and maintains an open dialog with the FRCC on reliability matters affecting the state. The<br />

<strong>Commission</strong> will continue to work closely with the FRCC, NERC, and FERC to guarantee the<br />

adequacy and reliability <strong>of</strong> Florida’s electric grid.<br />

FRCC Transmission Planning Process<br />

One <strong>of</strong> the benefits attributed to the formation <strong>of</strong> a regional transmission organization (RTO)<br />

is centralized, coordinated transmission planning. In April 2006, the <strong>Commission</strong> closed a lengthy<br />

investigation into the prudence <strong>of</strong> forming an RTO, known as GridFlorida, because the RTO did not<br />

appear to be cost-effective. The <strong>Commission</strong> directed Peninsular Florida’s utilities to coordinate their<br />

transmission planning activities through the FRCC in an effort to capture some benefits <strong>of</strong> an RTO.<br />

The FRCC’s transmission planning process is expected to yield a more complete transmission<br />

expansion plan from a peninsular perspective. The process will make sure that the reliability<br />

standards and criteria established by the NERC and the FRCC are met and will use the specific design,<br />

operating, and planning criteria employed by Peninsular Florida transmission owners. The<br />

<strong>Commission</strong> staff continues to participate in the FRCC’s meetings on transmission planning. The<br />

<strong>Commission</strong> will continue to monitor coordinated planning efforts by Florida’s utilities and, if<br />

necessary, will exercise its Grid Bill authority to ensure the adequacy and reliability <strong>of</strong> Florida’s<br />

transmission system.<br />

The FRCC performs a long range, ten-year study, as well as a study <strong>of</strong> the interface between<br />

Florida and the Southern Company (Southern). Sensitivity studies test the robustness <strong>of</strong> Peninsular<br />

Florida’s transmission system under various conditions and are performed within both studies.<br />

Examples <strong>of</strong> the sensitivities studied are as follows:<br />

• Transmission and/or generation facilities unavailable due to scheduled and/or forced outages<br />

• Weather extremes for summer and winter periods<br />

• Different load levels (e.g., 100-, 80-, 60-, and 40 percent) and/or seasons <strong>of</strong> the year<br />

• Various generation dispatches that will test or stress the transmission system<br />

• Reactive supply and demand assessment (generator reactive limits and power factor)<br />

• Specific areas <strong>of</strong> combination/cluster <strong>of</strong> generation and load serving capability among various<br />

transmission owners/providers in the FRCC that continually experience or are expected to<br />

experience significant congestion<br />

• Other scenarios or system conditions, such as stability analysis<br />

Consistent with the FRCC transmission planning process, these sensitivity studies will not<br />

necessarily call for the construction <strong>of</strong> transmission facilities identified in the studies, but will furnish<br />

insight into how robust the planned transmission system is expected to be.<br />

<strong>Review</strong> <strong>of</strong> <strong>2008</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong> <strong>Plans</strong> - 36 -