FPL, in response to a staff data request, identified other facilities that are potentially capable <strong>of</strong><br />

conversion. Table 9 below summarizes FPL’s response.<br />

Table 9. Fossil Steam Facilities to Consider for Conversion<br />

Plant Name Capacity (MW) Respective In-<strong>Service</strong> <strong>Year</strong><br />

Cutler Units 5 & 6 0,205 1954 & 1955<br />

Manatee Units 1 & 2 1,638 1976 & 1977<br />

Martin Units 1 & 2 1,678 1980 & 1981<br />

Port Everglades Units 1, 2, 3, & 4 1,219 1971<br />

Sanford Unit 3 0,138 1959<br />

Turkey Point Units 1 & 2 0,788 1967 & 1968<br />

Total Capacity 6,672<br />

PEF is in the process <strong>of</strong> completing the Bartow Repowering Project which is scheduled to be<br />

completed in June 2009. The project consists <strong>of</strong> replacing 444 MW <strong>of</strong> oil-fired steam generation with<br />

a new 1,159 MW natural gas-fired combined cycle unit. PEF is in the process <strong>of</strong> considering a similar<br />

project at its Suwannee Station which will replace 129 MW <strong>of</strong> oil-fired steam generation with a new<br />

1,159 MW natural gas-fired combined cycle unit. PEF is currently conducting a request for proposal<br />

process for the Suwannee new combined cycle unit which is scheduled to be in-service in 2013.<br />

When considering the addition <strong>of</strong> supply-side generation, Florida’s electric utilities must<br />

consider many environmental, economic, and reliability issues. The modernization <strong>of</strong> existing units<br />

plays a key role in addressing each <strong>of</strong> these issues. Such projects may require the temporary removal<br />

<strong>of</strong> existing units, thus impacting reliability until the completion <strong>of</strong> the modernization. Utilities should<br />

continue to explore potential conversion projects and report the feasibility <strong>of</strong> each conversion in next<br />

year’s <strong>Ten</strong> <strong>Year</strong>-<strong>Site</strong> <strong>Plans</strong>.<br />

Traditional Energy Generation and a Balanced Fuel Supply<br />

Prior to the late 1970s, Florida’s utilities used oil as the primary fuel source for generating<br />

electricity. Following the dramatic increase in oil prices in the 1970s, Florida’s utilities made a<br />

concerted effort to add generating units that used solid fuels. One early response was the purchase <strong>of</strong><br />

economical “coal-by-wire” from the Southern Company, which had a temporary surplus <strong>of</strong> coal-fired<br />

generation resources already constructed. The <strong>Commission</strong> supported the utilities’ efforts to maintain<br />

fuel diversity with regulatory programs such as the Oil Backout Cost Recovery Factor, which gave<br />

utilities an incentive to recover costs <strong>of</strong> converting from oil-based generation, and the Energy Broker,<br />

a computerized system which matched buyers and sellers <strong>of</strong> economy energy to minimize the real<br />

time fuel costs <strong>of</strong> the participating utilities.<br />

Prior to Congressional repeal <strong>of</strong> the Power Plant and Industrial Fuel Use Act in 1987, natural<br />

gas demand had declined substantially because <strong>of</strong> restrictions on its usage as a boiler utility fuel.<br />

These restrictions contributed to a significant oversupply <strong>of</strong> gas, resulting in falling prices. Shortly<br />

after the repeal, a new era <strong>of</strong> highly efficient, flexible, environmentally preferred combustion turbine<br />