<strong>of</strong> generating up to approximately 13.8 MW <strong>of</strong> wind generation. FPL’s goal is to start construction on<br />

the St. Lucie Wind Project in <strong>2008</strong> with completion in 2009. FPL’s <strong>Ten</strong>-<strong>Year</strong> <strong>Site</strong> Plan also indicates<br />

that other wind development efforts are currently underway on Florida’s coastline.<br />

FPL is also planning to add 3 new solar facilities which will produce 110 MW <strong>of</strong> solar<br />

generation. These projects are further discussed in the following section. In addition to FPL’s solar<br />

projects, OUC is planning the addition <strong>of</strong> a 1 MW solar facility. Table 7 below summarizes the<br />

planned renewable resources through the planning horizon.<br />

Table 7. Planned Renewable Resource Additions<br />

Fuel Type Capacity (MW)<br />

Biomass 326<br />

Hydro 000<br />

Landfill Gas 011<br />

Municipal Solid Waste 020<br />

Solar 111<br />

Wind 014<br />

Waste Heat 000<br />

Total 482<br />