Based upon other utility filings and actions subsequent to the filing <strong>of</strong> the <strong>2008</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong><br />

<strong>Plans</strong>, approximately 5,000 MW <strong>of</strong> planned capacity may be delayed beyond 2017. TECO has<br />

withdrawn its RFP for a 555 MW combined cycle generator planned for 2013. Similarly, GULF has<br />

withdrawn its RFP for a 840 MW combined cycle generator planned for 2013. FPL’s repowering <strong>of</strong><br />

existing units has led to the deferral <strong>of</strong> a 1,219 MW combined cycle unit which was planned for 2014.<br />

Recent information filed in FPL testimony indicated that both 1,219 MW combined cycle units<br />

planned for 2016 are no longer part <strong>of</strong> FPL’s plans. Utilities have cited declining peak demand and<br />

energy projections as one reason for the recent changes. Table 12 below summarizes the utilities’<br />

proposed capacity additions as listed in the <strong>2008</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong> <strong>Plans</strong> which will require a<br />

determination <strong>of</strong> need. Units which may be deferred are shown in BOLD ITALIC CAPS.<br />

Table 12. Proposed Units Requiring a Determination <strong>of</strong> Need<br />

Utility Generating Unit Name<br />

<strong>Review</strong> <strong>of</strong> <strong>2008</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong> <strong>Plans</strong> - 28 -<br />

Fuel<br />

Type<br />

Summer<br />

Capacity<br />

(MW)<br />

In-<strong>Service</strong><br />

Date<br />

PEF Suwannee NG 1,159 Jun-13<br />

TECO POLK UNIT 6 NG 555 JAN-13<br />

TECO Future NG 555 Jan-17<br />

FPL UNSITED CC NG 1,219 JUN-14<br />

FPL UNSITED CC NG 1,219 JUN-16<br />

FPL UNSITED CC NG 1,219 JUN-16<br />

GULF UNLOCATED UNIT NG 840 JUN-13<br />

Total Capacity Per <strong>2008</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong> <strong>Plans</strong> 6,766<br />

TOTAL CAPACITY WHICH MAY BE DEFERRED BEYOND 2017 5,052