</strong><br />

Pfluger<br />

ville<br />

<strong>ISD</strong><br />

Bastro<br />

p <strong>ISD</strong><br />

Leande<br />

r <strong>ISD</strong><br />

Manor<br />

<strong>ISD</strong><br />

Del<br />

Valle<br />

<strong>ISD</strong><br />

I&S $0.17 $0.16 $0.27 $0.29 $0.42 $0.44 $0.44 $0.45 $0.47 $0.49<br />

M&O $1.04 $1.07 $1.04 $1.04 $1.04 $1.04 $1.04 $1.04 $1.04 $1.04<br />

118


Historical Tax Burden of A<strong>ISD</strong> Tax Rule<br />

Revenue from Remaining M & O Pennies<br />

A<strong>ISD</strong> Outstanding Debt<br />

A<strong>ISD</strong> has a remaining Bond authorization of $229,308,189. The highest estimated tax rate for<br />

remaining authorization is 0.1865.<br />

A<strong>ISD</strong> is the only school district in the state with a Commercial Paper program, which saved an<br />

estimated $5.8M in fiscal year 2011 alone.<br />

Notes: A<strong>ISD</strong> Commercial Paper debt is<br />

refunded annually. School districts are<br />

prohibited from issuing certificates of<br />

obligation.<br />

119


Overview of Commercial Paper<br />

<strong>Austin</strong> <strong>ISD</strong> has a $150M Commercial Paper (CP) program to utilize for the Bond Funds. When the<br />

outstanding CP grows to a level of $75M – analysis begins to convert to long-term debt.<br />

Advantages to District include:<br />

Construction delays are effectively managed with “just in time” borrowing.<br />

Short–term CP borrowing rates have been extremely low, currently .11%, close to the<br />

investment pool rates.<br />

Analysis for last year was an interest savings of $5.8M over straight coupon bonds.<br />

Bond Elections Scenarios and Tax Rate<br />

Recent Election History<br />

Bond Election<br />

The Citizens’ Bond Advisory Committee is comprised of various community members who make<br />

the recommendation to the Board on the Scope of Work for the potential bond. A<strong>ISD</strong> Board of<br />

Trustees must approve the order calling the election, the legal document that formalizes the scope<br />

of work for the bond program, at least 60 days prior to the election. Groundwork for a May 2013<br />

election is expected to commence in January 2012 if a CBAC is formed to plan for a bond election<br />

at that time.<br />

120


Tax Ratification Election (TRE)<br />

Intrinsically tied to the budget development process (September - August)<br />

Board adopts tax rate at proposed higher rate and then takes action to call for the election<br />

(June/August)<br />

Hypothetical Impact to Tax rate<br />

Assumptions:<br />

Appraisal Growth of 1.50% per year<br />

Estimated 5% interest rate on bonds<br />

Issue $100mm in 2013<br />

Issue $129.3 in 2014<br />

Issue $70M 2015<br />

Build America Bond subsidy from Series 2010 applied to interest costs<br />

Limited Information on Other Jurisdictional Planning<br />

City: Possibility of Bond Election November 2012; M&O Increase – TBD<br />

County: Recently approved Bond Election November 2011; M&O Increase of 3%<br />

ACC: Possible Bond Election in 2013 or 2014 M&O Increase – TBD<br />

Healthcare: No information to date<br />

A<strong>ISD</strong>: Possible Bond Election in 2013; M&O increase – Possible TRE in November 2012<br />

or May/November 2013<br />

121


KEY FINDINGS<br />

At the February 21, 2012, meeting of the CIBPAC, the committee chairs, Mr. Albert Hawkins and<br />

Mr. Richard Frazier, led the group in a discussion of five key questions from the “Decision<br />

Framework”, which included:<br />

1. Does the District have major capital improvement needs that are unfunded?<br />

2. Is it urgent to address these needs in the short term?<br />

3. Does the amount of funding needed require longer-term financing?<br />

4. Is there sufficient capacity to incur additional long-term debt?<br />

5. Do economic and community indicators seem favorable to a bond election?<br />

During the course of the discussion, several members expressed agreement that the District did<br />

have major capital improvement needs that need to be addressed, and that these needs would<br />

best be funded through a bond program. Taking advantage of the current low interest rates, the<br />

importance of using capital investments instead of maintenance and operations funding, the<br />

effective practice of managing bond debt with the use of a commercial paper strategy to reduce<br />

costs, and the consequences of delays on addressing pressing facilities needs were all points<br />

made in support of a decision to proceed with the formation of the Citizens’ Bond Advisory<br />

Committee (CBAC).<br />

Several members raised other issues that they felt needed to be acknowledged, if not addressed<br />

by the CIBPAC. These collateral issues included:<br />

The need for a robust education program to help the public and taxpayers understand:<br />

o The need for a bond program, including how student learning will be supported and<br />

improved, and how each school will benefit from the program.<br />

o The impact of the school finance system on the district’s budget.<br />

o The effect of the authorization of additional bonding authority on the property tax<br />

rate.<br />

o The impact of both a tax ratification election and a bond election on property tax<br />

rates, and possible taxpayer fatigue.<br />

o The challenge of funding capital improvements from the maintenance and<br />

operations budget.<br />

The importance of addressing the efficient use of existing available capacity and related<br />

issues such as boundary changes, transfers, and the repurposing of schools.<br />

The importance of emphasizing the District’s successes, including its effective management<br />

of resources as the bond program is being presented to the community.<br />

The need to assess the level of community support for a bond election.<br />

At the CIBPAC’s final meeting on March 21, 2012, CIBPAC members discussed and voted to<br />

include two additional areas that they wanted to have considered for additional attention and study.<br />

These areas were:<br />

A long-range plan for the improvement of A<strong>ISD</strong> athletic facilities; and<br />

The location of the South High School.<br />

122


RECOMMENDATION<br />

The CIBPAC held its final meeting on March 21, 2012. The committee convened to discuss the<br />

March 5, 2012, presentation at the Board Work Session, identify any additional observations to be<br />

included in this report, and affirm the recommendation of the CIBPAC to the Superintendent.<br />

Members were thanked for their service by co-chairs Mr. Richard Frazier and Mr. Albert Hawkins,<br />

and on behalf of A<strong>ISD</strong> by Chief Operations Officer, Mr. Lawrence Fryer.<br />

During the course of the committee’s work, members considered the following information and<br />

related data:<br />

Conditions of schools and other district facilities<br />

Facility equity<br />

Strategic priorities<br />

Current and projected growth<br />

School overcrowding and under-utilization<br />

New or expanded academic program offerings<br />

Student transportation<br />

Technology<br />

Health and safety<br />

Resource conservation and environmental protection<br />

Community and regional plans<br />

Future bond programs<br />

Other areas as may be directed by the Superintendent<br />

After these discussions, the members of the CIBPAC voted unanimously to recommend to the<br />

Superintendent the creation of a Citizens’ Bond Advisory Committee to begin the process of<br />

developing the scope of work for a future bond program. The Superintendent’s recommendation to<br />

the Board of Trustees is scheduled for the regular Board of Trustees meeting on March 26, 2012.<br />

123


7<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

124


<strong>Austin</strong> Independent School District<br />

Proposed 2004 Bond (CBAC Recommendations of March 29, 2004)<br />

Category Number Factor Total<br />

Renovations & Additions<br />

Elementaries 74 with 8 Additions incl. 90,298,918<br />

Middle Schools 15 with 1 Addition incl. 41,051,112<br />

High Schools 12 with 1 Addition incl. 51,138,830<br />

Other Schools 3 incl. 3,549,000<br />

Support Facilities 6 incl. 6,784,372<br />

Athletic Reno 3 incl. 3,600,900<br />

Transportation (New & Reno) 3 incl. 7,675,000<br />

Temporary Facilities incl. 300,000<br />

New Schools<br />

Elementary with 32 Classrooms 4 16,566,253 incl. 66,265,012<br />

Elementary with 40 Classrooms 1 18,317,473 incl. 18,317,473<br />

Middle 1 32,441,738 incl. 32,441,738<br />

Departments<br />

Elementary PE (Cov'r'd Slabs) 74 29,730 incl. above<br />

Athletics ($8,994,200 Task Force - reno above) incl. 8,994,200<br />

Transportation (includes $12,000,000 for buses, incl. 12,325,000<br />

& $325,000 for site acquisition - reno & new Term above)<br />

Technology ($10,450,000, with no funds for purchase of computers) 1.176 12,289,200<br />

Safety/Security/Tech Support (card access, CCTV, fire alarms 1.4 19,000,000<br />

at $16,000,000) Safety & Security Committee (at $3,000,000)<br />

Media Services (includes $700,000 for digital equipment) incl. 1,088,500<br />

Libraries (not included with individual school's needs) 2,500,000<br />

Food Service (included with individual school's needs) 0<br />

Construction Management (expansion of computerized N/A 375,000<br />

facility management system)<br />

Sub Total 377,994,255<br />

Land Acquisition<br />

One (1) future MS site, SW 1 3,000,000 3,000,000<br />

One (1) bus terminal site 1 13 acres see above 0<br />

(one for a "third" base)<br />

Legal (Bond Counsel/Bond Issuance Expenses) 1,000,000<br />

Asbestos/Hazardous Material Abatement 2,000,000<br />

Net Value of Principals' Comments above<br />

Sub Total 383,994,255<br />

Program Contingency 36,386,778<br />

Total 420,381,033<br />

125


<strong>Austin</strong> Independent School District<br />

Proposed 2004 Bond (CBAC Recommendations of March 29, 2004 and May 3, 2004)<br />

Category Number Factor Total<br />

Renovations & Additions<br />

Elementaries 74 with 8 Additions incl. 90,298,918<br />

Middle Schools 15 with 1 Addition incl. 41,051,112<br />

High Schools 12 with 1 Addition incl. 51,138,830<br />

HS Fine Arts Additions at 2 HSs 1,030,000<br />

HS Science Additions/Reno at 6 HSs 6,321,840<br />

Other Schools 3 incl. 3,549,000<br />

Support Facilities 6 incl. 6,784,372<br />

Athletic Reno 3 incl. 3,600,900<br />

Transportation (New & Reno) 3 incl. 7,675,000<br />

Temporary Facilities incl. 300,000<br />

New Schools<br />

Elementary with 32 Classrooms 4 16,566,253 incl. 66,265,012<br />

Undesignated Elementary 1 16,566,253 incl. 16,566,253<br />

Elementary with 40 Classrooms 1 18,317,473 incl. 18,317,473<br />

Middle 1 32,441,738 incl. 32,441,738<br />

Departments<br />

Partial Funding for District-Wide PAC 7,000,000<br />

Elementary PE (Cov'r'd Slabs) 74 29,730 incl. above<br />

Athletics ($8,994,200 Task Force - reno above) incl. 8,994,200<br />

Transportation (includes $12,000,000 for buses, incl. 12,325,000<br />

& $325,000 for site acquisition - reno & new Term above)<br />

Technology ($10,450,000, with no funds for purchase of computers) 1.176 12,289,200<br />

Safety/Security/Tech Support (card access, CCTV, fire alarms 1.4 19,000,000<br />

at $16,000,000) Safety & Security Committee (at $3,000,000)<br />

Media Services (includes $700,000 for digital equipment) incl. 1,088,500<br />

Libraries (not included with individual school's needs) 2,500,000<br />

Food Service (included with individual school's needs) 0<br />

Construction Management (expansion of computerized N/A 375,000<br />

facility management system)<br />

Sub Total 408,912,348<br />

Land Acquisition<br />

One (1) undesignated ES site 933,747<br />

One (1) future MS site, SE 1,500,000<br />

One (1) future MS site, SW 1 3,000,000 3,000,000<br />

One (1) bus terminal site 1 13 acres see above 0<br />

(one for a "third" base)<br />

Legal (Bond Counsel/Bond Issuance Expenses) 1,000,000<br />

Asbestos/Hazardous Material Abatement 2,000,000<br />

Net Value of Principals' Comments above<br />

Sub Total 417,346,095<br />

Program Contingency (March 29, 2004) 36,386,778<br />

Additional Program Contingency Caused by Increased Total 5,347,832<br />

Total 459,080,705<br />

126


Item Projected Budget<br />

I. Relief for Overcrowding/Growth<br />

1. Barrington eight-classroom addition $4,313,318<br />

2. Hart ES eight-classroom addition $4,442,242<br />

3. Langford ES eight-classroom addition $4,367,607<br />

4. Undesignated Elementary School $25,168,951<br />

5. Undesignated Elementary School land acquisition $2,574,880<br />

SUBTOTAL $40,866,998<br />

II. Academic Achievement<br />

1. High school science laboratory additions/renovations to meet new science<br />

requirements<br />

Additional Projects by Board of Trustees<br />

District-wide Performing Arts Facility and Land Acquisitions $40,000,000<br />

Land Acquisition for South High School $32,000,000<br />

Classroom Addition and Fine Arts Renovation at Anderson High School $10,000,000<br />

Linder Elementary School Early Childhood Center $21,600,000<br />

Land Acquisition for Linder Elementary School Early Childhood Center* $2,400,000<br />

$36,338,317<br />

2. Technology Services (See attached document, “Technology Requests”) $69,850,000<br />

SUBTOTAL $106,188,317<br />

III. Health and Safety<br />

1. Campus cafeteria kitchen renovations required by the Health Department $1,852,787<br />

2. Menchaca Elementary internal roadway $826,836<br />

SUBTOTAL $2,679,623<br />

IV. Environmental Improvements<br />

1. Purchase of low-emission school buses $12,205,600<br />

2. Capacitor bank installation to improve power factor and balance electric<br />

power demand for all facilities<br />

$14,569,913<br />

SUBTOTAL $26,775,513<br />

V. Renovations and Upgrades to Protect Taxpayers’ Investments<br />

1. Critical renovations at various campuses (See attached document, “Critical<br />

Renovations”)<br />

2. Additional projects -submitted by principals and various district-wide<br />

departments (See attached document, “Critical Renovations”)<br />

$31,455,145<br />

$18,181,251<br />

NOT FUNDED<br />

3. Upgrade of payroll software $1,045,000<br />

4. Funding option to repair/replace cold-storage warehouse $6,207,300<br />

SUBTOTAL $56,888,696<br />

GRAND TOTAL $233,399,147<br />

127


*Initially, 2008 CBAC members recommended an eight-classroom addition to<br />

provide relief for Linder Elementary School; however, after further consideration of<br />

the overcrowding in this area of this district, the committee opted for the Board of<br />

Trustees to address this issue and to develop a resolution.<br />

128


8<br />

<br />

<br />

Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

129


May 7, 2012<br />

Dear Principals,<br />

On March 26, 2012, the Board of Trustees approved the creation of a Citizens’ Bond<br />

Advisory Committee (CBAC) after receiving the Superintendent’s recommendation that<br />

the District has major capital improvement needs that should be addressed, and that<br />

these needs would best be funded through a bond program. This recommendation<br />

was based on the Superintendent’s close work with the Capital Improvement and Bond<br />

Planning Advisory Committee (CIBPAC), which met from January through March 2012.<br />

As the District works toward finalizing the creation of the CBAC, with guidance provided<br />

by the Board on the full extent of the Committee’s responsibilities and the timing and<br />

process for the next bond election, the Office of Facilities is engaged in its annual<br />

process of verifying and updating the facilities needs of each campus and support<br />

facility across the District.<br />

Last September 2011, the Office of Facilities asked you to participate in the data<br />

verification process for your campus, relative to the existing site and building system<br />

facility deficiencies that had been identified at you school. This process helped the<br />

District accurately delineate existing facilities deficiencies that existed at each campus,<br />

and provided the user-based input that was necessary to produce an accurate,<br />

standardized facility condition rating system for the District, expressed as a Facility<br />

Condition Index (FCI) rating for each facility.<br />

While last September’s efforts were concentrated on accurately identifying deficiencies<br />

to existing site and building systems (roofs, air-conditioning systems, site drainage<br />

issues, etc.), this current effort, the Individual School Facility Planning process, with<br />

which the Office of Facilities now needs your assistance, is focused on the identification<br />

of space deficiencies and missing support elements (marker boards, tack boards,<br />

overhead projectors and similar instructional support features) that are impediments to<br />

the successful delivery of the educational programs in your school.<br />

The Office of Facilities and the Construction Management Department have created an<br />

“Individual Campus Plan Planning Guide” for each school, to help identify critical<br />

instructional and support space deficiencies, and other missing instructional support<br />

elements. Beginning the week of May 14, a project manager from the Construction<br />

Management Department will be contacting each school principal to set up an initial 30-<br />

to 45-minute meeting to orient you to the Individual School Facility Planning process.<br />

The project manager will provide you with a copy of the planning guide that was<br />

developed for your school, explain its purpose and use, and offer any other level of<br />

assistance you might need in identifying your campus’s space needs.<br />

130


The Citizens’ Bond Advisory Committee (CBAC) will begin meeting in June to start its<br />

process of reviewing the District’s many facilities needs. The timeline for the Committee<br />

to begin reviewing campus space needs is late September or early October. To support<br />

this effort, we need to have all campus input relative to space deficiencies collected,<br />

verified and compiled in a standardized manner by mid-September. Consequently, we<br />

are requesting that you return the completed planning guide survey forms for your<br />

school no later than September 9, 2012. The Construction Management Department’s<br />

project managers will be available to assist you over the next 3-1/2 months. Although<br />

you may not have the usual access to your school’s Campus Advisory Council (CAC)<br />

during the summer months, we are hopeful that you will be able to engage one or two of<br />

its members in this Individual School Facility Planning process to enable that<br />

perspective to be gained.<br />

We thank you in advance for your help with this effort. We want to be able to provide a<br />

comprehensive and accurate picture of all the District’s facilities needs as the CBAC<br />

begins its deliberations over the scope of work. After the CBAC completes its close<br />

examination of the district-wide and individual campus facility needs, it will develop a<br />

scope of work that will eventually be recommended to the Superintendent, and<br />

ultimately the Board of Trustees for inclusion in the next A<strong>ISD</strong> capital improvement bond<br />

program.<br />

If you have any questions about this request, please contact Mr. Paul Turner, the<br />

Executive Director of Facilities, at 414-2667, or Mr. Curt Shaw, Director of the<br />

Construction Management, at 414-1715.<br />

Sincerely,<br />

Lawrence Fryer<br />

Chief Operations Officer<br />

131


132


133


134


135


136


137


138


139


140


141


142


143


144


145


146


147


148


149


150


151


152


153


154


155


156


157


158


159


160


161


162


163


164


165


166


167


168


169


170


171


172


173


174


175


176


177


178


179


180


181


182


183


184


185


186


187


188


189


190


191


192


193


194


195


196


197


198


199


Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

200


Disaggregation of Previous Bond Programs<br />

Type of Improvement 1983 -­‐ $210M 1990 -­‐ 1996 -­‐ $369.5M<br />

BOND PROGRAMS<br />

2002 –<br />

2004 –<br />

2008 –<br />

$80M<br />

$49.3M $519.5M<br />

$343.7M<br />

New School<br />

Construction and Site<br />

Acquisition<br />

$134.5M $40.0M $128.6M __ $190.1M $87.7M<br />

Other New<br />

Construction/<br />

Additions<br />

__ $5.6M $53.7M __ $14.5M $52.2M<br />

Classroom Additions $34.0M $3.9M $15.9M __ $30.3M $13.2M<br />

Renovations<br />

District-­‐wide Facilities<br />

$29.1M $30.0M $125.8M $49.1M $187.6M $92.8M<br />

$10.8M __ $45.5M __ $73.5M $97.8M<br />

Renovations for<br />

Special<br />

Education,<br />

Athletics,<br />

Transportation<br />

and Food<br />

Service<br />

Renovations/Additions<br />

for Security, Technology,<br />

ADA, Building Energy<br />

Management Systems<br />

(BEMS)<br />

Renovations/Additions<br />

for Technology, Safety<br />

and Security, Low-­‐<br />

Emission Buses,<br />

Hazardous Material<br />

Abatement, Athletics,<br />

Joint-­‐Use Facilities,<br />

Administrative Facilities,<br />

Bus Terminals,<br />

Elementary Physical<br />

Education (Playslab<br />

Covers)<br />

Renovations/Additions<br />

for Technology, Low-­‐<br />

Emission Buses, Power<br />

Factor Correction<br />

Capacitors, Payroll<br />

Software<br />

201


Response to requests for information arising from the June 5, 2012 meeting of the<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

1<br />

<br />

<br />

202


May<br />

2012<br />

05/21/12<br />

Appointment of<br />

CBAC<br />

CITIZENS’ BOND ADVISORY COMMITTEE (CBAC): 2013 BOND PROGRAM<br />

TIMELINE, ACTIVITIES AND MILESTONES FOR ELECTION IN MAY 2013<br />

05/29/12 – 10/19/12<br />

May –<br />

October 2012<br />

05/29/12<br />

CBAC<br />

organizational<br />

meeting<br />

CBAC studies demographic, facility needs<br />

assessment and other pertinent information<br />

and develops the preliminary 2013 Bond<br />

Program scope of work for community review<br />

Board work session CBAC progress reports<br />

are scheduled for August 13 and October 8,<br />

2012<br />

10/23/12 & 10/25/12<br />

CBAC holds public<br />

forums for<br />

community comment<br />

on preliminary 2013<br />

Bond Program scope<br />

of work<br />

10/30/12<br />

CBAC meets to revise<br />

scope of work<br />

recommendations in<br />

preparation for<br />

presentation to the<br />

Board<br />

November<br />

2012<br />

11/13/12<br />

CBAC presents the<br />

recommended 2013<br />

Bond Program scope<br />

of work to the Board of<br />

Trustees and<br />

Board members<br />

accept the work of the<br />

CBAC or request<br />

additional follow-up<br />

December<br />

2012<br />

12/10/12<br />

CBAC reports to<br />

the Board on<br />

revision of<br />

recommendations<br />

if indicated and<br />

Board of Trustees<br />

accepts CBAC<br />

report<br />

January 2013<br />

1/14/13<br />

Board of<br />

Trustees holds<br />

work session<br />

on 2013 Bond<br />

Program<br />

proposal<br />

01/17/13 & 01/22/13<br />

Board of Trustees<br />

holds public forums<br />

on proposed 2013<br />

Bond Program, if<br />

desired<br />

February 2013<br />

02/11/13<br />

Board of Trustees<br />

holds work session<br />

to finalize the 2013<br />

Bond Program<br />

scope of work<br />

02/25/13<br />

Board adopts the<br />

Order Calling the<br />

Election for the<br />

2013 Bond<br />

Program<br />

February –<br />

May 2013<br />

02/26/13 – 5/10/13<br />

Citizens’ Committee<br />

conducts campaign<br />

05/11/13<br />

Bond election is held<br />

203


September<br />

2012<br />

09/24/12<br />

Appointment of<br />

CBAC<br />

CITIZENS’ BOND ADVISORY COMMITTEE (CBAC): 2014 BOND PROGRAM<br />

TIMELINE, ACTIVITIES AND MILESTONES FOR ELECTION IN MAY 2014<br />

October 2012 –<br />

October 2013<br />

10/01/12<br />

CBAC<br />

organizational<br />

meeting<br />

10/01/12 – 10/18/13<br />

CBAC studies demographic, facility needs<br />

assessment and other pertinent<br />

information and develops the preliminary<br />

2014 Bond Program scope of work for<br />

community review<br />

Board work session CBAC progress<br />

reports are scheduled for February 11,<br />

April 8, June 10, and September 9, 2013<br />

10/22/13 & 10/24/13<br />

CBAC holds public<br />

forums for<br />

community comment<br />

on preliminary 2014<br />

Bond Program scope<br />

of work<br />

10/29/13<br />

CBAC meets to revise<br />

scope of work<br />

recommendations in<br />

preparation for<br />

presentation to the<br />

Board<br />

November<br />

2013<br />

11/12/13<br />

CBAC presents the<br />

recommended 2014<br />

Bond Program scope<br />

of work to the Board of<br />

Trustees and<br />

Board members<br />

accept the work of the<br />

CBAC or request<br />

additional follow-up<br />

December<br />

2013<br />

12/09/13<br />

CBAC reports to<br />

the Board on<br />

revision of<br />

recommendations<br />

if indicated and<br />

Board of Trustees<br />

accepts CBAC<br />

report<br />

January 2014<br />

1/13/14<br />

Board of<br />

Trustees holds<br />

work session<br />

on 2014 Bond<br />

Program<br />

proposal<br />

01/16/14 & 01/21/14<br />

Board of Trustees<br />

holds public forums<br />

on proposed 2014<br />

Bond Program, if<br />

desired<br />

February 2014<br />

02/10/14<br />

Board of Trustees<br />

holds work session<br />

to finalize the 2014<br />

Bond Program<br />

scope of work<br />

02/24/14<br />

Board adopts the<br />

Order Calling the<br />

Election for the<br />

2014 Bond<br />

Program<br />

February –<br />

May 2014<br />

02/25/14 – 5/10/14<br />

Citizens’ Committee<br />

conducts campaign<br />

05/10/14<br />

Bond election is held<br />

204